APPENDIX K RURAL ENVIRONMENTAL CLEARANCE PROJECTS

Similar documents
DRAFT. Public Meetings November 7, 9, 15, Year UTP Planning Effort Cost/Revenue Matrix FY FY 2026

Wichita Falls MPO - MTP Project List 1 of 6

APPENDIX C TRANSPORTATION PLANNING DOCUMENTS

FORT WORTH DISTRICT. Springtown Area Projects. Loyl C. Bussell, P.E. Acting District Engineer. Thursday, February 8, 2018 Date.

DULLES AREA HIGHLIGHTS. Gary Garczynski Commonwealth Transportation Board Northern Virginia District. Committee for Dulles August 4, 2016

APPENDIX A: Planning Consistency Checklist

INTERSTATE 35 CORRIDOR UPDATE

Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP)

Basic Project Information

US 380 FEASIBILITY STUDY

IMPLEMENTATION OF 3D DESIGN By: Brent Hillebrenner, Daniel Cruz, Eddie Acosta. October 13, 2015 Implementation of 3D Design October 13, 2015

Quiet Zone along FEC Corridor. Paul Calvaresi Regional Transportation Planner

Springettsbury Township. Road Improvement Projects

Transportation TRANSPORTATION PROJECTS

MEMORANDUM. FROM: John A. Bishop, AICP, Assistant Director - Transportation. May 22, 2017 Transportation Committee Meeting

State of Texas. District: County: Condition: Roadway: Direction: Time: Limits:

TEXAS TRANSPORTATION COMMISSION

Chapter 6 Existing and Proposed Transportation Facilities

TEXAS BORDER DISTRICT TRADE TRANSPORTATION ACTIVITIES

STAFF REPORT. MEETING DATE: February 7, 2008 AGENDA ITEM: 6

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications

SH 121: FM 423 To SH 121 At US 75 Interchange. APPENDIX A: Figures

35EXPRESS PROJECT UPDATE FOR DENTON COUNTY COMMISSIONERS

Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd

STRATHCONA COUNTY YELLOWHEAD NORTH ARTERIAL ROAD FUNCTIONAL DESIGN STUDY

Construction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013

Need County Priority Needs Identification Major Projects/Emerging Taking Care of the System (TCOS) 1=High 2=Medium 3=Low

WELCOME US 83 Public Meeting

TEXAS TRANSPORTATION COMMISSION

N O R T H T E X A S T O L L W A Y A U T H O R I T Y

2009 Regional Solicitation Selected Projects*

Delaware County Engineer

Fuller/Fuller Heights Road Improvements

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications. FY TIP Project Title/Location Number

Roadside Management Manual

Charlotte Regional Express Lane Facilities: I-485 and US 74. North Carolina Turnpike Authority March 21, 2018

Federal Register / Vol. 83, No. 155 / Friday, August 10, 2018 / Notices

FY FY 2022 TRANSPORTATION IMPROVEMENT PROGRAM (TIP) North Front Range Transportation & Air Quality Planning Council

2017 LIST OF PRIORITY PROJECTS

Highways: Interstate. Highways: State Highways

Appendix E. Build Alternative Design Information

2013 El Paso County Comprehensive Mobility Plan. December 16, 2013

IMPLEMENTATION OF COMPREHENSIVE DEVELOPMENT AGREEMENT (CDA) PROJECTS:

The Joint Charlotte County - Punta Gorda and Lee MPO Meeting has changed from 10:00 a.m. to 9:30 a.m.

US 19 Sunset Point Rd to Countryside Blvd.

November 21, 2012 Barbara Kelleher, (954)

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications. FY TIP Project Title/Location

The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP).

US 83 FROM NORTH OF THE STARR/ZAPATA COUNTY LINE TO LOMA BLANCA ROAD

Gulf Coast MPO Obligated Projects

FY TIP Fiscal Constraint 2017 Total Commitments. agencies (the Michigan Department of programmed in the Kalamazoo Area

LANCASTER CORRIDOR REDEVELOPMENT ROSEDALE STREET REDESIGN PEACH STREET RAILROAD CROSSINGS

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications

Welcome to Dayton Parkway Interchange Open House. November 26, 2018

2017 FTBA CONSTRUCTION CONFERENCE February 2-3, 2017 Hyatt Regency, Orlando FDOT WORK PROGRAM OVERVIEW

PROGRESS PARK CONNECTOR

FY Transportation Improvement Program. Ozarks Transportation Organization

Aviation and Heliport Use Survey

DIRECTOR S REPORT TRANSPORTATION BOARD OCTOBER 8, 2018

TRANSPORTATION INITIATIVE. Review of Road Funding and Revenue Alternatives February 8, 2017

