A14 SCHEME - LAST CHANCE TO OBJECT

Similar documents
Response to the London Heathrow Airport Expansion Public Consultation

Why build a third runway, when you can build a longer runway?

The impact of investments & storms on the economic benefits provided by the South West Coast Path National Trail to the region between 2010 and 2014

South of England north-south connectivity

Road Investment Strategy A1 East of England Strategic Road Study

M621. Junctions 1 to 7 Improvement scheme. Share your views

Network Management, building on our experience of flow management and network planning.

SUTTON UNDER WHITESTONECLIFFE PARISH COUNCIL

Victoria Station Upgrade

TAG Guidance Notes on responding to the Civil Aviation Authority s consultation on its Five Year Strategy

N4 Carrick-on-Shannon to Dromod Road Project. 2.1 Introduction

M4 Junctions 3 to 12 Smart motorway

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL

Introduction of traffic control measures to improve congestion and air quality within the town centre

Policy Transport. Policy highlights. Our plan

About ABTA. Executive summary

Questions inviting views and conclusions in respect of the three short-listed options

Strategic Transport Forum 7 th December 2018

Consultation on Draft Airports National Policy Statement: new runway capacity and infrastructure at airports in the South East of England

EASYJET TRADING STATEMENT FOR THE QUARTER ENDED 31 DECEMBER easyjet delivers a good start to the year, in line with expectations

A63 Preferred Route Announcement

Lower Thames Crossing Consultation

THE NEXT STAGES FOR DELIVERING HEATHROW EXPANSION

DEADLINE APPROACHES FOR AVIATION CARBON FOOTPRINT CAP

Heathrow Consultation January March 2018

International Operations: NATA 2012 Air Charter Summit

Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content

IAPSC CONFERENCE 4 DECEMBER 2003 EU EMISSIONS TRADING SCHEME

Proposals for the Harrogate Road / New Line Junction Improvement Scheme. August / September Supported by:

Major Scheme Business Case Summary Report for Programme Entry

reformscotland.com Cut then scrap: The case against Air Passenger Duty

AIRSPACE PRINCIPLES CONSULTATION DOCUMENT JANUARY 2018

Economic Development Sub- Committee

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Executive Director / Senior Planning Policy Officer

Kilometres. Blacktown. Penrith. Parramatta. Liverpool Bankstown. Campbelltown

High Speed Two: From Crewe to Manchester, West Midlands to Leeds and beyond

A TRANSPORT SYSTEM CONNECTING PEOPLE TO PLACES

Meeting the capacity challenge: The case for new lines

A303. Sparkford to Ilchester Dualling Scheme Preferred Route Announcement

A120 Braintree to Marks Tey Consultation

State of the Aviation Industry

A31 Ringwood improvement scheme

Emerging Strategy. Executive Summary November Midlands Connect Powering the Midlands Engine

Wokingham Borough Council Response to the Consultation on the Draft Airports National Policy Statement

A303 Stonehenge Amesbury to Berwick Down

A63 Castle Street, Hull HullBID Network Lunch 24 August 2017

Lower Thames Crossing consultation response

Boxley Parish Council Highway Issues Briefing Note M2 junction 3 A229 Local Traffic Infrastructure

The economic impact of ATC strikes in Europe Key findings from our updated report for A4E

October 2013 compared with September 2013 Industrial production down by 1.1% in euro area Down by 0.7% in EU28

A5-M1 Link (Dunstable Northern Bypass) Explanatory Statement

East West Rail Consortium

A30 Chiverton to Carland Cross Improvement Scheme Preferred route announcement

Felixstowe Branch Line FAQ

Performance Criteria for Assessing Airport Expansion Alternatives for the London Region

UNLOCKING THE BRIGHTON MAINLINE

WRITTEN SUBMISSION FROM RMT 17 OCTOBER 2008

Single European Sky II

SUSTAINABLE DEVELOPMENT PLAN 2015

% change vs. Dec ALL VISITS (000) 2,410 12% 7,550 5% 31,148 1% Spend ( million) 1,490 15% 4,370-1% 18,710 4%

Report to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub

Operation of the UK Traffic Distribution Rules in relation to all-cargo services at London Gatwick Airport. Consultation paper by BAA Gatwick

Appendix. Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Gatwick Airport Limited

M56. New Junction 11a Summary of the consultation report

Submission by Heathrow Southern Railway Ltd.

