FEDERAL AIRPORT IMPROVEMENT PROGRAM (AIP) PRE-APPLICATION FFY 2017 CHECKLIST

Similar documents
Application to Impose and Use Passenger Facility Charges - #16

Ann Arbor Municipal Airport Ann Arbor, MI Date of Latest ALP ACIP Airport Code - A Airport Identifier - ARB

Chapter 9 Airport Financial Plan

Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL

JACIP-AIRPORT PROJECT DETAIL REPORT August 15, 2007

Chapter 8.0 Implementation Plan

MOST aircraft need a runway for landing and takeout.

PFC NOTICE AND OPPORTUNITY FOR PUBLIC COMMENT ST. THOMAS CYRIL E. KING AIRPORT SEPTEMBER 26, 2018

ADDENDUM NO. TWO AB

BOARD OF AIRPORT COMMISSIONERS

MassDOT Aeronautics Division Capital Improvements Presentation

CHICAGO DEPARTMENT OF AVIATION. Current Construction Projects AND THE O HARE MODERNIZATION PROGRAM. May 2, 2014

From concept through completion, CGA is your AVIATION engineering firm!

For Airport Environmental Services. Date Released: August 27, 2018 Deadline for Submission: 5:00pm, September 17, 2018

6.0 Capital Improvement Program. 6.1 Capital Improvement Plan (CIP)

Airport Master Plan Open House Front Range Airport February 23, 2017

DRAFT FINAL REPORT AIRPORT MASTER PLAN. Rifle Garfield County Airport Revised May 15, 2014

October 2014 BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN PRESENTATION

Passenger Facility Charge Application #1

CHAPTER 3 ALTERNATIVES CONSIDERED

Airport. Improvement Program (AIP) Overview. Federal Aviation Administration. Texas Aviation Conference Ben Guttery, Texas ADO April 2017

Port of Friday Harbor

Development Program and Implementation Plan

BELFAST MUNICIPAL AIRPORT OVERVIEW

SACRAMENTO COUNTY AIRPORT SYSTEM - OVERALL EXECUTIVE SUMMARY

Airport Master Plan for. Brown Field Municipal Airport PAC Meeting #3

TECHNICAL REPORT #7 Palm Beach International Airport Airport Layout Plan

Pierre Regional Airport Airport Master Plan. Kickoff Meeting April 7, 2017

Kittitas County Airport Bowers Field Airport Master Plan Planning Advisory Committee Meeting #1 April 6, 2016

FAA Update. Dakota-Minnesota (DMA) Airports District Office. Federal Aviation Administration. Presented to: By: Date: South Dakota Airports Conference

Request for Proposals. Aviation Service Providers At Tri-Cities Airport

Chapter 4 Airport Facility Requirements

Airports and UAS: Integrating UAS into Airport Infrastructure and Planning

PLU Airport Master Plan. Master Plan Advisory Committee (MPAC) Meeting #2 October 16, 2016

Waterloo Regional Airport

FAA Update. Airports Program. Western-Pacific Region. Federal Aviation Administration

Notice and Opportunity to Comment on New Proposed Passenger Facility Charge (PFC) New Application

Aviation Planning in Maine and Our Region. Stacie Haskell Aviation Coordinator & Study Manager Maine Department of Transportation April 27, 2011

Yakima Air Terminal/McAllister Field Airport Master Plan Update

6.4 Aviation AVIATION FACILITIES AND SERVICES

CatExes vs. EAs When and How to Prepare

THE CASE OF A SUCCESSFUL PFC APPLICATION

DRAFT MASTER PLAN UPDATE

Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3

What's your fleet mix for design?

Airport Finance 101 Session 3 - Capital Funding

FAA Update. Dakota-Minnesota (DMA) Airports District Office. Federal Aviation Administration. Presented to: By: Date: Minnesota Council of Airports

Appendix C. User Survey Data

nicholas j pela SUMMARY OF PERSONAL AIRPORT PROJECT EXPERIENCE ARIZONA

Analysis Item 71: Department of Aviation Aurora State Airport Runway Extension

SOUTH CAROLINA AERONAUTICS COMMISSION

Beginning balance available for Priority I Projects: $1,737,029

PUBLIC NOTICE ***************************** New Castle Airport. Intention to File a Passenger Facility Charge (PFC) Application

CHAPTER 1: INTRODUCTION

Appendix B PAVEMENT CONDITION AND HISTORY

BID FORM. Bid by: Name of Bidder. Address: Address: To the Texas Department of Transportation hereinafter called the Agent.