FDOT Treasure Coast Traffic Impact Report

±100 Acres. FM 359 & Settegast Ranch Road Land For Sale. Randy Wilhelm

2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016

Major Projects Overview

THE RICHMOND REGION Transportation Priority Projects

Draft Year 2040 Cost Feasible Plan

Recycled Asphalt Shingles

FDOT Treasure Coast Traffic Impact Report

April 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014

Project Application. General Information ODOT PID. ODOT District. Primary County (3 char abrv)

2008 DEKALB COUNTY TRANSPORTATION PLAN (UPDATE)

CRISIS COALITION. Regional Projects Analysis February 2, 2015

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications. FY TIP Project Title/Location

Summary of Transportation Development Credits (TDCs) Dallas-Fort Worth Metropolitan Planning Organization (MPO) (As of September 30, 2016)

TBARTA: 2015 Master Plan and Tampa Bay Express Project

EXTERNAL COMMUNICATIONS COMMITTEE MEETING APRIL 2015

Montgomery Citizens Advisory Committee Meeting Minutes

Santa Fe Metropolitan Planning Organization

DATE: April 19, 2016 REPORT NO. PW Chair and Members Committee of the Whole Operations and Administration

AGENCY NAME TRANSPORTATION

3. COLTA / HUGA CONNECTIONS - PRELIMINARY

Highways: Interstate. Highways: State Highways. Highways: Local Roads. Highways: Off State Hwy Sys/Off Fed Sys. Fixed Capital Outlay: Facilities

FREDERICKSBURG DISTRICT. District Engineer Marcie Parker, P.E. May 8, 2018

FEASIBILITY STUDY REFINED CONCEPT 1 PROJECT A

See Yellow Highlighted for Major Closures Mill/Overlay (Temporary Road Closures Possible)

HAMPTON ROADS CROSSINGS PATRIOTS CROSSING AND HRBT

A DIALOGUE WITH THE NORTHERN VIRGINIA DISTRICT. Nicholas J. Roper, P.E. Northern Virginia District Project Development Engineer

Construction Projects Report

DFW Connector North Airport Interchange

Recycled Asphalt Shingles

DFW Connector North Airport Interchange FY 2017 AND 2018 INFRA GRANT APPLICATION ATTACHMENT 1 COVER PAGE AND PROJECT NARRATIVE

Centennial Airport Flight school practice areas. A PowerPoint Presentation By Michael Shannon Chief Flight Instructor Aspen Flying Club

LENOIR COUNTY COMPREHENSIVE TRANSPORTATION PLAN: APRIL 2018 MUNICIPAL AND COUNTY PRESENTATIONS. 2. Recommendations

02/21/2013 OKLAHOMA DEPARTMENT OF TRANSPORTATION PAGE: 2 09:04:10 FINAL MAY 2013 BID OPENING JBPRC068 JOB PIECE CD HIGHWAY MILES ADV.

LBJ Corridor Study. LBJ Corridor Study. LBJ Corridor Study. LBJ Corridor Study. LBJ Corridor Study. LBJ Corridor Study. Agenda.

Measure R Program Update

Highways: State Highways

ALBERTA CAPITAL REGION Transportation Plan ( )

Add-A-Lane Contract V. along a Section of I-95 includes 6 Bridges

Additional Economic Development Strategy submissions- Klickitat County

Transcription:

APPENDIX K RURAL ENVIRONMENTAL CLEARANCE PROJECTS Appendix K contains a list of projects that are not planned for construction within the four-year time frame of the Rural TIP, but are referenced in the current Rural Transportation Improvement Program in order to allow feasibility or environmental clearance efforts to continue. Please note that these projects are preliminary and do not represent any commitment of construction funding, but strictly intent to pursue environmental clearance activities consistent with early project development. Consistency with the Air Quality Conformity Determination will be reexamined as alternatives are explored in these studies and environmental clearance efforts.

