Burlington ATCT Standard Operating Procedures

Similar documents
Cape Area Airports Standard Operating Procedures

Albany ATCT Standard Operating Procedures

Providence ATCT Standard Operating Procedures

Version O January 21, 2019

BOSTON ARTCC (vzbw) STANDARD OPERATING PROCEDURE KALB) ALBANY APPROACH (ALB

Denver ARTCC Colorado Springs ATCT & TRACON STANDARD OPERATING PROCEDURES

RALEIGH-DURHAM ATCT/TRACON STANDARD OPERATING PROCEDURES

ZTL ARTCC. Augusta Regional

- Updated formatting - Re-drawn airspace delegation diagram

ZTL ARTCC. Asheville Regional. Air Traffic Control Tower. Standard Operating Procedures AVL B. Effective: May 1, 2011

Greenville Spartanburg International

RELEASE RECORD. Version Date Author Notes Dec 2006 SK Initial Release

Virtual Jacksonville Air Route Traffic Control Center Tallahassee ATCT Standard Operating Procedures

VIRTUAL AIR TRAFFIC SIMULATION NETWORK UNITED STATES DIVISION. SUBJ: Phoenix (PHX) Air Traffic Control Tower (ATCT) Standard Operating Procedures

Piedmont Triad International Airport

ERIE ATCT STANDARD OPERATING PROCEDURES

VATUSA C90 TRACON AND O HARE ATCT LETTER OF AGREEMENT

Charlotte - Douglas International Airport Traffic Control Tower

VATUSA PHOENIX TRACON and VATUSA PHOENIX ATCT LETTER OF AGREEMENT. SUBJECT: Interfacility Coordination Procedures

VATUSA Approval 3/21/18

San Juan CERAP. Standard Operation Procedures. Version 2.2 May 5th, Welcome to San Juan CERAP (ZSU ARTCC, TJZS FIR)

FLIGHT STRIP MANAGEMENT - APPROACH LEVEL

Letter of Agreement by and between Jacksonville ARTCC and Miami ARTCC

ZTL ARTCC / CLT ATCT LETTER OF AGREEMENT. EFFECTIVE: July 10, SUBJECT: APPROACH CONTROL SERVICE

VIRTUAL AIR TRAFFIC SIMULATION NETWORK NORTH AMERICA REGION - USA DIVISION vzkc KANSAS CITY ARTCC

IVAO Switzerland Division

9/23/2010 RDU B. Raleigh-Durham Air Traffic Control Tower. Standard Operating Procedures

Virtual Jacksonville Air Route Traffic Control Center Daytona Beach ATCT Standard Operating Procedures

HOUSTON AIR ROUTE TRAFFIC CONTROL CENTER VATSIM United States Division. Letter of Agreement. Revised: July 25, 2004 Effective: July 25, 2004

LGB HELICOPTER OPERATIONS

VATUSA-VATNZ-VATPAC OCEANIC PARTNERSHIP OAKLAND OCEANIC FSS GENERAL SOP 1 OCT 2012

Virtual Air Traffic Simulation Network (VATSIM) United States Division Fort Worth vartcc (ZFW)

THE AREA CONTROL CENTRE (CTR) POSITION

Charlotte - Douglas International

Standard Operating Procedures Atlanta Intl Airport (ATL) Air Traffic Control

Cleveland ARTCC and Boston Virtual ARTCC Letter of Agreement

INTERNATIONAL VIRTUAL AVIATION ORGANISATION CANADIAN AIR TRAFFIC CONTROL PHRASEOLOGY ATC OPERATIONS DECEMBER 2016 BY: MATHIEU LAFLAMME

PITTSBURGH ATCT STANDARD OPERATING PROCEDURES

Standard Operational Procedures

AIR TRAFFIC ROUTE CONTROL CENTER

THE TOWER CONTROL POSITION (TWR)

LETTER OF AGREEMENT (LOA)

