DISTRICT CONSTRUCTION PROGRAM OHIO DEPARTMENT OF TRANSPORTATION

Similar documents
ODOT DISTRICT CONSTRUCTION PROGRAM JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT DIRECTOR HOWARD HUEBNER, DISTRICT DEPUTY DIRECTOR

2 Construction Program

District Construction Progr am. John R. Kasich, Ohio Governor Jerry Wray, ODOT Director Steve Mary, P.E., District Deputy Director

DISTRICT CONSTRUCTION PROGRAM PROGRAM DISTRICT CONSTRUCTION

Federal State PID Number. Letting Date 8/9/ /19/2019 E170(418) Ashland HUR /HUR CHIP FY2019. CHIP SEAL DBE Goal

Ohio Department of Transportation Construction Update

Construction Update. ODOT District Two Construction Update. For Immediate Release Thursday, October 18, Lucas County

PID Number. Letting Date. Federal State BRIDGE REPAIR DBE Goal 10/20/2016

State Route 8 Corridor. Northern Summit County s Path to Success

PID Number. Letting Date. Federal State BRIDGE REPAIR 7/9/2008. Federal State Letting Date. PID Number

CONSTRUCTION PROJECTS IN CUYAHOGA COUNTY CLEVELAND EUCLID 3/9/18 RICHMOND MAYFIELD HIGHLAND HEIGHTS HEIGHTS SOUTH EAST MAYFIELD EUCLID CLEVELAND

CONTACT: Nichole Lawrence CELL: FOR IMMEDIATE RELEASE Wednesday March 28, 2018

PID Number. Letting Date. Federal State /26/2018 FOUR LANE RESURFACING DBE Goal

Ohio Department of Transportation Traffic Advisory. District 4 Allen C. Biehl, P.E., Deputy Director S. Arlington Road.

* Short term resurfacing projects are not included in this listing. 4T39.07 Project: Annual Rural County Sign Improvements, Genesee/Orleans Counties

ODOT DISTRICT CONSTRUCTION PROGRAM JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT DIRECTOR JOHN PICURI, P.E., DISTRICT DEPUTY DIRECTOR

Guide to. Road Construction Projects

Federal State PID Number. Letting Date BRIDGE REPAIR DBE Goal 9/16/2010

PID Number Letting Date 8/26/2009 GUARDRAIL REBUILDING LAKE ERIE CONSTRUCTION COMPANY P O BOX 777, NORWALK, OH $633,

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015

ODOT DISTRICT CONSTRUCTION PROGRAM JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT DIRECTOR KIRK SLUSHER, DISTRICT DEPUTY DIRECTOR

FDOT Treasure Coast Traffic Report through

TRAFFIC ALERT FOR OCTOBER 15-19, 2018 Highway Work Zones in the Staunton District

Projected Advertisement Date

Letting Date. Federal State PID Number. 4/9/2015 TWO LANE RESURFACING DBE Goal

Palm Beach County Traffic Report July 13 through July 20, 2012

NORTHEAST OHIO AREAWIDE COORDINATING AGENCY MEMORANDUM

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016

Delaware County Engineer

TRAFFIC ALERT FOR DECEMBER 10-14, 2018 Highway Work Zones in the Staunton District

Jobs and Progress. Central Ohio Region ODOT Districts 3, 5 and 6. Ohio's Transportation Improvement Strategy

PID Number Letting Date 4/4/2019 FOUR LANE RESURFACING DBE Goal

Most people notice when ODOT builds something

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015

April 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014

RELEASE: IMMEDIATE September 14, 2012 CONTACT: Sandy Myers (office) STA (cell)

Road Commission for Oakland County 2016 Road and Permit Projects (6/29/16 Update) Community or Communities

PennDOT Interstate Work next week March 30-April 3:

For Immediate Release Christine Girardin January 19, 2018 SUMTER COUNTY FLORIDA S TURNPIKE AND I-75 INTERCHANGE IMPROVEMENTS

Route 29 Business Replacing bridge over river and railroad in Altavista. Signed detour in place.

