STUDY WORK GROUP MEETING No. 3. November 29, 2016

Similar documents
STUDY WORK GROUP MEETING No. 4. July 12, 2017

Prepared By: Mead & Hunt, Inc Port Lansing Road Lansing, MI 48906

Tallahassee International Airport Master Plan. Technical Advisory Committee Meeting #2 October 19, 2016

Airport Master Plan. Brookings Regional Airport. Runway Runway 17-35

Meeting Summary ABE Master Plan Project Advisory Group (PAG) Meeting #3 August 15, Shannon Eibert, C&S Companies

STUDY WORK GROUP MEETING No. 2. March 15, 2016

AIRPORT MASTER PLAN UPDATE

DRAFT FINAL REPORT AIRPORT MASTER PLAN. Rifle Garfield County Airport Revised May 15, 2014

TABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved

1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan

Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3

Study Committee Meeting. September 2015

CHAPTER 5 - FACILITY REQUIREMENTS

Airport Master Plan for. Brown Field Municipal Airport PAC Meeting #3

Public Information Meeting. September 2015

Airport Master Plan Open House Front Range Airport February 23, 2017

Table of Contents. Master Plan March 2014 TOC i Spokane International Airport

Merritt Island Airport

Master Plan Update Technical Advisory Committee Meeting

Table of Contents. Overview Objectives Key Issues Process...1-3

CHAPTER 1 EXECUTIVE SUMMARY

Technical Advisory Committee Meeting February 29, 2016

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport

General Aviation Master Plan Update

CHAPTER 3 ALTERNATIVES CONSIDERED

AIRPORT MASTER PLAN ADVISORY COMMITTEE MEETING #2 AGENDA

Lake Tahoe Airport Master Plan

ERIE INTERNATIONAL AIRPORT MASTER PLAN TABLE OF CONTENTS

Aviation Planning in Maine and Our Region. Stacie Haskell Aviation Coordinator & Study Manager Maine Department of Transportation April 27, 2011

Document prepared by MnDOT Office of Aeronautics and HNTB Corporation. MINNESOTA GO STATE AVIATION SYSTEM PLAN

Westover Metropolitan Airport Master Plan Update

CHAPTER 1: INTRODUCTION

FORECASTING FUTURE ACTIVITY

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015

TABLE OF CONTENTS. Washington Aviation System Plan Update July 2017 i

CHAPTER 1 BACKGROUND AND PROPOSED ACTION

Airport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal

Norfolk International Airport

BNA Master Plan Update Public Meeting No. 2

FACILITY REQUIREMENTS SUMMARY OF KEY ISSUES OVERVIEW

4.0 AIRFIELD CAPACITY & FACILITY REQUIREMENTS

BNA Master Plan Update Community Advisory Committee Meeting No. 5

Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL

PLU Airport Master Plan. Master Plan Advisory Committee (MPAC) Meeting #2 October 16, 2016

Chapter Three AIRPORT FACILITY REQUIREMENTS/ALTERNATIVES

DRAFT MASTER PLAN UPDATE

Lopez Island Airport Master Plan Update. Public Meeting June 15, 2017

TECHNICAL ADVISORY COMMITTEE MEETING 3 SEPTEMBER 10, Airport Master Plan

AIRPORT MASTER PLAN. Newport State Airport. Draft. (Colonel Robert F. Wood Airpark) THE Louis Berger Group, INC. Prepared for: Prepared by:

MASTER PLAN UPDATE. Planning Advisory Committee (PAC) FRESNO YOSEMITE INTERNATIONAL AIRPORT. Meeting #4

Current and Forecast Demand

Agenda: SASP SAC Meeting 3

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES

Master Plan Update Community Advisory Committee Kick-off Meeting

Chapter 5 Facility Requirements

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES

Introduction DRAFT March 9, 2017

Chapter 5 Airport Development Alternatives

Chapter 4 Airport Facility Requirements

The offers operators increased capacity while taking advantage of existing airport infrastructure. aero quarterly qtr_03 10

The presentation was approximately 25 minutes The presentation is part of Working Group Meeting 3

Fort Wayne International Airport Master Plan Study. Executive Summary

Current Airport Roles

According to FAA Advisory Circular 150/5060-5, Airport Capacity and Delay, the elements that affect airfield capacity include:

Appendix D Project Newsletters. Tacoma Narrows Airport. Master Plan Update

Chapter 5. Facility Requirements

8.0 AIRPORT LAYOUT PLANS

CATCODE ] CATCODE

PUBLIC MEETING 2. Airport Master Plan Update. March 2019

B GEORGIA INFRASTRUCTURE REPORT CARD AVIATION RECOMMENDATIONS DEFINITION OF THE ISSUE. Plan and Fund for the Future:

