UNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

Similar documents
UNCLASSIFIED FY 2015 FY 2015 OCO. FY 2015 Base FY 2015 FY Base

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 P-1 Line #35

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 24 P-1 Line #55

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. FY 2016 Base FY 2016 OCO FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 18 P-1 Line #12

UNCLASSIFIED. UNCLASSIFIED United States Special Operations Command Page 1 of 6 P-1 Line #53

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 16 P-1 Line #57

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 10 P-1 Line #47

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 P-1 Line #55

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 5 P-1 Line #21

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 17 P-1 Line #121

UNCLASSIFIED. FY 2014 Base. OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Total Cost ($ M)

UNCLASSIFIED FY 2016 OCO. FY 2016 Base. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 23 P-1 Line #27

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 18 P-1 Line #56

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 31 P-1 Line #41

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 21 P-1 Line #19

UNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Total Cost ($ M) Unit Cost ($) Qty (Each)

UNCLASSIFIED. FY 2017 Base FY 2017 OCO. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 17 P-1 Line #55

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 33 P-1 Line #94

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 16 P-1 Line #15

UNCLASSIFIED FY 2015 FY 2015 OCO. FY 2015 Base FY 2015 FY Base

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 151 P-1 Line #32

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 30 P-1 Line #36

UNCLASSIFIED. FY 2016 Base FY 2016 OCO FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Total Cost ($ M) Unit Cost ($) Qty (Each)

UNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. FY 2014 Base. OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 34 P-1 Line #51

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 126 P-1 Line #32

UNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Unit Cost ($ M) Qty (Each)

UNCLASSIFIED. FY 2017 Base FY 2017 OCO. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. UNCLASSIFIED Page 1 of 5. EXHIBIT R-2, RDT&E Budget Item Justification RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-5

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 17 P-1 Line #13

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE A: AIRCRAFT CERTIFICATION FY 2012 OCO

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit)

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Communication, Navigation, Surveillance/Air Traffic Management (CNS/ATM) FY 2012 OCO

Global Civil and Military Simulation & Training Market ( Edition) July 2017

Cost-effective, flexible avionics for today s missions and future challenges. Flight2 integrated avionics system. UPGRADES FOR LEGACY C-130s

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 27 P-1 Line #2

Global Civil Aviation & Military Simulation & Training Market( ) Trends & Opportunities

AIRCRAFT SERVICE CHANGE

AIRCRAFT SERVICE CHANGE

NUMBER 904 RECORDING / INDICATING SYSTEMS (ATA 31) PLANEVIEW MASTER OPERATING SYSTEM SOFTWARE UPDATE

M7 AEROSPACE LP

TRANSMITTAL SHEET. Concurrent Requirement Added G450 Customer Bulletin Number 141 (aircraft that have previously incorporated ASC 016)

HERItAGE & PREsENCE. AIRCRAft MANAGEMENt. twenty two locations. three i. i HAwkER PACIfIC

Gegaso Ltd. Company Presentation

Your Trusted Special Missions Partner

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 31 P-1 Line #2

NUMBER 903 RECORDING / INDICATING SYSTEMS (ATA 31) PLANEVIEW MASTER OPERATING SYSTEM SOFTWARE UPDATE

NUMBER 008 PLACARDS AND MARKINGS (ATA 11) MAXIMUM ZERO FUEL GROSS WEIGHT - 48,000 POUNDS PLACARD INSTALLATION

Safety Enhancement SE 226 Cargo Hazardous Material Fires Enhanced Protection of Occupants and Aircraft

Part 104 CAA Consolidation 1 March 2007 Gliders - Operating Rules

Presidential Aircraft Recapitalization

AE 452 Aeronautical Engineering Design II Cost of an Airplane. Prof. Dr. Serkan Özgen Dept. Aerospace Engineering April 2017

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

AE 452 Aeronautical Engineering Design II Cost Analysis. Prof. Dr. Serkan Özgen Dept. Aerospace Engineering

Thales on the Civil Aerospace market

Surveillance and Broadcast Services

AIRCRAFT SERVICE CHANGE

UNCLASSIFIED UNCLASSIFIED

Roadmapping Breakout Session Overview

Department of Defense DIRECTIVE

U.S. NAVY CNS/ATM Program Status

LANDING GEAR - REPLACEMENT OF NOSE LANDING GEAR RETRACT PLUNGER ASSEMBLY

DEPARTMENT OF CIVIL AVIATION Airworthiness Notices EXTENDED DIVERSION TIME OPERATIONS (EDTO)

TDR Mode S and ADS-B Transponders

OPNAVINST B N98 15 Apr Subj: NAVAL AVIATION POLICY FOR AIRCRAFT AVIONICS SAFETY SYSTEMS

THE BOEING COMPANY

Visit Beechcraft.com or contact a defense company sales rep: Beechcraft.com

Section 7 Supplements. Miodel 400A SUPPLEMENTS

Department of Legislative Services Maryland General Assembly 2009 Session

Mode S & ACAS Programme Operational Introduction of SSR Mode S

KEY FEATURES IN SHORT

Reporting Instructions FILING REQUIREMENTS

Investor Presentation

RAAC/15-WP/14 International SUMMARY REFERENCES. A Safety

U.S. DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION. National Policy

CUSTOMER SERVICE OWNER PUBLICATIONS CATALOG

A New Era. in Offshore Aviation. a SEACOR company

1-7(28)-2W Wiring Diagrams Manual 10 Sept.27/ to

TABLE OF CONTENTS 1.0 INTRODUCTION...

