Assembly Instructions - TSK

Similar documents
BR B Bike Rack Instructions

FOREWORD CONTENTS. 1. Preparation and tools required for assembly. 2. Complete parts

Cassette-folding arm-awning markilux 990

5 Scoop stretcher/carrying chair

S E L E C T I O N. Abdominal Crunch. User manual

12 Cage Installation Instructions

PEAK 1 GENERAL INFORMATION 1.1 THE CONCEPT 1.2 SAFETY 1.3 THE SPEED SYSTEM 2 THE EMERGENCY PARACHUTE 2.1 EMERGENCY PARACHUTE ASSEMBLY

BowDown. MiniMuM Crossbar spread 24 (61CM) Steel Hook (2X) Buckle Strap (2X) Plastic Tube (2X) Plain Strap (2X) SHORT BLACK T-BOLT (2x) BOWDOWN (2x)

INSTRUCTION MANUAL ALEKO RETRACTABLE AWNING

THE SUPERGUARD SERIES EXPANDABLE CROWD CONTROL BARRIERS

Instruction for edge trimming knife sharpening of M-Type shoe sewing machines

Read all instructions and warnings before using this fireplace. WARNING

PR-429BF-600M. Bell 429 Blade Fold Kit Operations Manual

User s Manual Trampoline 8

TITAN Fuel Tanks. INSTALLATION INSTRUCTIONS G e n e r a t i o n V

Product instruction manual Ream Cutting Systems RE3943, RE3946, RE3947, RE3971, RE3952E

TRAINING BULLETIN ROPE 4 March 8, 2007 PERSONAL SAFETY SYSTEM (PSS)

Installation and Maintenance Manual

π H-3505 GARAGE CANOPY PARTS SAFETY uline.com TOOLS NEEDED 10' X 20' X 8'

Assembly Instructions

Maintenance Instructions and Directions for Use Wind Support

Step by Step Set Up Guide

An Improved Pedestal To A Version One Worksurface

WINTERIZATION KIT. UNHCR Item No Item Application Sample. General Information and Description. Packing. Pallet Details

Installation Instructions

Installation Guide: Round Trampoline

Item #: BTOT Assembly Instructions

General Purpose Shelter

10 Economy Popup Tent

Rigging a portable loop antenna

LINUS. Vineyard Poles. LINUS Vineyard Poles quality wins. voestalpine Präzisionsprofil GmbH

Wave Curtain Workroom Guide

MYRIAD Banner Stand is a trademark of Skyline Exhibits. Patent Pending PN32294-B. MYRIAD Banner Stand

Alternative Designs Report Joshua s Jumper

SOFT TOP ROOF TENT INSTRUCTION MANUAL

TUCSON PATIO AWNING INSTALLATION MANUAL

Bm Industries.

[tips & tricks for modelmakers] Plate 4 Decks. Required tools

EXCEL MODULAR FOLDING SIDE BRACKET

Back to the Basics. Internal Pullers. What Are Internal Pullers?

ALPTREK 50+5 ALPTREK 45+5

Ely Cagliari. for installation

Deluxe, heat resistant slide system: Quadro for ovens

markilux 930 swing The designer awning with unique pivoting mechanism PATIO AND BALCONY AWNINGS safe timeless beautiful

INSTANT GARAGE MODEL NO: CIG81224 ASSEMBLY INSTRUCTIONS PART NO: ORIGINAL INSTRUCTIONS

IMPORTANT OWNER-OPERATOR INSTALLATION INSTRUCTIONS C2204A

OVERVIEW PEUTEREY PEUTEREY 40 / PEUTEREY 30

markilux 990 the compact markilux cassette awning slender, practical, functional PATIO AND BALCONY AWNINGS safe timeless beautiful

OVERVIEW ALPTREK ALPTREK 40+5 / ALPTREK 35+5

Our Energy, Your Power.