M54 to M6/M6 Toll Link Road Public consultation

The Government s Aviation Strategy Transport for the North (TfN) response

Briefing: ICAO Council discussion on including aviation in the EU-ETS

Scotland to England Journeys (million)

SOUTH GLOS COUNCIL UPDATE FOR SUSCOM - JANUARY 2016

State Budget Comment

Report on the Crafthole Traffic Light Project 3 rd July th September 2017

At least 725,000 people are already impacted by aircraft noise from Heathrow.

ECONOMY & SURFACE ACCESS SUMMARY LAND USE LAND USE SUSTAINABLE DEVELOPMENT PLAN 2016 DHL. manchesterairport.co.uk

As part of our transport vision, Leeds City Council, working with the West Yorkshire Combined Authority and Leeds Bradford Airport Company, is

IRISH PARKING ASSOCIATION. The use of Pay and Display in Traffic Management in Kilkenny City

Steve Smith Director Cargo Supply Chain Management

RESPONSE TO AIRPORT EXPANSION CONSULTATION 27 MARCH 2018 Submitted online by Helen Monger, Director

A358. Taunton to Southfields Dualling Scheme Public consultation

Public consultation exhibition

The case for a local rail station. At Great Blakenham, Suffolk.

WELLINGTON $422 MILLION $614 MILLION $83 MILLION 22% SPEND $1.9 BILLION

Policy National s plan for regional New Zealand. Policy highlights. Backing our regions. Delivering for New Zealanders

In response to the decision by the Labour Government to give the go-ahead to a third runway in 2009, May said:

EAST WEST RAIL EASTERN SECTION. prospectus for growth

ANNUAL TOURISM REPORT 2013 Sweden

SUMMARY PROOF OF EVIDENCE. Gerald Kells Transport Policy and Campaigns Advisor

G Street Undercrossing. City Council Meeting Date: November 3, 2008

BUSINESS CASE EXECUTIVE SUMMARY CHANNEL CAPACITY UPGRADE

STANSTED AIRPORT PLANNING APPLICATION UTT/18/0460/FUL SECTION 106 CONDITIONS TO BE REQUIRED IF PLANNING APPLICATION IS APPROVED

THE PROPOSED NETWORK RAIL (ESSEX AND OTHERS LEVEL CROSSING REDUCTION) ORDER DEPARTMENT FOR TRANSPORT REFERENCE: TWA/17/APP/05

East Midlands Airport - Past, Present and Future Introduction The History of East Midlands Airport (EMA) Fig. 1 - RAF Castle Donnington Layout -1945

European Joint Industry CDA Action Plan

Regional summary - Wellington

LifeWatch, costing and funding. The LifeWatch e-infrastructure financial issues

ASLEF s Response to the East Anglia Rail Franchise Consultation

Elpida A. Epaminonda. TEN-T and CEF Coordinator Ministry of Transport, Communications and Works

Threats to possible orbital light-rail in outer London from the current Brent Cross planning application...

Slovene Perspective on Mobility in Europe and its Reflection on Countries in the Danube Region

1. Summary of key points 2

Transcription:

Issue 31 Brampton Parish Council Newsletter Autumn-Winter 2009 A14 SCHEME - LAST CHANCE TO OBJT First the bad news. Draft orders for the A14 scheme were issued on 30 Sep 09. The hatched areas in the scheme drawing below denote areas for minerals extraction during the construction phase. Those of you who object to the scheme should write now to ensure that a Public Inquiry takes place. The deadline for letters of objection is 6 January 2010. Further information is on pages 2-5. HIGHWAYS AGENCY S A14 SCHEME BRAMPTON A1/ NEW A14 INTERCHANGE Now for the good news! To help EU nations during the economic downturn, the European Commission recently brought forward funding for European freight route projects which include the Highways Agency s A14 road scheme. The good news is that two key elements of Brampton Campaign Group s alternative proposal (1) upgrading the Felixstowe-Nuneaton rail freight route and (2) installing traffic management systems on the existing A14 - were awarded 20million euros of EU funding. It s not much compared to the vast sums the Highways Agency is seeking for the road scheme ( 1.3 billion) but it is much better value for money, for A14 communities and for the future of the planet. The Highways Agency s A14 road scheme got nothing.