Table of Contents. Overview Objectives Key Issues Process...1-3

Airport Master Plan. Brookings Regional Airport. Runway Runway 17-35

RECONSTRUCT/REHABILITATE TRANSIENT APRON AND TAXIWAY 'A' PHASING PLAN - PHASE 1

Hutchinson Regional Airport Request for Proposals for Hangar Lease RFP #15-163

RESOLUTION NO

Chapter 5 Airport Development Alternatives

Nantucket Memorial Airport Commission. Master Plan Workshop. October 26, 2012

Financial Plan/Capital Improvements - DRAFT 6-1

P U B L I C N O T I C E. MBS International Airport Freeland, Michigan Passenger Facility Charge (PFC) Application C-00-MBS

PFC Application #2 Niagara Falls International Airport

Merritt Island Airport

Hollaway Consulting Engineers, LLC Statement of Qualifications

GDOT AND FAA ADO UPDATES

Chapter 10 FAA Compliance Review

PUBLIC NOTICE. Table 1 Projects Proposed by Amendment

14 C.F.R. Part 158. Passenger Facility Charge Program Logan International Airport. Public Notice

PEE DEE REGIONAL AIRPORT AUTHORITY FLORENCE REGIONAL AIRPORT

GENERAL INSTRUCTIONS REQUEST FOR STATEMENTS OF QUALIFICATIONS (RFQ) ON-CALL AVIATION ENGINEERING SERVICES

Input Efforts Online survey of tenants and users Focus group meetings with Tenants and users Agencies and stakeholders General Aviation Pilot

Florida Department of Transportation Aviation Office GUIDEBOOK FOR AIRPORT MASTER PLANNING

Airport Closure Evaluation Report Silver Bay Municipal Airport (BFW) Prepared by MnDOT Office of Aeronautics

Wyoming Valley Airport Proposed Improvements. Presented June 26, 2012 By The WBW Airport Advisory Board & FBO

Aviation Trust Fund. The Results of Senate Bill 526

Grants Pass Airport Master Plan & Airport Layout Plan Update

Rio Vista Municipal Airport Potential Alternatives for the Future Ownership, Operation and Maintenance of the Airport

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES

AIRPORT MASTER PLAN. Newport State Airport. Draft. (Colonel Robert F. Wood Airpark) THE Louis Berger Group, INC. Prepared for: Prepared by:

MEETING MINUTES Page 1 of 5

AWP ACIP DATA SHEET. $100,000 $5,263 $105,263 Access Road Project

PORT OF PORTLAND. Chapter Seven CAPITAL IMPROVEMENT PROGRAM

JOHNSTON COUNTY AIRPORT AUTHORITY

Airport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal

AIRSIDE CAPACITY AND FACILITY REQUIREMENTS

OREGON AVIATION PLAN AIRPORT SUMMARY CORVALLIS MUNICIPAL AIRPORT

Collier County Airport Authority. Joint Automated Capital Improvement Program

Winona Runway Shift Project

Casper/Natrona County International Airport Master Plan Update Technical Advisory Committee Meeting Two - October 14th, :30 PM

Airport Master Plan 1

Chapter Six ALP Drawings. Tacoma Narrows Airport. Master Plan Update

AIRPORT PLANNING, DEVELOPMENT AND LAND ACQUISITION

TABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved

1.1.3 Taxiways. Figure 1-15: Taxiway Data. DRAFT Inventory TYPICAL PAVEMENT CROSS-SECTION LIGHTING TYPE LENGTH (FEET) WIDTH (FEET) LIGHTING CONDITION

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015

Pavement LCA Where Do We Go from Here!!