Chapter 4: Facility Requirements

Facility Requirements

CHAPTER 1 INTRODUCTION AND BACKGROUND

1.1.3 Taxiways. Figure 1-15: Taxiway Data. DRAFT Inventory TYPICAL PAVEMENT CROSS-SECTION LIGHTING TYPE LENGTH (FEET) WIDTH (FEET) LIGHTING CONDITION

Addendum - Airport Development Alternatives (Chapter 6)

Chapter 2 FINDINGS & CONCLUSIONS

Source: Chippewa Valley Regional Airport ASOS, Period of Record

HILLSBORO AIRPORT MASTER PLAN UPDATE Planning Advisory Committee Meeting 1

Nantucket Memorial Airport Commission. Master Plan Workshop. October 26, 2012

3.1 CRITICAL AIRCRAFT

3.9 AIRPORT SUPPORT FACILITIES

CEE 5614 and CEE Aircraft Classifications. Spring 2013

Hartford-Brainard Airport Potential Runway Closure White Paper

Pierre Regional Airport Airport Master Plan. Kickoff Meeting April 7, 2017

COMMERCIAL AND GENERAL AVIATION

Input Efforts Online survey of tenants and users Focus group meetings with Tenants and users Agencies and stakeholders General Aviation Pilot

4. Demand/Capacity Assessment and Facility Requirements

Airport Master Plan Update

Chapter 1 Introduction and Project Overview

1 PURPOSE AND NEED 1.1 INTRODUCTION

TECHNICAL REPORT #3 Palm Beach International Airport Demand/Capacity and Facility Requirements

Table of Contents Facility Requirements Overview Airport Capacity and Delay Analysis... 1

AIRPORT FACILITY REQUIREMENTS

Chapter Four Facility Requirements

Casper/Natrona County International Airport Master Plan Update Technical Advisory Committee Meeting Two - October 14th, :30 PM

The purpose of this Demand/Capacity. The airfield configuration for SPG. Methods for determining airport AIRPORT DEMAND CAPACITY. Runway Configuration

CHAPTER 3 FACILITY REQUIREMENTS

CHAPTER 5: Landside Facility Requirements and Development Concepts

Facility Requirements

What is an Airport Master Plan?

Transcription:

STUDY WORK GROUP MEETING No. 3 November 29, 2016

Agenda Welcome and introductions Update project schedule Brief overview of previous SWG meeting Update on aviation forecasts Introduction to airfield demand/capacity analysis and facility requirements Comments, questions and next steps

Team Introductions Mead & Hunt, Inc. Jon Scraper, Project Coordinator Bart Gover, Project Manager Dave Dietz, Lead Aviation Forecaster Jen Boehm, Project Engineer Matt Blankenship, Project Planner Rob Sims, Project Planner Kim Kenville Consulting Public Outreach Program

Project Schedule 5 total Study Work Group meetings 3 total Public Information meetings Project completion estimated in late 2017

Overview of Previous Meeting Results of Focus Group Meetings Inventory of Existing Conditions Passenger Demand Analysis Aviation Forecasts

Results of Focus Group Meetings Local pride for BIS terminal building Preserve beauty and functionality of terminal while accommodating need for future growth Expand parking, rental car, vehicular access, maintenance and ARFF facilities Continued growth of general aviation Utilize new technologies where appropriate (mobile friendly, website)

Inventory of Existing Conditions Airport role, history, and land use Local demographics and airport s economic impact within the region Existing airside, landside, and terminal facilities

Passenger Demand Analysis Travel patterns of passengers within BIS catchment area Influencing factors supporting future growth at BIS Insights for the development of aviation forecasts

Aviation Forecasts Passenger enplanements Based aircraft Aircraft operations Cargo tonnage Critical aircraft

Forecast Revisions Critical aircraft changed to MD 80 series Consistency with 2016 BIS Engineering Design Report Less dependency on a return to oil boom Submitted to FAA for review/approval

Critical Aircraft MD 80 series Aircraft Approach Category D Airplane Design Group III Taxiway Design Group TDG-4

Forecast Summary

Demand/Capacity Analysis

Peak Hour Demand 22 peak hour operations in 2015 28 peak hour operations by 2035

Annual Service Volume ASV = 143,000 annual operations No additional runway needed for capacity thru 2035

Facility Requirements

Facility Requirements Wind coverage Design standards Runway and taxiway system Aircraft aprons Navigational aids and weather equipment Terminal area General aviation and support facilities Air traffic control tower

Wind Coverage 10 years of hourly observations RW 13/31 has all-weather coverage of 92.85% for 10.5 knots Crosswind RW 3/21 required to service small aircraft Combined both runway s meet FAA s 95% wind coverage requirement for weather and aircraft size

NAVAIDs and Weather Equipment Visual Aids Rotating Beacon, Wind Indicators, Approach Lighting, PAPIs, Runway and Taxiway Lighting, Airfield Markings/Signage Electronic Navigational Aids ILS, RNAV, VOR Weather Reporting AWOS CAT I standards RVR