VATSIM JORDAN vacc QUICK REFERENCE HANDBOOK QUICK REFERENCE - STANDARD FORMATS FOR COMMUNICATION

Standard Operating Procedures

Northern Regional Training Scheme. EGBB Birmingham Airport Pilot s Guide. REVISION 1 (Monday, 30 January 2012)

11/21/2008 ZDC-ZTL LOA Version 1. Letter of Agreement

MILWAUKEE MKE TRACON GEN. MITCHELL INTL AIRPORT (KMKE) MKE TRACON SATELLITE AIRPORTS STANDARD OPERATING PROCEDURES

- Initial. - Added MCRAY and new PDC s. - General update. - Added ATIS frequency - Added gate diagram appendix - Typo fixes - Minor formatting changes

Northern Regional Training Scheme. EGNT Newcastle Aerodrome Pilot s Guide. REVISION 2 (Wednesday, 03 August 2011 at 15:51)

USE OF RADAR IN THE APPROACH CONTROL SERVICE

CHICAGO MIDWAY INTERNATIONAL AIRPORT (KMDW) STANDARD OPERATING PROCEDURES

BOSTON ARTCC (vzbw) TRAINING SYLLABUS LEVEL: Center Controller (C1)

Letter of Agreement. Between Jacksonville ARTCC and Virtual United States Navy Effective Date: Sept 1, 2008

10-February 2019 ZTL JO B VIRTUAL AIR TRAFFIC SIMULATION NETWORK ATLANTA CENTER

RWY 24. Designator Route Remarks. All traffic shall initially climb to 4000FT QNH with climb gradient 3.3% MNM, unless instructed otherwise by ATC.

VATSIM MINNEAPOLIS ARTCC MINNEAPOLIS TRACON LETTER OF AGREEMENT

UNIVERSITY OF ALABAMA FOOTBALL

SECTION 4 - APPROACH CONTROL PROCEDURES

VFR PHRASEOLOGY. The word IMMEDIATELY should only be used when immediate action is required for safety reasons.

Anchorage ARTCC Phraseology Guide. Clearance Delivery Operations

GENERAL INFORMATION The aerodrome consists of three runways (04L-22R, 04R-22L, 12-30) and four aprons.

D01 TERMINAL RADAR APPROACH CONTROL

Standard Operating Procedures (SOPs) for BAGHDAD (ORBI)

SOUTHERN CALIFORNIA TRACON LOS ANGELES AREA STANDARD OPERATING PROCEDURES VIRTUAL AIR TRAFFIC SIMULATION NETWORK LOS ANGELES ARTCC

IFR SEPARATION WITHOUT RADAR

Southern California TRACON and Lindbergh Tower LETTER OF AGREEMENT SUBJECT: INTER-FACILITY COORDINATION AND CONTROL PROCEDURES

ATC Training Syllabus Philippines vacc Version 1.1 September 25, 2016

Boston Consolidated TRACON (A90) Standard Operating Procedures

ATLANTA ARTC CENTER AND CHARLOTTE TOWER LETTER OF AGREEMENT

NATIONAL BUSINESS AVIATION ASSOCIATION (NBAA) CONVENTION

Southern California Terminal Radar Approach Control and Ontario Airport Traffic Control Tower

GENERAL OPERATING PROCEDURES FINLAND(GOP)

In order to start practical Tower controller training at Oslo Gardermoen, a student must meet the following requirements:

LETTER OF AGREEMENT. Between

This section sets forth all Los Angeles World Airports (LAWA) noise abatement procedures, restrictions, and regulations involving aircraft operations.

