Letter of Agreement. IVAO Switzerland & France Divisions. 1. Purpose. 2. General procedures

Similar documents
Object: LoA between the Reims FIR (LFEE) and the Geneva FIR (LSAG)

Object: LoA between the Barcelona FIR (LECB) and the Bordeaux FIR (LFBB)

Letter of Agreement. IVAO German & France Divisions. 1. Purpose. 2. General procedures

INDICE. 1. Purpose 2 2. General procedures 2 3. ATC units description 2 4. Coordination procedures En-route coordination 6

Letter of Agreement. IVAO United Kingdom and Ireland & France Divisions. 1. Purpose. 2. General procedures

Letter of Agreement. IVAO United Kingdom and Ireland & France Divisions. 1. Purpose. 2. General procedures

Letter of Agreement. IVAO Division France. 1. Purpose. 2. General procedures

Traffic shall be handed over as soon as practical and, whenever possible, at latest 3000 ft before reaching the cleared flight level.

Letter of Agreement. between. and

IVAO Switzerland Division

THE AREA CONTROL CENTRE (CTR) POSITION

Letter of Agreement. between

Letter of Agreement. between. and. Effective: 01-OCT-2016 / 1610 Edition: 3.0

LETTER OF AGREEMENT. Between

LETTER OF AGREEMENT. vacc Switzerland. VACC France Paris FIR (LFFF) Marseille FIR (LFMM) Reims FIR (LFEE)

International Virtual Aviation Organisation. Letter of Agreement. between. and. Effective: 15/05/2017 Edition: 2

International Virtual Aviation Organisation. Letter of Agreement. between. and. Effective: 15/05/2017 Edition: 1

Standard Operating Procedures (SOPs) for UAE Centre (OMAE)

AIRSPACE STRUCTURE. In aeronautics, airspaces are the portion of the atmosphere controlled by a country above its territory.

LETTER OF AGREEMENT. between. and

GENERAL OPERATING PROCEDURES FINLAND(GOP)

LETTER OF AGREEMENT. between. and

LETTER OF AGREEMENT BETWEEN BODØ FIR AND MURMANSK FIR

LETTER OF AGREEMENT BETWEEN DENMARK FIR AND SWEDEN FIR. VATSIM Scandinavia 4 April 2013

USE OF RADAR IN THE APPROACH CONTROL SERVICE

FLIGHT STRIP MANAGEMENT - APPROACH LEVEL

SEMI-CIRCULAR RULE. The default worldwide semi-circular rule is the East/West orientation of the flight level parity:

Standard Operating Procedures (SOPs) for Arabian Control (OGCC)

PILOT BRIEFING GENEVA RFE 2018

Denmark FIR and Sweden FIR

LETTER OF AGREEMENT BETWEEN POLISH VACC AND SWEDEN FIR

Traffic shall be handed over as soon as practical and, whenever possible, at latest 3000 ft before reaching the cleared flight level.

LETTER OF AGREEMENT BETWEEN NORWAY FIR AND DENMARK FIR

LETTER OF AGREEMENT. vacc Switzerland. vacc Italy (LIMM) Milano ACC Padova ACC

Letter of Agreement (LOA)

Eastern Caribbean PIARCO Virtual FIR. PIARCO Control Zone (CTR)

IVAO Flight Operations Department Indonesia (ID) Division Procedures

GENEVA OM ATC OPERATING MANUAL LSAG FIR DEPARTMENT LSAG-CH LSAG-ACH

THE TOWER CONTROL POSITION (TWR)

IFR SEPARATION USING RADAR

LETTER OF AGREEMENT BETWEEN NORWAY FIR AND DENMARK FIR

LETTER OF AGREEMENT BETWEEN NORWAY FIR AND DENMARK FIR

SECTION 6 - SEPARATION STANDARDS

Jordan Airspace Manual. Prepared by: Aboud Horani & Mahmoud Odeh XM-AOC / XM-ADIR

AIP ENR JORDAN 12 DEC 2013 RADAR SERVICES AND PROCEDURES

LETTER OF AGREEMENT BETWEEN NORWAY FIR AND SWEDEN FIR

AERONAUTICAL INFORMATION CIRCULAR

Standard Operating Procedures (SOPs) for BAGHDAD (ORBI)

WAKE TURBULENCE SEPARATION MINIMA

ZTL ARTCC. Asheville Regional. Air Traffic Control Tower. Standard Operating Procedures AVL B. Effective: May 1, 2011

