Object: LoA between the Barcelona FIR (LECB) and the Bordeaux FIR (LFBB)

Similar documents
Letter of Agreement. IVAO Switzerland & France Divisions. 1. Purpose. 2. General procedures

Object: LoA between the Reims FIR (LFEE) and the Geneva FIR (LSAG)

Letter of Agreement. IVAO German & France Divisions. 1. Purpose. 2. General procedures

INDICE. 1. Purpose 2 2. General procedures 2 3. ATC units description 2 4. Coordination procedures En-route coordination 6

Letter of Agreement. IVAO United Kingdom and Ireland & France Divisions. 1. Purpose. 2. General procedures

Traffic shall be handed over as soon as practical and, whenever possible, at latest 3000 ft before reaching the cleared flight level.

Letter of Agreement. IVAO United Kingdom and Ireland & France Divisions. 1. Purpose. 2. General procedures

Letter of Agreement. IVAO Division France. 1. Purpose. 2. General procedures

LETTER of AGREEMENT FRANCE - SPAIN vaccs VATSIM

Letter of Agreement. between. and

THE AREA CONTROL CENTRE (CTR) POSITION

Letter of Agreement. between. and. Effective: 01-OCT-2016 / 1610 Edition: 3.0

LETTER OF AGREEMENT. Between

IVAO Switzerland Division

Letter of Agreement. between

AIRSPACE STRUCTURE. In aeronautics, airspaces are the portion of the atmosphere controlled by a country above its territory.

International Virtual Aviation Organisation. Letter of Agreement. between. and. Effective: 15/05/2017 Edition: 2

LETTER OF AGREEMENT. between. and

FLIGHT STRIP MANAGEMENT - APPROACH LEVEL

LETTER OF AGREEMENT BETWEEN POLISH VACC AND SWEDEN FIR

Standard Operating Procedures (SOPs) for UAE Centre (OMAE)

International Virtual Aviation Organisation. Letter of Agreement. between. and. Effective: 15/05/2017 Edition: 1

USE OF RADAR IN THE APPROACH CONTROL SERVICE

LETTER OF AGREEMENT BETWEEN NORWAY FIR AND DENMARK FIR

GENERAL OPERATING PROCEDURES FINLAND(GOP)

Standard Operating Procedures (SOPs) for Arabian Control (OGCC)

IFR SEPARATION USING RADAR

LETTER OF AGREEMENT BETWEEN DENMARK FIR AND SWEDEN FIR. VATSIM Scandinavia 4 April 2013

ALTIMETER SETTING PROCEDURES

LETTER OF AGREEMENT BETWEEN BODØ FIR AND MURMANSK FIR

LETTER OF AGREEMENT BETWEEN NORWAY FIR AND DENMARK FIR

Denmark FIR and Sweden FIR

LETTER OF AGREEMENT BETWEEN NORWAY FIR AND SWEDEN FIR

LETTER OF AGREEMENT BETWEEN NORWAY FIR AND DENMARK FIR

PILOT BRIEFING GENEVA RFE 2018

IVAO Flight Operations Department Indonesia (ID) Division Procedures

SEMI-CIRCULAR RULE. The default worldwide semi-circular rule is the East/West orientation of the flight level parity:

IFR SEPARATION WITHOUT RADAR

NATS Edinburgh / BGA LOA effective 24 November 2005

Eastern Caribbean PIARCO Virtual FIR. PIARCO Control Zone (CTR)

AIP ENR JORDAN 12 DEC 2013 RADAR SERVICES AND PROCEDURES

LETTER OF AGREEMENT. between. and

SECTION 6 - SEPARATION STANDARDS

Burlington ATCT Standard Operating Procedures

HOLDING STACK MANAGEMENT

Letter of Agreement (LOA)

EASA NPA on SERA Part ENAV Response sheet. GENERAL COMMENTS ON NPA PACKAGE Note: Specific comments are provided after the General Comments

Jordan Airspace Manual. Prepared by: Aboud Horani & Mahmoud Odeh XM-AOC / XM-ADIR

VATUSA-VATNZ-VATPAC OCEANIC PARTNERSHIP OAKLAND OCEANIC FSS GENERAL SOP 1 OCT 2012

Standard Operating Procedures Atlanta Intl Airport (ATL) Air Traffic Control

ZTL ARTCC. Asheville Regional. Air Traffic Control Tower. Standard Operating Procedures AVL B. Effective: May 1, 2011

RELEASE RECORD. Version Date Author Notes Dec 2006 SK Initial Release

VFR PHRASEOLOGY. The word IMMEDIATELY should only be used when immediate action is required for safety reasons.