[Docket No. FAA ; Directorate Identifier 2007-NM-047-AD; Amendment ; AD ]

Transcription:

Exhibit P-40, Budget Item Justification Sheet: PB 2014 Navy Date: April 2013 Aircraft / BSA 1: Modification Of Aircraft ID Code (A=Service Ready, B=Not Service Ready) : A Program Elements for Code B Items: Other Related Program Elements: MDAP/MAIS Code(s): Resource Summary Prior Years FY 2012 FY 2013 # Base OCO ## tal FY 2015 FY 2016 FY 2017 FY 2018 Procurement Quantity (Units in Each) - - - - - - - - - - - - Gross/Weapon System Cost ($ in Millions) 160.852 18.290 34.284 43.720-43.720 36.512 49.606 46.953 57.897 200.218 648.332 Less PY Advance Procurement ($ in Millions) - - - - - - - - - - - - Net Procurement (P1) ($ in Millions) 160.852 18.290 34.284 43.720-43.720 36.512 49.606 46.953 57.897 200.218 648.332 Plus CY Advance Procurement ($ in Millions) - - - - - - - - - - - - tal Obligation Authority ($ in Millions) 160.852 18.290 34.284 43.720-43.720 36.512 49.606 46.953 57.897 200.218 648.332 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway (Units in Dollars) - - - - - - - - - - - - Gross/Weapon System (Units in Dollars) - - - - - - - - - - - - # FY 2013 Program is from the FY 2013 President's Budget, submitted February 2012 ## The OCO Request will be submitted at a later date Description: This line item funds modifications to a group of trainer aircraft which includes T-44A/C, and TH-57. The trainer aircraft are described as follows: The T-44 is a twin-engine, multi-seat turboprop aircraft produced by Hawker Beech Aircraft used to simulate operation of multi engine aircraft, specifically the P-3; the TH-57 is a single-engine, multi-seat rotary wing aircraft used for helicopter training. The overall goal of the modification is to maintain safe and reliable operation of the trainer aircraft through the timely installation of necessary changes. tal numbers for T-44 and TH-57 aircraft are 54 and 126, respectively. A total of 3 T-44A aircraft will be modified in FY14 to become T-44C aircraft (via the Avionics Systems Upgrade), bringing the total of T-44C aircraft to 54. tal Item Nomenclature* 1 - OSIP 005-04 - T44 AVIONICS OBSOLESCENCE 2 - OSIP 006-07 TH-57 SAFETY UPGRADE Item Schedule Prior Years FY 2012 FY 2013 Base OCO tal Exhibits ID CD tal Cost tal Cost P3A 85.919 15.475 17.930 20.074-20.074 P3A 18.982 2.815 15.614 22.899-22.899 3 - OSIP 007-07 Wing Wiring P3A 4.777-0.740 0.747-0.747 4 - Inactive OSIPs P3A 51.174 - - - - - tal Gross/Weapon System Cost tal Cost tal Cost tal Cost tal Cost 160.852 18.290 34.284 43.720-43.720 LI Navy Page 1 of 18 P-1 Line #42 Volume 2-649

Exhibit P-40, Budget Item Justification Sheet: PB 2014 Navy Date: April 2013 Aircraft / BSA 1: Modification Of Aircraft ID Code (A=Service Ready, B=Not Service Ready) : A Program Elements for Code B Items: Other Related Program Elements: MDAP/MAIS Code(s): Item Nomenclature* 1 - OSIP 005-04 - T44 AVIONICS OBSOLESCENCE 2 - OSIP 006-07 TH-57 SAFETY UPGRADE Item Schedule FY 2015 FY 2016 FY 2017 FY 2018 tal Exhibits ID CD tal Cost tal Cost P3A 4.570 - - - - 143.968 P3A 31.942 49.606 46.953 57.897 200.218 446.926 3 - OSIP 007-07 Wing Wiring P3A - - - - - 6.264 4 - Inactive OSIPs P3A - - - - - 51.174 tal Gross/Weapon System Cost tal Cost tal Cost tal Cost tal Cost 36.512 49.606 46.953 57.897 200.218 648.332 *Item Nomenclature represents Item Number, DODIC, and Item Name for the P40A and P5; Name for the P18 and P23; Modification Number and Modification Title for the P3A; Item Number and Item Name for the P10. Note: tals in this Exhibit P-40 set may not be exact or add due to rounding. Justification: The change from FY13 to FY14 was in the OSIP 005-04 T-44 Avionics Obsolescence Training Equipment cost element line. It was broken out to better reflect execution. Engineering Change Orders cost element line is necessary because avionics obsolescence will be required to be replaced due to technology improvements. This will be the last device and the Government is preparing for engineering changes that will be required to support these products to 2025. Data Publications will be required in FY14 to support the logistics footprint for the life cycle of this product. This funding will support technical publication development, updates and deliverables to support these devices to 2025. ILS in FY14 is required to support the current and future logistics integrated into these devices. Without this element, supportability and sustainability of these devices will not be capable. LI Navy Page 2 of 18 P-1 Line #42 Volume 2-650

