BUILD. Update CONSTRUCTION. In this issue: FEATURED PROJECT: KENT AVENUE ARCH CONSTRUCTION AT THE SJ RIVER VIADUCT FEBRUARY 2019

Similar documents
BUILD. In this issue: NEW AERIALS OF CONSTRUCTION NEW PROJECT IN CONSTRUCTION PAC K AG E 4. August 2018

EXTERNAL COMMUNICATIONS COMMITTEE MEETING APRIL 2015

County of Fairfax, Virginia. Silver Line Update. Committee for Dulles March 2, Mark Canale Fairfax County Department of Transportation

EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015

IRONTON-RUSSELL BRIDGE REPLACEMENT

Mason Street Bike/Pedestrian Trail Project

LOST HILLS ROAD INTERCHANGE PROJECT CONSTRUCTION UPDATE. CALABASAS CITY COUNCIL April 26, 2017

Hospital Link Project Project Update September 2015

Elected Officials Briefing

December 2012 Update. I-95 New Haven Harbor Crossing. Corridor Improvement Program

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015

Exposition Light Rail Transit Project

Watching the Ravenel Bridge Grow

Deterioration Factors at Girder Ends

PROJECT UPDATES: November 22, 2017

5.7 Local road upgrades

SECTION 55A1 ROBINSON TOWNSHIP IN WASHINGTON COUNTY

Phoenix Sky Harbor transit guideway bridge

Welcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program,

Expo E-News. Santa Monica s Getting Ready for Expo! Phase 2 Update Page 2. Keeping Our Community Informed

LAND FOR SALE SUBDIVISION LAND: SFR DEVELOPMENT LAND OF ±100 HOMES Ave 13 1/2, Madera, CA PROPERTY FEATURES

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Aug , 2016

1 Metrolinx overview. Mission We connect our communities. Vision Getting you there better, faster and easier

Dufferin Jog Elimination Project

This section evaluates the projected traffic operations and circulation impacts associated with the proposed upgrade and expansion of the LWRP.

April 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015

FDOT Treasure Coast Traffic Report through

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016

DART Blue Line Extension. Garland Rowlett. May 26, 2011

Pattullo Bridge Replacement Project

Historic Bridge Foundation Facebook Archives

HISTORIC AMERICAN ENGINEERING RECORD COVE CREEK SPILLWAY BRIDGE. HAER No. AR-83

The Holes Creek Bridge Replacement By Bradley McClelland

Georgia 400 Tolls to End Friday, November 22 Toll collection scheduled to end after rush hour

Viaduct Demolition at Girard Interchange

NEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release

FDOT Treasure Coast Traffic Impact Report

Mission Statement. Spur 601 Project Highlights

Welcome to the Downtown Fort Lauderdale Neighborhood Working Group Meeting. First meeting june 17, 2010

Canada and Alberta announce 33 new infrastructure projects

Weekly construction update

Head to University Avenue and save!

SLC Airport Project Adds New Scope; Teams Scramble to Stay on Schedule

Regional Connector Transit Project Community Leadership Council. 2 nd Hope Station & Flower St Committees January 17, 2017

State Route 8 Corridor. Northern Summit County s Path to Success

Bridge work done right

Corridor Management Committee Meeting. April 2, 2014

Progress Report for Projects of Regional Significance

For Immediate Release Christine Girardin January 19, 2018 SUMTER COUNTY FLORIDA S TURNPIKE AND I-75 INTERCHANGE IMPROVEMENTS

May 1, 2015 Meredith Cruz, (561) Palm Beach County Traffic Report May 1 through May 8, 2015

2018 Investment in Infrastructure Expo February 27, 2018 Jason Jonas, P.E. Public Works Director

N Prime Retail Pads w/ Direct CA-99 & Betty Dr Access. Direct Access to Upgraded HWY 99 Off/On Ramps

I-10 will close overnight Sunday through Thursday next week. Crews continue to make progress on Sunland s new bridges and ramps.

25 th Avenue Grade Separation. Community Meeting November 13, 2018

Second Street Improvements Project Project Update Archive

OFFICE OF THE CITY MANAGER

Figure 1: Little Dry Creek Trail Crossing

Neighbourhood Committee NDG - Westmount. September 12, 2016

P3 & Design-Build. 101 st Annual THE Conference February 25 th, Speaker: Andrew Gensch, P.E.