PILOT BRIEFING GENEVA RFE 2018

LFPG / Paris-Charles de Gaulle / CDG

SOUTHERN CALIFORNIA TRACON BURBANK AREA STANDARD OPERATING PROCEDURES VIRTUAL AIR TRAFFIC SIMULATION NETWORK LOS ANGELES ARTCC

Albuquerque Center Standard Operating Procedures

ATMM. Air Traffic Management Manual. Air Traffic Management Manual VACC AUSTRIA LOVV ATMM Air Traffic Management Manual

STANDARD OPERATING PROCEDURES (CLE SOP) December 3, 2016

AERODROME CONTROLLER (ADC) EXAM BRIEFING GUIDE AND EXAM STANDARDS

Instrument Refresher Course. Airfield Operations Flight Tower 412 OSS/OSAT

Jacksonville ARTCC. F11 TRACON Standard Operating Procedures

LETTER OF AGREEMENT BETWEEN DENMARK FIR AND SWEDEN FIR. VATSIM Scandinavia 4 April 2013

EFFECTIVE NOTAM KGON 10/06 SPECIAL FLIGHT PROCEDURES GROTON, CT

MINIMUM FLIGHT ALTITUDES

Virtual Jacksonville Air Route Traffic Control Center Orlando International ATCT Standard Operating Procedures

1.2 An Approach Control Unit Shall Provide the following services: c) Alerting Service and assistance to organizations involved in SAR Actions;

CHICAGO TRACON (C90) O HARE INTERNATIONAL AIRPORT MIDWAY INTERNATIONAL AIRPORT SATELLITE AIRFIELDS STANDARD OPERATING PROCEDURES

KBLI MEDIUM. Bellingham Intl Airport Bellingham, Washington, United States. Diagram #1: All Runways. NOISE ABATEMENT PROCEDURES by Whispertrack

VFR Arrival and Departure Procedures Rocky Mountain Airshow 2012 Rocky Mountain Metropolitan Airport (KBJC)

Teterboro Airport Overview

INSTRUMENT RATING (SENIOR PRIVATE PILOT) UK FLIGHT TEST STANDARDS

Holland-America Line Pilot Briefing. December 14, bvartcc.com

ZDC ORDER G ZDC ARTCC ORDER TRAINING POLICIES AND PROCEDURES

Pilot Briefing Document Cross The Pond 2013 Heathrow Airport EGLL/LHR

PLAN Anoka County - Blaine Airport

40 BEALEAFBI OCTOBER Chapter 8 RQ-4 OPERATIONS

Section 5. Radar Separation

Transcription:

This air traffic control procedural document is provided for virtual air traffic control in the ZBW ARTCC of the VATSIM network only. It is not for real-world ATC use. These procedures are approved for use as defined by the Boston Virtual ARTCC Administration Team only. For more information about Boston Virtual ARTCC, visit www.bvartcc.com. Burlington ATCT Standard Operating Procedures Version F January 21, 2019 bvartcc.com /BVARTCC @BVARTCC

Version Log & Changes from Previous Version Changes from the previous three versions are listed at the top of every SOP. Changes within the document are emphasized with a vertical blackline beside changed text. Version F January 21, 2019 Adds Opposite Direction Operations procedures Page 6 Version E September 30, 2016 Updates document formatting All Version D June 3, 2016 Multiple modifications to better reflect real-world procedures Multiple Using this Document The information contained in Chapter 1 is knowledge material that all controllers should be familiar with. The other information in this SOP is designed as additional resource material for controllers who wish to apply extra realism within this airspace. It is not required knowledge for practical exams or on-network controlling, as the OTS Exam Evaluation Standards still act as the primary reference document for practical exams. Controllers are encouraged to review the additional resource material in Chapter 2 onward at their leisure and apply it at their discretion. BVA Burlington ATCT Standard Operating Procedures Page 1