FORT WORTH DISTRICT RURAL ENVIRONMENTAL CLEARANCE PROJECTS K.2

THURSDAY, MARCH 25, 2010 5:12:51 PM DALLAS-FORT WORTH MPO FY 2008-20 TRANSPORTATION IMPROVEMENT PROGRAM FORT WORTH DISTRICT RURAL PROJECTS RURAL APPENDIX PROJECTS D DISTRICT COUNTY CSJ HWY PHASE CITY MPO PROJ ID PAGE: 1 FORT WORTH ERATH 0079-08-001 US 67 E,R ERATH LIMITS FROM: 1.75 MILES N OF COMANCHE COUNTY LIN LIMITS TO: 1.57 MILES N OF FM 219/EX. US 67N TIP DESCRIPTION: RECONSTRUCT US 67 ON ALTERNATE LANE ROUTE NORTH AND WEST OF DUBLIN THIS PROJECT IS NOT INCLUDED IN THE 2009 AIR CONFORMITY FORT WORTH ERATH 0080-01-90 US 377 E,R ERATH LIMITS FROM: BU 377J EAST OF STEPHENVILLE LIMITS TO: 5.1 MI NE OF STEPHENVILLE TIP DESCRIPTION: RECONSTRUCT ROADWAY 2 TO LANE DIVIDED THIS PROJECT IS NOT INCLUDED IN THE 2009 AIR CONFORMITY FORT WORTH ERATH 0080-02-90 US 377 E,R ERATH LIMITS FROM: 5.1 MI NE OF BU377J IN STEPHENVILLE LIMITS TO: HOOD C/L TIP DESCRIPTION: RECONSTRUCT ROADWAY 2 TO LANE DIVIDED THIS PROJECT IS NOT INCLUDED IN THE 2009 AIR CONFORMITY FORT WORTH HOOD 0080-03-032 US 377 E,R HOOD LIMITS FROM: ERATH C/L NE LIMITS TO: LP 26 W OF GRANBURY TIP DESCRIPTION: WIDEN 2 LANE UNDIVIDED TO LANE DIVIDED ROADWAY THIS PROJECT IS NOT INCLUDED IN THE 2009 AIR CONFORMITY FORT WORTH HOOD 0080-03-09 US 377 E,R GRANBURY LIMITS FROM: END OF BRAZOS RIVER BRIDGE LIMITS TO: 0.615 SOUTH OF BRAZOS RIVER BRIDGE TIP DESCRIPTION: WIDEN LANE TO 6 LANE DIVIDED ROADWAY WITH INTERCHANGE AT SH 1 AND FM 51 THIS PROJECT IS NOT INCLUDED IN THE 2009 AIR CONFORMITY FORT WORTH HOOD 0080-0-060 US 377 E,R OTHER LIMITS FROM: US 377 S OF CRESSON, N LIMITS TO: JOHNSON CO LINE TIP DESCRIPTION: CONSTRUCT LANE LOOP AROUND CRESSON ON NEW LOCATION 10 THIS PROJECT IS NOT INCLUDED IN THE 2009 AIR CONFORMITY FORT WORTH HOOD 0080-0-081 US 377 E,R GRANBURY LIMITS FROM: FM 167 SOUTH LIMITS TO: END OF BRAZOS RIVER BRIDGE IN GRANB TIP DESCRIPTION: WIDEN LANE TO 6 LANE DIVIDED ROADWAY WITH INTERCHANGE AT BU 377H EAST END OF BRIDGE TO EAST FM 167 THIS PROJECT IS NOT INCLUDED IN THE 2009 AIR CONFORMITY FORT WORTH JOHNSON 0365-03-01 SH 171 C,E,R JOHNSON LIMITS FROM: HOOD COUNTY LINE REV DATE: 05/2009 LIMITS TO: 0.8 MI E OF INTERSECTION W/ US 377 TIP DESCRIPTION: CONSTRUCT 2 LANE ONE WAY ON SH 171 10 ADD TO APPENDIX D PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER K.3

THURSDAY, MARCH 25, 2010 5:12:51 PM DALLAS-FORT WORTH MPO FY 2008-20 TRANSPORTATION IMPROVEMENT PROGRAM FORT WORTH DISTRICT RURAL PROJECTS RURAL APPENDIX PROJECTS D DISTRICT COUNTY CSJ HWY PHASE CITY MPO PROJ ID PAGE: 2 FORT WORTH JOHNSON 022-03-037 US 67 E JOHNSON LIMITS FROM: PARK ROAD 21, EAST LIMITS TO: FM 13 TIP DESCRIPTION: RECONSTRUCT 2 LANE TO LANE DIVIDED ROADWAY FORT WORTH PARKER 1601-02-028 FM 188 E WEATHERFORD LIMITS FROM: SH 171 LIMITS TO: IH 20; IN WEATHERFORD TIP DESCRIPTION: WIDEN 2 LANE TO LANE DIVIDED ROADWAY WITH RAISED MEDIAN PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER K.

