D R A F T. December 6, 2016

Similar documents
Northern Branch Corridor DEIS December Appendix B: Site Plans of Project Elements

PROJECT: Gold House 819 Cerrito Street

ballfields 5-8 red hook park

HEFT/I-75 INTERCHANGE ROADWAY PLAN HEFT WB Feet WETLAND IW95 POND MD6-3 POND MD6-2 PROP. L/A R/W LINE CS MD-6

RECURRENT FLIGHT SCHOOL SECURITY AWARENESS (FSSA) TRAINING

ELLICOTT STATION- BATAVIA, NY

BICYCLE AND PEDESTRIAN IMPROVEMENTS DOBBIN ROAD/ MCGAW ROAD


BUILDING / RESTROOMS WALKING LOOP SIGNALIZED AT- GRADE CROSSING

Avonmouth, BRISTOL. Design AND build opportunities for up to 1.1 MILLION sq ft in an outstanding strategic location

PICNIC AREA PLAY AREA. Wirth/ Victory Memorial Parkway Regional Trail. Zenith Ave N

Warehouse District/Hennepin Ave. Rosedale Transit Center. Nicollet Mall. Government Plaza. 3rd St. U.S. Bank Stadium. Stadium Village Prospect Park

25 th Avenue Grade Separation. September 13, 2017

COASTAL CONSERVANCY. Staff Recommendation September 22, 2011 BAY AREA RIDGE TRAIL: HOOD MOUNTAIN TO HIGHWAY 12

CITY COUNCIL AGENDA MEMORANDUM

UNDER NEW OWNERSHIP AND MANAGEMENT

FINAL. Bicycle/Pedestrian Feasibility Study City of DeBary Dirksen Drive Trail. Prepared For: Volusia County MPO

Welcome to Sage Hill Corner

Madison Metro Transit System

Hospital Link Project Project Update Winter 2018

FDOT Treasure Coast Traffic Report through

2018 Cub Scout Day Camp Parents Guide Passport to Adventure

25 th Avenue Grade Separation. December 13, 2017

Exit 148 (Quantico) to Exit 133 (Route 17/Fredericksburg)

Prairie Village Parks and Recreation Master Plan Individual Park Plans and Details

WHY ARE YOU HERE? To provide feedback on the Area Redevelopment Plan.

2017 Chinese Youth Camp The University of Texas at Austin Austin, Texas Sunday, July 23 Saturday, July 29 Sunday, July 23 is the FIRST DAY of Camp!

VICINITY MAP END PROJECT BEGIN PROJECT Middle Fork Campground Middle. Lake. Moolock. Fork. Trailhead. Lake Nadeau SMC.

LOST HILLS ROAD INTERCHANGE PROJECT CONSTRUCTION UPDATE. CALABASAS CITY COUNCIL April 26, 2017

City of Madison, Buckeye Road Monona Drive to Stoughton Road County AB Dane County Public Involvement Meeting

Transportation TRANSPORTATION PROJECTS

9975 S. EASTERN AVE For Lease: HENDERSON EAST GREEN VALLEY. Highly Visible Retail Center at ANTHEM

Mason Street Bike/Pedestrian Trail Project

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT June 12 June 18, 2016

A UNIQUE PRE-LETTING OPPORTUNITY

FOR LEASE 5431 H Street Sacramento, CA

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016

New Jersey Department of Transportation

RESORT AREA STRATEGIC ACTION PLAN (RASAP) STEERING COMMITTEE MEETING - APRIL 3, 2019

RELEASE: IMMEDIATE September 14, 2012 CONTACT: Sandy Myers (office) STA (cell)

SAN RAFAEL City Council January 20, 2015

Exit 148 (Quantico) to Exit 133 (Route 17/Falmouth)

Georgetown-Lewes Rail/Trail Study. Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No.

College of Lake County West Washington Street Grayslake, Illinois 60030

CAMPUS OAKS TOWN CENTER

0.86 AC of Freeway Visible Retail Land Available For Ground Lease or BTS

Backpack. Travel Gear for the Avid Golfer. Limited One-Year Warranty

As the Toronto Transit Commission (TTC) operates a transit service on Bay Street, City Council approval of this report is required.

LAKE MOUNTAIN PRELIMINARY

Public Workshop Preliminary Plans Review. Projects PW 1605, 1701, & 1702

AGENCY NAME TRANSPORTATION

COPTHALL AND MILL HILL OPEN SPACES MASTERPLAN

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015

Action Recommendation: Budget Impact:

FHWA Actions on Past Interstate Requests that were approved by the USRN were presented and conditions were lifted. FHWA Approval Date

April 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014

ADVANCED WARNING SYSTEM FOR SHARED USE CROSSING ON HOWARD STREET EAST OF NORDICA AVENUE

Datum on benchmarks All benchmarks with a Township name and number are on 1929 datum:. All benchmarks with a four-digit number are on 1988 datum:

2. RESOLUTION TO CLOSE MEETING

LANCASTER CORRIDOR REDEVELOPMENT ROSEDALE STREET REDESIGN PEACH STREET RAILROAD CROSSINGS

BID FORM. Bid by: Name of Bidder. Address: Address: To the Texas Department of Transportation hereinafter called the Agent.

TRAIL ANNUAL REPORT

Memorandum / Letter of Intent

November 21, 2012 Barbara Kelleher, (954)

THREE MILE PLAN TOWN OF SUPERIOR COLORADO

ATTACHMENT C CITY OF FEDERAL WAY 2018 ASPHALT OVERLAY PROJECT BID SCHEDULE

SAN RAFAEL CITY COUNCIL AGENDA REPORT

Non-Motorized Transportation

UP TO 13,854 SQ FT (1,287 SQ M) OF GRADE A OFFICE SPACE AVAILABLE

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

Area Surrounding Maplewood Manor

Crystal City Station Improvements. Project Overview. Table 2: North Entrance. Table 1: South Entrance. 20th St. S 18th St. S.

RUNWAY OPERATIONS: Computing Runway Arrival Capacity

Kansas Department of Transportation DISTRICT TE / TA-T043(301) Project(s): Min: Max:

AVAILABLE FOR SALE ENTITLED 53,228 SF BUILDING FOR SALE Washington Dr., Fontana. Property Features:

Section 3-04 Cross Sectional Elements TABLE OF CONTENTS. INTRODUCTION...3 General...3 Exhibit 1-Cross-Sectional Elements...3

BALLAS METROBUS CENTER

1133 W. MORSE BLVD, WINTER PARK, FL OFFICE / MEDICAL SPACE FOR LEASE

Carport Syste. Carport System. Formsteel Industries. Innovative. building. systems

Waterloo Court 31 WATERLOO ROAD, WOLVERHAMPTON WV1 4DJ

ADA Checklist for Emergency Shelters

Birthplace of the Oil Industry Trail Town Crawford County, Pennsylvania. for the Titusville Redevelopment Authority.

