145th Crossing Sammamish River Trail Connection Tourism District Pedestrian Enhancement. ~ King County PIBBI. YourBigBa~

Similar documents
REPORT TO THE PARKS AND RECREATION COMMISSION rd Avenue NE, Woodinville, WA

Crystal City Station Improvements. Project Overview. Table 2: North Entrance. Table 1: South Entrance. 20th St. S 18th St. S.

Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012

FEASIBILITY CRITERIA

SR 934 Project Development And Environment (PD&E) Study

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT

2016 Regional Transportation Alternatives Program (TAP) Grant Application

Claremont Project Background and Update Community Meeting September 11, 2017

Auburn Trail/Ontario Pathways Trail Connector Feasibility Study Project Advisory Group Meeting August 25, 2011 Farmington Town Hall Approved Minutes

East Link Project Update. Maintenance of Traffic During Construction. April 21, 2015

Georgetown-Lewes Rail/Trail Study. Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No.

Community Advisory Panel Meeting #

RW Bruhn Bridge and Approaches Project

Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge

VRE Manassas Park Station Parking Expansion Alternatives Analysis

Becker County Trail Routing Feasibility Study

Trail # NW Tuesday, June DESIGN. Provide an Review the Provide an. Project Goals: System system. wayfinding

Pattullo Bridge Replacement Project

Union Station Queens Quay Transit Link Study

Committee Members: Page 1 of 6

Overview of Highway 37 Project. Napa County Board of Supervisors December 20, 2016

Laxon Terrace - Sarawia. Click to add title. Street Rail Level Crossing. Public Forum. December

Section II. Planning & Public Process Planning for the Baker/Carver Regional Trail began in 2010 as a City of Minnetrista initiative.

Report to the Strategic Development Committee

State Route 189 Project and Draft Resolution of Support. November 2014

Overview of Highway 37 Project. Novato Rotary November 4, 2016

Northaven Trail Phase 2 Initial Project Overview

US 83 Relief Route. City of La Joya City of Peñitas Hidalgo County. November 15, 2012

PORT OF SEATTLE MEMORANDUM. COMMISSION AGENDA Item No. 4g ACTION ITEM Date of Meeting February 9, 2016

Trail Feasibility Study

CENTRAL AND EAST CORRIDORS

Welcome to the Downtown Fort Lauderdale Neighborhood Working Group Meeting. First meeting june 17, 2010

2. Goals and Policies. The following are the adopted Parks and Trails Goals for Stillwater Township:

Interstate 90 and Mercer Island Mobility Study APRIL Commissioned by. Prepared by

PRESENTED TO Town of Middlebury, VT. PRESENTED BY VTrans, VHB, Fitzgerald & Halliday, Inc., and Kubricky Construction

Citrus Heights Creek Corridor Trail Project Trail Advisory Group Field Trip #2 September 11, :00 11:00 am Trellis Hall, Citrus Heights

WELCOME AND AGENDA DOWNTOWN REDMOND LINK EXTENSION

Riverbank Precinct Footbridge

I. INTRODUCTION EAST COAST GREENWAY STUDY PURPOSE

EP8.2 Presentation Exhibition GO Station Improvements

SCOPING INFORMATION PACKET

DENISON STREET EXTENSION. Transportation Committee. January 14, Feasibility Study

Saint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts

Welcome! This open house provides an early look at: Garage layout and access Potential pedestrian, bicycle and transit improvements

Sarawia Street Laxon Terrace Rail Level Crossing Removal

Committee Members: Page 1 of 5

Route 141 and I-44 Design-Build Project Community Involvement Group. March 21, 2016

ETOBICOKE CREEK NORTH TRAIL PROJECT. May 18, 2017 at Michael Power High School 105 Eringate Drive, Etobicoke ON M9C 3Z7

Executive Summary. See Figure ES-5 on page 9. Figure ES-6: Typical At-Grade Alignment. Figure ES-7: Typical Underground Alignment

Restoration of Historic Streetcar Services in Downtown Los Angeles

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Table of contents. Sound Transit 2 Plan map... A-2

City of Woodinville Non-Motorized Transportation Plan June 2005

Dogpatch Community Task Force Meetings. April 24, 2017 Meeting #6

West Santa Ana Branch Transit Corridor. Community Meetings March 12, 13, 17 & 19, 2018