KITFOX WING FOLDING INSTRUCTIONS

Compass Home 8' x 8' No Tools Gazebo with Awning and Anchor Bags Assembly Instruction for Gazebo (no tools required)

CABLE CUTTING, STRIPPING AND CRIMPING TOOLS

4-wheeled container systems. The LARGE family

User Guide. Tripod. flowtech 75 Tripod. Part No. V

INSTINCT ALASKAN TENTS

AND LOAD CANOPY RACK SPECIFICATIONS

IB 7/40 Classic. Automatic residual ice discharge. Outstanding mobility. Efficient airflow in the device. Clear display

ELE-3COP-375 Title - Braid termination using a Band Strap Adaptor.

YCU 750 TU Unitized Curtain Wall System

Assembly instructions for Eurotramp trampolines Series: Ultimate, Grand Master Exclusiv, Grand Master, Master

Rhino-Rack SUNSEEKER II Awning 2.0 metres (32109)

Primrose Awnings - Standard Manual Instructions

Installation instruction

Bevel Buddy Instruction Manual

Rhino-Rack SUNSEEKER Awning Black

ROOFTOP CARGO BAG (FRONT OF VEHICLE) HOOK (x4) ATTACHMENT STRAP (x4)

FG03 Sliding Stacking Doors FG02 Sliding Stacking Shutter System FG04 Security Mesh System

DOWN MANUAL. Aeros Ltd. St. Post-Volinskaya, 5 Kiev, UKRAINE

Home Improvement Fittings Wardrobe Fittings

Primrose Awnings Half Cassette Manual & Electric Instructions

OWNER S MANUAL. ezup.com. 13 x 13 (4.0m x 4.0m) 10 x 10 (3.0m x 3.0m) 16 x 16 (5.0m x 5.0m)

Blue Series Hot Melt Hose with RediFlext II Hanger System

JOINTED ARM AWNING SWINGLINE CASSETTE

Performance Designs, Inc.

Installation manual. Awning. V480 Cannes

ROOFTOP CARGO BAG (FRONT OF VEHICLE) HOOK (x4) ATTACHMENT STRAP (x4)

TRANSFER OIL. thermoplastic and ptfe hoses fittings and assemblies

Mitchell. Furniture Systems

½ SkyBean ChaseCam user guide (rev. 1803)

Rhino-Rack SUNSEEKER II Awning (32105)

R3579. Plastic Female Rod End. Material Housing: Igumid G plastic - Black. Spherical bearing: Iglidor w300.

MOBILITY AIDS. Aluminum Folding Walker.

Rhino-Rack SUNSEEKER II Awning

[tips & tricks for modelmakers] Plate 4 Decks. Required tools 19

NORMACLAMP COBRA. One-piece hose clips. Advantages at a glance. Applications

User Guide. Tripod. flowtech 75 Tripod. Part No. V

VERTICAL BLINDS AND CONSERVATORY AWNINGS safe timeless beautiful. markilux Technical Information. markilux

PEUTEREY 40 PEUTEREY 30

IMPORTANT OWNER-OPERATOR INSTALLATION INSTRUCTIONS C3215/C3215A

RUPHIS Blade Clamp. Instruction Manual

OVERVIEW GUIDE GUIDE 45 / GUIDE 35

Antenna Tower Positioning System

Manual Awning. Assembly Instructions. Product No Toll-free:

Universal beds basic range Calma, Terra, Novos, Eleganza1

Check Out Our Web Site at: To Order, Call Toll-Free From anywhere in North America

Beds and Related Equipment for HSP

Section 4 Strapping & Accessories

GEAR GUIDE CABELA S SET NUMBER:

Serie 5. EXTERNAL LOCKING SOLUTION For LIGHT COMMERCIAL VEHICLES. GatelockVan /11

Transcription:

Assembly Instructions - Please read these instructions once completely before beginning with the individual steps. General Note Required Experience for the construction of gabions have to be the following conditions: safe handling of tools and machines as well as with ladder and scaffold Knowledge in the field of accident prevention, work safety and operational safety Experience in the field of transportation and use with heavy and bulky components If the above mentioned required experience is non-existent or in case of uncertainty, please contact an expert or instruct a specialist company. Safety Rules Set up gabions only on a load-bearing, level surface in accordance with the assembly instruction Protective equipment such as protective gloves and safety boots must be worn during all work CAUTION! Wire could be sharp and sharp-edged! CAUTION! Risk of falling during work. Risks have to be assessed and corresponding protections to be taken. - PORTABLE stone basket 1