Fuller Road/Fuller Heights Road Improvements

EXCITING DEVELOPMENT/ OWNER-OCCUPIER OPPORTUNITY IN THE HEART OF KENTISH TOWN. THE SHED Kentish Town NW5

Exit 136 (Centreport Parkway/Stafford County) to Exit 130 (Route 3/Fredericksburg)

October 31, 2014 Chuck McGinness, (954)

Community Development

Wichita Falls MPO - MTP Project List 1 of 6

PRESENTED TO Town of Middlebury, VT. PRESENTED BY VTrans, VHB, Fitzgerald & Halliday, Inc., and Kubricky Construction

TRAFALGAR PARK. 78: p.140 W 99th St FLAT ROCK CREEK PARK. W 103rd St OVERLAND PARK. Quivira Rd. College Blvd. Shared use path. Mountain bike trail

22-23 Pavement Marking Items. (Pages 7 & 8 removed)

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

3. COLTA / HUGA CONNECTIONS - PRELIMINARY

Capital Improvement Plan

OUR EXISTING PARK SYSTEM

Montgomery Citizens Advisory Committee Meeting Minutes

DELIVERED GREENFIELD PARKWAY Garner, North Carolina 1001 GREENFIELD NORTH CONTACT:

ADDENDUM NO. TWO AB

Construction Staging Area Blue Jays Way (357 King Street West)

URBAN AND LANDSCAPE DESIGN - PRELIMINARY CONCEPT COBHAM DRIVE CYCLEWAY - MARCH 2017

Transcription:

D R A F T December 6, 2016 Mr. Gregory C. Johnson, P.E. Office of the Administrator Mail Stop C-400 State Highway Administration P.O. Box 717 Baltimore MD 21203-0717 RE: MD 978 (Hall Road) Sidewalk Funding Dear Administrator Johnson: I am writing on behalf of the City Council to bring to your attention the serious need for complete pedestrian access improvements on MD 978 (Hall Road). Hall Road is a two-lane, substandard State road identified as a Primary Road in Prince George s County s Master Plan of Transportation. This busy road, which connects to MD (Central Avenue) at both ends, is approximately 3,300 feet long and is the major point of access for several residential communities and businesses, as well as a County library. Although a Conceptual Design was completed for pedestrian improvements for the entire length (see Attachment), sidewalk improvements are under design for only a portion of the corridor. The remaining portion, from the CSX railroad tracks to the east, needs to have design funding. The City Council and neighborhood groups have worked with SHA for years to try to get a sidewalk constructed in this area. MD 978 was the subject of a Roadway Safety Audit (RSA) in 2008. The Hall Road study was one of the first RSAs conducted in SHA District 3. The Audit revealed safety issues that have only been exacerbated by the opening of the Hall Station retail center and the County library at the western end of the MD 978 corridor. There is strong community consensus, as evidenced by the large number of residents who attended the community meeting held in late 2015, in support of pedestrian improvements. The City is contributing 25% of the cost of the sidewalk now in design, and The Maryland-ational Capital Park and Planning Commission has indicated they will contribute partial funding for the remaining sidewalk east of the railroad tracks. SHA District 3 has the funds budgeted this fiscal year for construction of first phase of the sidewalk improvements. Because this situation is rather unique, with so much of the need already documented and public investment now taking place, the City is asking for your approval of design funding for the remaining section of sidewalk, east of the CSX railroad tracks, as soon as possible. Sincerely, Bowie City Council G. Frederick Robinson Mayor

Letter to SHA Administrator Johnson re: MD 978 (Hall Road) Sidewalk Funding 2 Attachment cc: The Honorable Douglas J.J. Peters, State Senator The Honorable Marvin E. Holmes, Delegate The Honorable Geraldine Valentino-Smith, Delegate The Honorable Joseph F. Vallario, Jr., Delegate The Honorable Todd M. Turner, County Council Member Mr. Brian Young, SHA District 3 Engineer Mr. Darrell Mobley, Director of Prince George s County DPW&T Mr. Duff Durkin, Citizens Association of South Bowie

JO PO ST EE GROVEHURST DURHAM PERRELL WAY DARBY DALE DIDMARTO CETRAL DULEIGH D E I G TO D EVO W O O D DO DSO IVE DTRY PI O AK ASHLEIGH STATIO POITER PARAMOT PIECR T PE JASPER HSBERG JEIGS JEIGS LAE STATIO JEIGS CETRAL POITER SOUTH WOOD FECE AD JESFO JO O JO ES FALL JEAW O O D JEI GS JERRIGTO JE LOCATIO MAP KIS JEY JEIGS 18" RCP APPROX. RIGHT--WAYLIE MD () DITCH 6+00 7+00 REMOVE 3' WIDE COS OPEIG. REACE WITH 13.25' WIDE COS OPEIG (STD. O. MD 374.68) W 24" RCP CMP ITY POLES LIE - SEE SHEET PS-02 OT FOR COSTRUIO SIDEWALK COC. SIDEWALK MATCH ITY POLE W/ SIGAL CABIETS APPROX. RIGHT- -WAYLIE RIP-RAP 18" RCP 15" RCP WALL 15" RCP STATIO IVE WALL ADJUST MAHOLE LID 42" RCP 15" RCP 15" RCP DITCH MAITEACE TRAFFIC OTES: 1. ALL WORK S BE PERFORMED I ACCOACE WITH THE MOT STADAS MD 4.00-01 THRU 6.03. OTE: THE WORK I THIS AREA S BE DOE USIG THE METHOD "SAME DAY STABILIZATIO." O MORE AREA S BE DISTURBED THA CA BE STABILIZED BY THE ED THE WORKDAY. ALL DISTURBED AREAS THAT DO OT AI TO A SEDIMET COTROL DEVICE S BE STABILIZED BY THE ED THE WORKDAY. O DISTURBED AREA S BE LEFT USTABILIZED OVERIGHT ULESS THE RUF IS DIREED TO A MDE APPROVED SEDIMET COTROL DEVICE. LEGED COCRETE SIDEWALK/IVEWAY COCRETE REMOVAL EW CURB GEERAL OTES: 1. BASELIE SHOW FOR ILLUSTRATIVE PURPOSES OLY. 2.ALL SIDEWALK AD RAMPS S BE 60" WIDE. TAPER SIDEWALK TO EXISTIG I ACCOACE TO STD. O. MD 655.02 ULESS OTED OTHERWISE. SIDEWALK CROSS SLOPE S BE 2%. WHERE THE SIDEWALK TRASITIOS TO EXISTIG THE CROSS SLOPE S TRASITIO TO EXISTIG OVER 5'. 3.ALL DISTURBED AREAS BETWEE SIDEWALK / RAMP AD CURB OR PMET S BE SODDED. ALL DISTURBED AREAS COTIGUOUS WITH THE SIDEWALK / RAMP S BE SODDED WITH A 2' STRIP SOD ALOG THE EDGE THE SIDEWALK / RAMP. SOD S RECEIVE ADDITIOAL WATERIG. 4. ALL DISTURBED AREAS BEYOD 2' FROM THE EDGE SIDEWALK / RAMP S RECEIVE 4" TOPSOIL, SEED AD MULCH. 5. REFER TO ES-01 FOR EROSIO AD SEDIMET COTROL REQUIREMETS. 6. SEDIMET AD EROSIO COTROL REGULATIOS WILL BE STRILY EFORCED DURIG COSTRUIO. 7. ALL IVEWAY ETRACES THAT H CURB RETURS MUST CARRY A MIIMUM 36" WIDE PEDESTRIA ACROSS THE ETIRE ETRACE, REGALESS WHAT MATERIAL IS USED TO COSTRU THE ETRACE. 2. O WORK IS TO BEGI ALL ADVACE WARIG SIGS, UMS AD ARROW PAELS ARE I ACE AD OPERATIOAL. 3. ADVACED OTIFICATIO SIDEWALK CLOSURES S BE PROVIDED. A BARRIER THAT IS DETEABLE BY A PERSO WITH A VISUAL DISABILITY S BE ACED ACROSS THE FULL WIDTH THE CLOSED 4. WHERE PEDESTRIAS ARE DIREED TO CROSS TO THE OPPO SIDE THE WAY, APPROPRIATE ADVACED SIGIG SHOULD BE ACED AT THE ITERSEIOS RATHER THE MID-BLOCK CROSSIGS. 5. TRAFFIC COTROL DEVICES AD OTHER COSTRUIO MATERIALS AD FEATURES S OT ITRUDE ITO PATHWAY OR OTHER PEDESTRIA FACILITY. DESIGED BY AW BY F.A.P. O. AWIG O. STATE MARYLAD DEPARTMET TRASPORTATIO STATE HIGHWAY ADMIISTRATIO DISTRI 3 - PROJE DEVELOPMET SIDEWALK IMPROVEMETS ALOG MD ( ) FROM WEST PI OAK PARKWAY TO MD (CETRAL UE) COSTRUIO A PS-01 JUE 2013 COUTY COTRA O. HORIZOTAL VERTICAL PRICE GEORGE'S SHEET O. 1 OTTED: June 14, 2013 FILE: :\31651-015\CADD\pHD-P001_MD.dgn