Transcription:

Form 291111wd (09-15) Storm Lake Municipal Airport Airport FEDERAL AIRPORT IMPROVEMENT PROGRAM (AIP) PRE-APPLICATION FFY 2017 SLB FAA Identifier CHECKLIST Please attach the following documents with your application: Sponsor Identification Sheet for the Airport CIP Data Sheet (one for each project listed in the first 3 years of the CIP) and detailed cost estimate for each data sheet. 5-year Capital Improvement Program (CIP) Long Range Needs Assessment Verification of an updated ALP (when applying for new construction of buildings or airfield expansion) Verification of completed environmental processing in accordance with NEPA. Verification of completed land acquisition or signed purchase agreement. Verification of pavement maintenance program (when applying for pavement preservation or reconstruction) If requesting Federal assistance for snow removal equipment, please include an inventory of the existing equipment and calculations based on Chapters 4 & 5 of the Airport Winter Safety and Operations, Advisory Circular (AC) 150/5200-30 and the Airport Snow and Ice Control Equipment, AC 150/5220-20 showing the minimum equipment needed, along with the ACIP Data Sheet. Include a copy of a completed FAA Snow Plow Design Spreadsheet. If requesting Federal assistance for general aviation apron expansion, include a copy of a completed GA Apron Design spreadsheet. If requesting pavement reconstruction, submit an engineering report showing the need for the reconstruction as part of the CIP justification. For revenue-producing facilities (i.e., fueling facilities and hangars), please submit: 1) a statement that airside development needs are met or include a financial plan to fund airside needs over the next 3 years; 2) a statement that runway approach surfaces are clear of obstructions (the FAA Airport 5010 should show at least a 20:1 clear approach), and; 3) justification for the project. SAM (System for Award Management) registration is up-to-date. (www.sam.gov) Please scan and e-mail with support documents identified in checklist to shane.wright@dot.iowa.gov. Iowa Department of Transportation Attn.: Program Manager Office of Aviation E-mail: shane.wright@dot.iowa.gov 800 Lincoln Way FAX: 515-233-7983 Ames, IA 50010 515-239-1048 www.iowadot.gov/aviation

Form 291111wd (09-15) FEDERAL AIRPORT IMPROVEMENT PROGRAM (AIP) PRE-APPLICATION FFY 2017 AIRPORT SPONSOR IDENTIFICATION Airport Name: Storm Lake Municipal Airport Airport Sponsor Name: City of Storm Lake, Iowa Contact Person: Keri Navratil Title: Assistant City Manager Complete Mailing Address: P.O. Box 1086 Storm Lake IA 50588 Daytime Phone: 712-732-8000 City State ZIP Code E-mail Address: navratil@stormlake.org FAX Number: 712-732-4114 U.S. Congressional District Number: Iowa 4th District Please scan and e-mail with support documents identified in checklist to shane.wright@dot.iowa.gov. Iowa Department of Transportation Attn.: Program Manager Office of Aviation E-mail: shane.wright@dot.iowa.gov 800 Lincoln Way FAX: 515-233-7983 Ames, IA 50010 515-239-1048 www.iowadot.gov/aviation

Form 291112 (10-15) Storm Lake Municipal Airport City of Storm Lake Airport Comission Telephone: 712-732-8000 navratil@stormlake.org October 2015 FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 Taxiway and Apron Rehab Lighting Replacement - Runway 13/31 & Taxiway Lighting Replacement - Runway 17/35 149,490 16,610 166,100 577,265 64,140 641,405 551,763 61,307 613,070

Form 291113 (09-14) AIRPORT LONG RANGE NEEDS ASSESSMENT FFY 2021 FFY 2025 Airport Name: Storm Lake Municipal Airport Description of Project (include estimated Fiscal Year) Funding Source Runway 17/35 Subdrains (FY 2022) 90% 10% 100% 183,330 20,370 203,700 Total Estimated Cost

