Neighbourdhood Committee NDG-Westmount-Montréal-Ouest. February 6, 2018

Similar documents
Neighbourdhood Committee NDG-Westmount. October 16, 2017

NDG-Westmount Neighbourhood Committee. November 16, 2015

Neighbourhood Committee NDG - Westmount. September 12, 2016

NDG/Westmount Neighbourhood Committee. May 16, 2016

2017 Work and Launch of the Next Phase. Information meeting, Montréal-Ouest September 14, 2017

Work in 2015 and Annual Mobility- Management Plan

FINAL TERMINAL TRAFFIC MONITORING STUDY

GROUPE IMMOBILIER SANTÉ MCGILL Chantal Sorel (Vice-President and MUHC Project Director, SNC-Lavalin)

Treasure Island Supplemental Information Report Addendum

Blackburn Road Blackburn Level Crossing Removal. Frequently Asked Questions August 2014 GENERAL

25 th Avenue Grade Separation. September 13, 2017

25 th Avenue Grade Separation. Community Meeting November 13, 2018

Route 141 and I-44 Design-Build Project Community Involvement Group. March 21, 2016

All aviation except commercial aviation. Including but not limited to business aviation, air taxi operations and technical flights.

Chapter 25 Route Window SE6 Plumstead portal. Transport for London

STAGE 2 & 3 Pavement reconstruction within viaduct footprint, pavement widening and resurfacing N/S of viaduct footprint, sidewalk

Engagement Summary Report. Trans-Canada Highway 1 RW Bruhn Bridge and Approaches Project Community Engagement February 1 18, 2018.

Pacifica. Short Term Aircraft Noise Monitoring

Public Information Center August 12, 2010

Full I-35E Mainlane Closure at Beckley Avenue - July 27-30

State Route 8 Corridor. Northern Summit County s Path to Success

TECHNICAL BRIEFING WORK ON THE RÉSEAU EXPRESS MÉTROPOLITAIN APRIL 25, 2018

Engineering. Traffic Division Involvement. Two Locations in Lynnwood. Disclaimer. Design Constraints: 12/4/2013

LESLIE BARNS & CONNECTION TRACK. Construction Liaison Group Meeting #6 January 30, 2014

East Link Project Update. Maintenance of Traffic During Construction. April 21, 2015

Boston Redevelopment Authority 2/26/ Chestnut Hill Avenue Boston/Brookline, MA

Construction Staging Adelaide Street West

DENISON STREET EXTENSION. Transportation Committee. January 14, Feasibility Study

Noise Oversight Committee

25 th Avenue Grade Separation. December 13, 2017

Route 29 Solutions Projects

RW Bruhn Bridge and Approaches Project

Integrated Optimization of Arrival, Departure, and Surface Operations

Northeast Stoney Trail In Calgary, Alberta

A31 Ringwood improvement scheme

Venues and Directions Au Sommet Place Ville Marie Location: 3 Place Ville Marie, Montreal, QC H3B 2B6 Main entrance: Cathcart Street

This section evaluates the projected traffic operations and circulation impacts associated with the proposed upgrade and expansion of the LWRP.

Hospital Link Project Project Update Winter 2018

ICAO Noise Standards

US 19 Sunset Point Rd to Countryside Blvd.

G Street Undercrossing. City Council Meeting Date: November 3, 2008

Engagement Summary Report. Trans-Canada Highway 1 RW Bruhn Bridge Replacement Project. Community Engagement November 15, 2016 to January 15, 2017

5.1 Traffic and Transportation

2006 WEEKDAY TRAFFIC PROFILE. June 15, 2007

Hospital Link Project Project Update September 2015

Réseau électrique métropolitain (REM)

VOLUME CHANGES OF THE GLACIERS IN SCANDINAVIA AND ICELAND IN THE 21st CENTURY

October 2014 BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN PRESENTATION

Second Avenue: Union Street to Lenora Street, Condominium Owners c/o Michael McQuaid 1521 Second Avenue Seattle, WA 98101

Score. Category. Access Aesthetics Community Resources

Cell: (408) Release MA June 25, 2012

KING STREET TRANSIT PILOT

As the Toronto Transit Commission (TTC) operates a transit service on Bay Street, City Council approval of this report is required.

