Section 3.6 Recreation

Similar documents
PUBLIC DRAF MISSION TRAILS REGIONAL PARK Mission Gorge 5-27

NAVAJO COMMUNITY PLAN

Blueways: Rivers, lakes, or streams with public access for recreation that includes fishing, nature observation, and opportunities for boating.

Appendix L Technical Memorandum Aesthetics

MINUTES OF THE MEETING OF THE May 19, 2016 MISSION TRAILS REGIONAL PARK TASK FORCE

CHAPTER III: TRAIL DESIGN STANDARDS, SPECIFICATIONS & PERMITS

MINUTES OF THE MEETING OF THE MAY 16, 2013 MISSION TRAILS REGIONAL PARK TASK FORCE

This section evaluates the projected traffic operations and circulation impacts associated with the proposed upgrade and expansion of the LWRP.

MINUTES OF THE MEETING OF THE MARCH 17, 2016 MISSION TRAILS REGIONAL PARK TASK FORCE

Preferred Recreation Recommendations Stemilt-Squilchuck Recreation Plan March 2018

5.0 OUTDOOR RECREATION OPPORTUNITIES AND MANAGEMENT

Spencer Environmental Appendix A: Alternative Analysis for Construction Access Route

Coronado National Forest Santa Catalina Ranger District

The Chu property is a 6.57 acre parcel located in the Town of Superior on the west side of McCaslin Boulevard. In 2014, the Town of Superior acquired

MINUTES OF THE MEETING OF THE MARCH 20, 2014 MISSION TRAILS REGIONAL PARK TASK FORCE

MISSION TRAILS REGIONAL PARK CITIZENS ADVISORY COMMITTEE MINUTES OF THE MEETING OF MAY 3, 2016

TABLE COUNTY REGIONAL PARKS AND COMMUNITY PARKS IN THE DESERT REGION

Section 4(f) and Section 6(f) Technical Analysis

Tierrasanta 5K Runners Route & Traffic Blocks along Clairemont Mesa Blvd in Tierrasanta plus projected road block and control points

COASTAL CONSERVANCY. Staff Recommendation September 22, 2011 BAY AREA RIDGE TRAIL: HOOD MOUNTAIN TO HIGHWAY 12

BACKCOUNTRY TRAIL FLOOD REHABILITATION PROGRAM

APPENDIX L -4 RECREATIONAL TRAIL CROSSING PLANS

Lakeview-Reeder Fuel Reduction Project

White Mountain National Forest Saco Ranger District

Flow Stand Up Paddle Board Parkway Plan Analysis

Section 5.16 Parks and Recreation Facilities

FEASIBILITY CRITERIA

Recreation News. Welcome. Chris Jackson. In this Issue: O S U C o l l e ge F o r e s t s

EAST DON TRAIL ENVIRONMENTAL ASSESSMENT. Community Liaison Committee Meeting #3 July 15, :30 to 8:30 pm Flemingdon Park Library

Georgetown-Lewes Rail/Trail Study. Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No.

Long water shutdown scheduled for Tuesday, September 18

Appendix 3. Greenway Design Standards. The Whitemarsh Township Greenway Plan

PROPOSED PARK ALTERNATIVES

PRESERVE TRAIL GUIDELINES Resource Management Guidelines for Trails in Preserves

Dumont Dunes Special Recreation Management Area (SRMA)

3.13 RECREATION Introduction Environmental Setting. Regional Characteristics. Orange County

St. Joe Travel Management EA CULTURAL RESOURCES

Section 3.9 Recreation

Docket ID: NPS ; NPS-PERI-25774; [PPMWPERIS0 PPMPSPD1Z.YM0000]

E40. Temporary activities

BAYFIELD COUNTY FOREST COMPREHENSIVE LAND USE PLAN TABLE OF CONTENTS CHAPTER 700 ACCESS MANAGEMENT ROADS AND TRAILS

As outlined in the Tatshenshini-Alsek Park Management Agreement, park management will:

Classifications, Inventory and Level of Service

COMMENT PERIOD INTRODUCTION

Decision Memo Sun Valley Super Enduro & Cross-Country Mountain Bike Race. Recreation Event

Continental Divide National Scenic Trail Legislative History and Planning Guidance