CIP DATA SHEET AIRPORT Storm Lake Municipal Airport LOCID SLB LOCAL PRIORITY 1 PROJECT DESCRIPTIO N Taxiway & Apron Rehab Identify FFY that you desire to construct (FFY: Oct. 1-Sept. 30) 2017 SKETCH: JUSTIFICATION: The existing taxiway and apron are in need of pavement maintenance to help prolong the life of the pavement. The project will consist of joint and crack sealing over the entire area. Full depth patching is proposed in the area adjacent to the fuel system. This area was originaly constructed in 1968 and has a PCI of 63. Partial depth patching is also recommended in both the older and new pavements to address corner and joint spalling. COST ESTIMATE: (Attach detailed cost estimate) Federal(90%) 149,490 State 0 Local (10%) 16,610 Total 166,100 SPONSOR S VERIFICATION: Date (see instruction sheet or point mouse over each date box for more information) For each and every project as applicable In Progress - Date of approved ALP with project shown - Date of environmental determination (ROD, FONSI, CE), or cite CE paragraph # (307-312) in Order 1050.1E - Date of land acquisition or signed purchase agreement FAA USE ONLY 9/6/2012 - Date of pavement maintenance program FAA Verification: (initial/date) - Snow removal equipment inventory & sizing worksheet (for SRE acquisition) - Apron sizing worksheet (for apron projects) Revenue producing facilities (for fuel farms, hangers, etc.) - Date statement submitted for completed airside development - Date statement submitted for runway approaches are clear of obstructions SPONSOR S SIGNATURE: DATE: PRINTED NAME: Keri Navratil TITLE: Assistant City Manager PHONE NUMBER: 712-732-8000 FAA USE ONLY PREAPP NUMBER GRANT NUMBER NPIAS CODE WORK CODE FAA PRIORITY FEDERAL

TAXIWAY AND APRON REHAB ITEM QTY UNIT UNIT PRICE TOTAL Federal 90% State 0% Local 10% 1 MOBILIZATION 1 LS 23,000.00 23,000.00 20,700.00-2,300.00 2 TRAFFIC CONTROL 1 LS 5,000.00 5,000.00 4,500.00-500.00 3 PAVEMENT REMOVAL 200 SY 12.00 2,400.00 2,160.00-240.00 4 SUBBASE PREPARATION 200 SY 8.00 1,600.00 1,440.00-160.00 5 CRUSHED AGGREGATE BASE COURSE 200 SY 18.00 3,600.00 3,240.00-360.00 6 JOINT SEALANT 21,000 LF 2.50 52,500.00 47,250.00-5,250.00 7 CRACK SEALANT 700 LF 4.00 2,800.00 2,520.00-280.00 8 PCC PAVEMENT 200 SY 70.00 14,000.00 12,600.00-1,400.00 9 PARTIAL DEPTH REPAIRS 33 EA 1,000.00 33,000.00 29,700.00-3,300.00 Subtotal 137,900.00 124,110.00-13,790.00 PROJECT DEVELOPMENT / SCOPING - DESIGN ENGINEERING (8%) 11,000.00 CONSTRUCTION ENGINEERING (11%) 15,200.00 GRANT ADMINISTRATION - DISADVANTAGED BUSINESS ENTERPRISE (DBE) PLAN 1,500.00 ENVIRONMENTAL CATEX - ESTIMATED CITY ADMINISTRATION 500.00 TAXIWAY AND APRON REHAB 166,100.00 - - - 9,900.00-1,100.00 13,680.00-1,520.00 - - - 1,350.00-150.00 - - - 450.00-50.00 149,490.00-16,610.00