CENTER FOR AIR TRANSPORTATION SYSTEMS RESEARCH Education, Analysis and Research for the Next Frontier. Airport Capacity. Outline/Notes for Class

Citrus Heights Creek Corridor Trail Project Trail Advisory Group Field Trip #2 September 11, :00 11:00 am Trellis Hall, Citrus Heights

Metro ExpressLanes April 5, 2011 Community Meeting re: Adams Blvd Improvements

Day and night time road closures and traffic changes on Campbell Street and surrounding streets, St Peters from Monday 9 April to Friday 13 April

Atlantic Street Bridge Project CTDOT Project Nos & (Phase 2)

Strategies to keep people and goods moving in and through Seattle. SR 99 Closure and the Seattle Squeeze

LUDWIG RD. SUBDIVISION PROJECT TRAFFIC IMPACT ANALYSIS

Lake Erie Commerce Center Traffic Analysis

November 21, 2012 Barbara Kelleher, (954)

THRESHOLD GUIDELINES FOR AVALANCHE SAFETY MEASURES

EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015

35EXPRESS PROJECT UPDATE FOR DENTON COUNTY COMMISSIONERS

Section 106 Update Memo #1 Attachment D. Traffic Diversion & APE Expansion Methodology & Maps

Classification: Public. Night Flights and Quiet Night Charter update

Fringe Club and Corner 2016 Feedback on an event licence application for the Park Lands

Noise Mitigation Program

Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content

AIRBUS Generic Flight Test Installation

Palm Beach County Traffic Report July 13 through July 20, 2012

METROBUS SERVICE GUIDELINES

Weekly Performance Update

KING STREET TRANSIT PILOT

AGENDA ITEM I-6 Public Works

Weekly Performance Update

Frequently Asked Questions on the Route 29 Solutions Improvements Projects

A Study of Tradeoffs in Airport Coordinated Surface Operations

Our ref: FRC/REC/Nov Steve Farrell Clerk to the Rural Economy and Connectivity Committee The Scottish Parliament.

COME VISIT! heartofthetownships.com

CREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS PUBLIC MEETING DECEMBER 6, 2017

Metra Board of Directors. Board Meeting November 11, 2011

Technical Report. Aircraft Noise Analysis. Portola Valley and Woodside, California. July Prepared by: Aircraft Noise Abatement Office

Meeting Notes Public Open House

ARTERIAL ROAD RECONSTRUCTION 127 STREET AVENUE TO YELLOWHEAD TRAIL

Technical Report. Aircraft Overflight and Noise Analysis. Brisbane, California. December Prepared by:

TORONTO TRANSIT COMMISSION REPORT NO.

Provincial Railway Guides Section:

2017 LRT Passenger Count Report

The Point Roundabout Improvement Scheme

I-35 Reconstruction Project

2017/2018 Q3 Performance Measures Report. Revised March 22, 2018 Average Daily Boardings Comparison Chart, Page 11 Q3 Boardings figures revised

Memorandum. DATE: May 9, Board of Directors. Jim Derwinski, CEO/Executive Director. Fare Structure Study Fare Pilot Program

Aircraft Maintenance Run Procedures. Date: 1 June 2015 Version: 3.0

Glasgow Street Traffic Review

Pedestrian Safety Review Spadina Avenue

Section 4(f) and Section 6(f) Technical Analysis

Figure 1: Little Dry Creek Trail Crossing

Exposition Light Rail Transit Project

Transcription:

Neighbourdhood Committee NDG-Westmount-Montréal-Ouest February 6, 2018

2 Presentation Outline Feedback on questions Traffic Monitoring Work update and closures Reconstruction of Saint-Jacques bridge Dismantling Operations Progress Sound Monitoring Local Closures Questions

3 Feedback on questions Green strip : funding envelope Budget for a decrease in property values Budget for active transportation in the project Implementation of bollards on Chemin Glen to define a corridor for cyclists Avenue Greene : addition of signs for local traffic CN Installation of a metallic structure by the CN near Avenue Brock sud.

4 Traffic Monitoring Rue Saint-Antoine Ouest Parking on St-Antoine between Atwater and Rose-de-Lima Analysis of traffic conditions Free flow right turn impossible Truck access Light dedicated to pedestrians Actions: Push button for pedestrian Detection system in the Atwater exit

5 Traffic Monitoring Boul. Pullman et Angrignon Intervention requests to allow simultaneous movments or add movements 1 2

6 Traffic Monitoring Boul. Pullman et Angrignon Intervention requests to allow simultaneous movements or add movements 1. Angrignon exit from A-20 W: new movements in intersection Simultaneous right turn impossible for trucks (conflict) 2. Entry to A-20 W: new movement Add left turn to access entry traffic congestion 2. 1.