Models of Systems Affected: T-44A/C Type Modification: Safety Related RDT&E PEs: Resource Summary Prior Years FY 2012 FY 2013 # Base 1 - OSIP 005-04 - T44 AVIONICS OBSOLESCENCE OCO ## tal FY 2015 FY 2016 FY 2017 FY 2018 Procurement Quantity (Units in Each) - - - - - - - - - - - - Gross/Weapon System Cost ($ in Millions) 85.919 15.475 17.930 20.074-20.074 4.570 - - - - 143.968 Less PY Advance Procurement ($ in Millions) - - - - - - - - - - - - Net Procurement (P1) ($ in Millions) 85.919 15.475 17.930 20.074-20.074 4.570 - - - - 143.968 Plus CY Advance Procurement ($ in Millions) - - - - - - - - - - - - tal Obligation Authority ($ in Millions) 85.919 15.475 17.930 20.074-20.074 4.570 - - - - 143.968 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System (Units in Dollars) # FY 2013 Program is from the FY 2013 President's Budget, submitted February 2012 ## The OCO Request will be submitted at a later date - - - - - - - - - - - - tal Description: The T-44A Avionics are becoming non-supportable due to non-availability of parts. The following analog avionics systems require replacement: NCS-31A Area Navigation/Control System, AP-106 Autopilot, Flight Director, digital engine gauges and the RDR-130 Weather Radar. Avionics are being returned from the repair vendor Beyond Economical Repair (BER) due to non-availability of parts. Spare units are not available in the commercial market. Following these Avionics Upgrades the aircraft are designated T-44C; includes funding for changes to Ground Based Training Systems (simulators) to align trainers to T-44C aircraft configuration. IMPACT: As avionics become BER due to lack of parts, spares are being depleted. Lack of avionics will ground aircraft and severely degrade Chief of Naval Air Training's ability to meet Pilot Training Requirements. Current plans call for T-44 to fly its training mission until 2025. There are 54 T-44A in the inventory and all 54 will receive this modification. DEVELOPMENT STATUS / MAJOR DEVELOPMENT MILESTONES: The T-44 Avionics Obsolescence (Operational, Safety, and Improvement Program 05-04) non-recurring engineering occurred in FY04. Commercially available Non-Development Item kit procurement began in FY05 and installations in FY05. Beginning in FY13, kits were commercially procured via Fleet Support Team (FST) contract but installed by Naval Air Station (NAS) Jacksonville Fleet Readiness Center (FRC). In FY14, kits will be commercially procured via FST contract but installed by NAS Jacksonville FRC. LI Navy Page 3 of 18 P-1 Line #42 Volume 2-651

Models of Systems Affected: T-44A/C Type Modification: Safety Related RDT&E PEs: Procurement Financial Plan OSIP 005-04 - T44 AVIONICS OBSOLESCENCE A Kits Recurring Prior Years FY 2012 FY 2013 / tal Cost / tal Cost / tal Cost Base / tal Cost OCO / tal Cost 1 - OSIP 005-04 - T44 AVIONICS OBSOLESCENCE tal FY 2015 FY 2016 FY 2017 FY 2018 / tal Cost / tal Cost / tal Cost / tal Cost / tal Cost / tal Cost tal / tal Cost (1) 1.1.1) Install Kits - A kits - NonOrganic 48 / 11.841 3 / 0.675 3 / 0.750 - / - - / - - / - - / - - / - - / - - / - - / - 54 / 13.266 Subtotal Recurring 48 / 11.841 3 / 0.675 3 / 0.750 - / - - / - - / - - / - - / - - / - - / - - / - 54 / 13.266 Non-Recurring 1.2.1) Installation Kits Non-recurring - Organic 3 / 5.641 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 3 / 5.641 Subtotal Non-Recurring 3 / 5.641 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 3 / 5.641 B Kits Recurring 2.1.1) Install Kits - B kits - Organic 48 / 39.978 3 / 3.662 3 / 3.902 - / - - / - - / - - / - - / - - / - - / - - / - 54 / 47.542 2.1.2) Digital Engine Gauges (B kits) - Organic - / - 10 / 0.610 3 / 0.187 - / - - / - - / - - / - - / - - / - - / - - / - 13 / 0.797 2.1.3) Digital Engine Gauges - "O" level installation - Organic - / - 16 / 0.965 7 / 0.459 18 / 1.187 - / - 18 / 1.187 - / - - / - - / - - / - - / - 41 / 2.611 Subtotal Recurring 48 / 39.978 29 / 5.237 13 / 4.548 18 / 1.187 - / - 18 / 1.187 - / - - / - - / - - / - - / - 108 / 50.950 tal, OSIP 005-04 - T44 AVIONICS OBSOLESCENCE 99 / 57.460 32 / 5.912 16 / 5.298 18 / 1.187 - / - 18 / 1.187 - / - - / - - / - - / - - / - 165 / 69.857 tal Procurement, All Modifications 99 / 57.460 32 / 5.912 16 / 5.298 18 / 1.187 - / - 18 / 1.187 - / - - / - - / - - / - - / - 165 / 69.857 Support 3.1) Engineering Change Orders - / - - / - - / - - / 3.100 - / - - / 3.100 - / - - / - - / - - / - - / - - / 3.100 3.2) DATA - Publications - / 0.344 - / - - / - - / 2.403 - / - - / 2.403 - / - - / - - / - - / - - / - - / 2.747 (2) 3.3) Training Equipment 14 / 22.555 - / 0.152 - / 2.713 - / 3.400 - / - - / 3.400 - / 2.285 - / - - / - - / - - / - 14 / 31.105 3.4) ILS - / - - / - - / - - / 2.400 - / - - / 2.400 - / - - / - - / - - / - - / - - / 2.400 (3) 3.5) Other Support - / 1.875 - / 1.459 - / 1.613 - / 1.801 - / - - / 1.801 - / 2.285 - / - - / - - / - - / - - / 9.033 3.6) Support Equipment - / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 3.7) Interim Contractor Support - / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - tal Support, All Modifications 24.774 1.611 4.326 13.104-13.104 4.570 - - - - 48.385 tal Procurement and Support 82.234 7.523 9.624 14.291-14.291 4.570 - - - - 118.242 OSIP 005-04 - T44 AVIONICS OBSOLESCENCE Installation Cost - / 3.685 - / 7.952 - / 8.306 - / 5.783 - / - - / 5.783 - / - - / - - / - - / - - / - - / 25.726 LI Navy Page 4 of 18 P-1 Line #42 Volume 2-652