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Aug , 2016

District One Contacts

FDOT Treasure Coast Traffic Impact Report

PID Number Letting Date 3/7/2019 MAJOR RECONSTRUCTION DBE Goal

Letting Date 11/2/2017 BRIDGE REPLACEMENT (3 BRIDGES) DBE Goal. PID Number Federal State Letting Date. PID Number

FDOT Treasure Coast Traffic Impact Report

ODOT DISTRICT CONSTRUCTION PROGRAM JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT DIRECTOR KIRK SLUSHER, DISTRICT DEPUTY DIRECTOR

Weekly East Tennessee Construction Report for May 31-June 6, 2018

Road Construction Ahead January-April 2015 NORTHWEST REGION

(Jo Daviess, Stephenson, Winnebago, Boone, Carroll, Ogle, Whiteside, Lee, Rock Island, Henry counties)

City of Grand Island Tuesday, December 12, 2017 Council Session

FY Regional Transportation Improvement Program Basic Project List (All Values in Thousands of Dollars) All costs in current dollars

Letting Date. Federal State PID Number 10/25/ BRIDGE REPAIR DBE Goal. PID Number. Letting Date. Federal State

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

Project ID Project Description Date Sum of Obligation. Grand Total $7,942,419.19

Sierra Roadwork Schedule Sunday through Saturday, October 1-7, 2017 LONG-TERM PROJECTS

TRAFFIC ALERT FOR JUNE 4-8, 2018 Highway Work Zones in the Staunton District

PID Number. Letting Date. Federal State /5/2018 FOUR LANE RESURFACING DBE Goal

TRAFFIC ALERT FOR MARCH 5-9, 2018 Highway Work Zones in the Staunton District

TRAFFIC ALERT FOR SEPTEMBER 17-21, 2018 Highway Work Zones in the Staunton District

Fall 2015 Tender Release

I-94 East Corridor Performance

PID Number. Letting Date. Federal State BRIDGE REPAIR DBE Goal 2/1/2018

TRAFFIC ALERT FOR JANUARY 15-19, 2018 Highway Work Zones in the Staunton District

Constructor: Joseph B. Fay

Exit 148 (Quantico) to Exit 133 (Route 17/Fredericksburg)

TRAFFIC ALERT FOR MARCH 26-30, 2018 Highway Work Zones in the Staunton District

TRAFFIC ALERT FOR FEBRUARY 4-8, 2019 Highway Work Zones in the Staunton District

MONTANA CONSTRUCTION REPORT 06 / 14 / 2016

Exit 148 (Quantico) to Exit 133 (Route 17/Falmouth)

PID Number. Letting Date. Federal State /17/2018 FOUR LANE RESURFACING DBE Goal

FOR IMMEDIATE RELEASE February 22, 2019 CONTACT: Jen K. Ward, SALEM 69

TRAFFIC ALERT FOR FEBRUARY 11-15, 2019 Highway Work Zones in the Staunton District

Palm Beach County Traffic Report August 24 through August 31, 2012

BROWARD COUNTY TRAFFIC IMPACT REPORT March 13 through March 20, March 13, 2015 Chuck McGinness,

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT June 12 June 18, 2016

Evansville Metropolitan Planning Organization Program Year 2015 Annual Listing of Obligated Projects

FORT WORTH DISTRICT. Springtown Area Projects. Loyl C. Bussell, P.E. Acting District Engineer. Thursday, February 8, 2018 Date.

May 1, 2015 Chuck McGinness, BROWARD COUNTY TRAFFIC IMPACT REPORT May 1 through May 8, 2015

Weekly construction update

PennDOT Announces 2016 Allegheny County Highway and Bridge Improvement Projects

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

October 31, 2014 Chuck McGinness, (954)

RELEASE: IMMEDIATE Oct. 6, 2017 CONTACT: Darragh Copley Frye (office) (cell)

PID Number. Letting Date. Federal State SIGNALIZATION 5/21/2015

TRAFFIC ALERT FOR DECEMBER 25, 2017 to JANUARY 5, 2018 Highway Work Zones in the Staunton District

El Dorado County / Tahoe Roadwork Schedule

November 21, 2012 Barbara Kelleher, (954)

May 1, 2015 Meredith Cruz, (561) Palm Beach County Traffic Report May 1 through May 8, 2015

PID Number. Letting Date. Federal State BIKEWAYS DBE Goal 5/11/2017

Exit 136 (Centreport Parkway/Stafford County) to Exit 130 (Route 3/Fredericksburg)

MoDOT Southwest District

Apparent Bids for Letting of April 10, 2018

Progress Report for Projects of Regional Significance

CUY LAKE TO LAKES TRAIL (PHASE 2): PID

TRAFFIC ALERT FOR JUNE 25-29, 2018 Highway Work Zones in the Staunton District

Wichita Falls MPO - MTP Project List 1 of 6

EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015

Townships Eligible to Apply for Township Sign Grant 2018

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

Transcription:

OHIO DEPARTMENT OF TRANSPORTATION DISTRICT 3 2013 CONSTRUCTION PROGRAM SERVING ASHLAND, CRAWFORD, ERIE, HURON, LORAIN, MEDINA, RICHLAND AND WAYNE COUNTIES. JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT DIRECTOR ALLEN C. BIEHL, DISTRICT DEPUTY DIRECTOR ***Dates in the 2013 Program are subject to change without notice