Chapter 1: Overview 1.1 Quick Reference Sheets a. BTV_DEL (119.150) Initial Altitude for IFR Aircraft: 10,000 Departure Procedures: BTV#, radar vectors to (FIX) b. BTV_GND (126.30) Taxi Routes: Refer to Appendix 1 c. BTV_TWR (118.30) Airspace: 4nm from KBTV from surface to 2,000 MSL. Calm Wind Configuration: None. ATIS: Digital. Departure Headings: Runway Departures Missed Approach 15/9 150, 170, or 190 Coordinate with APP. If unable to coordinate, 1/33 330, 350, or 010 Runway Heading, 3000. 1.2 General a. This document outlines the air traffic control procedures and responsibilities for controllers working positions at BTV ATCT. b. The following callsigns and frequencies shall be used when working positions at BTV ATCT: Identifier Position Frequency VOX Channel BTV_DEL Clearance Delivery 119.15 BTV_119.150 BTV_GND Ground Control 126.30 BTV_126.300 BTV_TWR Local Control 118.30 BTV_118.300 BTV_E_APP Approach (East Radar) 121.10 BTV_121.100 BTV_W_APP Approach (West Radar) 119.20 BTV_119.200 KBTV_ATIS ATIS 123.80 BTV_123.800 c. Except when split, BTV APP shall use frequency 121.10. BVA Burlington ATCT Standard Operating Procedures Page 2

Chapter 2: Clearance Delivery a. Altitude Assignments: 1. The BTV# SID is the primary SID from BTV. This procedure shall be assigned by DEL to all aircraft not inserted into the flight plan. 2. Aircraft unable the BTV# SID shall be cleared via radar vectors (first fix) as there are no heading assignments listed on the BTV# SID. 3. IFR departures shall be assigned an initial altitude of 10,000. Departures shall expect their final cruise altitude 10 minutes after departure. 4. Special VFR departures shall be instructed to maintain SVFR at or below 2,000 Chapter 3: Ground Control a. Taxiway and Run-up Restrictions: 1. As much as possible, assign departure runways consistent with direction of flight to avoid crossing traffic. 2. Refer to Appendix 1 for preferred taxi routes. 3. Ground control does not have control/jurisdiction of movement while aircraft are on the ramp areas. 4. The east side of the airport (Taxiways D, E, F, and N) are closed to civilian aircraft. If an aircraft spawns and requests taxi from the east side of the airport, issue taxi instructions to the west side of the airport, then to the departure runway. 5. The air carrier ramp is restricted to airline operations only; charter and private flights must use the FBO. 6. Taxiway A between G and C is closed to aircraft with wingspans of 118 or greater. 7. Taxiway L is restricted to aircraft weighing less than 60,000 lbs. BVA Burlington ATCT Standard Operating Procedures Page 3

LAHSO Distance: 3,600 LAHSO Distance: 2,600 LAHSO Distance: 2,900 Heritage Aviation Hangars Heritage Aviation FBO BVA Burlington ATCT Standard Operating Procedures Page 4

Chapter 4: Local Control a. BTV_TWR is authorized to provide Class C services within the area extending 4nm from KBTV, upwards from the surface to 2,000 feet. b. BTV_TWR has control of arrivals either at the final approach fix or 7 miles from the airport, whichever is closer. c. Releases 1. Blanket releases are authorized for all aircraft assigned an appropriate heading and departing the active runway pair (15/19 or 01/33). 2. SVFR aircraft require a release. Once released, blanket releases are suspended until re-authorized by the departure controller. d. Runway selection: 1. There is no calm wind runway configuration utilized by the ATCT. Surface winds, departures, and approach minima shall be the primary criteria for runway selection. TWR and DEP/APP should coordinate to determine which configuration allows for the most efficient use of airspace. 2. Opposite direction operations or simultaneous use of crossing runways is not approved unless a particular aircraft has an operational necessity for the inactive runway. e. Runway changes: 1. Coordinate with all affected BTV positions when weather forces a runway change to determine the optimal runway(s) to open. f. Departure heading: 1. TWR shall assign one of the following headings, or runway heading, predicated on the first fix beyond Burlington airspace: Runway Departures 15 or 19 150, 170, or 190 1 or 33 330, 350, or 010 2. VFR traffic that will leave the traffic pattern shall be assigned runway heading. BVA Burlington ATCT Standard Operating Procedures Page 5

