Whittier Bridge Project

Similar documents
Project ID Project Description Date Sum of Obligation. Grand Total $7,942,419.19

State Route 8 Corridor. Northern Summit County s Path to Success

December 2012 Update. I-95 New Haven Harbor Crossing. Corridor Improvement Program

EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015

PennDOT Interstate Work next week March 30-April 3:

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015

U.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County

November 21, 2012 Barbara Kelleher, (954)

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016

STAGE 2 & 3 Pavement reconstruction within viaduct footprint, pavement widening and resurfacing N/S of viaduct footprint, sidewalk

* Short term resurfacing projects are not included in this listing. 4T39.07 Project: Annual Rural County Sign Improvements, Genesee/Orleans Counties

2 Construction Program

EXTERNAL COMMUNICATIONS COMMITTEE MEETING APRIL 2015

April 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014

Palm Beach County Traffic Report July 13 through July 20, 2012

Springettsbury Township. Road Improvement Projects

TABLE C-1: Greenhouse Gas Regional Highway Project Tracking

Pre-Construction Public Meeting July 2017

FDOT Treasure Coast Traffic Report through

FDOT Treasure Coast Traffic Impact Report

Transportation Supporting Dulles Airport

2004 Congestion Management System Report

Ohio Department of Transportation Construction Update

35EXPRESS PROJECT UPDATE FOR DENTON COUNTY COMMISSIONERS

CONSTRUCTION PROJECTS IN CUYAHOGA COUNTY CLEVELAND EUCLID 3/9/18 RICHMOND MAYFIELD HIGHLAND HEIGHTS HEIGHTS SOUTH EAST MAYFIELD EUCLID CLEVELAND

Northeast Anthony Henday Drive Edmonton Ring Road Update. Strathcona Chamber of Commerce March 18, 2015

Public Informational Meeting

ROUTE 630 DIVERGING DIAMOND INTERCHANGE

Hospital Link Project Project Update September 2015

Viaduct Demolition at Girard Interchange

FREDERICKSBURG DISTRICT. District Engineer Marcie Parker, P.E. May 8, 2018

PRIORITIES COMMITTEE MEETING

May 1, 2015 Meredith Cruz, (561) Palm Beach County Traffic Report May 1 through May 8, 2015

County of Fairfax, Virginia. Silver Line Update. Committee for Dulles March 2, Mark Canale Fairfax County Department of Transportation

Appendix 4.1 L. No-Build Project Descriptions

District Construction Progr am. John R. Kasich, Ohio Governor Jerry Wray, ODOT Director Steve Mary, P.E., District Deputy Director

AGENDA ITEM I-6 Public Works

Guide to. Road Construction Projects

CONTACT: Nichole Lawrence CELL: FOR IMMEDIATE RELEASE Wednesday March 28, 2018

Fairfax County Parkway Widening Fairfax County

Exit 148 (Quantico) to Exit 133 (Route 17/Fredericksburg)

For Immediate Release Christine Girardin January 19, 2018 SUMTER COUNTY FLORIDA S TURNPIKE AND I-75 INTERCHANGE IMPROVEMENTS

Public Information Center August 12, 2010

Route 29 Solutions Projects

Commonwealth Avenue Bridge Deck Replacement Project. Legislative and Stakeholder Briefing. April 13, 2017

Score. Category. Access Aesthetics Community Resources

Exit 136 (Centreport Parkway/Stafford County) to Exit 130 (Route 3/Fredericksburg)

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT June 12 June 18, 2016

October 31, 2014 Chuck McGinness, (954)

P3 & Design-Build. 101 st Annual THE Conference February 25 th, Speaker: Andrew Gensch, P.E.

FFY 2017 Federal Funds Obligations by MPO

DULLES AREA HIGHLIGHTS. Gary Garczynski Commonwealth Transportation Board Northern Virginia District. Committee for Dulles August 4, 2016

FFY Development. Transportation Improvement Program (TIP) March 11, 2016 Cape Cod Joint Transportation Committee

DALLAS HORSESHOE PROJECT. Project Update including the Margaret McDermott Bridge Transportation and Trinity River Project Committee February 22, 2016

FY TRANSPORTATION IMPROVEMENT PROGRAM. Authority Projects FY

Design Meeting Presentation

Table 2: FFYs Transportation Improvement Program (TIP) Development Universe of Projects

BROWARD COUNTY TRAFFIC IMPACT REPORT March 13 through March 20, March 13, 2015 Chuck McGinness,

CVRPC FY 13 Project Priorities (Bridge, Roadway, Bike & Ped., Park & Ride) - 3/29/11

TRAFFIC ALERT FOR MARCH 26-30, 2018 Highway Work Zones in the Staunton District

FOR IMMEDIATE RELEASE Fiorella Teodista January 5, 2018 SOUTH FLORIDA AND TREASURE COAST WEEKLY LANE CLOSURES AND WORK ZONE ADVISORY

