Tender Close 001-05-00 001-05-80 Hwy. 1, Grade & Pave, Indian Head, km 54.77 to 55.53 & km 0.00 to 0.33 Grade and Pave Southern November 2016 November 2016 Length = 1.09 km Base = 12 000 t Asphalt Concrete = 3 500 t 001-10-00 Hwy. 1, Resurfacing, West of Grand Coulee to E of Belle Plaine, km 15.40 to 36.50 Resurfacing Southern December 2016 January 2017 Specs (EPS) Length = 21.10 km Asphalt Concrete = 16 000 t 001-10-43 Hwy. 1, Safety Improvement, New ramps at Kalium Road/Hwy 1 Safety Improvement Southern December 2016 January 2017 Specs (EPS) Length = 0.00 km Excavation = 52 000 m³ Subbase = 17 000 t Base = 4 000 t Asphalt Concrete = 3 000 t 001-10-43 Hwy. 1, Resurfacing, Kalium Road, km 0.00 to 2.70 Resurfacing Southern December 2016 January 2017 Specs (EPS) Length = 2.70 km Asphalt Concrete = 7 000 t 001-17-00 Hwy. 1, Rehabilitation, East of Swift Current, km 28.11 to 0.00 Rehabilitation Southern November 2016 December 2016 Length = 0.00 km 002-10-00 Hwy. 2, Micro Surfacing, Between Liberty and Imperial, km 5.66 to 29.21 Micro Surfacing Southern January 2017 January 2017 Length = 23.55 km Page 1 of 10
Tender Close 004-02-00 Hwy. 4, Granular Strengthening, South of Cadillac, km 24.70 to 54.69 Granular Strengthening Southern January 2017 January 2017 Length = 29.99 km Excavation = 270 000 m³ Seal Coat = 480 000 m² 004-05-00 Hwy. 4, Resurfacing, North of Jct. Hwy 1, km 11.65 to 22.95 Resurfacing Southern November 2016 November 2016 Specs (EPS) Length = 11.30 km Asphalt Concrete = 27 000 t 006-01-00 Hwy. 6, Micro Surfacing, US border north, km 0.00 to 16.38 Micro Surfacing Southern January 2017 January 2017 Length = 16.38 km 007-02-00 Hwy. 7, Grading, CS 7-02, Grading, Twinning West of Vanscoy to Delisle, km 20.0-30.5, km 20.00 to 30.50 Grading Central January 2017 January 2017 Length = 10.50 km Excavation = 590 000 m³ Asphalt Concrete = 9 000 t 008-03-00 Hwy. 8, Rut Fill and Seal, South of Fairlight, km 13.80 to 34.03 Length = 20.23 km Seal Coat = 150 000 m² 009-03-00 Hwy. 9, Resurfacing, North of Jct. Hwy 13, km 11.40 to 30.14 Resurfacing Southern October 2016 October 2016 Specs (EPS) Length = 18.74 km Asphalt Concrete = 45 000 t Page 2 of 10
Tender Close 011-01-00 Hwy. 11, Resurfacing, East of Lumsden, km 6.50 to 25.56 Resurfacing Southern October 2016 November 2016 Length = 19.06 km Base = 10 000 t Asphalt Concrete = 43 000 t 011-02-00 020-01-00 Hwy. 11 & 20, Resurfacing, West of Lumsden North of Lumsden, km 0.00 to 25.90 & km 0.00 to 6.50 Resurfacing Southern October 2016 November 2016 Length = 32.40 km Base = 18 000 t Asphalt Concrete = 48 000 t 012-02-00 Hwy. 12, Resurfacing, Petrofka North, km 13.50 to 23.00 Resurfacing Central February 2017 February 2017 Yes Length = 9.50 km Asphalt Concrete = 15 000 t 013-06-00 013-07-00 Hwy. 13, Resurfacing, 2.5 km West of Weyburn to Jct Hwy 28 Jct Hwy 28 to Jct Hwy 6, km 2.53 to 32.14 & km 0.00 to 22.60 Resurfacing Southern November 2016 December 2016 Length = 52.21 km Base = 20 000 t Asphalt Concrete = 58 400 t 013-16-00 Hwy. 13, Rut Fill and Seal, Eastend to Robsart, km 0.00 to 22.83 & km 29.01 to 52.50 Length = 46.32 km Seal Coat = 300 000 m² 016-17-00 Hwy. 16, Culvert, Birch Creek East of Wynyard, km 2.37 to 0.00 Culvert Central October 2016 October 2016 Length = 0.00 km Page 3 of 10