SECTION 4 - APPROACH CONTROL PROCEDURES

WAKE TURBULENCE SEPARATION MINIMA

MINIMUM FLIGHT ALTITUDES

ZTL ARTCC. Augusta Regional

THE TOWER CONTROL POSITION (TWR)

Greenville Spartanburg International

AIP PORTUGAL ENR NOV-2007

1.2 An Approach Control Unit Shall Provide the following services: c) Alerting Service and assistance to organizations involved in SAR Actions;

AERONAUTICAL INFORMATION CIRCULAR

Denver ARTCC Colorado Springs ATCT & TRACON STANDARD OPERATING PROCEDURES

FLIGHT PLAN VALIDATION

TRANSPONDER WITH IVAC

LGAV LTAI Real Flights Event Partnership EUROPE. PILOT's BRIEFING. March 7th 2009 Event time: 1200z 2200z. Ankara and Istanbul FIR Guides & LTAI Guide

VFR FLIGHTPLAN EQUIPMENTS

Piedmont Triad International Airport

CHAPTER 5 SEPARATION METHODS AND MINIMA

Traffic shall be handed over as soon as practical and, whenever possible, at latest 3000 ft before reaching the cleared flight level.

Temporary Radio Mandatory Zone

MODULE 4: SIDs and STARs. Slide <#> of

PHRASEOLOGY COMMON MISTAKES

Albany ATCT Standard Operating Procedures

LETTER OF AGREEMENT. vacc Switzerland. vacc Italy (LIMM) Milano ACC Padova ACC

Letter of Agreement by and between Jacksonville ARTCC and Miami ARTCC

UK MOUNTAIN WAVE FESTIVAL - TRA (G) CAIRNGORM GLIDING CLUB

GENERAL INFORMATION The aerodrome consists of three runways (04L-22R, 04R-22L, 12-30) and four aprons.

HOUSTON AIR ROUTE TRAFFIC CONTROL CENTER VATSIM United States Division. Letter of Agreement. Revised: July 25, 2004 Effective: July 25, 2004

Cleveland ARTCC and Boston Virtual ARTCC Letter of Agreement

A Letter of Agreement Between: Robin Hood Airport Doncaster Sheffield and British Gliding Association

LETTER OF AGREEMENT. Between. and RELATING TO

BASIC IVAC FUNCTIONS

LETTER OF AGREEMENT LETTER OF AGREEMENT BETWEEN LONDON SOUTHEND AIRPORT AND STOKE AIRFIELD

San Juan CERAP. Standard Operation Procedures. Version 2.2 May 5th, Welcome to San Juan CERAP (ZSU ARTCC, TJZS FIR)

Standard Operating Procedures (SOPs) for BAGHDAD (ORBI)

Luxembourg TMA Contingency measures. Clear the sky procedure & Agreement on service continuity

LETTER OF AGREEMENT. between. The purpose of this Letter of Agreement is to define the coordination procedures to be applied

International Civil Aviation Organization. Agenda Item 6: Free Route Airspace Concept implementations within the EUR Region FREE ROUTE AIRSPACE DESIGN

ENR 1.7 ALTIMETER SETTING PROCEDURES

ATM REGIONAL CONTINGENCY PLAN FOR.. CTA/UTA/FIR

Airspace Namibia 2017/18. Released Version

11/21/2008 ZDC-ZTL LOA Version 1. Letter of Agreement

LETTER OF AGREEMENT. 1. General. VACC-AUSTRIA and VACC-CZ Purpose Operational Status Validity. Between

ERIE ATCT STANDARD OPERATING PROCEDURES

ivirtual Royal Air Force

IVAO ZA division. Air Traffic Control Procedures

Letter of Agreement. Between Jacksonville ARTCC and Virtual United States Navy Effective Date: Sept 1, 2008

DIRECTORS GENERAL OF CIVIL AVIATION CONFERENCE ON A GLOBAL STRATEGY FOR AVIATION SAFETY

International Civil Aviation Organization COMMON FORMAT LOA BETWEEN ATS UNITS. (Presented by United Arab Emirates) SUMMARY

Transcription:

Letter of Agreement IVAO Spain & France Divisions Name: LOA-LECB-LFBB_EN Date: May the 12 th 2016 Version: v1 Validity: permanent Contrib.: ES-AOC, ES-AOAC, FR-AOC, FR-AOAC, LECB-CH, LECB-CHA1, LFBB-CH, LFBB-ACH Contact: es-aoc@ivao.aero ; es-aoac@ivao.aero fr-aoc@ivao.aero ; fr-aoac@ivao.aero Object: LoA between the Barcelona FIR (LECB) and the Bordeaux FIR (LFBB) 1. Purpose The purpose of this Letter of Agreement (LoA) is to define the coordination procedures to be applied between the Barcelona FIR and the Bordeaux FIR when providing Air Traffic Services (ATS) operating under IFR or VFR flight rule. The content of the agreement is approved by the concerned ATC Operation Department and FIR Chiefs and its application is mandatory for all IVAO member providing ATS within and active ATC position concerned by this LoA. 2. General procedures Traffic in sequence shall be handed over with minimum spacing of 10 NM. This separation must be constant (aircrafts restrained to the same speed) or increasing (succeeding aircraft is not faster). Coordination of speed control should be granted via entries in radar labels and does neither need approval nor acknowledgement by receiving sector. Traffic shall be handed over as soon as practical and, whenever possible, at latest 3000 ft before reaching the cleared flight level and, in case the transfer point is not defined within this LOA, at latest ten (10) miles before the airspace limits. Traffic in sequence shall be handed over properly separated and clear of any conflict. Unless the receiving ATC unit issue a clearance modifying the route, altitude or speed, the transferring sector remains responsible for separation.