Ashland County Projects PID Number Route Section Work Type Location Sale Date Award Date Est. Start Est. End Est. Cost Contactor Maintenance of Traffic 77316 RIC-71-20.56 PM Preventive Maintenance From 0.61 mile south of the Richland County line to north of US 250 7/12/12 7/19/12 8/20/12 6/30/13 $2,160,155.04 Strawser Two lanes maintained in each direction, except at night 80194 ASD-250-17.73 Bridge Rehabilitations Resurface From CR-1575 to TR-653, including three structures near the Interstate 71 interchange 5/24/12 6/1/12 7/9/12 6/15/13 $3,277,637.37 Bridge Overlay Systems One lane maintained in each direction at all times 82822 ASD-60-6.18 Slide Repair Between CR-2404 and TR-585 1/17/13 3/13/13 $1,391,999.36 90-day detour begins April 15 1/28/13 9/18/13 Shelly Sands 87674 ASD-250-19.13 Culvert 0.17 mile east of TR-593 1/31/13 2/11/13 3/26/13 5/31/13 $89,463.67 GE Baker Shoulder restrictions; traffic maintained at all times 86718 ASD-96-0.0 Resurface From the Richland County line to SR-60 in the City of Ashland 3/14/13 3/25/13 5/1/13 7/31/13 $1,243,829.57 Kokosing 84518 ASD-42-3.8 Resurface From Baney Road to just north of US 250 3/28/13 4/8/13 8/15/13 11/1/13 $2,000,000 temporary signalized lane closures 87675 ASD-511-16.80 Culvert Just north of TR-975 5/9/13 5/20/13 7/1/13 8/31/13 $230,000 21-day detour 90351 ASD-42-1.78 Culvert 0.12 mile north of TR-1323 5/23/13 6/3/13 7/1/13 8/31/13 $210,000 14-day detour 76980 ASD-71-8.93 Micro Surface 0.13 mile south of TR-593 to just north of the Medina/Wayne County line 6/27/13 7/8/13 8/1/13 9/30/13 $2,800,000 Intermittent lane restrictions 83406 ASD-511-0.0 Resurface From SR-39 to the City of Ashland 6/27/13 8/1/13 $2,300,000 7/8/13 10/15/13 ASHLAND COUNTY 1

Resurfacing Reactive/Preventive Maintenance Bridge/Culvert Continued Construction from 2012 New Construction in 2013 Sale in 2013; Construction in 2014 ASHLAND COUNTY 2

Crawford County Projects PID Number Route Section Work Type Location Sale Date Award Date Est. Start Est. End Est. Cost Contactor Maintenance of Traffic 83437 D03-CHIP FY-2013 Preventive Maintenance On SR-602 from SR-19 to Guiss Road; On SR-96 from SR-98 to SR-602 6/21/12 6/28/12 7/20/12 9/15/13 $996,669.90 Specialized Construction 92732 CRA-103-17.81 CRA-103-22.71 Bridge s Between CR-208 SR-39 and 0.4 mile west of the Huron County line 9/20/12 9/27/12 10/29/12 9/29/13 $1,046,577.42 R I Construction CRA-103-17.81: 120-day detour CRA-103-22.71: Maintained with temporary signalized lane closures 84519 CRA-598-1.54 Resurface From Brandt Road to CR-330 10/18/12 5/15/13 $739,830.03 10/25/12 7/14/13 Shelly Sands 81393 Deck Overlay FY13 Bridge Repair CRA-30-9.61; RIC-598-3.33 12/13/12 12/20/12 5/15/13 8/15/13 $230,170.52 BCC Ohio, Inc. Stetzer Rd: Maintained with a temporary signalized lane closure; SR-598: 21-day detour 88849 CRA-103-13.47 CRA-103-13.60 Bridge s Two locations between Swabb Road and High Street in the village of New Washington 5/9/13 5/20/13 6/24/13 8/31/13 $247,000 21-day detour and maintained with flaggers 84743 MICRO FY 14 Micro Surface On State Route 19 from Denzer Road to Quaintenance Road 6/27/13 7/8/13 9/2/13 10/15/13 $560,000 91301 CRA-30-6.74 Slide Repair 0.17 mile west of the CSX railroad underpass 8/1/13 8/12/13 9/2/13 10/31/13 $585,000 One lane of traffic will be maintained at all times 88760 CRA-97-0.83 Resurface From the City of Galion to the Morrow County line 9/26/13 10/7/13 5/1/14 7/31/14 $870,000 83443 CRA-61-5.08 Bridge Just north of SR-309 in the City of Galion 12/12/13 12/23/13 6/9/14 7/31/14 $300,000 21-day detour CRAWFORD COUNTY 3