Tender Close 017-07-00 Hwy. 17, Resurfacing, North of Jct. Hwy 3, km 0.00 to 10.69 Resurfacing Central December 2016 January 2017 Yes Length = 10.69 km Asphalt Concrete = 26 000 t 018-04-00 Hwy. 18, Resurfacing, Outram to 7.53 km West, km 24.97 to 32.50 Resurfacing Southern October 2016 November 2016 Length = 7.53 km Subbase = 40 000 t Base = 28 000 t Asphalt Concrete = 9 000 t 021-10-00 Hwy. 21, Micro Surfacing, North of Kindersley, km 0.82 to 21.25 Micro Surfacing Southern November 2016 November 2016 Length = 20.43 km 021-19-00 Hwy. 21,, West of Pierceland over Unnamed Stream, km 1.80 to 1.81 Northern December 2016 January 2017 Length = 0.00 km Page 4 of 10
Tender Close 022-02-00 Hwy. 22,, Hwy 22 over Deerhorn Creek east of Gerald, km 0.27 to 0.00 Central November 2016 December 2016 Length = 0.00 km 022-05-00 Hwy. 22, Rut Fill and Seal, East of the Jcn of Hwy 6, km 30.58 to 50.88 Length = 20.30 km Seal Coat = 150 000 m² 027-01-00 Hwy. 27, Paving, From its junction with Highway 41 to Vonda, km 22.78 to 34.00 Paving Central November 2016 November 2016 Yes Length = 11.22 km Subbase = 118 000 t Base = 48 000 t Asphalt Concrete = 15 000 t 031-04-00 Hwy. 31, Micro Surfacing, Denzil to Macklin, km 10.78 to 33.88 Micro Surfacing Southern November 2016 November 2016 Length = 23.10 km 033-03-00 Hwy. 33,, Northwest of Sedley over Unnamed Creek, km 14.90 to 0.00 Southern September 2016 October 2016 Length = 0.00 km 035-04-00 Hwy. 35, Rut Fill and Seal, Francis south, km 21.25 to 48.28 Length = 27.03 km Seal Coat = 200 000 m² Page 5 of 10
Tender Close 040-03-00 Hwy. 40,, Northwest of Speers over Unnamed Stream, km 17.98 to 0.00 Central September 2016 September 2016 Length = 0.00 km 040-04-00 Hwy. 40,, East of Cut Knife, km 29.31 to 0.00 Central September 2016 September 2016 Length = 0.00 km 042-03-00 Hwy. 42, Rut Fill and Seal, 14 km west of the Jct of Hwy. 19 to Riverhurst Ferry, km 14.40 to 38.65 Length = 24.25 km Seal Coat = 175 000 m² 051-01-00 Hwy. 51, Granular Strengthening, Near Kelfield, km 34.70 to 62.64 & km 0.00 to 1.84 Granular Strengthening Central November 2016 December 2016 Length = 29.78 km Subbase = 100 000 t Base = 100 000 t Subgrade Stabilization = 250 000 m² Haul = 2 500 000 t-km 055-02-00 Hwy. 55,, East of Shoal Lake over Rice River, km 21.12 to 21.16 Northern December 2016 January 2017 Length = 0.00 km 055-03-00 Hwy. 55,, West of Shoal Lake over Red Earth Creek, km 23.20 to 23.22 Northern December 2016 December 2016 Length = 0.00 km 055-03-00 Hwy. 55,, West of Shoal Lake over Cracking River, km 27.70 to 27.73 Northern December 2016 January 2017 Length = 0.00 km Page 6 of 10
