LAX Specific Plan Amendment Study (SPAS) Update. December 3, 2012

Similar documents
LAX Specific Plan Amendment Study (SPAS) Final EIR and Related Actions. Board of Airport Commissioners February 5, 2013

Exhibit H: Statement of Overriding Considerations

Scoping Meeting LAX Landside Access Modernization Program

Los Angeles International Airport (LAX) Airside $907M

Metro Green Line to LAX. January, 2012

Public Notice of Opportunity to Comment on Los Angeles World Airports Passenger Facility Charge Application at Los Angeles International Airport


LAX PLAN LOS ANGELES INTERNATIONAL AIRPORT ACTIVITY LOG TABLE OF CONTENTS CONTENTS

Opposition to LAWA s North Runway Complex Expansion Proposal

LOS ANGELES WORLD AIRPORTS' AUTOMATED PEOPLE MOVER

Greater Orlando Aviation Authority

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019

DEVELOPMENT OF TOE MIDFIELD TERMINAL IROJECT CAPACITY ENHANCEMENT REPORT DEPARTMENT OF AVIATION TOM FOERSTER CHAIRMAN BARBARA HAFER COMMISSIONER

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Table of Contents. List of Tables. Cincinnati/Northern Kentucky International Airport 2035 Master Plan Update

WHERE SHOULD WE EXPAND AIRPORT CAPACITY IN METRO LA? December 11, Jacki Murdock, Transportation and Environmental Planner

Comments on the Draft Environmental Impact Report (DEIR) of the LAX Landside Access Modernization Program (LAMP)

Chapter 4 Airport Facility Requirements

LAX Plan September 29, 2004

Houston Airport System IAH Master Plan 2035 Summary

DRAFT. Master Plan RESPONSIBLY GROWING to support our region. Summary

TABLE OF CONTENTS. Airport Master Plan Update Manchester-Boston Regional Airport. W:\ _Manchester\MPU\Final\Executive Summary.

BNA Master Plan Update Public Meeting No. 2

EXECUTIVE SUMMARY. Master Plan Update Phase 2/3 FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT 1. INTRODUCTION 2.

Exhibit B: Proposed LAX Plan Amendments

Tampa International Airport Master Plan Update. December 12, 2012

Appendix 6.1: Hazard Worksheet

BNA Master Plan Update Community Advisory Committee Meeting No. 5

PFC Quarterly Status Report September 30, 2016

Community Noise Consortium Meeting (CNC)

PUBLIC NOTICE OF PASSENGER FACILITY CHARGE FOR DENVER INTERNATIONAL AIRPORT

Destination Lindbergh

The challenges of growth, the growth of challenges Airports Canada 2013 April 11, JAMES C. CHERRY CEO Aéroports de Montréal

EXECUTIVE SUMMARY FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT (FLL) MASTER PLAN UPDATE PHASE 1

Master Plan Phase 2 Workshop

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015

Update on the Aspen/Pitkin County Airport Improvements

14 C.F.R. Part 158. Passenger Facility Charge Program Logan International Airport. Public Notice

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis

TERMINAL DEVELOPMENT PLAN

Norfolk International Airport

BOARD ITO Aide REPORT TO THE AIRPORT COMMISSIONERS

Massport Study Team Evaluation of CAC Noise Study Alternatives. October 2010

Birmingham Airport 2033

Master Plan Update Community Advisory Committee Kick-off Meeting

State of the Airport Robert S. Bowen, Executive Director October 18, 2018

According to FAA Advisory Circular 150/5060-5, Airport Capacity and Delay, the elements that affect airfield capacity include:

Fort Lauderdale Hollywood International Airport

FLL Master Plan Update BOARD OF COUNTY COMMISSIONERS BRIEFING

Community Noise Consortium Meeting (CNC)

Draft Environmental Impact Report. for Los Angeles International Airport (LAX) Landside Access Modernization Program. Appendix D

