Environmental Assessment and Final Section 4(f)

Similar documents
Arlington County Board Work Session Eastbound Widening January 17, Amanda Baxter, VDOT Special Projects Development Manager

FHWA P/N Guidelines. Corridor Relationship. Highway 22 Segment 1 - US 169 to CSAH 2 Relevance / Documentation of Need

Section 106 Update Memo #1 Attachment D. Traffic Diversion & APE Expansion Methodology & Maps

1.2 Corridor History and Current Characteristics

Fairfax County Transportation Advisory Commission (TAC)

Section 4(f) and Section 6(f) Technical Analysis

PURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40

A. From I-68 in Monongalia County, West Virginia to SR 6119 in Fayette County, Pennsylvania 1

5.1 Traffic and Transportation

FINAL. Bicycle/Pedestrian Feasibility Study City of DeBary Dirksen Drive Trail. Prepared For: Volusia County MPO

Interstate 90 and Mercer Island Mobility Study APRIL Commissioned by. Prepared by

PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor

City of Madison, Buckeye Road Monona Drive to Stoughton Road County AB Dane County Public Involvement Meeting

TABLE OF CONTENTS. Coral Springs Charter High School and Middle School Job No Page 2

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT

DULLES AREA HIGHLIGHTS. Gary Garczynski Commonwealth Transportation Board Northern Virginia District. Committee for Dulles August 4, 2016

Business Item No XXX. Proposed Action That the Metropolitan Council approve the Coon Creek Regional Trail Master Plan.

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications

St. Croix River Crossing Project Memorandum of Understanding For the Implementation of Riverway Mitigation Items

Summary of Transportation Development Credits (TDCs) Dallas-Fort Worth Metropolitan Planning Organization (MPO) (As of September 30, 2017)

Current Corridor Characteristics

PUBLIC INFORMATION SESSION #2

4.19 Parks, Recreation, and Conservation Lands

Lake Erie Commerce Center Traffic Analysis

FEDERAL HIGHWAY ADMINISTRATION NEVADA DEPARTMENT OF TRANSPORTATION ENVIRONMENTAL IMPACT STATEMENT RE-EVALUATION

RW Bruhn Bridge and Approaches Project

EXECUTIVE SUMMARY FALL Introduction. Findings

DISTRICT EXPRESS LANES ANNUAL REPORT FISCAL YEAR 2017 JULY 1, 2016 JUNE 30, FloridaExpressLanes.com

SECTION 106 ACTIVITIES ANNUAL REPORT

TRANSPORTATION SYSTEM PERFORMANCE INDICATORS

HAMPTON ROADS CROSSINGS PATRIOTS CROSSING AND HRBT

Construction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013

Fairfax County Parkway Widening Fairfax County

Rappahannock-Rapidan Regional Commission 2010 Travel Time Survey

Trail Feasibility Study

Lawrence Loop SWOT Analysis

This section of the Plan provides a general overview of the Smoky Mountain Region. It consists of the following four subsections:

5.4 SECONDARY (INDUCED) IMPACTS

Decision Memo Ice Age Trail Improvement (CRAC 37)

I-94 East Corridor Performance

FEASIBILITY CRITERIA

White Mountain National Forest Saco Ranger District

SECTION 106 ACTIVITIES ANNUAL REPORT

Committee Report. Community Development Committee For the Metropolitan Council meeting of August 12, Business Item No.

Memorandum. Roger Millar, Secretary of Transportation. Date: April 5, Interstate 90 Operations and Mercer Island Mobility

Appendix 4.8 A. Agency Correspondence and Final APE Statement

2008 DEKALB COUNTY TRANSPORTATION PLAN (UPDATE)

Chapter Seven REFERENCES

THREE MILE PLAN TOWN OF SUPERIOR COLORADO

Chapter 2: Entire US287 Corridor

Section 3.6. Parklands & Recreation Areas

Committee Report. Community Development Committee For the Metropolitan Council meeting of April 13, Business Item No.

SAM S CLUB PLAZA 315/335 SW PINE ISLAND RD CAPE CORAL, FL 33991

Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd

1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan

Project Overview. Hunter Mill Road Over Colvin Run Bridge Replacement Fairfax County. Get Involved. Public Information Meeting. Contact Information

Steven Bauer, Policy Advisory Committee Chairperson, Presiding

10/25/2013. What is the SCORP?! 2013 Local Government Survey 2013 Statewide Public Survey Advisory Group Priority Areas Your Suggestions!