MATCH LIE - SEE SHEET PS-01 JO PO ST TREE EE REC. AREA GROVEHURST PERRELL TALL OAKS CROSSIG DARBY DALE DIDMARTO ETRAL DULEIGH D E I G TO D EVO W O O D DO DSO IVE DURHAM DTRY PI O AK ASHLEIGH STATIO POITER PARAMOT PIECR T PE PESIVE LAE WALL JASPER HSBERG JEIGS JEIGS LAE STATIO JEIGS CETRAL POITER RIDG TRAIL 4' PI OAK PARKW AY PI OAK PARKW AY ATIG BED LIGHT POLE JESFO JO O JO ES FALL JEAW OOD JEI GS JERRIGTO JE LOCATIO MAP KIS RIDG JEY JEIGS ITY POLE ATIG BED STOE WOOD FECE APPROX. RIGHT- CMP -WAYLIE RCP 8+00 5' 3' APPROX. RIGHT--WAYLIE ATIG BED BUS STOP CROSSWALK 12" WHITE - 85 L.F. MD ( ) 9+00 ITY POLE 12:1 MAX. RELOCATED BUS STOP FROM STA. 13+72 COC. COC. APPROX. RIGHT- -WAY LIE S/ W MATCH LIE - SEE SHEET PS-03 OT FOR COSTRUIO MAITEACE TRAFFIC OTES: 1. ALL WORK S BE PERFORMED I ACCOACE WITH THE MOT STADAS MD 4.00-01 THRU 6.03. OTE: THE WORK I THIS AREA S BE DOE USIG THE METHOD "SAME DAY STABILIZATIO." O MORE AREA S BE DISTURBED THA CA BE STABILIZED BY THE ED THE WORKDAY. ALL DISTURBED AREAS THAT DO OT AI TO A SEDIMET COTROL DEVICE S BE STABILIZED BY THE ED THE WORKDAY. O DISTURBED AREA S BE LEFT USTABILIZED OVERIGHT ULESS THE RUF IS DIREED TO A MDE APPROVED SEDIMET COTROL DEVICE. LEGED COCRETE SIDEWALK/IVEWAY GEERAL OTES: 1. BASELIE SHOW FOR ILLUSTRATIVE PURPOSES OLY. 2.ALL SIDEWALK AD RAMPS S BE 60" WIDE. TAPER SIDEWALK TO EXISTIG I ACCOACE TO STD. O. MD 655.02 ULESS OTED OTHERWISE. SIDEWALK CROSS SLOPE S BE 2%. WHERE THE SIDEWALK TRASITIOS TO EXISTIG THE CROSS SLOPE S TRASITIO TO EXISTIG OVER 5'. 4. ALL DISTURBED AREAS BEYOD 2' FROM THE EDGE SIDEWALK / RAMP S RECEIVE 4" TOPSOIL, SEED AD MULCH. 5. REFER TO ES-01 FOR EROSIO AD SEDIMET COTROL REQUIREMETS. 6. SEDIMET AD EROSIO COTROL REGULATIOS WILL BE STRILY EFORCED DURIG COSTRUIO. 2.O WORK IS TO BEGI ALL ADVACE WARIG SIGS, UMS AD ARROW PAELS ARE I ACE AD OPERATIOAL. 3. ADVACED OTIFICATIO SIDEWALK CLOSURES S BE PROVIDED. A BARRIER THAT IS DETEABLE BY A PERSO WITH A VISUAL DISABILITY S BE ACED ACROSS THE FULL WIDTH THE CLOSED 4. WHERE PEDESTRIAS ARE DIREED TO CROSS TO THE OPPO SIDE THE WAY, APPROPRIATE ADVACED SIGIG SHOULD BE ACED AT THE ITERSEIOS RATHER THE MID-BLOCK CROSSIGS. STATE MARYLAD DEPARTMET TRASPORTATIO STATE HIGHWAY ADMIISTRATIO DISTRI 3 - PROJE DEVELOPMET SIDEWALK IMPROVEMETS ALOG MD ( ) FROM WEST PI OAK PARKWAY TO MD (CETRAL UE) COSTRUIO A JUE 2013 COTRA O. COCRETE REMOVAL EW CURB 3.ALL DISTURBED AREAS BETWEE SIDEWALK / RAMP AD CURB OR PMET S BE SODDED. ALL DISTURBED AREAS COTIGUOUS WITH THE SIDEWALK / RAMP S BE SODDED WITH A 2' STRIP SOD ALOG THE EDGE THE SIDEWALK / RAMP. SOD S RECEIVE ADDITIOAL WATERIG. 7. ALL IVEWAY ETRACES THAT H CURB RETURS MUST CARRY A MIIMUM 36" WIDE PEDESTRIA ACROSS THE ETIRE ETRACE, REGALESS WHAT MATERIAL IS USED TO COSTRU THE ETRACE. 5. TRAFFIC COTROL DEVICES AD OTHER COSTRUIO MATERIALS AD FEATURES S OT ITRUDE ITO PATHWAY OR OTHER PEDESTRIA FACILITY. DESIGED BY AW BY F.A.P. O. AWIG O. PS-02 COUTY HORIZOTAL VERTICAL PRICE GEORGE'S SHEET O. 2 OTTED: June 14, 2013 FILE: :\31651-015\CADD\pHD-P002_MD.dgn