7 Work update and closures

8 Reconstruction of Saint-Jacques bridge Weekend of 9 february

9 Reconstruction of Saint-Jacques bridge

10 Reconstruction of Saint-Jacques bridge

11 Dismantling Operations Progress

12 Dismantling Operations Temporary bridge av. Greene Monday to Friday work between 7 AM et 5 PM Work sequence and approximate schedule 1. Roadway removal: February 5 to 12 2. Bridge deck removal and dismantling: February 13 to 16 3. Dismantling of the west abutment: from February 22nd 3 2 1

13 Dismantling Operations Montréal-Ouest area Start: around February 17 End: April 2018 Work schedule Monday to Friday: 6 AM to 7 PM Week-end: 24 hours a day or 6 AM to 11 PM

14 Sound Monitoring Methodology Equipment Sound level meter Calibrator Wind protector

15 Sound Monitoring Methodology Favorable weather conditions Positioning Parameter Value Humidity Less than 90% Temperature Minimum of -10 ºC Wind speed 20 km/h or less Precipitation None

16 Sound Monitoring Methodology What is a sound test? Measurement of the sound climate in L 10 Characterizes the peak levels over a defined period of time when the noise is less stable Recording time of 30 minutes The equipment identifies the noise levels with the highest thresholds 10% of the time

17 Sound Monitoring Online console Manual noise level surveys by the quality team on the site

18 Sound Monitoring Authorization to exceed the established thresholds Exceptional situation: acknowledgement of an impossibility Submission of an application by KPH Analysis by the Ministère Mitigation measures taken Specificity and technical constraints Duration of the work Nature of the work

19 Sound Monitoring A-720 ouest Dismantling Week-end of December 16 and 17, 2017 Average temperatures between -11,5 ºC and -16,7 ºC 1 to 2 cm of precipitation - snow Work area Manual sound recording by KPH Tucot MTMDET Monitoring stations (highest treshold) 61.8 db 16 dec. - 10 h 47 62.3 db 17 dec. - 9 h 25 83.4 db 16 dec. 15 h 84.7 db 17 dec. 11 h 30 60.6 db 16 dec. - 19 h 84.7 db 16 dec. 15 h 71.8 db 17 dec. - 8 h 33 82.6 db 16 dec. - 11 h 37

20 Sound Monitoring A-720 ouest Dismantling January 14, 2018 Average temperature -22,8 ºC Manual sound recording not possible Work area Manual sound recording by KPH Tucot MTMDET Monitoring stations (highest treshold) 76,6 db 18 H 58.8 db Midi 69.2 db 20 h 30 61,5 db 13 h

21 Sound Monitoring A-720 ouest Dismantling Week-end of January 20 and 21, 2018 Average temperatue between 1,5 ºC et -3,1 ºC No precipitation Work area Manual sound recording by KPH Tucot MTMDET Monitoring stations (highest treshold) 80.7 db 21 jan. 13 h 30 73.0 db 21 jan. 8 h 48 79.2 db 21 jan. - 9 h 45 80.1 db 21 jan. - 15 h 30 73 db 21 jan. 11 h 68.1 db 20 jan. 7 h 30 63.8 db 20 jan. 6 h 30 59.4 db 20 jan. 17 h 60.4 db 20 jan. 9 h 68.6 db 21 jan. - 2 h 85 db 20 jan. - 15 h 79.6 db 20 jan. - 18 h 20 72.3 db 21 jan. - 1 h 20

22 Local Closures Rue Saint-Jacques Ferbruary 9 to 12 Visuel navette ch. Glen - MTMDET

23 Local Closures Chemin Glen February 16 to 19

24 Questions

25 Communications Neighborhood Committee NDG-Westmount March 28, 2018 Victoria Hall Westmount (4626, rue Sherbrooke Ouest) Neighborhood Committee Sud-Ouest February 13, 2018 Project website: www.turcot.gouv.qc.ca Twitter @MTQ_Turcot Monthly electronic bulletin (subscription on the Turcot website) Direct phone line: 514 873-1372 Turcot email: turcot.commentaires@transports.gouv.qc.ca