Lake Tahoe Airport Master Plan

2018 Airport Master Plan Overview of Development Concepts. Greg Ballentine (WSP)

Aviation, Rail, & Trucking 6-1

FORECASTING FUTURE ACTIVITY

Exhibit A: Proposed LAX Specific Plan Amendments

I-3 DFW Extension Public Hearing. June 2, 2011

B GEORGIA INFRASTRUCTURE REPORT CARD AVIATION RECOMMENDATIONS DEFINITION OF THE ISSUE. Plan and Fund for the Future:

GRANDE PRAIRIE AIRPORT. Reduced Visibility Operations Plan

An Overview of GMR Megawide Consortium s Unsolicited Proposal. March 2018

TampaInternationalAirport

Westshore Development Forum Presented by: Alice J. Price, AICP, Senior Project Director

South Bay Metro Green Line Extension

CHAPTER 1 EXECUTIVE SUMMARY

2. 1:45 to 1:50 Review and Approval of November 18, 2009 NOC Meeting Minutes

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Airport Preliminary Master Plan Workshop Board of County Commissioners April 18, 2017

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport

State of Hawaii Dept. of Transportation Airports Division Capital Improvement Program Update

Public Outreach August 2011 Collateral Materials

The offers operators increased capacity while taking advantage of existing airport infrastructure. aero quarterly qtr_03 10

Community Noise Consortium Meeting (CNC)

FLL Master Plan Update Policy Advisory Committee (PAC) Briefing #2 July 10, 2017

Development and Use of Air Passenger Trip Tables in SCAG's 2016 Regional Transportation Plan

Community Noise Consortium Meeting (CNC)

The pilot and airline operator s perspective on runway incursion hazards and mitigation options. Session 2 Presentation 2

KJFK Runway 13R-31L Rehabilitation ATFM Strategies

Welcome Sustainability Initiatives of. International Airport

Noise Mitigation Program

Master Plan. Executive Summary

Appendix F International Terminal Building Main Terminal Departures Level and Boarding Areas A and G Alternatives Analysis

Los Angeles Basin Terminal Airspace Redesign

Airport Master Plan for. Brown Field Municipal Airport PAC Meeting #3

Vista Field Airport. Master Plan Update. February, Prepared for: Port of Kennewick One Clover Island Kennewick, Washington

Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3

WEST CENTURY BOULEVARD LOS ANGELES, CA 90045

City of Austin Department of Aviation Austin Bergstrom International Airport 2040 Master Plan. Public Workshop #2 April 19, 2018

Community Noise Consortium Meeting (CNC)

Study Committee Meeting. September 2015

Appendix C AIRPORT LAYOUT PLANS

msp macnoise.com MSP Noise Oversight Committee (NOC) November 17, 2010

75 YEARS OF EXPERIENCE 350+ AIRPORT PROJECTS AIRPORT TERMINAL ENGINEER (BUILDING DESIGN+CONSTRUCTION) AIRPORTS (ENR 2016)

Chapter 8.0 Implementation Plan

CHAPTER 4: ALTERNATIVES

Chapter 4.0 Alternatives Analysis

? 0-? WA", ilp. Y ON 1Z Cond 1 0 AIRPORT COMMISSIONERS BOARD REPORT TO THE Los Angeles World Airports 0*1-

BOARD OF AIRPORT COMMISSIONERS

Wake Turbulence Standards

Measuring, Managing and Mitigating Aircraft Related Noise

PUBLIC NOTICE ***************************** New Castle Airport. Intention to File a Passenger Facility Charge (PFC) Application

Transcription:

LAX Specific Plan Amendment Study (SPAS) Update December 3, 2012

Response to the Draft Environmental Impact Report

Draft EIR Release and Public Comment Official Comment Period was July 27, 2012 through October 10, 2012 (75 days) Three public meetings held in late August - Over 370 attended 101 verbal comments Virtual Meeting was available from September 10 until the close of the comment period. Comments Received - 251 commenters, over 2000 individual comments A majority of comments were focused on: The selection of a particular Alternative The importance of moving forward through the SPAS process. Formal responses to submitted comments are being prepared for the Final Environmental Impact report. 3