Resurfacing Reactive/Preventive Maintenance Bridge/Culvert Continued Construction from 2012 New Construction in 2013 Sale in 2013; Construction in 2014 CRAWFORD COUNTY 4

Erie County Projects PID Number Route Section Work Type Location Sale Date Award Date Est. Start Est. End Est. Cost Contactor Maintenance of Traffic 23105 ERI-6-5.70 Railroad Grade Separation 0.73 mile west of State Route 101 in the City of Sandusky 7/28/11 8/3/11 9/2/11 7/31/14 $8,154,128.72 Mosser Construction Phased construction detours on US 6 SR-101; Superior Street Huron Street closed permanently 87436 ERI-6-23.79 Culvert Between Joppa Road and Chappel Creek Road 11/29/12 12/6/12 1/17/13 8/19/13 $270,640.00 CG Cole Const. 21-day detour 92195 ERI-Kelleys Island State Park Resurface Parking lot at campground and the Glacial Grooves parking areas 1/17/13 1/28/13 4/15/13 5/31/13 $460,184.30 Henry W. Bergman Inc. 90357 ERI-13-1.95 Culvert Between US Route 250 Old Mudbrook Road 4/11/13 4/22/13 6/1/13 7/31/13 $130,000 SR-13: One lane maintained at all times US 250: One lane maintained westbound 90356 ERI-61-5.5 Culvert 0.25 mile south of Deehr Road (TR-82) 6/6/13 6/17/13 8/1/13 10/1/13 $175,000 24-day detour 83442 ERI-4-0.33 Bridge Repairs From 0.3 mile north of the Huron County line to TR-97 9/26/13 10/7/13 6/2/14 9/5/14 $500,000 One lane maintained at all times 80184 ERI-13-1.84 Resurface From US Route 250 to the City of Huron 11/7/13 11/18/13 6/1/14 8/30/14 $728,000 temporary signalized lane closures 82259 ERI-2- SYSSIGN Sign On State Route 2 within Erie Lorain Counties 12/12/13 12/23/13 3/3/14 9/3/14 $225,000 Maintained; Shoulder closures as needed 88763 ERI-99-0.0 Resurface From the Huron County line to SR-99 1/23/14 2/3/14 6/2/14 9/15/14 $960,000 two 28-day detours ERIE COUNTY 5

Resurfacing Reactive/Preventive Maintenance Bridge/Culvert Continued Construction from 2012 New Construction in 2013 Sale in 2013; Construction in 2014 ERIE COUNTY 6

Huron County Projects PID Number Route Section Work Type Location Sale Date Award Date Est. Start Est. End Est. Cost Contactor Maintenance of Traffic 80197 HUR-13-2.56 Bridge Just north of US Route 224 over a branch of the Vermillion River 5/10/12 5/17/12 8/23/12 5/26/13 $1,057,505.74 Fechko 87477 HUR-601-0.94 Culvert 0.14 mile south of US Route 20 11/8/12 11/15/12 4/1/13 10/15/13 $138,637.40 Mark Haynes 21-day detour 89506 HUR-20-6.83 Resurface Within the corporation limits of the village of Monroeville 11/29/12 12/6/12 6/3/13 8/31/13 $1,496,221.65 Erie Blacktop One lane maintained in each direction at all times 84521 HUR-61-2.48 HUR-598-3.03 Resurface On State Route 61 from SR-598 to the city of Norwalk; on State Route 598 from SR-61 to State Route 103 11/29/12 12/6/12 4/15/13 11/30/13 $3,913,031.07 Erie Blacktop or temporary traffic signals; Snyder Rd: 100-day detour S Norwalk Rd.: 90-day detour 76959 HUR-99-13.77 Slide Repair 0.5 mile north of TR-34 12/13/12 12/20/12 3/1/13 11/24/13 $1,304,009.83 Mosser Maintained with a temporary traffic signal 90359 HUR-303-0.7 Drainage Repair 0.2 mile east of State Route 60 1/17/13 5/1/13 $134,246.45 14-day detour 1/28/13 6/30/13 Mark Haynes 82315 HUR-250-0.73 Urban Paving On US Route 250 State Route 61 within the corporation limits of the city of Norwalk 4/11/13 4/22/13 7/1/13 8/31/14 $3,000,000 and temporary signalized lane closures 85692 HUR-Prospect St Bridge Bridge Between Energy Street Main Street in the village of New London 5/23/13 6/3/13 9/2/13 12/31/13 $500,000 Prospect Street First Street: 90-day detour 20383 HUR-61-21.87 Bridge 0.3 mile north of Laylin Road over Rattlesnake Creek 6/6/13 6/17/13 7/1/13 10/31/13 $1,700,000 60-day detour 76975 HUR-250-15.56 Bridge Just east of State Route 13 over the Vermilion River 6/6/13 6/17/13 7/15/13 7/15/14 $3,200,000 210-day detour HURON COUNTY 7