Tender Close 055-12-00 Hwy. 55, Resurfacing, Resurfacing North of Big River, km 4.10 to 20.00 Resurfacing Northern December 2016 January 2017 Length = 15.90 km Excavation = 20 000 m³ Subbase = 35 000 t Base = 30 000 t Asphalt Concrete = 40 000 t 102-26-00 Hwy. 102, Grade & Gravel, 12.23 km north of Hwy 915 to Otter Rapids, km 26.50 to 46.50 Grade and Gravel Northern January 2017 January 2017 Length = 20.00 km Subbase = 30 000 t Base = 170 000 t 322-01-00 Hwy. 322, Grade & Pave, North of Silton, km 9.13 to 19.52 Grade and Pave Southern December 2016 January 2017 Length = 10.39 km Excavation = 48 000 m³ Subbase = 37 000 t Base = 59 000 t Seal Coat = 84 000 m² 334-02-00 Hwy. 334, Rut Fill and Seal, Jcn of 39 to Avonlea, km 0.00 to 32.85 Length = 32.85 km Seal Coat = 200 000 m² 903-03-00 Hwy. 903,, South of Buffalo Narrows over Apps River, km 52.80 to 52.81 Northern December 2016 January 2017 Length = 0.00 km 903-03-00 Hwy. 903,, South of Buffalo Narrows over Mckusker River, km 62.40 to 62.44 Northern December 2016 January 2017 Length = 0.00 km Hwy., Micro Surfacing, Micro Surfacing Consisting of rut fill and and overlay in Southern and Central SK Micro Surfacing Southern January 2017 January 2017 Length = 160.00 km Page 7 of 10
Tender Close Hwy.,, One Tender for three bridge to culverts C.S. 3-06 km 3.61 & 21.96, C.S. 20-07 km 3.91 Northern February 2017 February 2017 Length = 0.00 km Hwy., Culvert, Three tenders for five culverts replacements Culvert Northern February 2017 February 2017 Length = 0.00 km Hwy., Culvert, Central Region Culvert s at various locations (4 projects) Culvert Central November 2016 December 2016 Length = 0.00 km Other Contracts Bitmix - Contract #1 Bituminous Mix All January 2017 February 2017 2000 t liquid asphalt t Bitmix - Contract #2 Bituminous Mix All January 2017 February 2017 2000 t liquid asphalt t Rubber Asphalt Crack Sealing (7 contracts) RACS All November 2016 December 2016 Rubber Ashphalt Crack Sealing = 525,000 m Page 8 of 10
Tender Close Patching, various areas (5 contracts) Patching All January 2017 January 2017 Patching = 22000 t Stockpiling (3 contracts) Stockpiling All November 2016 November 2016 100 000 t Swift Current Area Aggregate Stockpiling Southern October 2016 October 2016 50 000 t Moose Jaw Area Aggregate Stockpiling Southern October 2016 November 2016 50 000 t Regina Area Aggregate Stockpiling Southern October 2016 November 2016 44 000 t Excavation (m 3 ) Granular (t) Asphalt Concrete (t) Seal Coat (m 2 ) http://www.highways.gov.sk.ca/tenderpost/ Total 980 000 876 000 364 900 1 739 000 Page 9 of 10
Tender Close Types of Projects include 1 Paving, 2 Grade & Pave, 1 Grading, 1 Gravel, 1 Granular Strengthening, 1 Safety Improvement, 11 Resurfacing, 14 s, Culverts, 11 Medium Preservation Projects and several other Preservation projects. Projects Announced on Previous Tender Plans 026-05-00 Hwy. 26, Grade & Pave, Goodsoil to Jct. Hwy. 55, km 44.72 to 52.03 Grade and Pave Northern October 2016 October 2016 Length = 7.31 km Excavation = 207 000 m³ Subbase = 77 000 t Base = 34 500 t Asphalt Concrete = 13 000 t 042-02-00 Hwy. 42, Paving, Keeler to Eyebrow, km 1.88 to 24.40 Paving Southern October 2016 October 2016 No Length = 22.52 km Subbase = 165 000 t Base = 63 000 t Asphalt Concrete = 29 000 t Page 10 of 10