SPAS Alternatives & Objectives

SPAS Alternatives Summary Alternative Designation Integrated Alternatives Alternative 1 Alternative 2 Former References or Description 260 N with Busway/No Consolidated Rent- A-Car (CONRAC) Facility No Increased Separation with Busway/No CONRAC Alternative 3 Master Plan/ Alternative D Alternative 4 No Yellow Light Projects Airfield Alternatives Alternative 5 350 N Alternative 6 100 N Alternative 7 100 S Ground Transportation Alternatives Alternative 8 Busway/CONRAC Alternative 9 Automated People Mover (APM)/CONRAC 5

SPAS Project Objectives 1. Provide North Airfield Improvements That Support Safe and Efficient Movement of Aircraft 2. Improve Ground Access System to Better Accommodate Airport Traffic 3. Maintain LAX's Position as International Gateway to Southern California 4. Plan Improvements That Do Not Result in More Than 153 Passenger Gates at 78.9 MAP 5. Enhance Safety and Security at LAX 6. Minimize Environmental Impacts on Surrounding Communities 7. Produce an Improvement Program that is Sustainable, Feasible, and Fiscally Responsible 6

Staff Airfield & Terminal Recommendation

Airfield Objectives Review Safe and Efficient Movement of Aircraft LAX as International Gateway Alt. 1 Alt. 2 Alt. 3 Alt. 4 Alt. 5 Alt. 6 Alt. 7 5 1 4 0 4 2 2 5 1 4 0 4 2 2 Enhance Safety 5 1 4 0 4 2 2 Fiscally Responsible 4 4 0 4 4 4 4 350 North (Alt. 5) is the only alternative that meets all of the airfield objectives. No Increased Separation (Alt. 2), No Runway Improvements (Alt. 4), 100 North (Alt. 6), and 100 South (Alt. 7) do not meet these objectives, primarily because they do not allow for standard operations of ADG 5 or 6 aircraft on the North Airfield. Alt. D (Alt. 3) is the least fiscally responsible. The objective of Minimizing Environmental Impacts is considered on subsequent slides. 8

2025 Projected Fleet Mix Under the projected 2025 fleet mix for LAX, Group 5 aircraft make up more than 10% of all operations, and almost 40% of the international operations. 9

SPAS DEIR Air Quality (Airfield) Relative Increase in APU/GSE/Aircraft Emissions Compared to No Airfield Improvements (Alt. 4) Below Line = Reduction Below No Improvements Worst Significant and unavoidable impacts findings are limited to SOx, PM10 and PM2.5 Alt. D (Alt. 3) increased emissions compared to no airfield improvements All other Alts. offered emissions reductions. Alt. 2 had the lowest emissions. 10

SPAS DEIR Aircraft Noise (Dwellings) Fewest Dwellings Exposed Compared to no airfield improvements, all of the Alternatives decreased the number of dwellings significantly impacted by aircraft noise. Alt. 5 had the lowest number of dwellings newly impacted. 11

SPAS Airfield and Terminal Recommendation (Alt. 1) Achieves centerline taxiway with a movement of arrivals runway 260 north. Supports standard operations on the North Airfield, except for Group 6 aircraft when visibility is less than ½ mile. Provides pilot line-of-sight to end of departures runway for Group 5 operations. Addresses RSA and Taxiway/Taxilane deficiencies. Allows redevelopment or extension to north terminal facilities, including Terminal 0, TBIT and the Midfield Satellite Concourse (MSC) 153 passenger gates. 12