25 th Avenue Grade Separation. September 13, 2017

Southwest LRT Alignment Video Narration

Milestone: Bridge to Nowhere scheduled for demolition Aug 14

APPENDIX F List of Commitments

Downtown Cotati Mixed Use Development Site +/- 6.6 acres FOR SALE $3,950,000

Trail # NW Tuesday, June DESIGN. Provide an Review the Provide an. Project Goals: System system. wayfinding

90 I-90 Snoqualmie Pass East September Annual Mega-Project Report. Project Benefits

25 th Avenue Grade Separation. December 13, 2017

remember when? CELEBRATING 75 YEARS, MAY 27, 2012

PROJECT UPDATES October 26, 2017

NEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release

Ohio Department of Transportation Construction Update

CONTACT: Nichole Lawrence CELL: FOR IMMEDIATE RELEASE Wednesday March 28, 2018

United States Department of the Interior National Park Service. Boundary Expansion Listed in National Register January 11, 2017

Sierra Roadwork Schedule Sunday through Saturday, October 1-7, 2017 LONG-TERM PROJECTS

Overview. ECO RAPID TRANSIT Meeting April 8, 2015 Don Sepulveda, P.E. Executive Officer Regional Rail

Just to keep you informed, as of May 12, 2017, here is a brief synopsis of things being worked on/or accomplished in your City.

Premier Airport Park Airport Haul Road, Fort Myers, FL , ,890 SF FOR LEASE ALL OR PART

FOR IMMEDIATE RELEASE Fiorella Teodista January 5, 2018 SOUTH FLORIDA AND TREASURE COAST WEEKLY LANE CLOSURES AND WORK ZONE ADVISORY

Commonwealth Avenue Bridge Deck Replacement Project. Legislative and Stakeholder Briefing. April 13, 2017

Port MacKenzie Rail Extension

TRAIL ANNUAL REPORT

Important Lane Closures March 1 5, 2010

Chicago St. Louis High-Speed Rail. Enos Park Neighborhood Association May 13, 2014

BALLAST CLEANING TO IMPROVE DRAINAGE IN METROLINK S VALLEY SUBDIVISION TUNNEL 25

Crenshaw/LAX Transit Project Construction Community Meeting July 26 th, 2017

Lincoln Village Pedestrian Bicycle Bridge Community Meeting September 13th, 2016

Delaware County Engineer

Capital Programs Update

SAN RAFAEL City Council January 20, 2015

GARFIELD BRIDGE. Building A Bridge to No-Where

Progress Report for Projects of Regional Significance

Important Lane Closures, April 3 9, 2011

Main Street Station Upgrades

Northeast Anthony Henday Drive Edmonton Ring Road Update. Strathcona Chamber of Commerce March 18, 2015

DULLES AREA HIGHLIGHTS. Gary Garczynski Commonwealth Transportation Board Northern Virginia District. Committee for Dulles August 4, 2016

STAGE 2 & 3 Pavement reconstruction within viaduct footprint, pavement widening and resurfacing N/S of viaduct footprint, sidewalk

I-10 West and Sunland Park Drive southbound will close July 13 at night. Detour onto North Mesa will be required.

Port MacKenzie Rail Extension

Metro Gold Line Eastside Extension Review Advisory Committee October 9, 2008

Transcription:

BUILD CONSTRUCTION Update FEBRUARY 2019 In this issue: ARCH CONSTRUCTION AT THE SJ RIVER VIADUCT FEATURED PROJECT: KENT AVENUE

* Featured Project KENT AVENUE CP 2-3

CONSTRUCTION UPDATE February 2019 At the overcrossing for Kent Avenue, workers use a crane to set girders for the bridge deck on the three-span structure. A total of 12 girders will be set during this phase, eight that are about 50 feet in length that will connect the abutments to the piers, and four about 80 feet long between the piers that will span the crossing over the future high-speed train line. BUILDHSR.COM

ROAD 27 GRADE SEPARATION Madera County

CONSTRUCTION UPDATE February 2019 ROAD 27 GRADE SEPARATION Madera County At the northern end of Construction Package 1, crews continue building the structures (called diaphragms) that will connect the girders to one another along the sides at the Road 27 Grade Separation in Madera County. They are also preparing for closure pours which will connect the girder sections end to end. Ultimately, the bridge will be nearly 650 feet long with frontage roads providing access to local homes along the sides. BUILDHSR.COM