Northern Virginia District State of the District. Helen L. Cuervo, P.E. District Engineer October 18, 2017

Major Projects Overview

Sudbury to Hudson Transmission Reliability Project

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Aug , 2016

Add-A-Lane Contract V. along a Section of I-95 includes 6 Bridges

New Orleans Municipal Yacht Harbor

LANCASTER CORRIDOR REDEVELOPMENT ROSEDALE STREET REDESIGN PEACH STREET RAILROAD CROSSINGS

IRONTON-RUSSELL BRIDGE REPLACEMENT

PURPOSE AND NEED REPORT. I-93 Transit Investment Study

May 1, 2015 Chuck McGinness, BROWARD COUNTY TRAFFIC IMPACT REPORT May 1 through May 8, 2015

State Project Reconstruction I-84

Atlantic Street Bridge Project Update CTDOT Project Nos & (Phase 2)

EXISTING CONDITIONS A. INTRODUCTION. Route 107 Corridor Study Report

RELEASE: IMMEDIATE Oct. 6, 2017 CONTACT: Darragh Copley Frye (office) (cell)

LOST HILLS ROAD INTERCHANGE PROJECT CONSTRUCTION UPDATE. CALABASAS CITY COUNCIL April 26, 2017

Cell: (408) Release MA June 25, 2012

Long water shutdown scheduled for Tuesday, September 18

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

FEASIBILITY STUDY REFINED CONCEPT 1 PROJECT A

Exit 148 (Quantico) to Exit 133 (Route 17/Falmouth)

Chicago St. Louis High-Speed Rail. Enos Park Neighborhood Association May 13, 2014

TRAFFIC ALERT FOR MARCH 5-9, 2018 Highway Work Zones in the Staunton District

Palm Beach County Traffic Report August 24 through August 31, 2012

Constructor: Joseph B. Fay

Construction Staging Area Blue Jays Way (357 King Street West)

Minnesota Department of Transportation 2011 Twin Cities Metro Area Construction Projects

Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012

Needham Heights Neighborhood Association February Rail Trail Overview

APPENDIX I: Inventory of Existing Regional Trails in Freedom s Way National Heritage Area

Culpeper District. Albemarle County Monthly Report December 2011

Project Location MP A44.5 MP A38 PRELIMINARY. A A57 (Future Project) A42 - A44.5 (Fall Fall 2019) A38 - A42. A31 - A38 - In Design

4. Safety Concerns Potential Short and Medium-Term Improvements

Lawrence Loop SWOT Analysis

RELEASE: IMMEDIATE September 14, 2012 CONTACT: Sandy Myers (office) STA (cell)

Concord s Colonial Inn

The Covered Bridge of Pepperell

Route 29 Business Replacing bridge over river and railroad in Altavista. Signed detour in place.

PROGRESS REPORT WATERFRONT PROGRAM. Q (January - March) Highlights from Q1 2018

Transcription:

Amesbury / Newburyport / Salisbury Whittier Bridge / I-95 Improvement Project Original Whittier Bridge Proposed Whittier Bridges 10/21/2016 Whittier Bridge Project 1

Project Description The project limits extend on I-95 from Exit 57 (Route 113/Storey Avenue) in Newburyport to Exit 60 (Route 286/Toll Road) in Salisbury. The existing six lane I-95 Whittier Bridge over the Merrimack River will be replaced with a new eight lane structure. A four mile section of I-95, including associated bridge crossings, will be widened to provide four lanes in each direction to match the existing roadway cross sections to the south and north. The project includes the construction of the first longitudinal shared use path within an Interstate Highway layout in the Commonwealth. The path, which will cross the Merrimack River on the easterly portion of the new I-95 Northbound Whittier Bridge, will connect the Newburyport Park and Ride lot on Route 113 (Storey Avenue) in Newburyport to Route 110 in Salisbury. The existing Whittier Bridge will remain open to traffic throughout construction of the new I-95 Northbound Bridge. The additional width that will be provided for the shared use path will allow the new I-95 Northbound Bridge to temporarily carry all of the existing six lanes on I-95 Northbound and Southbound while the existing Whittier Bridge is demolished and the new I-95 Southbound Bridge is constructed. 10/21/2016 2

Design Changes Pier Column Changes The Base Technical Concept (BTC) design was modified to eliminate cantilevered pier caps. Base Technical Concept (Vertical Columns) The revised design reduces bending stresses at the pier caps, which will result in increased durability, extended service life and reduced maintenance costs. Revised Design (Battered Columns) 10/21/2016 3