Models of Systems Affected: T-44A/C Type Modification: Safety Related RDT&E PEs: Financial Plan Prior Years FY 2012 FY 2013 / tal Cost / tal Cost / tal Cost Base / tal Cost OCO / tal Cost 1 - OSIP 005-04 - T44 AVIONICS OBSOLESCENCE tal FY 2015 FY 2016 FY 2017 FY 2018 / tal Cost / tal Cost / tal Cost / tal Cost / tal Cost / tal Cost tal / tal Cost tal Installation Cost - / 3.685 - / 7.952 - / 8.306 - / 5.783 - / - - / 5.783 - / - - / - - / - - / - - / - - / 25.726 tal Cost (Procurement + Support + Installation) 85.919 15.475 17.930 20.074-20.074 4.570 - - - - 143.968 LI Navy Page 5 of 18 P-1 Line #42 Volume 2-653

Models of Systems Affected: T-44A/C Type Modification: Safety Related RDT&E PEs: Manufacturer Information: OSIP 005-04 - T44 AVIONICS OBSOLESCENCE Manufacturer Name: Government Field Mod Team Manufacturer Location: FRC SE Administrative Leadtime (in Months): 1 Production Leadtime (in Months): 12 1 - OSIP 005-04 - T44 AVIONICS OBSOLESCENCE Dates FY 2012 FY 2013 FY 2015 FY 2016 FY 2017 FY 2018 Contract Dates Jul 2012 Nov 2012 Delivery Dates Oct 2012 Oct 2013 Installation: OSIP 005-04 - T44 AVIONICS OBSOLESCENCE Method of Implementation: FRC SE Government Field Mod Team Installation Name: Install Kits Installation Cost Prior Years FY 2012 FY 2013 / tal Cost / tal Cost / tal Cost Base / tal Cost OCO / tal Cost tal FY 2015 FY 2016 FY 2017 FY 2018 / tal Cost / tal Cost / tal Cost / tal Cost / tal Cost / tal Cost tal / tal Cost All Prior Years 31 / 3.685 10 / 7.952 7 / 5.814 - / - - / - - / - - / - - / - - / - - / - - / - 48 / 17.451 FY 2012 - / - - / - 3 / 2.492 - / - - / - - / - - / - - / - - / - - / - - / - 3 / 2.492 FY 2013 - / - - / - - / - 3 / 5.783 - / - 3 / 5.783 - / - - / - - / - - / - - / - 3 / 5.783 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2015 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2016 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2017 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2018 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - tal 31 / 3.685 10 / 7.952 10 / 8.306 3 / 5.783 - / - 3 / 5.783 - / - - / - - / - - / - - / - 54 / 25.726 Installation Schedule FY 2012 FY 2013 FY 2015 FY 2016 FY 2017 FY 2018 APY 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 TC t In 31 3 3 2 2 3 3 3 1 1 1 1 - - - - - - - - - - - - - - - - - - 54 Out 31 3 3 2 2 3 3 3 1 1 1 1 - - - - - - - - - - - - - - - - - - 54 Installation: OSIP 005-04 - T44 AVIONICS OBSOLESCENCE Method of Implementation: Not Installed - Installation Kits Nonrecurring Installation Quantity: 3 Installation: OSIP 005-04 - T44 AVIONICS OBSOLESCENCE Method of Implementation: Organic - Install Kits - B kits Installation Quantity: 54 LI Navy Page 6 of 18 P-1 Line #42 Volume 2-654