Great Allegheny Passage

Aspen Skiing Company Policy for Use of Other Power-Driven Mobility Devices And Service Animals

CHAPTER 9. RECREATIONAL RESOURCES

ACCELERATED CONSTRUCTION LANE RENTAL FEES & A+B BIDDING DALLAS DISTRICT. June 7, 2018 Transportation Planning Conference June 7, 2018

RATTLESNAKE HILL PHILLIPS, HARRIS FARM, LIME KILN & QUARRY

Recreation Effects Report Travel Management

Table INYO COUNTY PARKS. Size (acres)

Daisy Dean Trail 628/619 ATV Trail Construction

Stephens Rd. Nature Preserve

FINAL TESTIMONY 1 COMMITTEE ON RESOURCES UNITED STATES HOUSE OF REPRESENTATIVES. July 13, 2005 CONCERNING. Motorized Recreational Use of Federal Lands

Recreation Specialist

AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY

Response to Public Comments

Description of the Proposed Action for the Big Creek / Yellow Pine Travel Plan (Snow-free Season) and Big Creek Ford Project

GREENWOOD VEGETATION MANAGEMENT

Decision Memo for Desolation Trail: Mill D to Desolation Lake Trail Relocation

VI. ALTERNATIVES TO THE MASTER PLAN C. RENOVATED EAST BUILDING ALTERNATIVE

STOWER SEVEN LAKES STATE RECREATION TRAIL POLK COUNTY, WISCONSIN. MASTER PLAN June, 2018

Kit Carson-Challenger Ridge Trail Project Annual Performance Report-2014 October 22, 2014

MISSION TRAILS REGIONAL PARK CITIZENS ADVISORY COMMITTEE MINUTES OF THE MEETING OF March 4, 2014

Logo Department Name Agency Organization Organization Address Information 5700 North Sabino Canyon Road

MORGAN CREEK GREENWAY Final Report APPENDICES

Rule Governing the Designation and Establishment of All-Terrain Vehicle Use Trails on State Land

REPORT TO THE CHIEF ADMINISTRATIVE OFFICER FROM THE PUBLIC WORKS AND UTILITIES DEPARTMENT

PLANNING COMMISSION AGENDA REPORT May 10, Members of the Planning Commission. Joyce Parker-Bozylinski, Contract Planner

Creating a User-Driven Long-Distance OHV Trail Through Partnering

Appendix F International Terminal Building Main Terminal Departures Level and Boarding Areas A and G Alternatives Analysis

Tinker Air Force Base, Oklahoma

Trails Technical Committee

DRAFT. Dorabelle Campground Rehabilitation

Northeast Quadrant Distinctive Features

BACK COUNTRY UNIT PREFERRED ALTERNATIVE

SOCIAL CONFLICT BETWEEN MOTORIZED AND NON-MOTORIZED RECREATIONAL ACTIVITIES.

SR 934 Project Development And Environment (PD&E) Study

Decision Memo Ice Age Trail Improvement (CRAC 37)

Trail Phasing Plan. Note: Trails in the Clear Creek Canyon area (Segments will be finalized in the future to minimize wildlife impacts

LAX Plan September 29, 2004

RECREATION. Seven issues were identified that pertain to the effects of travel management on outdoor recreation within portions of the project area.

Nov. 19 th Public Workshop Summary

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES

PALO CORONA REGIONAL PARK MPRPD BOARD MEETING AUGUST 8, 2018

Chuckanut Ridge Fairhaven Highlands EIS Scoping Concerns

ZoPath Trail. Extreme Park. Group III. Brendan Pillar, Conor Coakley James Amendola, & Mark McDermott. May 4, 2006

National Forests and Grasslands in Texas

APPENDIX F List of Commitments

RECREATIONAL VEHICLE RESORT DISTRICT R-RVR. Lacombe County Land Use Bylaw No: 1237/17 Date Adopted: July 6, Page 111

The Baker/Carver Regional Trail is intended to

Section 106 Update Memo #1 Attachment D. Traffic Diversion & APE Expansion Methodology & Maps

Understanding the caring capacity of the visitor experience Provide facilities to support a high level user experience Address visual quality through

White Mountain National Forest Saco Ranger District

Thornton Water Project. Larimer County Route Study and Project Update September 12, 2017