BRAMPTON A14 CAMPAIGN GROUP - AN ALTERNATIVE PROPOSAL Case based on environmental issues* & the Precautionary Principle *climate change *carbon emissions reduction targets *air and noise pollution *related health issues * flooding risk A428-A421 link from A14 to M1 Highways Agency map showing location of A14 scheme and A428-A421 link to M1 1. ROAD: SCRAP NEW A14 PLANS (ie Fen Drayton - Ellington section of the improvement scheme). Retain Huntingdon viaduct and existing A14 capacity. Costs of rebuilding viaduct offset by no need to widen A1 or build complex local road scheme in and around Huntingdon. New junction on A1198 also not required. Current cost estimate for A14 improvement scheme (22 miles) 1.2 BILLION. 2. ROAD: Complete upgrade of existing alternative route: A14/M11(J14) A428-A421-M1 A428 upgrade partially completed. More funding needed. A421 upgrade now under construction. Bring forward completion of both upgrades using part of new A14 funding if needed. 3. RAIL: Invest available new A14 funding in ports rail freight infrastructure. Existing EU TEN-T freight route Felixstowe Nuneaton. Some additional Govt and EU funding has been allocated but significantly greater investment is needed to increase network capacity to level required* (see note below) 4. GUIDED BUS: Under construction. Cambridge to Huntingdon. Aim is to reduce A14 car traffic. 5. COSTS: The proposals above would reduce the public health1 risks (and associated costs2) and would be better for the environment due to the lower carbon emissions of rail 3. The rail freight route would also relieve A14 congestion from Felixstowe to Huntingdon (and beyond) not merely from Cambridge to Huntingdon. Upgrading existing road and rail routes would be likely to be better value for money and could bring the required improvements into service more quickly. Notes: 1. The Gauderman report (p4) 2. Annual costs to the NHS attributed to road transport pollution estimated at 11 billion. 3. Per tonne carried, rail produces between five and ten times fewer emissions than road transport EWS March 2007. 6. TRAFFIC CONGESTION AND ROAD SAFETY could be further improved by: Improving traffic management: crawler lanes for HGVs; use of hard shoulder; road pricing; ATM* Testing of non-uk lorries at embarkation/disembarkation ports Validating papers and driving licences of non-uk drivers Policing adherence to limits on drivers hours/statutory breaks etc Providing truck stops to minimise parking in A14 villages. Note: Many of the points listed have now been addressed by the House of Commons Transport Select Committee Report published 24 Aug09 at http://www.publications.parliament.uk/pa/cm/cmtran.htm * Further funding approved by EU 21 Oct 09 for rail route and ATM on A14 (see page 3). 2

SUPPORT FROM THE EUROPEAN COMMISSION EUROPEAN COMMISSION PRESS RELEASE: TEN-T DAYS NAPLES 21OCT09 The European Commission has today announced the first group of projects that will benefit from a total of 500 million worth of investment in vital transport infrastructure projects across the EU. The grants will be allocated under the Trans-European Transport Network (TEN-T) programme, which helps to fund works to build missing transport links or remove bottlenecks in order to enable people and goods to circulate quickly and easily between Member States. The 500 million package constitutes a vital part of the Commission's response to the economic crisis. The funding announced today will go towards projects in Austria, Belgium, Germany, Spain, France, Hungary, Italy, the Netherlands, Portugal, Sweden and the United Kingdom. European Commission Vice-President Antonio Tajani in charge of transport, commented: "I am pleased to be signing these funding decisions today. It is my conviction that the EU's capacity to grow depends on the quality of its transport infrastructure and the TEN-T programme plays an essential role in ensuring its progress. Unlocking this funding shows the Commission is serious about tackling the economic crisis as it is targeted to encourage further economic growth. This funding released under the TEN-T programme plays a crucial role in keeping Europe moving forward." Comment: The funding allocated to the UK was for the A14 Traffic Management Scheme (ATM) and for works on the Felixstowe-Nuneaton rail freight route as advocated in the Brampton A14 Campaign Group alternative solution. 3