Models of Systems Affected: T-44A/C Type Modification: Safety Related RDT&E PEs: 1 - OSIP 005-04 - T44 AVIONICS OBSOLESCENCE Installation: OSIP 005-04 - T44 AVIONICS OBSOLESCENCE Method of Implementation: Organic - Digital Engine Gauges (B kits) Installation Quantity: 13 Installation: OSIP 005-04 - T44 AVIONICS OBSOLESCENCE Method of Implementation: Organic - Digital Engine Gauges - "O" level installation Installation Quantity: 41 Installation: OSIP 005-04 - T44 AVIONICS OBSOLESCENCE Method of Implementation: Organic - Training Equipment Installation Quantity: 14 Footnotes: (1) 1. NAS Jacksonville Fleet Support Team (FST) procures kits via contract with DLA. Installs are completed by the FRC. (2) In FY13 to FY14 Training Equipment (CE 3.3) exceeds OSD/OMB inflation rate because we had to pay licensing fees to Rockwell Collins because of the proprietary data in SN2. (3) In FY13 to FY 14 Other Support (CE 3.5) exceeds OSD/OMB inflation rate because TSD labor increased. Increased labor is due to completion of SETR events, engineering milestones and acquisition planning in support of SN2. LI Navy Page 7 of 18 P-1 Line #42 Volume 2-655

Models of Systems Affected: TH-57B/C Type Modification: Conversion/Safety Related RDT&E PEs: Resource Summary Prior Years FY 2012 FY 2013 # Base 2 - OSIP 006-07 TH-57 SAFETY UPGRADE OCO ## tal FY 2015 FY 2016 FY 2017 FY 2018 Procurement Quantity (Units in Each) - - - - - - - - - - - - Gross/Weapon System Cost ($ in Millions) 18.982 2.815 15.614 22.899-22.899 31.942 49.606 46.953 57.897 200.218 446.926 Less PY Advance Procurement ($ in Millions) - - - - - - - - - - - - Net Procurement (P1) ($ in Millions) 18.982 2.815 15.614 22.899-22.899 31.942 49.606 46.953 57.897 200.218 446.926 Plus CY Advance Procurement ($ in Millions) - - - - - - - - - - - - tal Obligation Authority ($ in Millions) 18.982 2.815 15.614 22.899-22.899 31.942 49.606 46.953 57.897 200.218 446.926 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System (Units in Dollars) # FY 2013 Program is from the FY 2013 President's Budget, submitted February 2012 ## The OCO Request will be submitted at a later date - - - - - - - - - - - - tal Description: The TH-57 is the sole platform for primary and advanced helicopter flight training for student aviators (United States Navy, United States Marine Corps, United States Coast Guard) and foreign military pilots. This modernization effort capitalizes on technology improvements to aircraft and Ground Based Training Systems (GBTS) by increasing aircrew survivability and situational awareness while providing a fleet representative digital cockpit capable of flying in national airspace after the FY20 mandate to incorporate NextGen requirements. GBTS equipment includes full Flight Simulator Training Devices, Cockpit Procedural Trainers, Computer-based training and courseware to support cockpit modification upgrade. Obsolescence upgrades are to replace avionics purchased in 1981 through 1985, when the TH-57B and TH-57C aircraft were originally purchased. avoid Training Wing FIVE rotary wing pilot throughput disruption, Chief of Naval Air Training requires a proportional number of TH-57D configured simulators, cockpit procedure trainers, and courseware delivered coincident with the TH-57D aircraft conversion. Recent contractor delivery delays of a Federal Aviation Administration Supplemental Type Certificate approving the cockpit configuration have necessitated a schedule adjustment and realignment of funding to properly align GBTS and aircraft modification delivery timelines. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: The components of this block upgrade will be Commercial Off The Shelf. LI Navy Page 8 of 18 P-1 Line #42 Volume 2-656

