Transportation Demand Management Plan for the Proposed Hampton Inn & Suites in San Mateo, California

Similar documents
RELATED SANTA CLARA SANTA CLARA, CALIFORNIA. RELATED SANTA CLARA Santa Clara, CA

Draft SamTrans Service Plan Public Outreach Presentation

Station Park Green. Turning a Big Box into Gold. By Rich Coffin, PE. October 28 th, 2008

Playa Vista Ability2Change Webinar

Strategies to keep people and goods moving in and through Seattle. SR 99 Closure and the Seattle Squeeze

San Mateo 101 Corridor Strategies:

FASHION ISLAND SAN MATEO, CALIFORNIA ±3,867 - ±5,875 RSF OFFICE SPACE AVAILABLE FOR LEASE

The latest Multi-Tenant Research Park in the Bay Area accommodating users from 10,000 SF to 600,000 SF

{ } Unexpected. Contact us: JOHN HELD Lic

FOR LEASE 7333 Gateway Boulevard, Newark CA

FOR LEASE 7707 Gateway Boulevard, Newark CA

Alameda Landing Transportation Demand Management Program 2014 Annual Report

Arlington County Board Meeting Project Briefing. October 20, 2015

Multimodal Planning Studies

DIRECTOR, ENVIRONMENT, FLEET, & SOLID WASTE UPDATE: REGIONAL RIDESHARE PROGRAM RECOMMENDATION

5901 Christie Avenue FOR LEASE. Emeryville, California

Investment Plaza OFFICE FOR LEASE Investment Boulevard El Dorado Hills, CA 95762

RIDESHARE: A transportation tool connecting people and jobs.

Investment Plaza OFFICE FOR LEASE Investment Boulevard El Dorado Hills, CA 95762

Ground Transportation Strategy. Victoria Airport Authority

ACRP Synthesis 36 Exploring Airport Employee Commute and Parking Strategies. Diane M. Ricard, Principal DMR Consulting.

Community Advisory Panel Meeting #

Dear Employee Transportation Coordinator (ETC):

444 WASHINGTON BOULEVARD

YOUR FUTURE WITH GATEWAY COMMONS

25 th Avenue Grade Separation. Community Meeting November 13, 2018

Site Location and Setting

Well situated. Centrally located between downtown Burlingame, Millbrae Intermodal & the SFO Airport.

Smart Commute Action Plan for The Middle School

Investment Plaza OFFICE FOR LEASE Investment Boulevard El Dorado Hills, CA 95762

Ideas + Action for a Better City learn more at SPUR.org. tweet about this #FarePolicy

601 Gateway Boulevard South San Francisco, CA

749 RSF 18,004 RSF OFFICE SPACE FOR LEASE

YOUR FUTURE WITH GATEWAY COMMONS

KING STREET TRANSIT PILOT

SAMTRANS SERVICE PLAN

2018 Service Changes Ada County

San Mateo County Transportation Authority Board Meeting November 2, 2017 Item #10 1

About This Report GAUGE INDICATOR. Red. Orange. Green. Gold

Four Sierra Business Center

Public Information Meetings. October 5, 6, 7, and 15, 2015

Investment Plaza OFFICE FOR LEASE Investment Boulevard El Dorado Hills, CA 95762

Metro ExpressLanes April 5, 2011 Community Meeting re: Adams Blvd Improvements

Oakland A s Gondola Economic Impact

FOR LEASE 7999 Gateway Boulevard, Newark CA

1.2 Corridor History and Current Characteristics

Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content

25 th Avenue Grade Separation. September 13, 2017

THE PREMIER CORPORATE ADDRESS > 1,000,000± SF TOTAL CarrAmerica Corporate Center

FOOD TRUCKS PULLING IN 4 Rotating Trucks Rain or Shine! Every Wednesday from 11:00AM - 2:00PM

BAYSIDE PLAZA 700 AIRPORT BOULEVARD

To request a meeting date, please visit and follow the instructions below.