3. ATC units description The ATC unit in charge of FIR and UIR airspaces under the responsibility of Barcelona ACC is Barcelona Control and includes three primary sectors (LECB_XAL_CTR, LECB_VFR_CTR and LECB_LVS_CTR). The LECB_XAL_CTR ATC unit may be split into four subsectors (LRD, RES, XAL, VRN). The LECB_VFR_CTR and LECB_LVS_CTR ATC units are not relevant in the framework of this LoA. The lateral and vertical boundaries of the airspace under the responsibility of the ACC are indicated in the figure and table below. PRIMARY SECTORS SECONDARY SECTORS

The ATC unit in charge of FIR and UIR airspaces under the responsibility of Bordeaux ACC is Bordeaux Control and consists in only one primary sector (LFBB_CTR). This ATC unit may be split into two subsectors (LFBB_W_CTR and LFBB_E_CTR) under the condition that both positions are open and FIR Chiefs are informed. The lateral and vertical boundaries of the airspace under the responsibility of the ACC are indicated in the figure and table below. The radio communication frequencies associated to the ACC positions are indicated below. ATC Position Callsign Frequency Remarks Primary Sectors Barcelona Control (XAL) LECB_XAL_CTR 133.025 SFC-FL460 Secondary Sectors Barcelona Control (RES) LECB_RES_CTR 132.575 SFC-FL460 Barcelona Control (LRD) LECB_LRD_CTR 132.355 SFC-FL460 Primary Sector Bordeaux Control LFBB_CTR 125.100 SFC-UNL ; SFC-FL245 if LFBB_U_CTR is active Secondary Sectors Bordeaux Control (East) LFBB_E_CTR 125.100 SFC-UNL ; SFC-FL245 if LFBB_U_CTR is active Bordeaux Control (West) LFBB_W_CTR 129.100 SFC-UNL ; SFC-FL245 if LFBB_U_CTR is active Bordeaux Control (Upper) LFBB_U_CTR 127.675 FL245-UNL

4. Coordination procedures Coordination procedures between the ATC under the responsibility of the Barcelona FIR and those under the responsibility of the Bordeaux FIR are defined as follows. They represent a general framework that does not replace the coordination between ATC. Any coordination procedure not mentioned in this LoA must be established on a case by case basis. 4.1 En-route coordination Coordination procedures between Barcelona ACC and Bordeaux ACC are defined as follows. Route Transfer point Cleared DCT Restrictions LECB_XAL_CTR LFBB_CTR A29 GIROM ASPET - A34 ANETO ANETO - N608 GIROM GIROM - N861 T113 OKABI OKABI - UN608 GIROM GIROM - UN860 ANETO ANETO - UN861 UQ78 OKABI OKABI - UT113 UN863 GIROM ASPET - LFBB_CTR LECB_XAL_CTR B31 PUMAL PUMAL - B281 GEANT GEANT - UN13 ROCAN IBRAP - UN859 ROCAN PUMAL - UN860 ANETO ANETO - UN862 PERDU BROTO - UN727 ROCAN GEANT -

4.2 Coordination of departures and arrivals Coordination procedures for the departure/arrival traffic management are defined as follows: Barcelona towards Bordeaux Airport SID/STAR Coordination procedures Remarks Departures (LECB LFBB) LEGE GEANT LEBL_APP LFBB_CTR (DCT GEANT FL190) If only LECB_XAL_CTR is active: DCT GEANT FL240 Arrivals (LECB LFBB) LFBO ASPET LECB_XAL_CTR LFBB_CTR (DCT ASPET descending FL150) - Bordeaux towards Barcelona Airport SID/STAR Coordination procedures Remarks Departures (LFBB LECB) LFBO PUMAL LFBB_CTR LECB_XAL_CTR (DCT PUMAL climbing FL260) - Arrivals (LFBB LECB) LEBL PUMAL LFBB_CTR LECB_XAL_CTR (DCT PUMAL FL250) If only LEBL_APP is active: DCT PUMAL FL200