Models of Systems Affected: TH-57B/C Type Modification: Conversion/Safety Related RDT&E PEs: Procurement Financial Plan OSIP 006-07 TH-57 SAFETY UPGRADE A Kits Recurring Prior Years FY 2012 FY 2013 / tal Cost / tal Cost / tal Cost Base / tal Cost OCO / tal Cost 2 - OSIP 006-07 TH-57 SAFETY UPGRADE tal FY 2015 FY 2016 FY 2017 FY 2018 / tal Cost / tal Cost / tal Cost / tal Cost / tal Cost / tal Cost tal / tal Cost (4) 1.1.1) Installation Kits - A kits - NonOrganic 1 / 2.810 - / - - / - - / - - / - - / - - / - - / - 9 / 2.370 22 / 5.790 95 / 32.140 127 / 43.110 Subtotal Recurring 1 / 2.810 - / - - / - - / - - / - - / - - / - - / - 9 / 2.370 22 / 5.790 95 / 32.140 127 / 43.110 Non-Recurring 1.2.1) Installation Kits Non-recurring. - NonOrganic - / 2.656 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 2.656 Subtotal Non-Recurring - / 2.656 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 2.656 B Kits Recurring 2.1.1) Installation Equipment - B kits - Organic - / 0.020 - / - - / - - / - - / - - / - - / - - / - 9 / 4.810 22 / 11.760 95 / 65.260 126 / 81.850 2.1.2) Airspace Compliance - B kits - Organic - / - - / - - / - - / - - / - - / - - / - - / - 9 / 0.097 19 / 0.236 98 / 1.260 126 / 1.593 Subtotal Recurring - / 0.020 - / - - / - - / - - / - - / - - / - - / - 18 / 4.907 41 / 11.996 193 / 66.520 252 / 83.443 tal, OSIP 006-07 TH-57 SAFETY UPGRADE 1 / 5.486 - / - - / - - / - - / - - / - - / - - / - 27 / 7.277 63 / 17.786 288 / 98.660 379 / 129.209 tal Procurement, All Modifications 1 / 5.486 - / - - / - - / - - / - - / - - / - - / - 27 / 7.277 63 / 17.786 288 / 98.660 379 / 129.209 Support (5) 3.1) DATA - Publications - / 0.031 - / - - / 0.560 - / 0.638 - / - - / 0.638 - / 0.601 - / 0.218 - / 0.222 - / - - / - - / 2.270 (6) 3.2) Training Equipment - Trainer OFT - / 7.971 - / - - / 9.554 - / 15.798 - / - - / 15.798 - / 24.749 - / 42.709 - / 28.364 - / 25.487 - / 24.074 - / 178.706 3.3) ILS - / - - / - - / - - / - - / - - / - - / - - / - - / 1.670 - / 1.700 - / 7.980 - / 11.350 (7) 3.4) Other Support - / 4.280 - / 2.815 - / 5.500 - / 6.463 - / - - / 6.463 - / 6.592 - / 6.679 - / 7.030 - / 7.074 - / 37.054 - / 83.487 3.5) Engineering Change Orders - / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 3.6) Support Equipment - / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 3.7) Interim Contractor Support - / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - tal Support, All Modifications 12.282 2.815 15.614 22.899-22.899 31.942 49.606 37.286 34.261 69.108 275.813 tal Procurement and Support 17.768 2.815 15.614 22.899-22.899 31.942 49.606 44.563 52.047 167.768 405.022 OSIP 006-07 TH-57 SAFETY UPGRADE Installation Cost - / 1.214 - / - - / - - / - - / - - / - - / - - / - - / 2.390 - / 5.850 - / 32.450 - / 41.904 tal Installation Cost - / 1.214 - / - - / - - / - - / - - / - - / - - / - - / 2.390 - / 5.850 - / 32.450 - / 41.904 tal Cost (Procurement + Support + Installation) 18.982 2.815 15.614 22.899-22.899 31.942 49.606 46.953 57.897 200.218 446.926 LI Navy Page 9 of 18 P-1 Line #42 Volume 2-657

Models of Systems Affected: TH-57B/C Type Modification: Conversion/Safety Related RDT&E PEs: 2 - OSIP 006-07 TH-57 SAFETY UPGRADE LI Navy Page 10 of 18 P-1 Line #42 Volume 2-658

Models of Systems Affected: TH-57B/C Type Modification: Conversion/Safety Related RDT&E PEs: Manufacturer Information: OSIP 006-07 TH-57 SAFETY UPGRADE Manufacturer Name: Contractor Field Mod Team Manufacturer Location: TBD Administrative Leadtime (in Months): 1 Production Leadtime (in Months): 3 2 - OSIP 006-07 TH-57 SAFETY UPGRADE Dates FY 2012 FY 2013 FY 2015 FY 2016 FY 2017 FY 2018 Contract Dates Oct 2016 Oct 2017 Delivery Dates Jan 2017 Jan 2018 Installation: OSIP 006-07 TH-57 SAFETY UPGRADE Method of Implementation: Contractor Field Mod Team Installation Name: Install Kits Installation Cost Prior Years FY 2012 FY 2013 / tal Cost / tal Cost / tal Cost Base / tal Cost OCO / tal Cost tal FY 2015 FY 2016 FY 2017 FY 2018 / tal Cost / tal Cost / tal Cost / tal Cost / tal Cost / tal Cost tal / tal Cost All Prior Years 0 / 1.214 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 1.214 FY 2012 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2013 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2015 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2016 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2017 - / - - / - - / - - / - - / - - / - - / - - / - 9 / 2.390 - / - - / - 9 / 2.390 FY 2018 - / - - / - - / - - / - - / - - / - - / - - / - - / - 19 / 5.850 3 / 1.050 22 / 6.900 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 95 / 31.400 95 / 31.400 tal 0 / 1.214 - / - - / - - / - - / - - / - - / - - / - 9 / 2.390 19 / 5.850 98 / 32.450 126 / 41.904 Installation Schedule FY 2012 FY 2013 FY 2015 FY 2016 FY 2017 FY 2018 APY 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 TC t In - - - - - - - - - - - - - - - - - - - - - - 3 3 3-7 7 5 98 126 Out - - - - - - - - - - - - - - - - - - - - - - 3 3 3-7 7 5 98 126 Installation: OSIP 006-07 TH-57 SAFETY UPGRADE Method of Implementation: Organic - Installation Equipment - B kits Installation Quantity: 126 Installation: OSIP 006-07 TH-57 SAFETY UPGRADE Method of Implementation: Organic - Airspace Compliance - B kits Installation Quantity: 126 LI Navy Page 11 of 18 P-1 Line #42 Volume 2-659