g. VFR pattern traffic shall operate at or below 2,000 MSL unless otherwise coordinated. For turbojet aircraft, the preference is for aircraft to fly patterns on the east side of the airport for noise abatement. h. In addition to the standard conditions affecting Line up and Wait (LUAW), the following additional restrictions apply at BTV: 1. Do not authorize LUAW at night from any position. 2. Do not authorize LUAW from any intersection. 3. Do not authorize simultaneous LUAW on Runway 19 and Runway 15. 4. When an aircraft is authorized to LUAW, inform it of the closest traffic requesting a full-stop, touch-and-go, stop-and-go, option or unrestricted low approach to the same runway. i. Multiple runway crossings are authorized between the intersections of A and E. j. Opposite Direction Operations (ODO): 1. The cutoff point for ODO is: (a) 5 flying miles from the threshold of the runway of intended landing, or (b) If an aircraft is established in the traffic pattern, prior to that aircraft turning base leg. BVA Burlington ATCT Standard Operating Procedures Page 6

Chapter 5: Radar a. Frequency: b. Airspace: 1. When all positions are consolidated: (a) APP will use frequency 121.10, with a voice channel of BTV_121.10. 2. The following splits can be staffed: (a) East Radar (BTV_E_APP), with a voice channel of BTV_121.100. (b) West Radar (BTV_W_APP), with a voice channel of BTV_119.200. 1. Burlington Approach Airspace extends upwards to 10,000' except as defined in any LOA. 2. When split, the border between Approach controllers is along the lake, as shown in Appendix 2. c. Departure Control: d. Arrivals: 1. All IFR departures from BTV will be assigned one of the pre-coordinated headings, or runway heading, and a climb to to 10,000. 2. Departing aircraft shall be cleared on to their filed routing as soon as practicable. Turbojet and large turboprop aircraft departing Runway 33 should not be issued a left turn until reaching 2,000. 3. Initiate an automated handoff to the appropriate ZBW sector upon the departure being cleared on course and ensured free of traffic conflicts. 4. Issue transfer of radio communications to the appropriate ZBW sector upon passing 6,000'-7,000, or within 10NM of the airspace boundary, as appropriate. 1. Turbojet and large turboprop aircraft being vectored for left traffic to Runway 15 shall be instructed to maintain 2,000 until turning final. 2. Transfer of communication to BTV_TWR shall occur no more than 13 and no less than 7 flying miles from the landing runway. BVA Burlington ATCT Standard Operating Procedures Page 7

3. When the ILS Runway 33 approach is in use and the airport is IFR, transfer of communications shall occur prior to EHIKO. e. Cold Weather Operations 1. When the temperature is -20 C or colder, the minimum altitude that may be assigned in the 5400 MVA area is 6000. f. Intrafacility Coordination: 1. Traffic landing RWY15 should be handed off to BTV_W_APP at the appropriate time and altitude for final vectoring. Traffic landing all other runways shall be handed off to BTV_E_APP at an appropriate time. BVA Burlington ATCT Standard Operating Procedures Page 8

Chapter 6: Interfacility Coordination a. BTV ATCT and ZBW ARTCC: 1. Control on contact: (a) BTV for turns up to 90 degrees once the aircraft is below FL190, and for descent to 7,000 for all arrivals within 10nm of the airspace boundary. (b) ZBW for turns up to 30 degrees when the aircraft leaves 6,000. 2. BTV to ZBW: (a) Clear all departures on course and issue a climb to 10,000' before transferring communications to ZBW. (b) Ensure that aircraft on the same route are handed off to Center with no less than 10 nm in-trail spacing. 3. ZBW to BTV: (a) Clear BTV arrivals via direct the BTV VOR or the airport. (b) Transfer of arrivals: (1) Turbojet aircraft must be at or descending to 11,000. (2) Non-turbojet aircraft must be handed off level at 7,000, 8,000 or 9,000. If the aircraft is higher than 9,000, then it must be descending to 9,000. BVA Burlington ATCT Standard Operating Procedures Page 9

Chapter 7: Appendices 7.1 Preferred Taxi Routes BVA Burlington ATCT Standard Operating Procedures Page 10

7.2 TRACON with East/West Split BVA Burlington ATCT Standard Operating Procedures Page 11