LA Metro Rapid - Considerations in Identifying BRT Corridors. Martha Butler LACMTA, Transportation Planning Manager Los Angeles, California

Update on the I-680 Transit Corridor Improvement Project HOV on/off Ramps Environmental Impact Report Community Engagement Plan

Lyft s Economic Impact 2015 REPORT

FOR LEASE 7707 Gateway Boulevard, Newark CA

To: Mary Beth Avedesian B.F. Saul Company

Transform66 Transportation Management Plan: Transit & TDM Strategies

Pyrolysis User s Training Course

FOR LEASE Gateway Boulevard, Newark FEATURES PACIFIC RESEARCH CENTER. Freestanding Office / Lab / R&D Building. ± 126,721 SF Available

Introduction. Project Overview

The Atrium S. Norfolk St San Mateo, CA. Ben Paul Lic #

CHOOSE THE HIGH GROUND. 232,523 SF Class A Office for Lease America Center Dr, San Jose, CA

STEP ALTERNATIVES RANKING TABLE

McLean Citizens Association Transportation Committee Project Briefing

3. Proposed Midwest Regional Rail System

For Sale or For Lease Repositioned Office Property Sale Price $205 PSF Lease Rate $1.50-$1.75 NNN. 503 Vista Bella Oceanside, CA 92057

Public Open House. Chief Peguis Trail Project

Activity-Based Model Applications

PRIME RETAIL SPACE AVAILABLE

CHOOSE THE HIGH GROUND. 232, ,523 SF Class A Office for Lease America Center Dr San Jose, CA

SAN RAFAEL City Council January 20, 2015

business performs Where th Avenue SW Calgary, AB

TransAction Overview. Introduction. Vision. NVTA Jurisdictions

Ridership Growth Strategy (RGS) Status Update

SAMTRANS TITLE VI STANDARDS AND POLICIES

JAY TECHNOLOGY CENTRE 3131 JAY STREET, SANTA CLARA, CA

Public Meeting: Metropolitan Washington Airports Authority (MWAA) Transportation Network Company (TNC) Lot on S. Eads Street

6 HIGH-OCCUPANCY-VEHICLE (HOV) LANES AND TRAVEL DEMAND MANAGEMENT (TDM) PROGRAMS

Ozaukee County Transit Development Plan

Santa Barbara County Association of Governments 2002 COMMUTE PROFILE

KING STREET TRANSIT PILOT

FOOD TRUCKS PULLING IN 4 Rotating Trucks Rain or Shine! Every Wednesday from 11:00AM - 2:00PM

25 th Avenue Grade Separation. December 13, 2017

th Street Oakland, CA 94601

4. Proposed Transit Improvements

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT

NEAR PROPOSED CASINOS

Premier Class A Office Campus ±1,289,134 SF

PENINSULA CORRIDOR JOINT POWERS BOARD STATE OF CALIFORNIA * * * PENINSULA COMMUTE SERVICE ( CALTRAIN ) CODIFIED TARIFF

FOR LEASE FIRST AMERICAN PLAZA

Regional Wayfinding Sign Strategy Thurston County Trails 2017

Tulsa Airports Improvement Trust Strategic Plan Update

Word Count: 3,565 Number of Tables: 4 Number of Figures: 6 Number of Photographs: 0. Word Limit: 7,500 Tables/Figures Word Count = 2,250

LOS ANGELES WORLD AIRPORTS LAX AIRPORT OPERATIONS

Downtown Office Building for Sale Owner/user Opportunity - Reduced Price $2,700, E Street Santa Rosa CA

Memorandum. Fund Allocation Fund Programming Policy/Legislation Plan/Study Capital Project Oversight/Delivery Budget/Finance Contract/Agreement Other:

Creeksides at CenterPoint

Reducing traffic: a new plan for public transport

2008 Oceanside to Annapolis

Transcription:

Memorandum Date: October 3, 207 To: From: Subject: Tricia Schimpp, City of San Mateo Gary Black Ricky Williams Transportation Demand Management Plan for the Proposed Hampton Inn & Suites in San Mateo, California Transportation Demand Management (TDM) is a combination of services, incentives, facilities, and actions that reduce single-occupant vehicle (SOV) trips to help relieve traffic congestion, parking demand, and air pollution problems. The purpose of TDM is to () reduce the amount of traffic generated by new developments; (2) promote more efficient utilization of existing transportation facilities and ensure that new developments are designed to maximize the potential for alternative transportation usage; (3) reduce the parking demand generated by new developments and allow for a reduction in parking supply; and (4) establish an ongoing monitoring and enforcement program to guarantee the desired trip and parking reductions are achieved. This TDM plan was developed for the proposed Hampton Inn & Suites project at 2940 S. Norfolk Street in San Mateo, California. The project proposes to demolish the existing Los Prados Hotel, consisting of rooms, and construct a new five-story, 82 room Hampton Inn & Suites. As proposed, the project would be providing fewer parking spaces than are required by the City s parking code for hotel uses. The City has requested that the project commit to the following TDM plan to support the parking reduction. Project Description The project proposes to demolish the existing Los Prados Hotel, consisting of rooms, and construct a new five-story, 82-room Hampton Inn & Suites (see Figure ). The project proposes 4 parking spaces on the site. Access to the project site is provided through the parking lot of the Marina Plaza shopping center from S. Norfolk Street and through the San Mateo Office Plaza parking lot from La Selva Street. The project site is located in close proximity to numerous employment centers and the San Francisco International Airport, and will cater to business travelers. The site is within walking distance to numerous bus transit stops, the Hillsdale Caltrain station, and various bicycle facilities that will provide additional travel options for hotel guests to reach their destinations. The site s relative location to transit services and bicycle facilities is shown in Figures 2 and 3, respectively.

C C 0 0' 20' 40' N TYPES OF PARKING SPACE REQUIRED PROVIDED Hampton Inn & Suites S S S TURNING LANE INDICATING 33' INTERIOR RADIUS AND 48' EXTERIOR RADIUS S2 TURNING LANE INDICATING 33' INTERIOR RADIUS AND 48' EXTERIOR RADIUS STANDARD PARKING 35 ACCESSIBLE PARKING COMPACT PARKING 20 TOTAL 84 NOTES:. TOTAL PARKING SPACES REQUIRED BY CODE IS THE NUMBER OF GUESTROOMS PLUS 2 FOR MANAGEMENT. THERE ARE 82 GUEST ROOMS. 82 + 2 = 84 PARKING STALLS REQUIRED BY CODE. 2. NOTE: A REDUCTION IN THE REQUIRED NUMBER OF PARKING SPACES IS BEING REQUESTED AS A PART OF THIS SUBMITTAL. SITE PLAN PARKING STU " = 30 E HILLDALE BLVD A200 24' - " 27' - 5 /2" S NORFOLK ST SITE PLAN - PROPOSED SITE ACCE " = 40 Figure Site Plan

Hillsdale Caltrain Station 4 5 2 3 Figure 2 Existing Bicycle Facilities Los Prados St Seal Slough S Norfolk St Lago St Casa De La Selva St Branson Dr E 39th Ave San Miguel Way Franklin Pkwy W Poinsettia Ave Curtiss St Hampton Inn & Suites Saratoga Dr LEGEND = Site Location X = Study Intersection = City of San Mateo = Class I Bike Paths = Class II Bike Lanes = Class III Bike Routes Proposed US 0/ Hillsdale Blvd Ped/Bike Overcrossing McLellan Ave El Camino Real

Los Prados St Hillsdale Caltrain Station 57 292 25 25 59 54 25 25 4 2 5 3 Figure 3 Existing Transit Services S Norfolk St Lago St Casa De La Selva St Branson Dr E 39th Ave Franklin Pkwy W Poinsettia Ave San Miguel Way Curtiss St McLellan Ave Hampton Inn & Suites LEGEND = Site Location X = Study Intersection = City of San Mateo = SamTrans Routes Connecting to Caltrain Stations = SamTrans School-day Only Routes Saratoga Dr El Camino Real