Models of Systems Affected: TH-57B/C Type Modification: Conversion/Safety Related RDT&E PEs: Footnotes: (4) FY09 PY quantity of 2 removed. 2 - OSIP 006-07 TH-57 SAFETY UPGRADE (5) In FY13 to FY14 Data Pubs (CE 3.1) exceeds OSD/OMB inflation rate because it includes data collection and pub development plus paying for a review/approval from 4.0P (Air Worthiness). (6) Three simulator kits installed in FY10. In FY13 to FY14 Training Equipment (CE 3.2) exceeds the OSD/OMB inflation rate due to procurement of the first simulator. (7) In FY12 to FY13 Other Support (CE 3.4) exceeds the OSD/OMB inflation rate due to labor needed to start building the simulators but there was a schedule slip in this effort. The effort/labor was moved to FY13. In FY13 to FY14 Other Support (CE 3.4) exceeds the OSD/OMB inflation rate due to T&E labor needed to test the aircraft. LI Navy Page 12 of 18 P-1 Line #42 Volume 2-660

Models of Systems Affected: T-44-A/C Type Modification: Safety Related RDT&E PEs: Resource Summary Prior Years FY 2012 FY 2013 # Base 3 - OSIP 007-07 Wing Wiring OCO ## tal FY 2015 FY 2016 FY 2017 FY 2018 Procurement Quantity (Units in Each) - - - - - - - - - - - - Gross/Weapon System Cost ($ in Millions) 4.777-0.740 0.747-0.747 - - - - - 6.264 Less PY Advance Procurement ($ in Millions) - - - - - - - - - - - - Net Procurement (P1) ($ in Millions) 4.777-0.740 0.747-0.747 - - - - - 6.264 Plus CY Advance Procurement ($ in Millions) - - - - - - - - - - - - tal Obligation Authority ($ in Millions) 4.777-0.740 0.747-0.747 - - - - - 6.264 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System (Units in Dollars) # FY 2013 Program is from the FY 2013 President's Budget, submitted February 2012 ## The OCO Request will be submitted at a later date - - - - - - - - - - - - tal Description: The Naval Air Systems Command Wiring System Team, AIR-4.4.4.3, completed a Wiring Integrity Study on the T-44A in FY02 and identified that the aircraft wiring, outside the pressure vessel, has deteriorated to an unacceptable condition. It was recommended that the wiring in the wings, from pressure vessel outward (including the engines) be replaced. Current Navy long-term plans are to operate the T-44A aircraft until the year 2025. In order to safely and economically maintain aircraft availability and Pilot Training Requirements, it is necessary to replace the wiring. Note that aircraft designated T-44A are redesignated T-44C upon completion of Avionics Obsolescence (Operational, Safety, and Improvement Program 005-04) Modifications. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: Wing rewire will be accomplished in conjunction with Avionics Upgrade Mod (OSIP 05-04). Naval Air Station Jacksonville Fleet Readiness Center (FRC) are now able to fabricate the wiring kits. Beginning in FY13, kits were not procured via Fleet Support Team (FST) contract, but fabricated by FRC Jacksonville. In FY14, kits will not be procured via FST contract, but fabricated by FRC Jacksonville. LI Navy Page 13 of 18 P-1 Line #42 Volume 2-661

Models of Systems Affected: T-44-A/C Type Modification: Safety Related RDT&E PEs: Procurement OSIP 007-07 Wing Wiring A Kits Recurring Financial Plan Prior Years FY 2012 FY 2013 / tal Cost / tal Cost / tal Cost Base / tal Cost OCO / tal Cost 3 - OSIP 007-07 Wing Wiring tal FY 2015 FY 2016 FY 2017 FY 2018 / tal Cost / tal Cost / tal Cost / tal Cost / tal Cost / tal Cost tal / tal Cost (8) 1.1.1) Installation Kits - Wing Wiring - NonOrganic 48 / 4.591 - / - 3 / 0.740 3 / 0.747 - / - 3 / 0.747 - / - - / - - / - - / - - / - 54 / 6.078 Subtotal Recurring 48 / 4.591 - / - 3 / 0.740 3 / 0.747 - / - 3 / 0.747 - / - - / - - / - - / - - / - 54 / 6.078 tal, OSIP 007-07 Wing Wiring 48 / 4.591 - / - 3 / 0.740 3 / 0.747 - / - 3 / 0.747 - / - - / - - / - - / - - / - 54 / 6.078 tal Procurement, All Modifications 48 / 4.591 - / - 3 / 0.740 3 / 0.747 - / - 3 / 0.747 - / - - / - - / - - / - - / - 54 / 6.078 Support 2.1) Support Equipment - / 0.048 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 0.048 2.2) Interim Contractor Support - / 0.138 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 0.138 2.3) Engineering Change Orders - / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 2.4) Data - / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 2.5) Training Equipment - / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 2.6) ILS - / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 2.7) Other Support - / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - tal Support, All Modifications 0.186 - - - - - - - - - - 0.186 tal Procurement and Support 4.777-0.740 0.747-0.747 - - - - - 6.264 OSIP 007-07 Wing Wiring Installation Cost - / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - tal Installation Cost - / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - tal Cost (Procurement + Support + Installation) 4.777-0.740 0.747-0.747 - - - - - 6.264 LI Navy Page 14 of 18 P-1 Line #42 Volume 2-662