O-T JO GROVEHURST PERRELL JASPER DALE DIDMARTO RAL HSBERG JESFO DULEIGH D E I G TO JO O P JEIGS JO ES FALL D EVO W O O D JEAW OOD DO DSO JEIGS IVE JEI GS JERRIGTO DURHAM DTRY LAE JE KIS LOCATIO MAP PI O AK STATIO JEY POITER JEIGS JEIGS ASHLEIGH STATIO POITER CETRAL PARAMOT PIECR T PE PESIVE LAE POITER MAOR PROPERTY LIE ATIG BEDS MATCH LIE - SEE SHEET PS-02 ATIG BED +00 ' P.U.E. W APPROX.RGIH SIDEWALK MD ( ) FW- AY IL E APPROX. RIGHT--WAYLIE 1+00 ATIG BED MATCH LIE - SEE SHEET PS-04 OT FOR COSTRUIO I-BEAM MAITEACE TRAFFIC OTES: 1. ALL WORK S BE PERFORMED I ACCOACE WITH THE MOT STADAS MD 4.00-01 THRU 6.03. OTE: THE WORK I THIS AREA S BE DOE USIG THE METHOD "SAME DAY STABILIZATIO." O MORE AREA S BE DISTURBED THA CA BE STABILIZED BY THE ED THE WORKDAY. ALL DISTURBED AREAS THAT DO OT AI TO A SEDIMET COTROL DEVICE S BE STABILIZED BY THE ED THE WORKDAY. O DISTURBED AREA S BE LEFT USTABILIZED OVERIGHT ULESS THE RUF IS DIREED TO A MDE APPROVED SEDIMET COTROL DEVICE. LEGED COCRETE SIDEWALK/IVEWAY COCRETE REMOVAL EW CURB GEERAL OTES: 1. BASELIE SHOW FOR ILLUSTRATIVE PURPOSES OLY. 2.ALL SIDEWALK AD RAMPS S BE 60" WIDE. TAPER SIDEWALK TO EXISTIG I ACCOACE TO STD. O. MD 655.02 ULESS OTED OTHERWISE. SIDEWALK CROSS SLOPE S BE 2%. WHERE THE SIDEWALK TRASITIOS TO EXISTIG THE CROSS SLOPE S TRASITIO TO EXISTIG OVER 5'. 3. ALL DISTURBED AREAS BETWEE SIDEWALK / RAMP AD CURB OR PMET S BE SODDED. ALL DISTURBED AREAS COTIGUOUS WITH THE SIDEWALK / RAMP S BE SODDED WITH A 2' STRIP SOD ALOG THE EDGE THE SIDEWALK / RAMP. SOD S RECEIVE ADDITIOAL WATERIG. 4. ALL DISTURBED AREAS BEYOD 2' FROM THE EDGE SIDEWALK / RAMP S RECEIVE 4" TOPSOIL, SEED AD MULCH. 5. REFER TO ES-01 FOR EROSIO AD SEDIMET COTROL REQUIREMETS. 6. SEDIMET AD EROSIO COTROL REGULATIOS WILL BE STRILY EFORCED DURIG COSTRUIO. 7.ALL IVEWAY ETRACES THAT H CURB RETURS MUST CARRY A MIIMUM 36" WIDE PEDESTRIA ACROSS THE ETIRE ETRACE, REGALESS WHAT MATERIAL IS USED TO COSTRU THE ETRACE. 2.O WORK IS TO BEGI ALL ADVACE WARIG SIGS, UMS AD ARROW PAELS ARE I ACE AD OPERATIOAL. 3. ADVACED OTIFICATIO SIDEWALK CLOSURES S BE PROVIDED. A BARRIER THAT IS DETEABLE BY A PERSO WITH A VISUAL DISABILITY S BE ACED ACROSS THE FULL WIDTH THE CLOSED 4.WHERE PEDESTRIAS ARE DIREED TO CROSS TO THE OPPO SIDE THE WAY, APPROPRIATE ADVACED SIGIG SHOULD BE ACED AT THE ITERSEIOS RATHER THE MID-BLOCK CROSSIGS. 5. TRAFFIC COTROL DEVICES AD OTHER COSTRUIO MATERIALS AD FEATURES S OT ITRUDE ITO PATHWAY OR OTHER PEDESTRIA FACILITY. DESIGED BY AW BY F.A.P. O. AWIG O. STATE MARYLAD DEPARTMET TRASPORTATIO STATE HIGHWAY ADMIISTRATIO DISTRI 3 - PROJE DEVELOPMET SIDEWALK IMPROVEMETS ALOG MD ( ) FROM WEST PI OAK PARKWAY TO MD (CETRAL UE) COSTRUIO A PS-03 JUE 2013 COUTY COTRA O. HORIZOTAL VERTICAL PRICE GEORGE'S SHEET O. 3 OTTED: June 14, 2013 FILE: :\31651-015\CADD\pHD-P003_MD.dgn

42' STORM AI EASEMET GROVEHURST PERRELL DULEIGH E D E I G TO D EVO W O O D DO DSO IVE DURHAM DTRY PI O AK ASHLEIGH STATIO POITER PARAMOT PIECR T PESIVE LAE PA POITER LAE ASHLEIGH STATIO L SBERG JEIGS JEIGS LAE STATIO JEIGS CETRAL PE POITER MAOR ASHLEIGH STATIO COURT 15" RCP COC. #01 42' STORM AI EASEMET JO O PO D JO ES FALL JEAW O O D JEI GS JERRIGTO JE JOHSTOE KIS JEY JEIGS ' P.U.E. LOCATIO MAP MATCH LIE - SEE SHEET PS-03 ' P.U.E. ATIG BED -WAY LIE APPROX. RIGHT- S/ W S/ W PROPOSED EASEMET 15" RCP WALL VERIZO VAULT ATIG BED APPROX. RIGHT--WAYLIE 18" RCP ' P.U.E. ATIG BED SHEET PS-05 PROPERTY LIE OT FOR COSTRUIO 12+00 MD () 13+00 14+00 RELOCATE BUS STOP TO STA. 8+45 MATCH LIE - SEE APPROX. RIGHT--WAYLIE GRL WOOD FECE WOOD FECE STOE STEEL PIPES MAITEACE TRAFFIC OTES: 1. ALL WORK S BE PERFORMED I ACCOACE WITH THE MOT STADAS MD 4.00-01 THRU 6.03. OTE: THE WORK I THIS AREA S BE DOE USIG THE METHOD "SAME DAY STABILIZATIO." O MORE AREA S BE DISTURBED THA CA BE STABILIZED BY THE ED THE WORKDAY. ALL DISTURBED AREAS THAT DO OT AI TO A SEDIMET COTROL DEVICE S BE STABILIZED BY THE ED THE WORKDAY. O DISTURBED AREA S BE LEFT USTABILIZED OVERIGHT ULESS THE RUF IS DIREED TO A MDE APPROVED SEDIMET COTROL DEVICE. LEGED COCRETE SIDEWALK/IVEWAY COCRETE REMOVAL EW CURB GEERAL OTES: 1. BASELIE SHOW FOR ILLUSTRATIVE PURPOSES OLY. 2.ALL SIDEWALK AD RAMPS S BE 60" WIDE. TAPER SIDEWALK TO EXISTIG I ACCOACE TO STD. O. MD 655.02 ULESS OTED OTHERWISE. SIDEWALK CROSS SLOPE S BE 2%. WHERE THE SIDEWALK TRASITIOS TO EXISTIG THE CROSS SLOPE S TRASITIO TO EXISTIG OVER 5'. 3. ALL DISTURBED AREAS BETWEE SIDEWALK / RAMP AD CURB OR PMET S BE SODDED. ALL DISTURBED AREAS COTIGUOUS WITH THE SIDEWALK / RAMP S BE SODDED WITH A 2' STRIP SOD ALOG THE EDGE THE SIDEWALK / RAMP. SOD S RECEIVE ADDITIOAL WATERIG. 4. ALL DISTURBED AREAS BEYOD 2' FROM THE EDGE SIDEWALK / RAMP S RECEIVE 4" TOPSOIL, SEED AD MULCH. 5. REFER TO ES-01 FOR EROSIO AD SEDIMET COTROL REQUIREMETS. 6. SEDIMET AD EROSIO COTROL REGULATIOS WILL BE STRILY EFORCED DURIG COSTRUIO. 7. ALL IVEWAY ETRACES THAT H CURB RETURS MUST CARRY A MIIMUM 36" WIDE PEDESTRIA ACROSS THE ETIRE ETRACE, REGALESS WHAT MATERIAL IS USED TO COSTRU THE ETRACE. 2.O WORK IS TO BEGI ALL ADVACE WARIG SIGS, UMS AD ARROW PAELS ARE I ACE AD OPERATIOAL. 3.ADVACED OTIFICATIO SIDEWALK CLOSURES S BE PROVIDED. A BARRIER THAT IS DETEABLE BY A PERSO WITH A VISUAL DISABILITY S BE ACED ACROSS THE FULL WIDTH THE CLOSED 4. WHERE PEDESTRIAS ARE DIREED TO CROSS TO THE OPPO SIDE THE WAY, APPROPRIATE ADVACED SIGIG SHOULD BE ACED AT THE ITERSEIOS RATHER THE MID-BLOCK CROSSIGS. 5.TRAFFIC COTROL DEVICES AD OTHER COSTRUIO MATERIALS AD FEATURES S OT ITRUDE ITO PATHWAY OR OTHER PEDESTRIA FACILITY. DESIGED BY AW BY F.A.P. O. AWIG O. STATE MARYLAD DEPARTMET TRASPORTATIO STATE HIGHWAY ADMIISTRATIO DISTRI 3 - PROJE DEVELOPMET SIDEWALK IMPROVEMETS ALOG MD ( ) FROM WEST PI OAK PARKWAY TO MD (CETRAL UE) COSTRUIO A PS-04 JUE 2013 COUTY COTRA O. HORIZOTAL VERTICAL PRICE GEORGE'S SHEET O. 4 OTTED: June 14, 2013 FILE: :\31651-015\CADD\pHD-P004_MD.dgn