DALLAS DISTRICT RURAL ENVIRONMENTAL CLEARANCE PROJECTS K.5

THURSDAY, MARCH 25, 2010 5:12:02 PM DALLAS-FORT WORTH MPO FY 2008-20 TRANSPORTATION IMPROVEMENT PROGRAM DALLAS DISTRICT RURAL PROJECTS RURAL APPENDIX PROJECTS D DISTRICT COUNTY CSJ HWY PHASE CITY MPO PROJ ID PAGE: 1 DALLAS NAVARRO 0122-01-033 US 287 E,R OTHER LIMITS FROM: IH 5 LIMITS TO: FM 739 TIP DESCRIPTION: RECONSTRUCT AND WIDEN TO LANES REV DATE: 08/2008 1 THIS PROJECT IS NOT INCLUDED IN THE 2009 AIR CONFORMITY DALLAS NAVARRO 0162-0-03 SH 31 E,R CORSICANA LIMITS FROM: 2.5 MILES WEST OF FM 2555 REV DATE: 02/2009 LIMITS TO: IH 5, 1.2 MILES SOUTH OF 15TH ST. TIP DESCRIPTION: CONSTRUCT LANE RURAL; NEW LOCATION RELIEF ROUTE (ULTIMATE LANE DIVIDED) LIMITED ACCESS FACILITY THIS PROJECT IS NOT INCLUDED IN THE 2009 AIR CONFORMITY DALLAS NAVARRO 0162-0-03 SH 31 E,R OTHER LIMITS FROM: IH 5, 1.2 MILES SOUTH OF 15TH ST LIMITS TO: SH 31, 3.2 MILES EAST OF IH 5 TIP DESCRIPTION: CONSTRUCT LANE RURAL; NEW LOCATION RELIEF ROUTE, PHASE II - (ULTIMATE LANE DIVIDED) LIMITED ACCESS FACILITY THIS PROJECT IS NOT INCLUDED IN THE 2009 AIR CONFORMITY DALLAS KAUFMAN 0173-03-015 SH 3 E,R KAUFMAN LIMITS FROM: 1.375 MILES SOUTHWEST OF FM 1388 LIMITS TO: SH 23 (MULBERRY ST) IN KAUFMAN TIP DESCRIPTION: CONSTRUCT LN DIVIDED URBAN OF ULTIMATE 6 LN DIVIDED ROADWAY & OVERPASS - (NEW LOCATION) 10 DALLAS KAUFMAN 0173-0-025 SH 3 C,E,R TERRELL LIMITS FROM: GROVE ST. LIMITS TO: HIGH ST. IN TERRELL TIP DESCRIPTION: CONSTRUCT LANE DIVIDED URBAN THOR., AND RAILROAD GRADE SEPARATION STRUCTURE ON NEW LOCATION DALLAS KAUFMAN 0173-0-026 SH 3 E OTHER LIMITS FROM: SH 23 (MULBERRY ST) IN KAUFMAN LIMITS TO: FM 2578/SH 3 INTERS. IN TERRELL TIP DESCRIPTION: CONSTRUCT LN RURAL THOROUGHFARE & STRUCTURE (NEW LOCATION) DALLAS KAUFMAN 0173-0-03 SH 3 C,E,R TERRELL LIMITS FROM: AIRPORT ROAD LIMITS TO: GROVE STREET IN TERRELL TIP DESCRIPTION: CONSTRUCT LN DIVIDED URBAN THOROUGHFARE (NEW LOCATION) DALLAS KAUFMAN 19-03-001 FM 386 C,R OTHER LIMITS FROM: FM 986 LIMITS TO: SH 3, NW TIP DESCRIPTION: CONSTRUCT NEW 2 LANE FM HIGHWAY REV DATE: 02/2009 REV DATE: 02/2009 5000-00-95 6 5000-00-95 PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER K.6

MODIFICATIONS TO APPENDIX D Projects Added to Appendix D Through Quarterly STIP Revision Cycles ENVIRONMENTAL CLEARANCE PROJECTS K.7