CIP DATA SHEET AIRPORT Storm Lake Municipal Airport LOCID SLB LOCAL PRIORITY 2 PROJECT DESCRIPTIO N Lighting replacement - Runway 13/31 & Taxiway Identify FFY that you desire to construct (FFY: Oct. 1-Sept. 30) 2018 SKETCH: JUSTIFICATION: The existing lights on the taxiway and runway 13/31 were installed 30+ years ago and are in need of replacement. The existing lighting system is experiencing outages due to old lights and wire. The parts for the lights are also becoming more exepensive and harder to find. The new installation will include replacing all of the edge lights along the taxiway and runway 13/31. The project will also add PAPI's, Reil's and windcones to Runway 13/31 which currently does not have any of those items. COST ESTIMATE: (Attach detailed cost estimate) Federal(90%) 577,265 State 0 Local (10%) 64,140 Total 641,405 SPONSOR S VERIFICATION: Date (see instruction sheet or point mouse over each date box for more information) For each and every project as applicable In Progress - Date of approved ALP with project shown - Date of environmental determination (ROD, FONSI, CE), or cite CE paragraph # (307-312) in Order 1050.1E - Date of land acquisition or signed purchase agreement FAA USE ONLY 9/6/2012 - Date of pavement maintenance program FAA Verification: (initial/date) - Snow removal equipment inventory & sizing worksheet (for SRE acquisition) - Apron sizing worksheet (for apron projects) Revenue producing facilities (for fuel farms, hangers, etc.) - Date statement submitted for completed airside development - Date statement submitted for runway approaches are clear of obstructions SPONSOR S SIGNATURE: DATE: PRINTED NAME: Keri Navratil TITLE: Assistant City Manager PHONE NUMBER: 712-732-8000 FAA USE ONLY PREAPP NUMBER GRANT NUMBER NPIAS CODE WORK CODE FAA PRIORITY FEDERAL

LIGHTING REPLACEMENTS - RUNWAY 13/31 & TAXIWAY No. ITEM QTY UNIT UNIT PRICE TOTAL Federal 90% State 0% Local 10% 1 MOBILIZATION 1 LS 49,100.00 49,100.00 44,190.00-4,910.00 2 TRAFFIC CONTROL 1 LF 5,000.00 5,000.00 4,500.00-500.00 3 CONSTRUCTION STAKING 1 LF 10,000.00 10,000.00 9,000.00-1,000.00 4 REMOVAL OF EXISTING EDGE LIGHTS 64 EA 100.00 6,400.00 5,760.00-640.00 5 DIRECTIONAL BORE, 2" CONDUIT 900 LF 40.00 36,000.00 32,400.00-3,600.00 6 CAN PLAZA 3 EA 10,000.00 30,000.00 27,000.00-3,000.00 7 TRENCHING 14,000 LF 3.00 42,000.00 37,800.00-4,200.00 8 CONDUIT, 2" PVC 20,000 LF 3.00 60,000.00 54,000.00-6,000.00 9 5KV WIRE 13,000 LF 2.00 26,000.00 23,400.00-2,600.00 10 5KV GROUND WIRE 12,000 LF 1.75 21,000.00 18,900.00-2,100.00 11 600V #4 Wire 8,500 LF 1.75 14,875.00 13,387.50-1,487.50 12 600V #6 Wire 3,800 LF 1.60 6,080.00 5,472.00-608.00 13 600V Ground Wire 8,200 LF 1.75 14,350.00 12,915.00-1,435.00 14 HANDHOLE 20 EA 800.00 16,000.00 14,400.00-1,600.00 15 MITL 50 EA 900.00 45,000.00 40,500.00-4,500.00 16 MIRL, EDGE LIGHTS - L-861 40 EA 1,000.00 40,000.00 36,000.00-4,000.00 17 MIRL, THRESHOLD LIGHTS - L-861SE 24 EA 1,100.00 26,400.00 23,760.00-2,640.00 18 PAPI's 2 EA 20,000.00 40,000.00 36,000.00-4,000.00 19 REILS 2 EA 16,000.00 32,000.00 28,800.00-3,200.00 20 WINDCONE 2 EA 10,000.00 20,000.00 18,000.00-2,000.00 0 - - - - Subtotal 540,205.00 486,184.50-54,020.50 PROJECT DEVELOPMENT / SCOPING - DESIGN ENGINEERING (8%) 43,200.00 CONSTRUCTION ENGINEERING (10%) 54,000.00 GRANT ADMINISTRATION 1,000.00 DISADVANTAGED BUSINESS ENTERPRISE (DBE) PLAN 1,500.00 ENVIRONMENTAL CATEX 1,000.00 ESTIMATED CITY ADMINISTRATION 500.00 LIGHTING REPLACEMENTS - RUNWAY 13/31 & TAXIWAY 641,405.00 - - - 38,880.00-4,320.00 48,600.00-5,400.00 900.00-100.00 1,350.00-150.00 900.00-100.00 450.00-50.00 577,264.50-64,140.50