24" RCP E.M. GROVEHURST PERRELL DULEIGH E D E I G TO L SBERG JEIGS D EVO W O O D DO DSO JEIGS IVE DURHAM DTRY LAE PI O AK STATIO ASHLEIGH STATIO POITER JEIGS POITER CETRAL PARAMOT PIECR T PE PESIVE LAE PA POITER MAOR LAE 42' STORM AI EASEMET 24" RCP PROPERTY LIE JO O PO D JO ES FALL JEAW O O D JEI GS JERRIGTO JE JOHSTOE KIS JEY JEIGS LOCATIO MAP 42' STORM AI EASEMET WOOD FECE MATCH LIE - SEE SHEET PS-04 COC. ITY POLE 15+00 ' P.U.E. MD ( ) APPROX. RIGHT--WAYLIE 16+00 METERS E.M. E.M. SEE SHEET PS-06 MATCH LIE - OT FOR COSTRUIO WOOD FECE APPROX. RIGHT--WAYLIE REDCEDAR TREES MAITEACE TRAFFIC OTES: 1. ALL WORK S BE PERFORMED I ACCOACE WITH THE MOT STADAS MD 4.00-01 THRU 6.03. OTE: THE WORK I THIS AREA S BE DOE USIG THE METHOD "SAME DAY STABILIZATIO." O MORE AREA S BE DISTURBED THA CA BE STABILIZED BY THE ED THE WORKDAY. ALL DISTURBED AREAS THAT DO OT AI TO A SEDIMET COTROL DEVICE S BE STABILIZED BY THE ED THE WORKDAY. O DISTURBED AREA S BE LEFT USTABILIZED OVERIGHT ULESS THE RUF IS DIREED TO A MDE APPROVED SEDIMET COTROL DEVICE. LEGED COCRETE SIDEWALK/IVEWAY COCRETE REMOVAL EW CURB GEERAL OTES: 1. BASELIE SHOW FOR ILLUSTRATIVE PURPOSES OLY. 2.ALL SIDEWALK AD RAMPS S BE 60" WIDE. TAPER SIDEWALK TO EXISTIG I ACCOACE TO STD. O. MD 655.02 ULESS OTED OTHERWISE. SIDEWALK CROSS SLOPE S BE 2%. WHERE THE SIDEWALK TRASITIOS TO EXISTIG THE CROSS SLOPE S TRASITIO TO EXISTIG OVER 5'. 3. ALL DISTURBED AREAS BETWEE SIDEWALK / RAMP AD CURB OR PMET S BE SODDED. ALL DISTURBED AREAS COTIGUOUS WITH THE SIDEWALK / RAMP S BE SODDED WITH A 2' STRIP SOD ALOG THE EDGE THE SIDEWALK / RAMP. SOD S RECEIVE ADDITIOAL WATERIG. 4. ALL DISTURBED AREAS BEYOD 2' FROM THE EDGE SIDEWALK / RAMP S RECEIVE 4" TOPSOIL, SEED AD MULCH. 5. REFER TO ES-01 FOR EROSIO AD SEDIMET COTROL REQUIREMETS. 6. SEDIMET AD EROSIO COTROL REGULATIOS WILL BE STRILY EFORCED DURIG COSTRUIO. 7. ALL IVEWAY ETRACES THAT H CURB RETURS MUST CARRY A MIIMUM 36" WIDE PEDESTRIA ACROSS THE ETIRE ETRACE, REGALESS WHAT MATERIAL IS USED TO COSTRU THE ETRACE. 2.O WORK IS TO BEGI ALL ADVACE WARIG SIGS, UMS AD ARROW PAELS ARE I ACE AD OPERATIOAL. 3.ADVACED OTIFICATIO SIDEWALK CLOSURES S BE PROVIDED. A BARRIER THAT IS DETEABLE BY A PERSO WITH A VISUAL DISABILITY S BE ACED ACROSS THE FULL WIDTH THE CLOSED 4. WHERE PEDESTRIAS ARE DIREED TO CROSS TO THE OPPO SIDE THE WAY, APPROPRIATE ADVACED SIGIG SHOULD BE ACED AT THE ITERSEIOS RATHER THE MID-BLOCK CROSSIGS. 5. TRAFFIC COTROL DEVICES AD OTHER COSTRUIO MATERIALS AD FEATURES S OT ITRUDE ITO PATHWAY OR OTHER PEDESTRIA FACILITY. DESIGED BY AW BY F.A.P. O. AWIG O. STATE MARYLAD DEPARTMET TRASPORTATIO STATE HIGHWAY ADMIISTRATIO DISTRI 3 - PROJE DEVELOPMET SIDEWALK IMPROVEMETS ALOG MD ( ) FROM WEST PI OAK PARKWAY TO MD (CETRAL UE) COSTRUIO A PS-05 JUE 2013 COUTY COTRA O. HORIZOTAL VERTICAL PRICE GEORGE'S SHEET O. 5 OTTED: June 14, 2013 FILE: :\31651-015\CADD\pHD-P005_MD.dgn