Overview of Highway 37 Project. Napa County Board of Supervisors December 20, 2016

MASTER PLAN UPDATE GRANT NUMBER

Establishing a National Urban Park in the Rouge Valley

Part Three : COMMUNITY PLAN AREAS AND SPECIAL STUDY AREAS SACRAMENTO 2030 GENERAL PLAN. Introduction

Freeway Volume-Crash Summary

A CASE FOR COMPLETING THE JORDAN RIVER PARKWAY: A

TRAFALGAR PARK. 78: p.140 W 99th St FLAT ROCK CREEK PARK. W 103rd St OVERLAND PARK. Quivira Rd. College Blvd. Shared use path. Mountain bike trail

Airport Planning Area

Overview of Highway 37 Project. Novato Rotary November 4, 2016

CHAPTER FOUR: TRANSPORTATION

INTERSTATE 395 EXPRESS LANES NORTHERN EXTENSION TRAFFIC & TRANSPORTATION TECHNICAL REPORT SEPTEMBER 2016

Madison Metro Transit System

Northaven Trail Phase 2 Initial Project Overview

Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012

Business Growth (as of mid 2002)

A63 Castle Street, Hull HullBID Network Lunch 24 August 2017

Table of Contents. Overview Objectives Key Issues Process...1-3

FFY Development. Transportation Improvement Program (TIP) March 11, 2016 Cape Cod Joint Transportation Committee

Basic Project Information

RUSHMORE CONNECTOR TRAIL PROPOSAL

APPENDIX H MILESTONE 2 TRAFFIC OPERATIONS ANALYSIS OF THE AT-GRADE CROSSINGS

Cell: (408) Release MA June 25, 2012

PREFACE. Service frequency; Hours of service; Service coverage; Passenger loading; Reliability, and Transit vs. auto travel time.

DENISON STREET EXTENSION. Transportation Committee. January 14, Feasibility Study

2. Goals and Policies. The following are the adopted Parks and Trails Goals for Stillwater Township:

Memorandum. Fund Allocation Fund Programming Policy/Legislation Plan/Study Capital Project Oversight/Delivery Budget/Finance Contract/Agreement Other:

Becker County Trail Routing Feasibility Study

Agenda Report. Spruce Street Outlet Drainage Improvements Tower Road Relief Sewer

Economic Impact. Airports and economic development. Airport location. Regional profile. Middleton Municipal Morey Field (C29) 2008 Middleton, WI

7272 WISCONSIN AVENUE LOCAL AREA TRANSPORTATION REVIEW

CUY LAKE TO LAKES TRAIL (PHASE 2): PID

Leasing Brochure. Park Plaza Shopping Center 1150 N. Federal Highway, Pompano Beach, Florida Under Construction - Coming Very Soon

I-15 CORRIDOR ALTERNATE ROUTE STUDY

DRAFT Service Implementation Plan

FY Regional Transportation Improvement Program Basic Project List (All Values in Thousands of Dollars) All costs in current dollars

Public Notice ISSUED: December 10, 2018 EXPIRES: January 9, 2019

Non-motorized Trail Plan & Proposal. August 8, 2014

DOGWOOD AT VILLA AVENUE PROJECT

FY Transportation Improvement Program Basic Project List (in Thousands)

A COMPARISON OF THE MILWAUKEE METROPOLITAN AREA TO ITS PEERS

SCOPING INFORMATION PACKET

Austin-Bergstrom International Airport Master Plan Update

Transcription:

Environmental Assessment and Final Section 4(f) South Pleasant View Road, City of Madison County Highway M Reconstruction Cross Country Road to Prairie Hill Road Project ID 5992-09-81 September 16, 2016

This page is intentionally left blank.