Bradley Brook Relocation Project. Scoping Notice. Saco Ranger District. United States Department of Agriculture Forest Service

Aircraft Maintenance Run Procedures. Date: 1 June 2015 Version: 3.0

4.8 RECREATION. Approach to Analysis

Transcription:

3.6 RECREATION This section evaluates the potential impacts of the proposed project on recreation within MTRP. The evaluation is based on field observations, a review of maps of MTRP and the MTRP Master Plan, and discussions with park rangers. 3.6.1 Existing Conditions MTRP provides numerous opportunities for recreation, including the use of utility roads and easements. Over 40 miles of roads and trails within MTRP are available to hikers, equestrians, and mountain bikers. In addition to hosting utility corridors for water, sewer, electricity, telephone, and gas, and providing roads and trails, MTRP provides natural open space for the support of native plant and animal species. The project area is used mostly for passive recreation with limited fencing and signage to protect sensitive resources. The project area is within the West Fortuna Mountain portion of the MTRP, which consists of the western portion of the park that is located adjacent to the Tierrasanta neighborhood and extends southward towards Mission Gorge Road and the Navajo and San Carlos neighborhoods. Travel is limited to existing roads and trails, which are designated for hiking only, hiking and biking, or hiking, biking, and equestrian use. Typical recreational use of this portion of the park consists of walking, dog walking, jogging, running, hiking, mountain biking, horseback riding, nature study, photography, and the general enjoyment of natural open space. The terrain consists of a series of ridges and valleys, with the San Diego River flowing through the deepest valley, Mission Gorge. Access points to MTRP within the project area, from north to south, are generally limited to Portobelo Drive, Corte Playa Catalina, Seda Drive, Clairemont Mesa Boulevard, Calle de Vida, and Mission Gorge Road, although other informal access points are possible from adjacent residential areas. With the exception of Corte Playa Catalina, each of these access points can be used by authorized motor vehicles, which are limited to park rangers, park maintenance staff and contractors, law enforcement, fire protection, and utility providers with facilities within the park. While motor vehicles operate within the project area on a daily basis, the number of trips is typically low and vehicle speeds are limited to 15 mph. 3.6.2 Thresholds of Significance Thresholds used to evaluate potential impacts to recreation are based on applicable criteria in the State CEQA Guidelines (CCR 15000-15387), Appendix G; and the thresholds established for the Water Authority s Program Environmental Impact Report for the Regional Water Facilities Master Plan. A significant impact to recreation would occur if the project would: Increase the use of existing neighborhood and regional parks or other recreational facilities such that substantial physical deterioration of the facility would occur or be accelerated. Result in the direct disturbance or displacement of established recreation facilities Mission Trails FRS II, Pipeline Tunnel, 3.6-1 March 2006

3.6.3 Impact Analysis Would the project increase the use of existing neighborhood and regional parks or other recreational facilities such that substantial physical deterioration of the facility would occur or be accelerated? The project would reduce the use of portions of the West Fortuna Area of MTRP, which represents the western edge of the park, during construction where access points and trails would be closed to maintain visitor safety. However, because the regional park offers multiple access points and trails, the inaccessibility to this part of MTRP is not expected to substantially increase the use of existing neighborhood parks or other portions of MTRP. Furthermore, the maximum period of closure would be approximately 2 years, a duration that would be unlikely to result in physical deterioration to other portions of MTRP or other facilities due to a redirected demand for passive recreation in an open space setting. This impact would be less than significant. Would the proposed project result in the direct disturbance or displacement of established recreation facilities? The proposed project would result in the temporary closure of dirt roads and trails within the West Fortuna Area of MTRP. These dirt roads and trails are used for recreation on a daily basis and are established recreation facilities for walking, running, jogging, hiking, nature study, mountain biking, and equestrian use. Closure of park trails and access areas is anticipated to range from 3 months at the San Diego River crossing to 2 years at the Clairemont Mesa Boulevard staging area, FRS II site, and North and South Portals. Access to park trails and roads through construction areas and on some roads used for truck routes would be prohibited for the duration of construction. The Clairemont Mesa Boulevard and Portobelo Drive access routes would be closed while the Calle de Vida access route would be open with public access restricted only while trucks and equipment are present. Figure 3.6-1 provides a map of the existing roads and trails in MTRP. Figure 3.6-2 shows the proposed road and trail closures that would be required to protect public safety during project construction. Active construction areas would be fenced and access would be restricted to authorized personnel. This would result in the direct disturbance of a portion of MTRP, which is an established, regional recreational facility. The direct impact to these recreational facilities would only occur during construction and would be limited to the extreme western part of the large regional park. Access to the park would be open during construction from many other points, including Mission Gorge Road at the Visitor s Center and at the Kumeyaay Lake Campground, as well as Deerfield Street, Navajo Road, Barker Way, Mesa Road, Big Rock Road, and Mast Boulevard. All trails from these access points would be open, including the BMX Track at the Deerfield Loop. As illustrated in Figure 3.6-3, Calle de Vida access would be a limited use access route for oversized construction equipment, and would typically remain open to the public for recreational use during construction. The Clairemont Mesa and Portobello access would be closed during construction. However, an alternative Portobello access, Corte Playa Catalina, Seda Drive, and Calle de Vida would allow continued recreational access to the Fortuna Mountain portion of MTRP. In addition, the entrance at Mission Gorge Road and Jackson Drive and the hike and bike trail to the river would be open except for a 2-month period during construction of the San Diego River Mission Trails FRS II, Pipeline Tunnel, 3.6-2 March 2006