LEIGH G TO D EVO W O O D DO DSO IVE M DTRY PI O AK ASHLEIGH STATIO POITER PARAMOT PIECR T PESIVE LAE PARKIG POITER LAE WETLAD BUFFER WETLAD 1 JEIGS RG JEIGS LAE STATIO JEIGS CETRAL PE POITER MAOR MATCH LIE - SEE SHEET PS-05 ' P.U.E. HISTORIC BAR 17+00 PROPERTY LIE RELOCATE SIG (12 S.F.) GRL 80" MD ( ) APPROX. RIGHT--WAYLIE DIAMETER TREE SIG ATIG BED TRAFFIC BARRIER OVERHEAD RAIL SIGAL L.F. 15" CMP EXTESIO APPROX. RIGHT- 32' -WAYLIE STD. O. MD 630.01 18+00 15"RCP WASTE PILE 20' - + ELEVATED PEDESTRIA WALKWAY WITH RAILIGS GAS PIPELIE MARKER TREE LIE STEEP SLOPE APPROXIMATE LOCATIO MATCH LIE - SEE SHEET PS-07 GAS PIPELIE TEST STATIO TREE LIE RAIL CROSSIG SIGAL GAS PIPELIE MARKER ADA COMIAT PEDESTRIA RAIL CROSSIG D JO ES FALL JEAW OOD JEI GS JERRIGTO JE JOHSTOE KIS JEY JEIGS LOCATIO MAP OT FOR COSTRUIO PARKIG LOT BELAIR VETERIARY HOSPITAL MAITEACE TRAFFIC OTES: 1. ALL WORK S BE PERFORMED I ACCOACE WITH THE MOT STADAS MD 4.00-01 THRU 6.03. OTE: THE WORK I THIS AREA S BE DOE USIG THE METHOD "SAME DAY STABILIZATIO." O MORE AREA S BE DISTURBED THA CA BE STABILIZED BY THE ED THE WORKDAY. ALL DISTURBED AREAS THAT DO OT AI TO A SEDIMET COTROL DEVICE S BE STABILIZED BY THE ED THE WORKDAY. O DISTURBED AREA S BE LEFT USTABILIZED OVERIGHT ULESS THE RUF IS DIREED TO A MDE APPROVED SEDIMET COTROL DEVICE. LEGED COCRETE SIDEWALK/IVEWAY COCRETE REMOVAL EW CURB GEERAL OTES: 1. BASELIE SHOW FOR ILLUSTRATIVE PURPOSES OLY. 2.ALL SIDEWALK AD RAMPS S BE 60" WIDE. TAPER SIDEWALK TO EXISTIG I ACCOACE TO STD. O. MD 655.02 ULESS OTED OTHERWISE. SIDEWALK CROSS SLOPE S BE 2%. WHERE THE SIDEWALK TRASITIOS TO EXISTIG THE CROSS SLOPE S TRASITIO TO EXISTIG OVER 5'. 3. ALL DISTURBED AREAS BETWEE SIDEWALK / RAMP AD CURB OR PMET S BE SODDED. ALL DISTURBED AREAS COTIGUOUS WITH THE SIDEWALK / RAMP S BE SODDED WITH A 2' STRIP SOD ALOG THE EDGE THE SIDEWALK / RAMP. SOD S RECEIVE ADDITIOAL WATERIG. 4. ALL DISTURBED AREAS BEYOD 2' FROM THE EDGE SIDEWALK / RAMP S RECEIVE 4" TOPSOIL, SEED AD MULCH. 5. REFER TO ES-01 FOR EROSIO AD SEDIMET COTROL REQUIREMETS. 6. SEDIMET AD EROSIO COTROL REGULATIOS WILL BE STRILY EFORCED DURIG COSTRUIO. 7.ALL IVEWAY ETRACES THAT H CURB RETURS MUST CARRY A MIIMUM 36" WIDE PEDESTRIA ACROSS THE ETIRE ETRACE, REGALESS WHAT MATERIAL IS USED TO COSTRU THE ETRACE. 2. O WORK IS TO BEGI ALL ADVACE WARIG SIGS, UMS AD ARROW PAELS ARE I ACE AD OPERATIOAL. 3. ADVACED OTIFICATIO SIDEWALK CLOSURES S BE PROVIDED. A BARRIER THAT IS DETEABLE BY A PERSO WITH A VISUAL DISABILITY S BE ACED ACROSS THE FULL WIDTH THE CLOSED 4. WHERE PEDESTRIAS ARE DIREED TO CROSS TO THE OPPO SIDE THE WAY, APPROPRIATE ADVACED SIGIG SHOULD BE ACED AT THE ITERSEIOS RATHER THE MID-BLOCK CROSSIGS. 5. TRAFFIC COTROL DEVICES AD OTHER COSTRUIO MATERIALS AD FEATURES S OT ITRUDE ITO PATHWAY OR OTHER PEDESTRIA FACILITY. DESIGED BY AW BY F.A.P. O. AWIG O. STATE MARYLAD DEPARTMET TRASPORTATIO STATE HIGHWAY ADMIISTRATIO DISTRI 3 - PROJE DEVELOPMET SIDEWALK IMPROVEMETS ALOG MD ( ) FROM WEST PI OAK PARKWAY TO MD (CETRAL UE) COSTRUIO A PS-06 JUE 2013 COUTY COTRA O. HORIZOTAL VERTICAL PRICE GEORGE'S SHEET O. 6 OTTED: June 14, 2013 FILE: :\31651-015\CADD\pHD-P006_MD.dgn

LEIGH G TO D EVO W O O D DO DSO IVE M DTRY PI O AK ASHLEIGH STATIO POITER PARAMOT PIECR T PESIVE LAE PARKIG POITER LAE TREE LIE WETLAD 1 APPROXIMATE 0 YEAR FLOODAI BOUDARY APPROXIMATE LOCATIO GAS PIPELIE COLLIGTO BRACH ELEVATED PEDESTRIA WALKWAY + - 270 L.F. TREE LIE D JEIGS RG JO ES FALL JEAW OOD JEIGS JEI GS JERRIGTO LAE JE JOHSTOE KIS STATIO JEY POITER JEIGS JEIGS CETRAL LOCATIO MAP PE MAOR MATCH LIE - SEE SHEET PS-06 19+00 WETLAD BUFFER TRAFFIC BARRIER APPROX. RIGHT--WAYLIE APPROX. RIGHT--WAYLIE HEADWALL TREE LIE TRAFFIC BARRIER 20+00 21+00 MD ( ) ITY POLE TREE LIE TREE LIE HEADWALL TRAFFIC BARRIER TRAFFIC BARRIER MATCH LIE - SEE SHEET PS-08 OT FOR COSTRUIO APPROX. RIGHT--WAYLIE COLLIGTO BRACH WETLAD 3 WETLAD BUFFER WETLAD BUFFER WETLAD 2 MAITEACE TRAFFIC OTES: 1. ALL WORK S BE PERFORMED I ACCOACE WITH THE MOT STADAS MD 4.00-01 THRU 6.03. OTE: THE WORK I THIS AREA S BE DOE USIG THE METHOD "SAME DAY STABILIZATIO." O MORE AREA S BE DISTURBED THA CA BE STABILIZED BY THE ED THE WORKDAY. ALL DISTURBED AREAS THAT DO OT AI TO A SEDIMET COTROL DEVICE S BE STABILIZED BY THE ED THE WORKDAY. O DISTURBED AREA S BE LEFT USTABILIZED OVERIGHT ULESS THE RUF IS DIREED TO A MDE APPROVED SEDIMET COTROL DEVICE. LEGED COCRETE SIDEWALK/IVEWAY COCRETE REMOVAL EW CURB GEERAL OTES: 1. BASELIE SHOW FOR ILLUSTRATIVE PURPOSES OLY. 2.ALL SIDEWALK AD RAMPS S BE 60" WIDE. TAPER SIDEWALK TO EXISTIG I ACCOACE TO STD. O. MD 655.02 ULESS OTED OTHERWISE. SIDEWALK CROSS SLOPE S BE 2%. WHERE THE SIDEWALK TRASITIOS TO EXISTIG THE CROSS SLOPE S TRASITIO TO EXISTIG OVER 5'. 3. ALL DISTURBED AREAS BETWEE SIDEWALK / RAMP AD CURB OR PMET S BE SODDED. ALL DISTURBED AREAS COTIGUOUS WITH THE SIDEWALK / RAMP S BE SODDED WITH A 2' STRIP SOD ALOG THE EDGE THE SIDEWALK / RAMP. SOD S RECEIVE ADDITIOAL WATERIG. 4. ALL DISTURBED AREAS BEYOD 2' FROM THE EDGE SIDEWALK / RAMP S RECEIVE 4" TOPSOIL, SEED AD MULCH. 5. REFER TO ES-01 FOR EROSIO AD SEDIMET COTROL REQUIREMETS. 6. SEDIMET AD EROSIO COTROL REGULATIOS WILL BE STRILY EFORCED DURIG COSTRUIO. 7. ALL IVEWAY ETRACES THAT H CURB RETURS MUST CARRY A MIIMUM 36" WIDE PEDESTRIA ACROSS THE ETIRE ETRACE, REGALESS WHAT MATERIAL IS USED TO COSTRU THE ETRACE. 2.O WORK IS TO BEGI ALL ADVACE WARIG SIGS, UMS AD ARROW PAELS ARE I ACE AD OPERATIOAL. 3.ADVACED OTIFICATIO SIDEWALK CLOSURES S BE PROVIDED. A BARRIER THAT IS DETEABLE BY A PERSO WITH A VISUAL DISABILITY S BE ACED ACROSS THE FULL WIDTH THE CLOSED 4.WHERE PEDESTRIAS ARE DIREED TO CROSS TO THE OPPO SIDE THE WAY, APPROPRIATE ADVACED SIGIG SHOULD BE ACED AT THE ITERSEIOS RATHER THE MID-BLOCK CROSSIGS. 5. TRAFFIC COTROL DEVICES AD OTHER COSTRUIO MATERIALS AD FEATURES S OT ITRUDE ITO PATHWAY OR OTHER PEDESTRIA FACILITY. DESIGED BY AW BY F.A.P. O. AWIG O. STATE MARYLAD DEPARTMET TRASPORTATIO STATE HIGHWAY ADMIISTRATIO DISTRI 3 - PROJE DEVELOPMET SIDEWALK IMPROVEMETS ALOG MD ( ) FROM WEST PI OAK PARKWAY TO MD (CETRAL UE) COSTRUIO A PS-07 JUE 2013 COUTY COTRA O. HORIZOTAL VERTICAL PRICE GEORGE'S SHEET O. 7 OTTED: June 14, 2013 FILE: :\31651-015\CADD\pHD-P007_MD.dgn