Design Standards Based on FAA Advisory Circular 150/5300-13A, Airport Design Organizes design standards based on aircraft approach speed, wingspan, and airplane undercarriage dimensions Classified by Runway Design Code (RDC) and Taxiway Design Group (TDG)

Runway Design Code (RDC) Aircraft Approach Category (AAC) Aircraft Design Group (ADG) Runway Visual Range (RVR)

Runway Design Code (RDC) Two most demanding aircraft at BIS MD-83 and Boeing 757-200 Runway 13/31 RDC = D-III Consistent with 2016 Engineering Design Report RW 13/31 rehabilitation project to follow RDC D-III standards Runway 3/21 RDC = C-II Serves primarily as general aviation runway Sometimes larger aircraft (i.e. A319) also use RW 3/21

Figure 3-3: Runway Length Requirements

Runway 13/31 Length -8,794 Current RW 13/31 length adequate thru 2035 Meets 20-year needs of commercial airline fleet Can accommodate 100% of corporate (large) general aviation fleet at a 90% useful load Consistent with 2016 Engineering Design Report

Runway 3/21 Length -6,600 Current RW 3/21 length adequate thru 2035 Experienced increase in usage by aircraft weighing less than 60,000 lbs. since 2010 Can accommodate 90% useful load of small GA fleet Serves as crosswind runway for small GA during high winds

Taxiway Design Group (TDG) Taxiway design based on TDG and ADG of critical aircraft TDG determines the physical pavement dimensions of taxiways ADG determines required taxiway separation, width of taxiway safety areas and object free areas

Taxiway System RW 13/31 taxiways TDG-5 Proximity to terminal drives larger aircraft usage RW 3/21 taxiways TDG-3 Provides noise abatement benefit

Terminal Area - Building Approximately 78,000 ft 2 (current) Additional 50,000ft 2 recommend by 2035 Includes support areas within terminal May vary based on individual airport needs and design

Terminal Area Apron Demand driven by Remaining Overnight Aircraft (RON) Five scheduled RON plus charters 8-9 total RON positions estimated by 2035

Terminal Gates Combination of schedule air service and charter demand Peak demand occurs in early evening Planning for 4 additional aircraft gates is recommended by 2035

Terminal Area Parking 1,119 current parking spaces Parking demand determined by ratio of enplanements to parking spaces Ratio held constant throughout planning period to determine future demand

Parking Projections Rental Car spaces needed Ready return -75 spaces Storage -211 spaces Employee parking needed 56 spaces

Parking Projections 743 total public parking spaces by 2035 Short term -189 spaces Economy -117 spaces Long term -437 spaces

General Aviation Facilities GA accounts for 72% of total operations GA Terminal Buildings combine for 17,200sf 2 Expected to meet future GA demand thru 2035 Future expansion based on needs of individual FBO Fixed Base Operator Services Full-service FBOs including fuel, maintenance, flight training

General Aviation Apron A factor of peak itinerant operations 5,625ft 2 per aircraft Sufficient space for the planning period Opportunities for future GA growth Bravo hangars

General Aviation Facilities Recommend hangar space by 2035 63,000sf 2 of additional T-Hangar 109,300sf 2 of additional Box Hangar Aviation Fuel Storage Facilities 7.5 day 5-year average turnover rate Jet A 88.4 day 5-year average turnover rate 100 LL Space for future fuel storage capacity to be identified Air Cargo Some expansion to cargo areas and facilities

Support Facilities ARFF Facility Existing and future capabilities can be accommodated Need for expansion will be driven by size of replacement vehicles (i.e. new 3,000 gallon truck) SRE Facility Currently over capacity Space for expansion of SRE facility to be identified

Support Facilities Airfield Electrical Vaults and Generator Continue upgrading vault components with lighting Consider future consolidation based on need and funding Deicing Fluid Collection/Disposal Continued protection for surrounding environment Use new technologies where possible to capture as much fluid as possible

Air Traffic Control Tower Built in 1986 Operating hours 6 am to 12 am No significant location-related issues Currently scarce funding for ATCT Opportunity for future technology upgrades

Next Steps Incorporate public feedback to demand/capacity and facility requirements Respond to FAA forecast review Develop airport alternatives to address future facility development Prepare environmental overview chapter Identify a preferred alternative concept for development of Airport Layout Plans (ALP) package Hold SWG Meeting No. 4 (March 22, 2017) Hold Public Meeting No. 2 (March 22, 2017)

Comments & Questions Open discussion Contact Airport Tim Thorsen tthorsen@bismarcknd.gov Contact the Project Manager Bart Gover bart.gover@meadhunt.com Bismarck Airport Master Plan Webpage Access to draft documents for review/comment