Resurfacing Reactive/Preventive Maintenance Bridge/Culvert Continued Construction from 2012 New Construction in 2013 Sale in 2013; Construction in 2014 HURON COUNTY 8

Lorain County Projects PID Number Route Section Work Type Location Sale Date Award Date Est. Start Est. End Est. Cost Contactor Maintenance of Traffic 25734 LOR-90-14.29 Bridge Repair Twin structures over the Black River and Ford Road 11/17/11 11/23/11 3/19/12 6/30/14 $10,892,135.88 Ruhlin Two lanes maintained in each direction; One lane maintained at night 82255 LOR-2 SYSSIGN FY12 Sign Various locations along State Route 2 and Interstate 90 3/22/12 4/3/12 2/18/13 8/9/13 $958,425.00 Lake Erie Const. 80199 LOR-301-23.49 Bridge Over Interstate 90 7/26/12 8/2/12 5/1/13 10/31/13 $3,120,579.80 Mosser SR-301: 120-day detour I-90: Intermittent single lane closures 81940 LOR-82-6.82 Bridge 0.13 mile east of Plum Creek Road (TR-1431) 10/4/12 10/11/12 6/1/13 7/31/13 $173,899.20 BOG Const. 21-day detour 93717 LOR-Boston Road Spot Safety at CSX railroad crossing 12/13/12 12/20/12 6/1/13 11/1/13 $607,900.00 Beaver Exc. 75-day detour 23104 LOR-58-7.36 Railroad Grade Separation 0.14 mile north of State Route 18 in the village of Wellington 1/17/13 1/28/13 4/1/13 9/1/14 $12,324,028.86 Beaver Exc. Three separate 14-day detours and one 35-day detour near project completion 84527 LOR-254-0.40 Resurface From just west of West River Road to the City of Avon 1/17/13 1/28/13 5/1/13 7/31/13 $754,219.59 Shelly Co. 92029 LOR-Oberlin ODOT Garage Salt Storage Building At ODOT maintenance facility in city of Oberlin 3/7/13 3/18/13 4/15/13 8/15/13 $329,777 Kelstin Inc. 84839 LOR-611-0.00 Urban Paving Within the City corporation limits of Lorain 3/28/13 4/8/13 6/1/13 10/31/13 $1,500,000 83447 LOR-611-9.63 Bridge Rehabilitation Resurface From Chester Road to State Route 254 5/9/13 5/20/13 5/1/13 6/30/14 $4,000,000 One lane of traffic in each direction maintained LORAIN COUNTY 9

Resurfacing Reactive/Preventive Maintenance Bridge/Culvert Continued Construction from 2012 New Construction in 2013 Sale in 2013; Construction in 2014 LORAIN COUNTY 10

Lorain County projects (continued) PID Number Route Section Work Type Location Sale Date Award Date Est. Start Est. End Est. Cost Contactor Maintenance of Traffic 88004 LOR-58-9.61 Culvert 0.2 mile north of Webster Road 5/23/13 6/3/13 7/1/13 8/31/13 $100,000 14-day detour 90425 LOR-303-1.49 Culvert 0.12 mile west of State Route 511 6/6/13 6/17/13 8/15/13 10/15/13 $100,000 21-day detour 84744 SMOOTH FY 14 Smooth Seal On State Route 511 from the Ashland County line to US Route 20 6/27/13 7/8/13 8/1/13 9/15/13 $1,600,000 88815 LOR-511-4.70 Bridge 0.3 mile north of Griggs Road 10/10/13 10/21/13 5/5/14 8/29/14 $660,000 90-day detour 80127 LOR-303-9.94 Bridge 0.28 mile east of Nickel Plate Diagonal Road 11/21/13 12/2/13 4/1/14 7/31/14 $250,000 45-day detour LORAIN COUNTY 11

Resurfacing Reactive/Preventive Maintenance Bridge/Culvert Continued Construction from 2012 New Construction in 2013 Sale in 2013; Construction in 2014 LORAIN COUNTY 12