D EVO W O O D DO DSO IVE DTRY PI O AK ASHLEIGH STATIO POITER PARAMOT PIECR T PESIVE LAE POITER ARKIGTO LAE PE MAOR POITER JEIGS JEIGS LAE STATIO JEIGS CETRAL POITER PAR SIDEWALK JEAW OOD JEI GS JERRIGTO JE KIS JEY JEIGS MATCH LIE - SEE SHEET PS-07 STOE GAS PIPELIE MARKER ITY CABIET ITY POLE TRAFFIC BARRIER TRAFFIC BARRIER ITY POLE APPROX. RIGHT--WAY LIE 22+00 G STOE GAZEBO WALL REMOVE CURB CROSSWALK 12" WHITE (96 L.F.) S/ W POITER IVE 23+00 MD ( ) UTLITY POLE SIG TREE LIE ITY POLE COC. RELOCATE CURB AD GUTTER STD. O. MD 374.68 RELOCATED BUS STOP FROM STA. 28+53 APPROX. RIGHT- -WAY LIE MATCH LIE - SEE SHEET PS-09 JOHSTOE LOCATIO MAP OT FOR COSTRUIO WASH. APPROX. RIGHT--WAYLIE RAIL TIES GAS STRUURE WETLAD 3 WETLAD BUFFER WETLAD BUFFER APPROXIMATE 0 YEAR FLOODAI BOUDARY MAITEACE TRAFFIC OTES: 1. ALL WORK S BE PERFORMED I ACCOACE WITH THE MOT STADAS MD 4.00-01 THRU 6.03. OTE: THE WORK I THIS AREA S BE DOE USIG THE METHOD "SAME DAY STABILIZATIO." O MORE AREA S BE DISTURBED THA CA BE STABILIZED BY THE ED THE WORKDAY. ALL DISTURBED AREAS THAT DO OT AI TO A SEDIMET COTROL DEVICE S BE STABILIZED BY THE ED THE WORKDAY. O DISTURBED AREA S BE LEFT USTABILIZED OVERIGHT ULESS THE RUF IS DIREED TO A MDE APPROVED SEDIMET COTROL DEVICE. 2. O WORK IS TO BEGI ALL ADVACE WARIG SIGS, UMS AD ARROW PAELS ARE I ACE AD OPERATIOAL. STATE MARYLAD DEPARTMET TRASPORTATIO STATE HIGHWAY ADMIISTRATIO LEGED COCRETE SIDEWALK/IVEWAY COCRETE REMOVAL EW CURB GEERAL OTES: 1. BASELIE SHOW FOR ILLUSTRATIVE PURPOSES OLY. 2.ALL SIDEWALK AD RAMPS S BE 60" WIDE. TAPER SIDEWALK TO EXISTIG I ACCOACE TO STD. O. MD 655.02 ULESS OTED OTHERWISE. SIDEWALK CROSS SLOPE S BE 2%. WHERE THE SIDEWALK TRASITIOS TO EXISTIG THE CROSS SLOPE S TRASITIO TO EXISTIG OVER 5'. 3.ALL DISTURBED AREAS BETWEE SIDEWALK / RAMP AD CURB OR PMET S BE SODDED. ALL DISTURBED AREAS COTIGUOUS WITH THE SIDEWALK / RAMP S BE SODDED WITH A 2' STRIP SOD ALOG THE EDGE THE SIDEWALK / RAMP. SOD S RECEIVE ADDITIOAL WATERIG. 4. ALL DISTURBED AREAS BEYOD 2' FROM THE EDGE SIDEWALK / RAMP S RECEIVE 4" TOPSOIL, SEED AD MULCH. 5. REFER TO ES-01 FOR EROSIO AD SEDIMET COTROL REQUIREMETS. 6. SEDIMET AD EROSIO COTROL REGULATIOS WILL BE STRILY EFORCED DURIG COSTRUIO. 7.ALL IVEWAY ETRACES THAT H CURB RETURS MUST CARRY A MIIMUM 36" WIDE PEDESTRIA ACROSS THE ETIRE ETRACE, REGALESS WHAT MATERIAL IS USED TO COSTRU THE ETRACE. 3. ADVACED OTIFICATIO SIDEWALK CLOSURES S BE PROVIDED. A BARRIER THAT IS DETEABLE BY A PERSO WITH A VISUAL DISABILITY S BE ACED ACROSS THE FULL WIDTH THE CLOSED 4. WHERE PEDESTRIAS ARE DIREED TO CROSS TO THE OPPO SIDE THE WAY, APPROPRIATE ADVACED SIGIG SHOULD BE ACED AT THE ITERSEIOS RATHER THE MID-BLOCK CROSSIGS. 5. TRAFFIC COTROL DEVICES AD OTHER COSTRUIO MATERIALS AD FEATURES S OT ITRUDE ITO THE USABLE WIDTH THE SIDEWALK, TEMPORARY PATHWAY OR OTHER PEDESTRIA FACILITY. FROM WEST PI OAK PARKWAY TO MD (CETRAL UE) DESIGED BY AW BY F.A.P. O. AWIG O. DISTRI 3 - PROJE DEVELOPMET SIDEWALK IMPROVEMETS ALOG MD ( ) COSTRUIO A PS-08 JUE 2013 COUTY COTRA O. HORIZOTAL VERTICAL PRICE GEORGE'S SHEET O. 8 OTTED: June 14, 2013 FILE: :\31651-015\CADD\pHD-P008_MD.dgn