Models of Systems Affected: T-44-A/C Type Modification: Safety Related RDT&E PEs: Manufacturer Information: OSIP 007-07 Wing Wiring Manufacturer Name: Government Field Mod Team (9) Manufacturer Location: FRC SE Administrative Leadtime (in Months): 0 Production Leadtime (in Months): 0 Contract Dates Delivery Dates 3 - OSIP 007-07 Wing Wiring Dates FY 2012 FY 2013 FY 2015 FY 2016 FY 2017 FY 2018 Installation: OSIP 007-07 Wing Wiring Installation Cost Prior Years FY 2012 FY 2013 / tal Cost / tal Cost Method of Implementation: Concurrent with Avionics Upgrade Modification at Fleet Readiness Center NAS Jacksonville / tal Cost Base / tal Cost OCO / tal Cost Installation Name: Installation Kits - Wing Wiring tal FY 2015 FY 2016 FY 2017 FY 2018 / tal Cost / tal Cost / tal Cost / tal Cost / tal Cost / tal Cost tal / tal Cost All Prior Years 48 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 48 / 0.000 FY 2012 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2013 - / - - / - 3 / - - / - - / - - / - - / - - / - - / - - / - - / - 3 / - - / - - / - - / - 3 / - - / - 3 / - - / - - / - - / - - / - - / - 3 / - FY 2015 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2016 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2017 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2018 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - tal 48 / 0.000 - / - 3 / - 3 / - - / - 3 / - - / - - / - - / - - / - - / - 54 / - Installation Schedule FY 2012 FY 2013 FY 2015 FY 2016 FY 2017 FY 2018 APY 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 TC t In 48 - - - - 1 1 1-1 1 1 - - - - - - - - - - - - - - - - - - 54 Out 48 - - - - 1 1 1-1 1 1 - - - - - - - - - - - - - - - - - - 54 Footnotes: (8) Installations are funded out of OSIP 05-04, Avionics Obsolescence; FY13 and FY14 kits are installed same year manufactured (9) Concurrent with Avionics Upgrade Modification at Fleet Readiness Center NAS Jacksonville. 1. Installs funded out of OSIP 05-04 LI Navy Page 15 of 18 P-1 Line #42 Volume 2-663

Models of Systems Affected: [No Model Specified] Type Modification: [No Modification Type Specified] Related RDT&E PEs: Resource Summary Prior Years FY 2012 FY 2013 # Base 4 - Inactive OSIPs OCO ## tal FY 2015 FY 2016 FY 2017 FY 2018 Procurement Quantity (Units in Each) - - - - - - - - - - - - Gross/Weapon System Cost ($ in Millions) 51.174 - - - - - - - - - - 51.174 Less PY Advance Procurement ($ in Millions) - - - - - - - - - - - - Net Procurement (P1) ($ in Millions) 51.174 - - - - - - - - - - 51.174 Plus CY Advance Procurement ($ in Millions) - - - - - - - - - - - - tal Obligation Authority ($ in Millions) 51.174 - - - - - - - - - - 51.174 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System (Units in Dollars) # FY 2013 Program is from the FY 2013 President's Budget, submitted February 2012 ## The OCO Request will be submitted at a later date - - - - - - - - - - - - tal Description: LI Navy Page 16 of 18 P-1 Line #42 Volume 2-664

Models of Systems Affected: [No Model Specified] Type Modification: [No Modification Type Specified] Related RDT&E PEs: Procurement Inactive OSIPs A Kits Recurring Financial Plan Prior Years FY 2012 FY 2013 / tal Cost / tal Cost / tal Cost Base / tal Cost OCO / tal Cost 4 - Inactive OSIPs tal FY 2015 FY 2016 FY 2017 FY 2018 / tal Cost / tal Cost / tal Cost / tal Cost / tal Cost / tal Cost tal / tal Cost 1.1.1) Inactive OSIPs - Organic - / 51.174 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 51.174 Subtotal Recurring - / 51.174 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 51.174 tal, Inactive OSIPs - / 51.174 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 51.174 tal Procurement, All Modifications - / 51.174 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 51.174 tal Procurement and Support 51.174 - - - - - - - - - - 51.174 tal Installation Cost - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - tal Cost (Procurement + Support + Installation) 51.174 - - - - - - - - - - 51.174 LI Navy Page 17 of 18 P-1 Line #42 Volume 2-665

Models of Systems Affected: [No Model Specified] Type Modification: [No Modification Type Specified] Related RDT&E PEs: Manufacturer Information: Inactive OSIPs Manufacturer Name: Manufacturer Name Not Provided. Administrative Leadtime (in Months): Contract Dates Delivery Dates Manufacturer Location: Manufacturer Location Not Provided. Production Leadtime (in Months): 4 - Inactive OSIPs Dates FY 2012 FY 2013 FY 2015 FY 2016 FY 2017 FY 2018 Installation: Inactive OSIPs Method of Implementation: No Quantities Associated with Install Installation Quantity: 0 LI Navy Page 18 of 18 P-1 Line #42 Volume 2-666