NCDOT, DIVISION SIX HIGHWAY INCIDENT MANAGEMENT PROGRAM CONSTRUCTION/BRIDGE/MAINTENANCE PROJECT STATUS REPORT DATE: 9-7-17 COUNTY: Cumberland TIP # ROUTE LOCATION WORK DESCRIPTION START DATE END DATE CONTACT COMMENTS NC 210 (Murchison Rd) SR 1003 (Camden Rd) NC 24 I-295 (Fayetteville Outer Loop) NC 59 (Hope Mills Rd) SR 1007 (Owen Dr) US 301 / I-95 BUS From Honeycutt Rd to Bragg Blvd From Oakland Ave to SR 1007 (Owen Dr) From Maxwell Rd to Sampson Co. Line From South of SR 1400 (Cliffdale Rd) to East of SR 1007 (All American ) From SR 1003 (Camden Rd) to SR 1118 (Parkton Rd) From US 301 to All American Freeway From NC 87 (MLK) to NC 59 Road Widening 11-15-12 8-31-17 Road Widening 9-1-14 10-29-18 Road Widening 8-1-13 9-30-17 Grading, Drainage, Paving, Signing and Structures Grading, Drainage, Paving, Signals, Signing & Pavement Markings Grading, Drainage, Signals & Bridge Preservation Grading, Paving, Concrete Island & Pavement Marking 9-29-14 6-1-19 6-15-15 9-30-17 3-1-16 9-30-17 3-1-16 5-26-18 Donavon Hunt 364-0608 or Ben Peterson Keith Eason 910-592-6316 or Steve Hill or Steve Lucas Donavon Hunt or Mike Davis 364-0608 Donavon Hunt or Mike Davis 364-0608
Revised June 23, 2004 NC 24 / 87 (Bragg Blvd) NC 24 / 210 (Rowan St) I-95 I-95 SR 3569 (Old Raeford Rd) I 295 NC 53 / 210 (Cedar Creek Rd) NC 24 (Rowan St & Bragg Blvd) SR 1006 (Maxwell Rd) US 401 (Ramsey St) From Barrington Cross to East of MLK Ramps From Ray Ave to Ramsey St From MP 53 to Johnston Co. Line From MP 40 to MP 53 US 401 (Raeford Rd) to SR 1402 (Rim Rd) From SR 1007 (All American Frwy) to I-95 At I-95 At Rowan St. Bridge Bridge at Sampson Co. Line From Walmart Entrance to Fernwood Dr Grading, Paving, Drainage & Signals Grading, Paving, Drainage & Signals 4-1-2016 11-15-2017 4-1-2016 11-15-2017 Resurfacing and Drainage 9-11-16 12-30-17 Resurfacing and Drainage 5-17-16 12-30-17 Grading, Paving, Structures, Retaining Walls, Signals ITS, CCTV Cameras & Dynamic Message Signs Grading, Paving, Directional Crossovers, Pedestrian Signals & Pavement Markings Grading, Drainage, Paving, Signals & Structures 1-18-17 9-30-17 1-18-17 11-1-17 1-2-17 11-1-17 1-2-17 5-13-20 Bridge Replacement 5-1-17 11-1-18 Milling, Paving, Signal Revision & Pavement Markings 5-22-17 5-15-18 or Gabe Shoffner or Gabe Shoffner Donavon Hunt or Mike Davis 364-0608 Mike Parker 910-618-5689 Donavon Hunt 364-0608 Donavon Hunt 364-0608 or Gabe Shoffner or Gabe Shoffner or Gabe Shoffner or Steve Lucas Mostly Night Work Mostly Night Work Mostly Night Work Phase I closure of Old Raeford Rd for replacement of Bridge over Lake Rim Possible lane closures Road Closure with detour
September 2017 Cumberland County UCC September 7, 2017
THOUGHTS We want you to get the most out of your time at this UCC meeting. We would also like to have more utilities, government agencies and contactors attend UCC meetings. Please take this brief survey and tell us your ideas on how we can better accomplish this goal.
Statewide Ticket and Transmission Data August: 2017 / 2016 Comparison Tickets 2017: 178,099 2016: 196,915 Difference: -9.6% Transmissions 2017: 1,000,845 2016: 1,076,866 Difference: -7.1%
Statewide Ticket and Transmission Data Year-to-Date: 2017 / 2016 Comparison Tickets 2017: 1,307,783 2016: 1,296,902 Difference: 0.8% Transmissions 2017: 7,410,337 2016: 6,978,942 Difference: 6.2%
County Ticket Volume August: 2017 Stats Compared with 2016 Stats Type Ticket CUMBERLAND 3 HR CNCL NEW RXMT UPDT TOTAL 2016 35 35 3,396 48 1,073 4,587 2017 58 42 2,957 63 939 4,059 +/- Var 65.7% 20.0% -12.9% 31.3% -12.5% -11.5%
County Ticket Volume Year-to-Date: 2017 Stats Compared with YTD 2016 Stats Type Ticket CUMBERLAND 3 HR CNCL NEW RXMT UPDT TOTAL 2016 178 246 22,555 302 6,502 29,783 2017 353 320 21,643 361 7,643 30,320 +/- Var 98.3% 30.1% -4.0% 19.5% 17.5% 1.8% Work Days Total Tickets Avg Locates per Day 168 30,320 180
County Ticket Distribution CUMBERLAND 4,059 BETHANY CROSSROADS 1 EASTOVER 76 FALCON 2 FAYETTEVILLE 2,846 FORT BRAGG 294 GODWIN 11 GRAYS CREEK 31 HOPE MILLS 424 LENA 8 LINDEN 41 POPE AIR FORCE BASE 33 ROSLIN 10 SPRING LAKE 99 STEDMAN 114 WADE 69
Events, Meetings, Holidays State UCC Meetings PSNC Energy Tue, Sept. 12, 2017 10am 12pm 1801 Trinity Church Rd., Concord, NC 28027 Piedmont Natural Gas Tue, Nov. 14, 2017 10am 12pm 1321 S 10th St, Wilmington, NC 28401 NC Underground Damage Prevention Review Board Meetings Located at: 2550 Operations Way, Raleigh, NC. On the corner of Operations Way and Westinghouse Blvd. October 17, 2017 10am to 4pm Board Meeting 3Q17 October 19-20 Double Tree by Hilton Hotel New Bern River Front New Bern, NC
September 13 th 2017 NC State Fairgrounds & Kerr Scott Building 1025 Blue Ridge Rd, Raleigh, NC 27607 ncpipesplus.org/mock-line-strike.html
How can an 811 liaison help you today? Get a PDF copy of this presentation at www.ncucc.org Use the UCC Issues form to voice your concerns to both local and state level UCC meetings in North Carolina. Available on both the NCUCC website and the NC811 app. Like and follow us on: facebook.com/nc811 twitter.com/nc_811