Medina County Projects PID Number Route Section Work Type Location Sale Date Award Date Est. Start Est. End Est. Cost Contactor Maintenance of Traffic 77474 MED-76-7.61 Rehabilitation From State Route 57 to the Summit County line 3/8/12 3/15/12 4/23/12 7/1/14 $17,785,160.16 Shelly Sands Two lanes of traffic maintained in each direction with contraflow; Detours on the SR-261, SR-94 SR-57 interchange ramps 78233 MED- Brunswick Signal Upgrades City-wide traffic signal replacement 5/24/12 6/1/12 8/3/12 9/30/13 $3,546,751.54 Terrace Const. 24130 MED-3-12.98 Intersection Improvement State Route 3 and Reagan Parkway 10/18/12 10/25/12 3/26/13 8/29/13 $565,092.81 Fechko SR-3: Two lanes maintained Foote Rd: 3-day detour 87920 MED-Noise Walls Two noisewalls around the Interstate 71 State Route 18 interchange and two walls north of the State Route 303 interchange 11/8/12 1/8/13 1/8/13 8/4/13 $1,328,367.10 Great Lakes Const Shoulder closures intermittent single lane closures 87439 MED-94-18.00 Culvert Between State Route 303 and State Route 606 11/29/12 12/6/12 3/3013 8/31/13 $104,122.00 Page Excavating 10-day detour 83424 MED-421-0.06 Resurface From US Route 224 to US Route 42 12/13/12 12/20/12 6/1/13 9/30/13 $1,034,009.83 Chagrin Valley 87130 MED-71-14.80 Slide Repair At the State Route 162 underpass 3/14/13 3/25/13 5/1/13 7/31/13 $305,101.80 Mark Haynes Shoulder closures intermittent single lane closures 90423 MED-224-14.46 Culvert 0.5 mile east of Leroy Road 3/28/13 4/8/13 5/27/13 7/29/13 $150,000 One lane of traffic in each direction maintained at all times 87440 MED-162-20.97 Culvert 0.28 mile east of Brynwood Road 4/25/13 5/6/13 7/1/13 8/31/13 $95,000 7-day detour 84750 MED-18-9.10 Urban Paving Within the city corporation limits of Medina, including the State Route 57 overlap 5/23/13 6/3/13 7/15/13 10/31/13 $2,000,000 MEDINA COUNTY 13

Resurfacing Reactive/Preventive Maintenance Bridge/Culvert Continued Construction from 2012 New Construction in 2013 Sale in 2013; Construction in 2014 MEDINA COUNTY 14

Medina County projects (continued) PID Number Route Section Work Type Location Sale Date Award Date Est. Start Est. End Est. Cost Contactor Maintenance of Traffic 80140 MED-71-22.42 Bridge Sleepy Hollow Road over Interstate 71 9/26/13 10/7/13 4/1/14 10/31/14 $950,000 150-day detour 82427 MED-3-21.19 Slide Repair Culvert 0.5 mile north of State Route 606 9/26/13 10/7/13 6/9/14 7/31/14 $700,000 75-day detour 80195 MED-71-20.34 Bridge Remsen Road over Interstate 71 10/10/13 10/21/13 4/1/14 10/31/14 $1,700,000 180-day detour MEDINA COUNTY 15

Resurfacing Reactive/Preventive Maintenance Bridge/Culvert Continued Construction from 2012 New Construction in 2013 Sale in 2013; Construction in 2014 MEDINA COUNTY 16

Richland County Projects PID Number Route Section Work Type Location Sale Date Award Date Est. Start Est. End Est. Cost Contactor Maintenance of Traffic 86916 MRW-71-12.19 Reconstruction From just south of the Richland County line to south of State Route 95 9/23/11 9/29/11 11/1/11 10/31/13 $42,036,977 Kokosing Two lanes of traffic maintained in each direction using I-71 SB; State Route 314: 120-day detour 77316 RIC-71-20.56 PM Preventive Maintenance From 0.61 mile south of the Ashland County line to north of US 250 in Ashland County 7/12/12 7/19/12 8/20/12 6/30/13 $2,160,155.04 Strawser Two lanes maintained in each direction, except at night 18897 RIC-BP-FY13 Bridge Painting Structures along the US Route 30 corridor, including Fourth Street; Lexington-Springmill Road Trimble Road 9/20/12 9/27/12 5/14/13 8/27/13 $1,385,000 APBN Inc. One lane in each direction maintained on US 30 88714 RIC-30-9.82 Signalization US Route 30 Trimble Road interchange area 11/29/12 12/6/12 1/15/13 10/11/13 $848,842.50 Perram Electric US 30: Intermittent single lane closures; Trimble Rd: Single lane closures 82297 RIC-96-4.63 Resurface From 0.25 mile east of Louise Drive to State Route 13 12/13/12 12/20/12 5/1/13 7/31/13 $1,092,695.25 Shelly Sands and temporary signalized lane closures 87677 RIC-314-5.72 Culvert s 0.48 mile north of Snodgrass Road 0.27 mile south of Beam Road 12/13/12 12/20/12 6/1/13 7/31/13 $186,866.07 Page Excavating 10-day detour at each culvert 83441 BH FY 13 Bridge Repair On State Route 13 over South Main St on US Route 42 just north of State Route 39 in Mansfield 3/14/13 3/21/13 5/15/13 9/30/13 $405,902.34 BCC Ohio Inc. SR-13: ; US 42: 60-day detour 85051 RIC-545-1.44 Resurface From US Route 30 to US Route 250 in Ashland County 4/11/13 4/18/13 5/1/13 10/30/13 $3,200,000 and temporary signalized lane closures 90238 RIC-Sewer Storm Sewer Reconstruction At ODOT Maintenance facility in the City of Mansfield 5/23/13 6/3/13 7/23/13 9/23/13 $150,000 Maintained RICHLAND COUNTY 17