ALTIMETER SETTING PROCEDURES

Burlington ATCT Standard Operating Procedures

HOLDING STACK MANAGEMENT

BASIC IVAC FUNCTIONS

IFR SEPARATION WITHOUT RADAR

AIP PORTUGAL ENR NOV-2007

Standard Operating Procedures Atlanta Intl Airport (ATL) Air Traffic Control

RELEASE RECORD. Version Date Author Notes Dec 2006 SK Initial Release

SWITZERLAND. AIP Services P.O. Box CH-8602 Wangen bei Dübendorf Switzerland

SWITZERLAND. AIP Services P.O. Box CH-8602 Wangen bei Dübendorf Switzerland

ZTL ARTCC. Augusta Regional

FLIGHT PLAN VALIDATION

IVAO Switzerland Division

NATS Edinburgh / BGA LOA effective 24 November 2005

VFR FLIGHTPLAN EQUIPMENTS

Albany ATCT Standard Operating Procedures

MINIMUM FLIGHT ALTITUDES

Temporary Radio Mandatory Zone

LETTER OF AGREEMENT LETTER OF AGREEMENT BETWEEN LONDON SOUTHEND AIRPORT AND STOKE AIRFIELD

Denver ARTCC Colorado Springs ATCT & TRACON STANDARD OPERATING PROCEDURES

VATUSA-VATNZ-VATPAC OCEANIC PARTNERSHIP OAKLAND OCEANIC FSS GENERAL SOP 1 OCT 2012

SECTION 4 - APPROACH CONTROL PROCEDURES

TRANSPONDER WITH IVAC

Greenville Spartanburg International

GENERAL INFORMATION The aerodrome consists of three runways (04L-22R, 04R-22L, 12-30) and four aprons.

LETTER of AGREEMENT FRANCE - SPAIN vaccs VATSIM

IVAO ZA division. Air Traffic Control Procedures

Letter of Agreement. Between Jacksonville ARTCC and Virtual United States Navy Effective Date: Sept 1, 2008

ELLX Procedures PROCEDURES FOR ELLX

1.2 An Approach Control Unit Shall Provide the following services: c) Alerting Service and assistance to organizations involved in SAR Actions;

LGAV LTAI Real Flights Event Partnership EUROPE. PILOT's BRIEFING. March 7th 2009 Event time: 1200z 2200z. Ankara and Istanbul FIR Guides & LTAI Guide

EASA NPA on SERA Part ENAV Response sheet. GENERAL COMMENTS ON NPA PACKAGE Note: Specific comments are provided after the General Comments

OPERATIONS MANUAL PART A

Air Traffic Services and Airspace

SWITZERLAND. AIP Services P.O. Box CH-8602 Wangen bei Dübendorf Switzerland

International Civil Aviation Organization. Agenda Item 6: Free Route Airspace Concept implementations within the EUR Region FREE ROUTE AIRSPACE DESIGN

MODULE 4: SIDs and STARs. Slide <#> of

VFR PHRASEOLOGY. The word IMMEDIATELY should only be used when immediate action is required for safety reasons.

Title: Airway Q41: Reclassify to Class G below Flight level 55. Subject Release of Controlled and Segregated Airspace

HOUSTON AIR ROUTE TRAFFIC CONTROL CENTER VATSIM United States Division. Letter of Agreement. Revised: July 25, 2004 Effective: July 25, 2004

Piedmont Triad International Airport

CHAPTER 5 SEPARATION METHODS AND MINIMA

A Letter of Agreement Between: Robin Hood Airport Doncaster Sheffield and British Gliding Association

GEN 3.3 Air Traffic Services

ENR 1.6 RADAR SERVICES AND PROCEDURES

San Juan CERAP. Standard Operation Procedures. Version 2.2 May 5th, Welcome to San Juan CERAP (ZSU ARTCC, TJZS FIR)

1 SOFTWARE INSTALLATION

Letter of Agreement by and between Jacksonville ARTCC and Miami ARTCC

Luxembourg TMA Contingency measures. Clear the sky procedure & Agreement on service continuity

Providence ATCT Standard Operating Procedures

Transcription:

Letter of Agreement IVAO Switzerland & France Divisions Number: LOA-FR-LFFF-LSAG_N Date: 27 th March 2018 Version: v3 Validity: permanent Contrib.: FR-AOC, FR-AOAC, CH-AOC, CH-AOAC LFMM-CH, LFMM-ACH, LSAG-CH Contact: fr-aoc@ivao.aero ; fr-aoac@ivao.aero ch-aoc@ivao.aero ; ch-aoac@ivao.aero Object: LoA between the Geneva FIR (LSAG) and the Paris FIR (LFFF) 1. Purpose The purpose of this Letter of Agreement (LoA) is to define the coordination procedures to be applied between the Geneva FIR and the Paris FIR when providing Air Traffic Services (ATS) operating under IFR or VFR flight rule. The content of the agreement is approved by the concerned ATC Operation Department and FIR Chiefs and its application is mandatory for all IVAO member providing ATS within and active ATC position concerned by this LOA. 2. General procedures Traffic in sequence shall be handed over with minimum spacing of 10 NM. This separation must be constant (aircrafts restrained to the same speed) or increasing (succeeding aircraft is not faster). Coordination of speed control should be granted via entries in radar labels and does neither need approval nor acknowledgement by receiving sector. Traffic shall be handed over as soon as practical and, whenever possible, at latest 3000 ft before reaching the cleared flight level and, in case the transfer point is not defined within this LOA, at latest ten (10) miles before the airspace limits. Traffic in sequence shall be handed over properly separated and clear of any conflict. Unless the receiving ATC unit issue a clearance modifying the route, altitude or speed, the transferring sector remains responsible for separation.

3. ATC units description The ATS unit in charge of the Geneva FIR and UIR is Swiss Radar and includes three lower positions (, and LSAG_N_CTR) and two higher positions ( and LSAG_L4_CTR). The different configurations of Swiss Radar are detailed here. Configuration ATC units Vertical responsibility Horizontal responsibility LSAG-1 LSAG-2 LSAG-3 S+N LSAG-4 LSAG-5 LSAG_N_CTR LSAG_N_CTR LSAG_L4_CTR FL250-FL330 FL330-UNL LSAS LSAS_LM1_CTR S N S N The whole Swiss airspace (LSAG+LSAZ) Swiss Radar shall announce its actual configuration to Marseille Control.

The ATC unit in charge of FIR and UIR airspaces under the responsibility of Paris ACC is Paris Control and consists in two primary sector (LFFF_CTR and LFFF_F_CTR). The primary sector (LFFF_CTR) may be split into two subsectors (LFFF_N_CTR and LFFF_S_CTR) under the condition that both sectors are open and the FIR Chiefs are informed. The lateral and vertical boundaries of the airspace under the responsibility of the CTR are indicated in the figure and table below. The ATS positions concerned by the present LoA are: ATC Position Callsign Frequency Remarks Primary Sector Swiss Radar (conf. LSAG-1) 124.225 Swiss Radar (conf. LSAS) LSAG_LM1_CTR 133.405 Secondary Sectors Swiss Radar (ast) 128.900 Swiss Radar (North) LSAG_N_CTR 134.025 Swiss Radar (Upper 1) 134.850 or FL250-FL330 Swiss Radar (Upper 4) LSAG_L4_CTR 124.030 FL340-UNL Primary Sector Paris Control LFFF_CTR 128.100 LFRR open : W (SFC-FL295) LF open : (SFC-FL295)

Paris Control (CCT) LFFF_F_CTR 135.405 SFC-FL295 Secondary Sectors Reims Control LF_CTR 128.300 < FL195 under LFFF Paris Control (North) LFFF_N_CTR 128.100 Paris Control (South) LFFF_S_CTR 132.100 LFRR open : W (SFC-FL295) LF open : (SFC-FL295) S (FL195-UNL)

4. Coordination procedures Coordination procedures between the ATC under the responsibility of the Geneva FIR and those under the responsibility of the Paris FIR are defined as follows. They represent a general framework that does not replace the coordination between ATC. Any coordination procedure not mentioned in this LoA must be established on a case by case basis. 4.1 n-route coordination n-route coordination shall be done according to the following table. If not mentioned in the table below it shall respect the airspace boundaries or use coordination between the ATC. Route Transfer point Cleared DCT Restrictions LSAG LFFF UB37 IBABA ven FL UM729 UNKIR ven FL UM982 1 to 2 minutes UL153 IBODI ven FL before boundary UZ124 TUTAX ven FL A1 B37 DJL ven FL LFFF LSAG UL612 1 to 2 minutes MILPA Odd FL UQ223 before boundary UM975 LUSAR Odd FL 4.2 Coordination of departures and arrivals Coordination procedures for the arrival traffic management are defined as follows. Paris towards Geneva Airport SID/STAR Coordination procedures Remarks Arrivals (LFFF LSAG) LSGG LUSAR DJL AKITO LFFF_CTR -> LSAS_LM1_CTR (Cleared LUSAR FL230) LFFF_CTR -> LSGG_APP (Cleared LIRKO FL190) LFFF_CTR -> LSAS_LM1_CTR (Cleared LIRKO FL230) FL250 Max over LUSAR Geneva towards Paris Airport SID/STAR Coordination procedures Remarks Departures (LFMM LSAG) LSGG DIPIR SIROD ARBOS LSGG_APP -> LFFF_CTR (Cleared DCT)