crossing. The Water Authority will continue to distribute community newsletters to residents within the 92124 Zip Code, MTRP staff, and other interested parties describing the project components, schedule, impacts to recreational uses, and suggested alternative park areas and trails that may be used for recreational purposes during construction. Direct impacts of the access point and trail closures would be adverse. However, the impacts would be less than significant due to the availability of other portions of the park for recreation and the limited duration of the project. Secondary or indirect impacts to recreational uses of the park would result from the intrusion of construction noise and dust and a change in park aesthetics due to the construction activities. Mitigation measures related to dust control are described in more detail in Section 3.4, Air Quality. Mitigation measures related to construction noise are described in Section 3.5, Noise and Vibration. These secondary impacts would be adverse, but less than significant, due to the availability of other portions of the park for recreation and the limited duration of the project. All existing roads and trails would be restored to their existing condition or better following construction. All road and trail restoration would be coordinated with the MTRP Senior Park Ranger. Because the proposed project would be almost entirely below ground, there would not be any long-term impacts to recreation. 3.6.4 Mitigation Measures Impacts to recreation in MTRP would be adverse, but less than significant. Therefore, no mitigation measures are required. See Section 2.6.5 for a discussion of project design features that would be implemented to maintain access to the Fortuna Mountain area of MTRP during construction. 3.6.5 Residual Impacts after Mitigation No residual impacts would occur. Mission Trails FRS II, Pipeline Tunnel, 3.6-3 March 2006

This page intentionally left blank. Mission Trails FRS II, Pipeline Tunnel, 3.6-4 March 2006

0 3200 Feet (Scale is Approximate) Mission Trails Flow Regulatory Structure II, Pipeline Tunnel, and Vent Demolition Project Map Notes MTRP Trails Map Figure 3.6-1

This page intentionally left blank. Mission Trails FRS II, Pipeline Tunnel, 3.6-6 March 2006

M.C.A.S. MIRAMAR PIPELINE INTERCONNECT RECONFIGURATION SITE RIVER Legend TRAILS CLOSED DURING CONSTRUCTION WORK AREAS CLOSED DURING CONTRUCTION TRAIL CLOSURE BARRIER AND SIGN JACKSON DRIVE CLOSURE APPROX. 3 MONTHS (SEPT-NOV) LIMITED ACCESS ROUTE\BARRIER AND SIGN (Typically open to public during construction) 0 3200 Feet (Scale is Approximate) Mission Trails Flow Regulatory Structure II, Pipeline Tunnel, and Vent Demolition Project Map Notes Date: Jan 9, 2006 Potential Trail Closures During Construction Figure 3.6-2

This page intentionally left blank. Mission Trails FRS II, Pipeline Tunnel, 3.6-8 March 2006

Mission Trails Flow Regulatory Structure II, Pipeline Tunnel, and Vent Demolition Project Map Notes Alternative Offsite Access Routes Figure 3.6-3

This page intentionally left blank. Mission Trails FRS II, Pipeline Tunnel, 3.6-10 March 2006