Hampton Inn & Suites TDM Plan October 3, 207 TDM Strategies The hotel is suited to promote non-single-occupancy-vehicle modes of transportation, including transit, bicycle, and ride-sharing. The project s location and catering to business travelers also assist in reducing the peak hour vehicle trips to and from the site. The project will implement several TDM strategies that will promote these alternative transportation trips during peak commute hours. Location Based Measures The following TDM measures would not need to be implemented by the project itself. Instead, they are features of the project s location that would likely result in fewer vehicle trips to and from the project site. Proximity to Transit. The project is located approximately 500 feet from various bus stops along S. Norfolk Drive at its intersections with Hillsdale Boulevard and Lago Street. These bus stops support three routes that run throughout the day and provide frequent and reliable transit service to and from nearby employment centers and retail areas. Proximity to Retail Uses. The proposed project is located within the Marina Plaza retail center, which provides easy access to restaurants and retail stores in the immediate vicinity of the project site. This is conveniently located for guests of the proposed hotel to access via walking, which will reduce the number of vehicle trips. Pedestrian and Bicycle Access. The project is located in close proximity to numerous existing bicycle and pedestrian paths, including the Bay Trail, the Foster City Levee Pedway, and the proposed US 0/Hillsdale Blvd Bicycle and Pedestrian Overcrossing. These routes provide access to and from the site in all directions via safe, convenient, and vehicle free pathways. Existing TDM Measures Currently, the Los Prados Hotel on the project site implements a variety of TDM measures that encourage hotel employees and guests to use alternative travel modes. These TDM measures will continue to be implemented at the proposed Hampton Inn & Suites Hotel, and include: Transit Ticket Reimbursement. Los Prados Hotel currently supports employees commuting to work at the hotel via transit by reimbursing their transit expenses. Hotel employees are given the option to purchase transit passes for local transit services including SamTrans, BART, and Caltrain through the hotel at a discounted rate. Employees submit their expenses for purchasing these tickets to the hotel for reimbursement. Incentives for Bicycle Commuting. Employees who commute via bicycle are provided incentives from the existing hotel, including various prizes and recognition. These incentives are awarded weekly and greater incentives are awarded monthly. Secure Bicycle Parking Facilities. Secure bike parking encourages employees to bike to work. The existing hotel provides short-term and long-term bicycle parking for employees and guests to use throughout the day. The proposed hotel will provide 0 short-term and 2 long-term bicycle facilities on-site. Airport Shuttle. The hotel operates a daily shuttle bus that runs every hour to and from the San Francisco International Airport between :00 AM and :00 PM. The shuttle is free of Page 5

Hampton Inn & Suites TDM Plan October 3, 207 charge for hotel employees and guests. This encourages hotel guests to not rent a car when travelling to and from the airport. Additionally, this shuttle provides access to and from the hotel for employees commuting via BART. Airline Contracts. The hotel currently has contracts with various airlines that fly out of San Francisco International Airport to house airline employees (i.e. pilots and flight attendants) during their scheduled periods of rest. The hotel estimates that between 30 and 0 percent of their hotel guests on any given night are airline employees. All airline employees travel to and from the hotel using the airport shuttle. New TDM Measures Based on the parking counts, discussed in Chapter of the Hampton Inn & Suites TIA (produced by Hexagon and dated June 9, 207), the current TDM measures implemented at the existing hotel create a significant reduction in on-site parking demand. Hexagon believes that the existing measures would be adequate to serve the proposed hotel, but has provided additional TDM measures not currently implemented that would even further the effectiveness of the TDM program. These measures include: Wayfinding Station. An on-site kiosk or information center consisting of multi-modal wayfinding and transit information will be provided to assist hotel guests in identifying preferred bicycle, pedestrian, or transit routes, and planning transit trips. This station should be located near the hotel s reception desk. TDM Coordination. The hotel receptionists will be available to provide information regarding multi-modal commuting and assist hotel guests in navigating to nearby destinations or transit stops. Ridesharing Incentives. Ridesharing services such as Lyft and Uber provide ride discounts for first time users with new rider coupons. These coupons can be provided to hotel guests at the reception desk to encourage guests to use ridesharing services to travel to and from the hotel. The project should coordinate with one of these ride sharing services to obtain these coupons. Page