Design Changes Precast Concrete Culvert at Abandoned Railroad Railroad Culvert and 110 Deck Replacement The BTC called for the bridges at Route 110 and the abandoned railroad to be reconstructed and widened towards the median. The design proposed to repair the existing bridge decks; however, inspection of the decks revealed inadequate thickness and substantially more areas in need of repair than originally anticipated. MassDOT issued an owner-directed change to replace the existing bridge decks at Route 110 and to replace the existing bridges at the abandoned railroad with a precast concrete arch culvert. These changes will result in extended service life and reduce long-term maintenance costs. These design changes will increase the overall project cost by approximately $3.6M and contribute to the additional time needed to complete the project. I-95 NB over Route 110 Deck Demolition 10/21/2016 4

10/21/2016 5

Upcoming Milestones Opening of the New I-95 NB Whittier Bridge I-95 NB traffic was shifted onto the new bridge in October 2015. I-95 SB traffic was shifted onto the new bridge in November 2015. Opening of the New I-95 NB Whittier Bridge I-95 SB traffic will be shifted onto the new bridge in July 2017. The Project completion date is scheduled for early September 2017. 10/21/2016 6

Municipal Small Bridge Program 10/21/2016 7

Eligible Bridges BRI s 10 20 span length Not eligible for federal aid 1,300 Municipally Owned BRIs in MA 10/21/2016 8

Funding Non-federal aid state funds $50 million over five years Approved projects will be funded through reimbursement agreements. The maximum amount of reimbursement, including design and construction costs is per year, per municipality. 10/21/2016 9

Program Description Key Points Applications accepted 3 times per year Oct. 31 st, Feb. 28 th & June 30 th. Emergency applications can be submitted anytime. Maximum reimbursement is $500,000 per municipality per year. Project can be for replacements or for preservations. Multiple bridges can be combined in one application ($500k maximum for entire application). 10/21/2016 10

Review and Approval Process 10/21/2016 11

Projects under Construction Acton- Carlisle- Westford- Bruce Freeman Rail Trail Extension, including 6 Railroad Bridges & 1 New Bridge over Route 2A/119 (Phase II-A) (#604532) $11 million Spring 2018 Completion Bedford- Billerica- Middlesex Turnpike Improvements, from Crosby Drive north to Manning Road, includes Reconstruction of B-04-006 (Phase III) (29492) $29.3 million January 2017 Bid Opening Billerica- Reconstruction of Allen Road, from Route 3A to Webb Brook Road (5,400 Feet) (#601426) $8.3 million Fall 2018 Completion Billerica- Construction of MassDOT Maintenance Facility at Concord Road and Route 3 (Exit 27) (#607821) $5.3 million Fall 2016 Completion Billerica- Reconstruction of Route 3A (Boston Road) at Charnstaffe Lane $XX million MassWorks Grant Project Burlington- Adaptive Traffic Control Signal System Installation on Cambridge Street, Middlesex Turnpike & Burlington Mall Road (#608068) $1.6 million Fall 2017 Completion 10/21/2016 12

Chelmsford- Tewksbury- Interstate Maintenance & Related Work on I-495 (#606174) $12.4 million Spring 2017 Completion Chelmsford- Bridge Superstructure Replacement, C-08-048, Hunt Road over I-495 (#607123) $7.9 Million Fall 2017 Completion Lexington- Bridge Replacement, L-10-009, Route 2 (EB & WB) over Route I- 95/Route 128 (Design-Build) (600703) $59.6 million Substantial Completion Fall 2016 Lexington- Burlington- Interstate Maintenance & Related Work on I-95 (606170) $23.5 million Late Summer 2017 Completion Lexington- Reconstruction on Massachusetts Avenue, from Marrett Road to Pleasant Street (#607409) $4.9 million December 2016 Bid Opening 10/21/2016 13

Lowell- Bridge Replacement, L-15-058, VFW Highway over Beaver Brook (#602932) $14.4 million - Fall 2018 Completion Lowell- Bridge Replacement, L-15-045, Market Street over the Western Canal (#604537) $3.7 million NTP Pending Westford- Intersection & Signal Improvements @ Route 110 & Tadmuck Road (#607251) $3.7 million January 2017 Bid Opening 10/21/2016 14

Projects in Design Billerica- Intersection & Signal Improvements at Route 3A (Boston Road) and Allen Road (#608181) $2.6 million 2017 TIP Chelmsford- Traffic Signal Installation at Route 110 & Route 495 (2 Locations) (#607401) $1.2 million - 2019 TIP Chelmsford- Traffic Signal Installation at Route 495 (Exit 42) & Route 4 (#607421) $1 million - 2017 TIP Chelmsford- Bridge Deck Replacement, C-08-037 (2K7), Route 4 (North Street) over I-495 (#607506) $2.4 million - 2017 TIP Chelmsford- Intersection Improvements at Route 129 and Riverneck Road (#608344) $3 million - 2021 TIP 10/21/2016 15