BASIC SHEETS 1. Table of Contents Basic Sheet 1... 1:1 Basic Sheet 2... 2:1 Basic Sheet 3 Coordination... 3:1 Basic Sheet 4 Environmental Factors Matrix... 4:1 Basic Sheet 5 Alternatives Comparison Matrix (South)... 5:1 Basic Sheet 5 Alternatives Comparison Matrix (North)... 5:2 Basic Sheet 6 Traffic Summary Matrix (South)... 6:1 Basic Sheet 6 Traffic Summary Matrix (North)... 6:2 Basic Sheet 7 EIS Significance Criteria... 7:1 Basic Sheet 8 Environmental Commitments... 8:1 FACTOR SHEETS Factor Sheet A-1... A-1:1 Factor Sheet A-3... A-3:1 Factor Sheet B-1: City of Madison... B-1:1 Factor Sheet B-1: City of Verona... B-1:7 Factor Sheet B-1: Town of Verona... B-1:11 Factor Sheet B-1: Town of Middleton... B-1:16 Factor Sheet B-5... B-5:1 Factor Sheet B-8: University Ridge Golf Course... B-8:1 Factor Sheet B-8: Dane County Parkland... B-8:5 Factor Sheet B-8: Ice Age National Scenic Trail... B-8:9 Factor Sheet B-8: Schroeder-Stickelberg-Thompson Farmstead... B-8:14 Factor Sheet B-8: Hawks Landing Golf Course... B-8:17 Factor Sheet B-8: Temporary Occupancy Ice Age Junction Path... B-8:20 Factor Sheet B-8: Temporary Occupancy City of Verona Unnamed Path... B-8:24 Factor Sheet B-9... B-9:1 Factor Sheet C-1... C-1:1 Factor Sheet C-2... C-2:1 Factor Sheet C-3... C-3:1 Factor Sheet D-1... D-1:1 Factor Sheet D-2... D-2:1 Factor Sheet D-3... D-3:1 Factor Sheet D-4... D-4:1 Factor Sheet D-5... D-5:1 Factor Sheet D-6... D-6:1 Project ID# 5992-09-81 Page i

This page is intentionally left blank.

List of Figures Figure 1 - Project Location... 2:2 Figure 2 - County M Transportation Improvement Program (TIP) Approved Construction Projects... 2:3 Figure 3-2006 Congestion Levels, Madison Area, Dane County... 2:4 Figure 4 - North/South Connector Routes... 2:9 Figure 5 - Madison Metro Transit Weekday Service and Supplemental School Day Service Maps... 2:10 Figure 6 - Corridor Phases... 2:15 Figure 7 - Preferred Alternative, South Phase... 2:16 Figure 8 - Preferred Alternative, North Phase... 2:17 Figure 9 - Access Changes... 2:19 Figure 10 Area Trails and Multi-Use Paths... 2:22 Figure 11 Option A-2: Signalized Intersection... 2:24 Figure 12 Option A-3: Continuous Flow Intersection... 2:25 Figure 13 Option A-4.1: Northeast Jug-Handle Intersection... 2:26 Figure 14 - Option A-4.3: Southeast Jug-Handle Intersection... 2:27 Figure 15 - Option A-4.4 Southwest Jug Handle... 2:29 Figure 16 - Option A-5: Multi-Lane Roundabout... 2:31 Figure 17 - Option A-6: Tight Diamond... 2:33 Figure 18 - Option A-7: Westbound Underpass... 2:35 Figure 19 - Option B-2: Continuous Flow Intersection... 2:38 Figure 20 - Option B-3: Roundabout... 2:39 Figure 21 - Option B-4: At-Grade Signalized Intersection... 2:41 Figure 22 - Typical Section Location Overview... 2:44 Figure 23 Typical Sections (South and North Phases)... 2:45 Figure 24 - Current Land Use: Madison Area January 2005... 2:51 Figure 25 - Neighborhood Plans Adjacent to County M Project Area... 2:53 Figure 26 - Municipalities in the Project Area... B-1:1 Figure 27 - Environmental Constraints Map... B-1:6 Figure 28 - Ice Age Junction Path Impacts - At Flagstone Drive... B-8:22 Figure 29 - Ice Age Junction Path Impacts - At Raymond Road... B-8:22 Figure 30 - Unnamed Path Impacts... B-8:25 List of Tables Table A - Current and Projected Traffic Counts, County M Project Corridor... 2:4 Table B - Signalized At-Grade Intersection Level of Service... 2:6 Table C - Crash Rates 2009-2013, County M Project Section and Statewide Average for County Trunk Highways... 2:7 Table D - Population, Households and Race (2010 Census)... 2:57 Table H - Household Income (2010 Census)... 2:58 Table F - Economic Characteristics for Dane County... A-1:1 Table G - University of Wisconsin Property Uses... B-8:2 Project ID# 5992-09-81 Page ii

This page is intentionally left blank.