HEALTH ISSUES GAUDERMAN REPORT Comment: 1. I have discussed Brampton s situation with the lead author of this report, Dr James Gauderman. He assures me that if the new A14 goes ahead (ie the proposed 6-lane highway from Fen Drayton to Ellington via Brampton), Brampton would fall well within the criteria for this study based on size of highway (combined A1 + A14), volume of traffic and proximity of housing. 2. The Precautionary Principle is a moral and political principle which states that if an action or policy might cause severe or irreversible harm to the public, in the absence of a scientific consensus that harm would not ensue, the burden of proof falls on those who would advocate taking the action. 4

WHAT S WRONG WITH THE A14 SCHEME? Well, what do you think about the potential impact of the Highways Agency s A14 scheme on Brampton and on the health and quality of life of our community? For example: Brampton was declared an Air Quality Management Area in September 2006 due to excessive nitrogen dioxide emissions from traffic on the existing A14 (4 lanes) to the north of the village; The A14 scheme shows 10 lanes of traffic (A1+A14) close to homes at the west end of the village; A1/A14 interchange (10 lanes of traffic - 114,600 vehicles daily) is at the south-west of village (Brampton would be virtually a traffic island); Demolition of Huntingdon viaduct* and construction of a complex series of link roads will result in increased traffic on Huntingdon Road & Thrapston Road at the east end of Brampton; de-trunking of the existing A14 is designed to channel the bulk of long-distance heavy freight traffic onto the new A14 past Brampton (currently around 30% of traffic HGVs - more than double the national average); HGVs are much more polluting than cars; health risks: particulates; air and noise pollution; risk to lung development of children (Gauderman report); risk to cardiac patients from traffic noise. Also, loss of rural tranquillity, diminished quality of life; loss of productive arable farmland; potential flood risk from new road embankments and roadside bunds (for noise mitigation); Brampton is already a flood risk area (see Environment Agency website). Costs for this 22-mile scheme have now escalated still further to 1.3 billion. The Highways Agency thinks this is good value for money do you? Climate Change & Copenhagen Campaign for Better Transport statistics show that this scheme is the costliest non-motorway project in the country and the biggest carbon emitter. Our children and grand-children will inherit the decisions we make today. Remember the principle of sustainable development defined in the Brundtland report (1987) as: development that meets the needs of the present without compromising the ability of future generations to meet their own needs. *NB: The Highways Agency claim that the viaduct is no longer fit for purpose but we have learned that structural engineers have recently advised Buckden Parish Council that it is feasible to repair the viaduct to a high standard in situ to minimise disruption to east coast mainline rail traffic. Retention of the existing A14 as a trunk road would be beneficial for Brampton. There would be no need to widen the A1, build link roads in Huntingdon or widen the Huntingdon-Brampton road. Those of you who wish to object to the scheme should write as soon as possible to Anna Smyth at the Highways Agency. You could also send a copy of your letter to The Secretary of State for Transport, Lord Adonis, House of Lords, Westminster SW1 1AA or email him at andrew.adonis@dft.gsi.gov.uk - the deadline for receipt of objections is 6 January 2010. Even if you sent an objection letter after our Public Inquiry seminar in May, you can do so again as this is the first time we have seen the finalised scheme. Brampton Parish Council and Brampton A14 Campaign Group will submit formal objections to the scheme and continue to work together to seek the best deal for Brampton should the scheme go ahead. This includes optimum mitigation measures for air and noise pollution and the possibility of a crossing over the A1/A14 for pedestrians, cyclists and horse-riders. The Campaign Group will also submit its alternative proposal, which now has EU support. Eileen Collier (Cllr) Founder Brampton A14 Campaign Group 5