Lowell- Reconstruction and Rehabilitation of Six Bridges (Enel Bridges) Tiger Grant (#608240) $15.4 Million Design Ongoing Lowell- Connector Reconstruction, from Thorndike Street to Gorham Street (#604694) $937,500 2018 TIP Lowell- Reconstruction & Related Work On VFW Highway (#605966) $5.7 Million 2019 TIP Lowell- Intersection & Signal Improvements at 2 Locations: Route 113 (Varnum Avenue & VFW Highway) at Mammoth Road & VFW at Aiken Street (#607752) $1.2 million 2017 TIP Lowell- Improvements on Route 38 at Four Intersections (#606189) $2.6 2018 TIP Lowell - Lord Overpass Reconstruction (#607862) $15.5 million - Design Ongoing 10/21/2016 16

Lowell- Pedestrian Walkway & Bicycle Connection at Pawtucket Falls Overlook, from Vandenberg Esplanade to School Street (#607885) $2.2 million 2019 TIP Lowell- Deck Replacement, L-15-068 (2H5), Lowell Connector (NB) over Industrial Avenue East (#608257) $1.6 million 2019 TIP Lowell- Deck Replacement, L-15-068 (2HG), Lowell Connector (SB) over Industrial Avenue East (#608678) $2.4 2021 TIP Tewksbury- Intersection Improvements at Main Street, Salem Road and South Street (#608346) $2.1 million 2020 TIP Tewksbury- Resurfacing and Sidewalk Reconstruction on Route 38 (#608297) $ 4 million 2021 TIP Tewksbury- Bridge Replacement, T-03-003, Mill Street over Shawsheen River (#607534) $1.2 million 2019 TIP 10/21/2016 17

Westford- Intersection Improvements @ Groton Road (Route 40) & Dunstable Road (#608037) $1.6 million 2018 TIP Westford- Intersection Improvements @ Groton Road (Route 40) & Oak Hill Road (#608036) $2 million 2017 TIP 10/21/2016 18

I-95 North to Route 3 North 10/21/2016 19

I-95 South to MTP/Route 3 North 10/21/2016 20

I-95 South to MTP/Route 3 North 10/21/2016 21

Burlington Adaptive Signal System 10/21/2016 22

Questions??? 10/21/2016 23

Middlesex 3 Coalition Board of Directors Meeting Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. David Gendall, Director Community & Customer Management October 21, 2016 24

Meeting Details Agenda Introductions Safety Message Company Overview Infrastructure Investments Complex Construction Process National Grid Attendees David Gendall Director MA Community & Customer Management Grace Sawaya Jurisdictional Manager Community & Customer Management Susan Griffin Jurisdictional Manager Community & Customer Management

National Grid in the US

National Grid in the UK

National Grid in Massachusetts Gas Distribution Boston Gas Colonial Gas Network of approximately 7,193 miles of gas pipelines covers an area of approximately 1,352 square miles. Provide services to 675,000 consumers. Network of approximately 3,841 miles of gas pipelines covers an area of approximately 622 square miles. Provide services to 201,000 consumers. Single Rate plan covering both companies ~24% ~28% ~48% Massachusetts Electric Electricity Distribution Network of approximately 13,560 miles of overhead line covers an area of approximately 4,625 square miles. Provide services to 1.28 million consumers. 1.3M electric customers 0.9M natural gas customers 231 communities served of 351 in MA 4,800 MA employees Nantucket Electric Provide services to 12,900 consumers on Nantucket Island Regulated as part of Massachusetts Electric Single Rate plan covering both companies 28

Infrastructure Investment (2016/17 examples) MERRIMACK VALLEY / NORTH SHORE

Expanding the Power Grid MV Reliability Project (MVRP) Expand capacity to Massachusetts by adding new, high capacity transmission lines - $85M investment Meadowbrook Substation Expand capacity in Lowell/Chelmsford by adding four new 13kV feeders and high capacity transformers - $35M investment Tyngsborough Substation Improve reliability by adding two 23/13kV transformers and new feeder positions - $2.4M Investment Old Boston Rd Substation Expand capacity in Tewksbury/Lowell by adding two new 13kV feeders and a new 13kV open air substation with five feeders - $16M Investment 30

31

Securing Electric Service with National Grid COMPLEX CONSTRUCTION PROCESS

Communication is crucial to success Customer Developer Consultants/Engineers National Grid Customer Fulfillment Contract Management Distribution Design Real Estate DigSafe Operations Scheduling / Resource Planning Civil Construction Account Management / Billing Municipal City Engineer City Council Water & Sewer Utilities DPW Abutters

Contact Us Electric Natural Gas Distributed Generation New Service Request 800-375-7405 New Service Request 800-732-3400 New Interconnection Request for Solar Report an Outage 800-322-3223 Report a Gas Emergency 800-233-5325 Distributed.generation @nationalgrid.com