PS- WOOD FECE JEIGS I D EVO W O O D JEI GS JERRIGTO DTRY LAE JE KIS JOHSTOE PI O AK STATIO JEY POITER JEIGS JEIGS ASHLEIGH STATIO POITER CETRAL PARAMOT PIECR T PE PESIVE LAE POITER MAOR LAE KIGTO PE YPA PARKLA PRESIDIO WAY LOCATIO MAP PS-08 JUIO BOX RCP APPROX. RIGHT--WAYLIE TREE LIE DITCH OT FOR COSTRUIO MATCH LIE - SEE SHEET 24+00 25+00 26+00 ITY POLE TREE LIE MD ( ) 48'- + STD. O. MD 630.02 ADJUST ATIG BED ITY POLE MATCH LIE - SEE SHEET WETLAD BUFFER RELOCATE TALL OAKS EARLY LEARIG CETER SIG 2' OSE DOW CURB S/ W APPROX. RIGHT--WAYLIE GATE WETLADS PARKIG LOT EXPRESS MART TALL OAKS EARLY LEARIG CETER MAITEACE TRAFFIC OTES: 1. ALL WORK S BE PERFORMED I ACCOACE WITH THE MOT STADAS MD 4.00-01 THRU 6.03. OTE: THE WORK I THIS AREA S BE DOE USIG THE METHOD "SAME DAY STABILIZATIO." O MORE AREA S BE DISTURBED THA CA BE STABILIZED BY THE ED THE WORKDAY. ALL DISTURBED AREAS THAT DO OT AI TO A SEDIMET COTROL DEVICE S BE STABILIZED BY THE ED THE WORKDAY. O DISTURBED AREA S BE LEFT USTABILIZED OVERIGHT ULESS THE RUF IS DIREED TO A MDE APPROVED SEDIMET COTROL DEVICE. 2.O WORK IS TO BEGI ALL ADVACE WARIG SIGS, UMS AD ARROW PAELS ARE I ACE AD OPERATIOAL. STATE MARYLAD DEPARTMET TRASPORTATIO STATE HIGHWAY ADMIISTRATIO LEGED COCRETE SIDEWALK/IVEWAY COCRETE REMOVAL EW CURB GEERAL OTES: 1. BASELIE SHOW FOR ILLUSTRATIVE PURPOSES OLY. 2.ALL SIDEWALK AD RAMPS S BE 60" WIDE. TAPER SIDEWALK TO EXISTIG I ACCOACE TO STD. O. MD 655.02 ULESS OTED OTHERWISE. SIDEWALK CROSS SLOPE S BE 2%. WHERE THE SIDEWALK TRASITIOS TO EXISTIG THE CROSS SLOPE S TRASITIO TO EXISTIG OVER 5'. 3. ALL DISTURBED AREAS BETWEE SIDEWALK / RAMP AD CURB OR PMET S BE SODDED. ALL DISTURBED AREAS COTIGUOUS WITH THE SIDEWALK / RAMP S BE SODDED WITH A 2' STRIP SOD ALOG THE EDGE THE SIDEWALK / RAMP. SOD S RECEIVE ADDITIOAL WATERIG. 4. ALL DISTURBED AREAS BEYOD 2' FROM THE EDGE SIDEWALK / RAMP S RECEIVE 4" TOPSOIL, SEED AD MULCH. 5. REFER TO ES-01 FOR EROSIO AD SEDIMET COTROL REQUIREMETS. 6. SEDIMET AD EROSIO COTROL REGULATIOS WILL BE STRILY EFORCED DURIG COSTRUIO. 7. ALL IVEWAY ETRACES THAT H CURB RETURS MUST CARRY A MIIMUM 36" WIDE PEDESTRIA ACROSS THE ETIRE ETRACE, REGALESS WHAT MATERIAL IS USED TO COSTRU THE ETRACE. 3. ADVACED OTIFICATIO SIDEWALK CLOSURES S BE PROVIDED. A BARRIER THAT IS DETEABLE BY A PERSO WITH A VISUAL DISABILITY S BE ACED ACROSS THE FULL WIDTH THE CLOSED 4. WHERE PEDESTRIAS ARE DIREED TO CROSS TO THE OPPO SIDE THE WAY, APPROPRIATE ADVACED SIGIG SHOULD BE ACED AT THE ITERSEIOS RATHER THE MID-BLOCK CROSSIGS. 5. TRAFFIC COTROL DEVICES AD OTHER COSTRUIO MATERIALS AD FEATURES S OT ITRUDE ITO PATHWAY OR OTHER PEDESTRIA FACILITY. FROM WEST PI OAK PARKWAY TO MD (CETRAL UE) DESIGED BY AW BY F.A.P. O. AWIG O. DISTRI 3 - PROJE DEVELOPMET SIDEWALK IMPROVEMETS ALOG MD ( ) COSTRUIO A PS-09 JUE 2013 COUTY COTRA O. HORIZOTAL VERTICAL PRICE GEORGE'S SHEET O. 9 OTTED: June 14, 2013 FILE: :\31651-015\CADD\pHD-P009_MD.dgn

SS MATCH LIE - SEE SHEET PS-09 D EVO W O O D O AK ASHLEIGH STATIO POITER PARAMOT PIECR T PESIVE LAE POITER LAE GTO YPACKER ECHO PE MAOR PEM B APPROX. RIGHT--WAYLIE LAE JE KIS JOHSTOE STATIO JEY JEIGS JEIGS CETRAL POITER PARKLAW PRESIDIO WAY PEGRO VE 978 DITCH TREE LIE BOWIE n LOCATIO MAP 27+00 MD ( ) 28+00 RELOCATE BUS STOP TO STA. 23+52 RELOCATE BUS STOP SIG ITY POLE TRAFFIC BARRIER OT FOR COSTRUIO BOLLA (TYP.) APPROX. RIGHT- -WAYLIE EXPRESS MART S/ W PARKIG LOT 29+00 DITCH DITCH MD (CETRALUE) MAITEACE TRAFFIC OTES: 1. ALL WORK S BE PERFORMED I ACCOACE WITH THE MOT STADAS MD 4.00-01 THRU 6.03. OTE: THE WORK I THIS AREA S BE DOE USIG THE METHOD "SAME DAY STABILIZATIO." O MORE AREA S BE DISTURBED THA CA BE STABILIZED BY THE ED THE WORKDAY. ALL DISTURBED AREAS THAT DO OT AI TO A SEDIMET COTROL DEVICE S BE STABILIZED BY THE ED THE WORKDAY. O DISTURBED AREA S BE LEFT USTABILIZED OVERIGHT ULESS THE RUF IS DIREED TO A MDE APPROVED SEDIMET COTROL DEVICE. 2.O WORK IS TO BEGI ALL ADVACE WARIG SIGS, UMS AD ARROW PAELS ARE I ACE AD OPERATIOAL. STATE MARYLAD DEPARTMET TRASPORTATIO STATE HIGHWAY ADMIISTRATIO LEGED COCRETE SIDEWALK/IVEWAY COCRETE REMOVAL EW CURB GEERAL OTES: 1. BASELIE SHOW FOR ILLUSTRATIVE PURPOSES OLY. 2.ALL SIDEWALK AD RAMPS S BE 60" WIDE. TAPER SIDEWALK TO EXISTIG I ACCOACE TO STD. O. MD 655.02 ULESS OTED OTHERWISE. SIDEWALK CROSS SLOPE S BE 2%. WHERE THE SIDEWALK TRASITIOS TO EXISTIG THE CROSS SLOPE S TRASITIO TO EXISTIG OVER 5'. 3. ALL DISTURBED AREAS BETWEE SIDEWALK / RAMP AD CURB OR PMET S BE SODDED. ALL DISTURBED AREAS COTIGUOUS WITH THE SIDEWALK / RAMP S BE SODDED WITH A 2' STRIP SOD ALOG THE EDGE THE SIDEWALK / RAMP. SOD S RECEIVE ADDITIOAL WATERIG. 4. ALL DISTURBED AREAS BEYOD 2' FROM THE EDGE SIDEWALK / RAMP S RECEIVE 4" TOPSOIL, SEED AD MULCH. 5. REFER TO ES-01 FOR EROSIO AD SEDIMET COTROL REQUIREMETS. 6. SEDIMET AD EROSIO COTROL REGULATIOS WILL BE STRILY EFORCED DURIG COSTRUIO. 7. ALL IVEWAY ETRACES THAT H CURB RETURS MUST CARRY A MIIMUM 36" WIDE PEDESTRIA ACROSS THE ETIRE ETRACE, REGALESS WHAT MATERIAL IS USED TO COSTRU THE ETRACE. 3. ADVACED OTIFICATIO SIDEWALK CLOSURES S BE PROVIDED. A BARRIER THAT IS DETEABLE BY A PERSO WITH A VISUAL DISABILITY S BE ACED ACROSS THE FULL WIDTH THE CLOSED 4.WHERE PEDESTRIAS ARE DIREED TO CROSS TO THE OPPO SIDE THE WAY, APPROPRIATE ADVACED SIGIG SHOULD BE ACED AT THE ITERSEIOS RATHER THE MID-BLOCK CROSSIGS. 5.TRAFFIC COTROL DEVICES AD OTHER COSTRUIO MATERIALS AD FEATURES S OT ITRUDE ITO PATHWAY OR OTHER PEDESTRIA FACILITY. FROM WEST PI OAK PARKWAY TO MD (CETRAL UE) DESIGED BY AW BY F.A.P. O. AWIG O. DISTRI 3 - PROJE DEVELOPMET SIDEWALK IMPROVEMETS ALOG MD ( ) COSTRUIO A PS- JUE 2013 COUTY COTRA O. HORIZOTAL VERTICAL PRICE GEORGE'S SHEET O. OTTED: June 14, 2013 FILE: :\31651-015\CADD\pHD-P0_MD.dgn