Updating the vision for regional transit

Dufferin Jog Elimination Project

Welcome KROSNO CREEK DIVERSION PROJECT CLASS ENVIRONMENTAL ASSESSMENT

Memo. Orange City Trail Plan Becky Mendez, AICP Jamie Krzeminski, PE, PTOE Matt Wiesenfeld, PE, AICP. Development of the Existing and Proposed Network

Railroad Safety Trail

Wallace Falls State Park Classification and Management Planning Stage 3 Preliminary Recommendations July 18, 2018 Sultan City Hall

Honorable Members of the Mobility Solutions, Infrastructure and Sustainability Committee

PULLMAN-MOSCOW REGIONAL AIRPORT Runway Realignment Project

DRAFT TH AVE NE URBAN DESIGN MERIT PRESENTATION DPD# NOVEMBER 2017

Public Informational Meeting

Frequently Asked Questions on the Route 29 Solutions Improvements Projects

Preferred Recreation Recommendations Stemilt-Squilchuck Recreation Plan March 2018

CREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS PUBLIC MEETING DECEMBER 6, 2017

A CASE FOR COMPLETING THE JORDAN RIVER PARKWAY: A

Appendix D Project Newsletters. Tacoma Narrows Airport. Master Plan Update

Figure 1: Little Dry Creek Trail Crossing

AIRPORT DEVELOPMENT PLAN. Design-Build Institute of America September 8, 2015

Attachment No. 20 RRLRT No. 1. Committee. Busway Grade Crossings STATUS/DATE OF ACTION

Grade Crossings in High Speed Rail Corridors

DOWNTOWN BRT ALTERNATIVE - 19th AVE

POLICY DCS-04: Tourism Directional Sign Policy. Development and Cultural Services

TORONTO TRANSIT COMMISSION REPORT NO.

Vasona Light Rail Signal Design Challenges. Hugh D. MacGillivray, Hatch Mott MacDonald Dennis Mellon, Santa Clara County Transportation Authority

A number of goals were identified during the initial work on this Big Lake Transportation Plan.

(This page intentionally left blank.)

North Shore Lacamas Lake

Section 4(f) and Section 6(f) Technical Analysis

A Presentation to: Project Advisory Group Meeting #6

Designing & Building for People on Bikes within evolving constraints Auckland Central City

RUSHMORE CONNECTOR TRAIL PROPOSAL

Appendix L Technical Memorandum Aesthetics

LUDWIG RD. SUBDIVISION PROJECT TRAFFIC IMPACT ANALYSIS

Committee Report. Community Development Committee For the Metropolitan Council meeting of April 13, Business Item No.

Metro ExpressLanes April 5, 2011 Community Meeting re: Adams Blvd Improvements

Tourism Why is it increasing?

Santa Cruz Wharf Improvement Project. Briefing Paper. Prepared by City of Santa Cruz. for

1.2 Corridor History and Current Characteristics

ALBANY-HUDSON ELECTRIC TRAIL FEASIBILITY STUDY. Final Report OCTOBER 2011

Maryland Transit Administration. Master Plan Alignment Trail

Coronado National Forest Santa Catalina Ranger District

WELCOME to the Iditarod Dog Sledding Historic District (IDSHD) Workshop. January 11, Houston Middle School Houston, Alaska

Human Environment. 2.1 Land Use

Non-Motorized Transportation

90 I-90 Snoqualmie Pass East September Annual Mega-Project Report. Project Benefits

Transcription:

145th Crossing Sammamish River Trail Connection Tourism District Pedestrian Enhancement ~ King County PIBBI YourBigBa~

The Trail & the Tourism District Growing pedestrian traffic between tourism destinations Improved crossing at 145th necessary for interim trail development (although several years off) Goal to improve safety, support new uses U) King County Your Big Backyard

T -- Study Questions How do we: Improve safety for crossing 145th Strengthen connection to Sammamish River Trail, tourism destinations to the east Improve non-motorized connections between west side destinations UI King County YourBigBa~

Why are we here? Explain the process to evaluate crossing options What we learned on the way What are our recommendations Discussion with group Seek validation - are we on the same page? Come to consensus ~ King County Your Big Backyard