Resurfacing Reactive/Preventive Maintenance Bridge/Culvert Continued Construction from 2012 New Construction in 2013 Sale in 2013; Construction in 2014 RICHLAND COUNTY 18

Richland County projects (continued) PID Number Route Section Work Type Location Sale Date Award Date Est. Start Est. End Est. Cost Contactor Maintenance of Traffic 77451 RIC-71-13.45 Micro Surface 0.14 mile north of Mansfield-Lucas Road to 0.61 mile south of the Ashland County line 6/27/13 7/8/13 8/15/13 10/15/13 $1,400,000 Two lanes maintained in each direction, except at night 88791 RIC-42-14.37 Resurface From North McElroy Road to Fleming Falls Road 6/27/13 7/8/13 8/1/13 10/1/13 $700,000 88787 RIC-39-16.69 Resurface On State Route 430 from State Route 39 to its Interstate 71 underpass, including its overlap with SR-39 10/10/13 10/21/13 6/15/14 8/30/14 $890,000 93093 RIC-96-13.41 Bridge Repair 0.6 mile east of State Route 13 11/7/13 11/18/13 7/1/14 8/31/14 $250,000 45-day detour 88826 RIC-42-1.02 Bridge 0.2 mile south of Kings Corners East Road 11/21/13 12/2/13 5/5/14 8/29/14 $720,000 Maintained with a temporary traffic signal RICHLAND COUNTY 19

Resurfacing Reactive/Preventive Maintenance Bridge/Culvert Continued Construction from 2012 New Construction in 2013 Sale in 2013; Construction in 2014 RICHLAND COUNTY 20

Wayne County Projects PID Number Route Section Work Type Location Sale Date Award Date Est. Start Est. End Est. Cost Contactor Maintenance of Traffic 81936 WAY-3-12.05 Bridge Repair State Route 3 over US Route 30 3/22/12 4/19/12 3/18/13 9/19/13 $2,297,610.04 Cosmos SR-3 NB: 60-day detour, SR-3 SB/Columbus Ave: Single lane maintained 79751 WAY-30-1.04 PM Smooth Seal From 0.5 mile west of South Elyria Road to State Route 3 7/12/12 7/19/12 9/4/12 6/21/13 $2,697,957.57 Kokosing One lane maintained in each direction 90191 LG FY 13 Highway Lighting US Route 30 State Route 172 interchange in Wayne County 10/4/12 10/11/12 4/1/13 8/15/13 $199,997.00 Cornerstone Elec. 85052 WAY-250-24.37 Resurface From Kidron Road to the Stark County line 11/29/12 12/6/12 5/1/13 8/15/13 $1,473,630.30 Kokosing 82032 WAY-3-26.12 Resurface From 0.12 mile south of Sterling Road to just south of Interstate 76 in Medina County 3/14/13 3/21/13 5/1/13 9/30/13 $1,931,595.54 Shelly Company 60-day detour maintained with flaggers 88670 WAY-83-8.06 Urban Paving From its intersection with Madison Avenue to US Route 250 on State Route 302 from State Route 83 to East Liberty Street 3/14/13 3/21/13 6/1/13 10/31/13 $688,887.77 Chagrin Valley 90434 WAY-83-10.88 Concrete Joint Repairs On the Dix Expressway from East Lincoln Way to Friendsville Road 4/11/13 4/22/13 5/15/13 10/15/13 $2,600,000 SR-83/SR-3: One lane maintained in each direction, US 30, SR-585 SR-3 Ramps: Detours 87131 WAY-604-6.00 Slide Repair 0.5 mile west of Overton Road 6/6/13 8/1/13 $280,000 45-day detour 6/17/13 10/31/13 79764 WAY-250-12.32 Smooth Seal From East Lincoln Way to Dover Road 6/27/13 7/8/13 8/15/13 9/30/13 $660,000 One lane maintained in each direction 93099 WAY-301-0.00 Resurface From State Route 302 to Interstate 71 12/12/13 12/23/13 6/2/14 9/1/14 $770,000 WAYNE COUNTY 21