Staff Ground Transportation Recommendation

Ground Transportation Review Alts. 1& 2 Alt. 3 Alt. 4 Alt. 8 Alt. 9 Better Accommodate Airport Traffic 4 4 1 4 4 Enhance Security 4 4 4 4 4 Fiscally Responsible 4 0 4 4 2 Alternatives featuring the Busway (Alts. 1, 2 & 8) meet all the Ground Transportation objectives. Alternatives with the APM (Alts. 3, 9) meet objectives relating to accommodating airport traffic, but are more capital intensive. Alt. 4 does not address key planning objectives related to accommodating airport traffic. The objective of Minimizing Environmental Impacts is considered on subsequent slides. 14

SPAS DEIR Off-Airport Intersection Impacts Highest Total Of Intersection Impacts Most identified traffic impacts occur regardless of Alternative selected. Alternatives with a CONRAC in Manchester Square (Alts. 8 & 9) had the highest totals of intersections significantly and unavoidably impacted. 15

SPAS DEIR Air Quality (Ground Transportation) Relative Increase/Decrease in Roadway/Parking Emissions Below Line = Reduction from 2009 Except for PM10 and PM2.5, ground transportation-related emissions are down compared to 2009. In general, the Alternatives had similar operational air emissions profiles. 16

SPAS Ground Transportation Recommendation (Alt. 9) Development of significant facilities arising from performance of ground transportation system and passenger conveyance needs. Facilities include, but not limited to: Intermodal Transportation Facility (ITF) Consolidated Rent-A-Car Facility (CONRAC) Automated People Mover system (APM) Service to Metro facilities in Lot C and at Century/Aviation to be provided by airport circulator 17

SPAS Ground Transportation Recommendation (cont.) Non-CTA ground transportation projects, like the ITF, CONRAC, and APM are not mitigations for other airport projects. Alt. 9 provides the most flexibility in addressing ground transportation performance in the future. Frees Up currently assigned curbside in the CTA Potentially reduces CTA traffic on the roadway by 2.5% when compared to Alt. 8 More detailed design and planning will determine: Potential phasing for each of the ground transportation facilities When and in what order each improvement should be constructed Whether the APM could enhance inter-terminal connectivity How facilities could interface with planned and potential Metro projects 18

Staff Recommended Alternative

Staff Recommended Alternative 20

Key Features of Staff Recommended Alternative Airfield/Terminal Features: Achieves centerline taxiway with a movement of arrivals runway 260 north. Supports standard operations on the North Airfield, except for Group 6 aircraft when visibility is less than ½ mile. Provides pilot line-of-sight to end of departures runway for all except Group 6 operations. Addresses Runway Safety Area and Taxiway/Taxilane deficiencies. Allows redevelopment or extension to north terminal facilities, including Terminal 0, TBIT and the Midfield Satellite Concourse (MSC) 153 passenger gates. Ground Transportation Features Significant new facilities to be developed based on airport ground transportation and passenger conveyance needs. Including: Intermodal Transportation Facility (ITF) Consolidated Rent-A-Car Facility (CONRAC) Automated People Mover system (APM) Service to Metro facilities in Lot C and at Century/Aviation to be provided by airport circulator 21

Light Rail Opportunities for Airport Metro Connector Metro Rail Station Options Metro is constructing the Crenshaw/LAX Corridor Light Rail Line along Aviation Blvd., with a station on Century and Aviation. In a parallel effort, LAWA is collaborating with Metro to identify convenient connections to LAX. As part of the Airport Metro Connector project, LAWA is working with Metro examining potential methods to connect Crenshaw/LAX Corridor and Green Line passengers to the airport. The Staff Recommended SPAS Alternative preserves two additional opportunities to connect Metrorail light rail directly to the airport. 22

Next Steps

SPAS Timeline 24

Next Steps Meet with the SPAS Advisory Committee (12/4/2012). Complete Final EIR. Assist Planning Department in its consideration of any potential LAX Specific Plan changes. Continue to work with Metro as it considers transit opportunities near and at LAX. 25