SAN JOAQUIN RIVER VIADUCT North Fresno

CONSTRUCTION UPDATE February 2019 SAN JOAQUIN RIVER VIADUCT North Fresno At the San Joaquin River Viaduct, foundations have been poured for a cast-in-place concrete arch that will act as the high-speed rail gateway to Fresno County. Nearby, a worker uses a highpressure hose to blow debris out of the rebar in preparation for another concrete structure pour. The completed viaduct, nearly a mile in length, will be one of the largest structures on this first phase of the high-speed rail project. BUILDHSR.COM

FRESNO TRENCH & SR 180 PASSAGEWAY Central Fresno

CONSTRUCTION UPDATE February 2019 FRESNO TRENCH & SR 180 PASSAGEWAY Central Fresno A little north of downtown Fresno, workers are nearing completion of the excavation for the highspeed rail crossing under State Route 180. As crews put the finishing touches on the walls inside the undercrossing, others excavate the area outside where the trains will come back to grade. The next step will be to construct a concrete box that will carry trains under the highway, a rail spur and the Dry Creek Canal. Crews have reached the bottom of the trench and are fine grading the area in order to start the box construction. Ultimately, the trench will extend approximately 1 mile in length. BUILDHSR.COM

CEDAR VIADUCT South Fresno At the Cedar Viaduct, construction crews continue extending the structure across State Route 99 south of Fresno. Columns for several support piers are rising on both sides of the highway and in the median as well. The viaduct will eventually be connected to the smaller Muscat Viaduct a little further to the south. One of the largest structures on Construction Package 1, the Cedar Viaduct will be about three-quarters of a mile long when it s complete.

CONSTRUCTION UPDATE February 2019 AVENUE 15 GRADE SEPARATION Madera County At Avenue 15, construction is underway again on the west side abutment wall and center pier. The 35-foot-tall west abutment was poured earlier this month. The formwork from the west abutment will next be moved over to the east abutment for crews to begin raising that structure out of the ground. The central pier has falsework around the columns and a rebar crew is tying the steel for the bent cap which will tie the two columns together. This two-span structure will take traffic over the future high-speed train and the existing BNSF freight rail alignment. BUILDHSR.COM

AVENUE 12 GRADE SEPARATION Madera County A little east of Madera Community College, crews have poured the concrete deck and are now setting concrete forms for barrier walls along the sides of the Avenue 12 overcrossing. Walls adjacent to the Avenue 12 overpass crossing the existing freight rail line are also being constructed. The recent rains slowed down the progress of the footings, but walls are starting to be formed on the west side of the tracks. The realignment of the busy roadway with two separate bridges will take traffic over the high-speed rail line and the BNSF freight tracks a little further east.

CONSTRUCTION UPDATE February 2019 AVENUE 11 GRADE SEPARATION Madera County Though the bridge itself is largely complete, recent cold temperatures and rain have held up final asphalt paving for the roadway leading up to it. This crossing for Avenue 11, a little east of Road 30 ½, will take traffic over the high-speed train alignment in Madera County. AVENUE 8 GRADE SEPARATION Madera County As at Avenue 11, the bridge deck for the Avenue 8 overcrossing in Madera County is mostly complete, but final paving for the approaches waits for better weather. BUILDHSR.COM

Faces of HSR Chi-Hsin Shao has spent years working in the transportation industry, serving in the 1980s as Head of the Transportation Planning Section for the San Francisco Planning Department and Deputy Commissioner of Policy and Planning for the City of Boston Transportation Department before eventually working in consulting. My dream was to have my own consulting business, Shao recalled. It was fascinating to me how someone could establish and grow a business. I was inspired from my previous company and its owners, and I thought it would be a great accomplishment if I could do the same. Visit buildhsr.com/facesofhsr to read more about how Shao was able to build and grow a company of his own. JOB NUMBERS AS OF JANUARY 2019 CONSTRUCTION LABOR WORKERS 2573 INCREASED CP 1: CP 2-3: CP 4: INCREASED IIICIWD INCREASED INCREASED 1632 683 258 LATEST VIDEOS YOUTUBE.COM/CAHIGHSPEEDRAIL 2019: LOOKING AHEAD Looking ahead to 2019, construction will continue in the Central Valley while we advance the environmental review process in Northern and Southern California and continue putting small businesses and Californians to work. contact TONI TINOCO CALIFORNIA HIGH -SPEED RAIL (559) 274-8975 TONI.TINOCO@HSR.CA.GOV DAN GALVIN CALIFORNIA HIGH -SPEED RAIL (559) 490-6863 DANIEL.GALVIN@HSR.CA.GOV