List of Exhibits Exhibit 1 Exhibit 2 Exhibit 3 Exhibit 4 Exhibit 5 Exhibit 6 Exhibit 7 Exhibit 8 Exhibit 9 Exhibit 10 Exhibit 11 Exhibit 12 Exhibit 13 Project Location Overview Traffic Forecast Report 2006 Congestion Levels, Madison Area, Dane County Madison Area Bus Routes Weekday Map Right of Way Cross Country Road to Flagstone Drive and Right of Way Flagstone Drive Prairie Hill Road Current Land Use: Madison Area Pioneer Neighborhood Development Plan with University Research Park City of Madison Midtown Neighborhood Development Plan City of Madison High Point Raymond Neighborhood Development Plan City of Madison North Neighborhood Plan City of Verona Section 4(f) Properties Right of way Map 11B University Ridge Golf Course 11C Dane County Parkland 11D Ice Age National Scenic Trail 11E Schroeder-Stickelberg-Thompson Farmstead 11F Hawk s Landing Golf Course Delineated Wetlands Map Badger Mill Creek Subwatersheds Project ID# 5992-09-81 Page iii

This page is intentionally left blank.

List of Attachments Attachment A Attachment B Attachment C Attachment D Attachment E Attachment F Attachment G Attachment H Attachment I Attachment J Attachment K Attachment L Attachment M Attachment N Attachment O Attachment P Attachment Q Attachment R Attachment S Attachment T Attachment U Attachment V Conceptual Stage Relocation Plan Other Agency Coordination Department of Agriculture, Trade, and Consumer Protection Dane County Sheriff s Office US Forest Service Region 9 Wisconsin Department of Natural Resources (WDNR) Coordination Section 106 Coordination Project Initiation Letters Documentation for Consultation US Army Corp of Engineers (COE) Coordination Natural Resource Conservation Service (NRCS) Coordination Fish & Wildlife Service (FWS) Coordination American Indian Tribes Coordination Indirect Effects Prescreening Cumulative Effects Analysis Determination of Eligibility Form Schroeder Stickelberg Thompson Farmstead Determination of Eligibility Form Gordon School Great Lakes Archaeological Research Center Coordination Preliminary Construction Cost Estimate Memorandum of Agreement Agricultural Impact Notice Schroeder-Stickelberg-Thompson Farmstead Correspondence Section 4(f) Documentation University Ridge Golf Course Dane County Parks Ice Age National Scenic Trail Temporary Occupancy: Ice Age National Scenic Trail Temporary Occupancy: Unnamed Path Section 4(f) Evaluation Air Quality Methodology and Analysis Documentation Noise Receptor Documentation Project ID# 5992-09-81 Page iv

This page is intentionally left blank.

2. Abbreviation List AADT Average Annual Daily Traffic MVM Millions of Vehicle Miles ADA Americans with Disabilities NDP Neighborhood Development Plans AIN Agricultural Impact Notice NHS National Highway System CFI Continuous Flow Intersection NLEB Northern Long-eared Bat COE United States Army Corps of Engineers NPS National Park Service CTH County Highway NRCS National Resource Conservation Service DATCP Department of Agriculture, Trade and Consumer Protection DOE DPW EA ECIP ERP FDM FHWA Determination of Eligibility Department of Public Works Environmental Assessment Erosion Control Implementation Plan Environmental Repair Program Wisconsin Department of Transportation Facilities Development Manual United States Department of Transportation Federal Highway Administration FONSI Finding of No Significant Impact FWS HCM IANST IATA United States Fish and Wildlife Service Highway Capacity Manual Ice Age National Scenic Trail Ice Age Trail Alliance LRTCP Long-Range Transportation Planning Committee NRHP OWJ PASER PIM PLE SHPO STIP STP-U TSS TLE TIP UW WDNR WisDOT WISLR National Register of Historic Places Official with Jurisdiction Pavement Surface Evaluation and Rating Public Information Meetings Permanent Limited Easement State Historic Preservation Office State Transportation Improvement Program Surface Transportation Program Urban Total Suspended Solids Temporary Limited Easement Transportation Improvement Program University of Wisconsin Wisconsin Department of Natural Resources Wisconsin Department of Transportation Wisconsin Local Roads LOS LWCF Level of Service Land and Water Conservation Fund MAP-21 Moving Ahead for Progress in the 21 st Century Act MEV Million Entering Vehicles MMSD Madison Metropolitan Sewer District MOA MPO MPH MSA Memorandum of Agreement Metropolitan Planning Organization Miles per Hour Metropolitan Statistical Area Project ID# 5992-09-81 Page v

This page is intentionally left blank.