Resurfacing Reactive/Preventive Maintenance Bridge/Culvert Continued Construction from 2012 New Construction in 2013 Sale in 2013; Construction in 2014 WAYNE COUNTY 22

District Wide Projects PID Number Route Section Work Type Location Sale Date Award Date Est. Start Est. End Est. Cost Contactor Maintenance of Traffic 89415 PR FY 2013 Tree Stump Removal Various locations within District 3 8/9/12 8/16/12 1/7/13 10/15/13 $533,430.00 VanCuren Services 89413 GR FY 13 Guardrail Maintenance Various locations within District 3 9/6/12 9/13/12 2/8/13 3/1/14 $556,895.00 Lake Erie Const. 81391 BH FY 13 Bridge Repair ASD-250-16.46; ASD-95-13.09; WAY-30-13.66 WAY-30-19.08 10/4/12 10/11/12 5/1/13 8/31/13 $400,548.16 Shelly Sands US 250: One lane in each direction; SR-95: 14-day detour; Honeytown Rd: Maintained with temporary signal; Carr Rd: Maintained with temporary signal 86754 TSG FY 13 Traffic Signal Repair Various locations within District 3 12/13/12 12/20/12 3/13/13 11/30/13 $156,879.18 Linward Electric 89419 LOOP FY 13 Loop Detector Repair Various locations within District 3 1/17/13 1/28/13 6/1/13 5/31/15 $99,410.00 Perram Electric 89422 PM FY 13 Pavement Markings Various locations within District 3 4/25/13 5/6/13 6/3/13 10/31/13 $2,200,000 89420 RPM FY 13 Raised Pavement Markers Various locations within District 3 4/25/13 5/6/13 6/17/13 5/30/14 $310,000 88732 I-71 RM FY 13 A Reactive Maintenance On Interstate 71 in Medina County from mile marker 204 to 208 5/23/13 6/3/13 7/15/13 9/30/13 $170,000 Two lanes maintained in each direction 88733 I-71 RM FY 13 B Reactive Maintenance On Interstate 71 in southern Richland County from mile marker 160 to 171 5/23/13 6/3/13 7/15/13 9/30/13 $390,000 Two lanes maintained in each direction DISTRICT-WIDE PROJECTS 23

Resurfacing Reactive/Preventive Maintenance Bridge/Culvert Continued Construction from 2012 New Construction in 2013 DISTRICT-WIDE PROJECTS 24

District Wide projects (continued) PID Number Route Section Work Type Location Sale Date Award Date Est. Start Est. End Est. Cost Contactor Maintenance of Traffic 84746 CRSEAL FY 14 Crack Seal Various locations within District 3 6/27/13 7/8/13 8/1/13 9/30/13 $450,000 88778 CHIP FY 14 Chip Seal On various sections of SR-181 in Crawford Richland Counties; and SR-162 in Huron, Lorain Medina Counties 7/18/13 7/29/13 8/29/13 11/15/13 $1,200,000 89427 PR FY 14 Tree Stump Removal Various locations within District 3 8/1/13 8/12/13 10/1/13 9/30/14 $125,000 89428 LG FY 14 Highway Lighting Various locations within District 3 9/26/13 10/7/13 4/1/14 8/1/14 $75,000 86755 TSG FY 14 Traffic Signal Installation Various locations within District 3 11/7/13 11/18/13 6/1/14 10/31/14 $150,000 89425 GR FY 14 Guardrail Maintenance Various locations within District 3 11/21/13 12/2/13 2/1/14 1/31/15 $725,000 DISTRICT-WIDE PROJECTS 25

Resurfacing Reactive/Preventive Maintenance Bridge/Culvert Continued Construction from 2012 New Construction in 2013 DISTRICT-WIDE PROJECTS 26

O UR M I S S I O N To provide easy conveyance of people and goods from place to place, we will: Take care of what we have; Make our system work better; Improve safety; Enhance capacity O UR V I S I O N A long-term, reliable, professional and highly productive organization For more information, Allen C. Biehl, P.E., District Deputy Director at (419) 207-7002, Robert L. Weaver, P.E., P.S., District Construction Administrator at (419) 207-7158, or Christine Myers, Public Information Officer at (419) 207-7182. Like us on Facebook: www.facebook.com/ohiodepartmentoftransportationdistrict3 Follow us on Twitter: www.twitter.com/odot_northcenoh Statewide Traffic Information: www.ohgo.com For general information, call (800) 276-4188 or visit District 3 s Web site at: www.transportation.ohio.gov/dist3 DISTRICT-WIDE PROJECTS 27