ERC Background

ERC Overview - )1:7... 26...-.................... '$.'"1;;0,.0,...J:i,. ( -u~r, " OO O O '*' ooooei 4 Io oo o o o ott I' o o o I"~ o t O I O O l(incc()f.i.,rt \ 'I.. is- WOODIN ILLE Follows old BNSF 26 miles railbanked, extends to Snohomish Connecting east side cities from Renton to Woodinville Commuters and recreational user Phased development ~ENTON UNINCORPORATED KING COUNTY

Woodinville Area Trails

Woodinville Feedback What we heard: Demand for pedestrian/bicycle facilities Tourism is a key generator Pedestrian safety is a concern Parking is needed Truck access will continue to be needed Ste. Michelle and Redhook property Must work for events ti King County YourBigBa~

Woodinville Circulation Needs.... ERC Trail - Local crossing.--~ Local circulation movements ~ Sammamish River Trail connection * Typical Jaywalking locations

Concept Details... til King County YourBigBa~

145th (SR 202) Crossing Three Concepts: Above Grade- Bridge Below Grade- Tunnel At Grade- Crosswalk with signal tq King County P,IBBS Your BigBackyanl

Separate Grade Crossings - Separate-grade Route - - At-grade Route

Above Grade

Above Grade PRO Separation of movements Vehicle operations not affected Opportunity for Gateway CON Not convenient for local pedestrians High vandalism opp o rt unities Obstruction of existing views

Below Grade

Below Grade PRO Separation of movements Vehicle operations not affected Minimum visual impact CON Not convenient for local pedestrians High vandalism opportunities Drainage Environmental impacts

At Grade

At Grade PRO Provides for local and regional needs Short travel distance/good connectivity Reduces ''Jay walking'' CON Interrupts vehicle traffic movement Users crossing need to wait to cross Does not separate traffic Low visual impact

T ---- Safety Nuances All 3 options are safe if everyone follows the rules. For bridge and tunnel, concerns that local users will choose to jaywalk, rather than walk up or down. Mobility impaired users face 2 bad choices For at-grade crossing, concerns that drivers will not comply with signal (risky or distracted driving) ti King County Your Big Backyard

Preliminary Evaluation 145th Crossing Criteria Above Grade Below Grade Crossing Safety Constructa bility Environmental Impacts i Local Business l"mpacts Vehicle Traffic Impacts Right of way required Vandalism resistance Maintenance and Operation Cost Overall Ranking 2 3 Cost Range (millions) $3.8-$5.5 $6.3-$8.3 I At Grade 1 $0.5-0.6 Pro Con Neutral

Sammamish River Trail Connector Two Concepts: North Side (Improve Existing) South Side (New) YourBigBa~

North Side

North Side PRO Aligns with existing trail Use existing Samm. River bridge Good connectivity to local businesses CON Crosses two business driveways Potential need for additional right-ofway /temporary easements

South Side

South Side PRO No driveway crossings Elevated trail experience CON Duplicates existing trail on north side Requires right-ofway in agricultural land Requires new bridge Environmental impacts (fish stream)

Preliminary Evaluation Connector Criteria North Side South Side Safety Constructa bi I ity Environmental Impacts Local Business Impacts Vehicle Traffic Impacts Right of way required Vandalism resistance Maintenance and Operation Cost Overall Ranking 1 2 Cost Range (millions) $1.1-$1.3 $3.3 - $5.7 Pro Con Neutral

Recommendations ~ King County P, Your Big Backyard

Recommendation 145th Crossing HAWK Pedestrian Signal Addresses regional and local needs Needed with any of the concepts Minimal environmental impacts Local visual impact to area Quick to implement U) - King County YourBigBa~

How a HAWK Signal Works

Recommendation Trail Connection North Side Maintain established trail alignment Bridge crossing is existing Minimal environmental impacts Local visual impact to area Little to no right-of-way needed Quick to implement ti King County Your Big Backyard

Discussion ti King County PABBS Your Big Backyard

Schematic Connections

EASTSIDE RAIL CORRIDOR (ERC) WOODINVILLE Alternatives - Pros & Cons Legend: Pro Con Neutral Criteria Above Grade Crossing Safety I Constructability I Environmental Impacts I Local Business Impacts I Vehicle Traffic Impacts I Right of way required I Vandalism resistance I Maintenance and Operation Cost Below Grade At Grade South Side Cost Range (millions) $3.8-$5.5 2 3 $6.3-$8.3 1 $0.5-0.6 I 1 1 s1.1-s1.3 2 $3.3- $5.7