1. Lay the bottom, side, front and back grid in a star shape and hang the floor in the side, front and rear grids. Bend at least three hooks - left, center, right - per side with the pliers. 2. Fold up side-, front- and back grid and hook them. Bend at least three hooks - up, center, down - per side with the pliers 3. Hang the staying rods in the exact hanging positions and bend them with the pliers Example: Basket 100x100x100cm back grid Front grid - PORTABLE stone basket 2

ATTENTION: Applies to all basket sizes! The staying rods which connect the two side grids are hooked over the cross point according to the following detail drawing. The staying rods which connect the front grid with the back grid are also hooked over the cross point according to the following detail drawing. It is advisable to install the stayings rods (which connect front grid with back grid) above the staying rods of the sides grids. Basket: 100x50x100cm - PORTABLE stone basket 3

Basket: 100x50x50cm Basket: 50x50x50cm 4. Fill the basket or baskets up to a level of about 30 35 cm and then compress by shaking. The baskets are only stable when compressed. CAUTION! All basket sizes must be shaken so that they are well compressed, otherwise the filling material could settle either during transportation or later when they are installed. In turn, this could lead to structural stability problems. The settling can be so great that the basket is no longer completely filled. - PORTABLE stone basket 4

CAUTION! The stone material must be frost and weather resistant,sufficiently pressure resistant, as well as resistant to the exposure to de-icing salt. 5. The next layer of stones is filled in the same manner and then compressed by shaking. 6. In the case of the upper layer of stones, steps must be taken to ensure that the stones are filled precisely to the upper horizontal edges and that there are no hollow spaces between the filling and the lid. If there are hollow spaces or cavities, the load of the basket on top will not be transferred in a force-locking manner via the stone filling, but will put pressure on the wire basket below causing deformation. This too can lead to structural stability problems. 7. Put the cover grid on top and secure it with means of clamps to front, side and back grids. This means that the cover is secured and cannot move. 8. The - portable stone baskets may only be transported using the special carrying brackets and with suitable lifting equipment or on a pallet with a fork-lift truck. The lifting equipment must be designed so that the lifting forces are directed vertically into the carrying brackets. Also, the lifting equipment should be adapted to the round shape of the carrying brackets. Lifting equipment, such as chains or ropes, that exert an inclined load on the carrying brackets may not be used. There is a risk here that the portable stone baskets will become deformed, thereby compromising the structural stability. Also, the tensile forces on the carrying straps are increased and may cause the brackets to break in the worst case scenario. CAUTION - IMPORTANT: The portable stone basket are designed for transport at the manufacturer site and at the construction site. When transporting by helicopter or crane above people or valuable objects, an additional transport safety device has to be used, e.g. such a fuse with heavy duty belts. - PORTABLE stone basket 5

9. For a vertical construction: A compensating layer of smaller stones in suitable grain-size (e.g.16-32mm) must be applied on the entire surface on top of the already placed -portable stone baskets (horizontal construction) in order to compensate for settlement of the fill materials. This has to be done to guarantee continious load transmission. 10. After the portable stone baskets are in their final position, the carrying brackets can be simply bent over or cut off. 11. Basket dimensions The dimensions of the basket system allow walls to be constructed in grids of the nominal dimensions of the baskets. This is why the individual stone baskets are slightly smaller and narrower than the respective nominal dimensions. The minus tolerances are the result of deviations in the baskets from the ideal shape, vertical joints during positioning, stones protruding through the baskets and horizontal compensation layers. Disclaimer Our assembly instructions in word and picture are provided best of our knowledge and belief. It does not relieve the user/contractor of the responsibility to examine the supplied products for their suitability of the intended procedures and purposes. Application, use and processing of the products are beyond our control and are therefore exclusively in the area of responsibility of the user/contractor. - PORTABLE stone basket 6