DATE: LOCATION TRAFFIC RESTRICTION DATE PERFORMING THE WORK PHILADELPHIA. Bridge Inspection: RIGHT SIDE CLOSED ON THE RAMP. 8 AM - 4 PM.

Montgomery County Bridges 3/27/2018. Page 1 of 5

2966 Street Road, Suite B Bensalem, PA W. Butler Avenue Chalfont, PA W. Street Road Warminster, PA

SOUTHEASTERN PENNSLYVANIA TRANSPORTATION AUTHORITY TARIFF NO. 270 GOVERNING THE FURNISHING OF PASSENGER TRANSPORTATION BY SEPTA S ROUTE 4

Transportation Summary. Project Scope. Findings. Pennsylvania Turnpike Corridor Reinvestment Project Montgomery County

U.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County

SOUTHEASTERN PENNSYLVANIA TRANSPORTATION AUTHORITY TARIFF NO. 159 SUPPLEMENT NO. 11 GOVERNING THE FURNISHING OF PASSENGER TRANSPORTATION

Kennedy & Associates, LLC

CONSTRUCTION PROJECTS IN CUYAHOGA COUNTY CLEVELAND EUCLID 3/9/18 RICHMOND MAYFIELD HIGHLAND HEIGHTS HEIGHTS SOUTH EAST MAYFIELD EUCLID CLEVELAND

All directions are from Roman Catholic High School (301 N. Broad Street, Philadelphia, PA 19107)

Viaduct Demolition at Girard Interchange

Wayne Mandatory Location: Saturday, Dawn-1pm Metered parking in town OR park at WAC Indoor/ Cover

PennDOT Interstate Work next week March 30-April 3:

400 Lincoln Ave, Prospect Park

Guide to. Road Construction Projects

TRAFFIC ALERT FOR OCTOBER 15-19, 2018 Highway Work Zones in the Staunton District

Exit 148 (Quantico) to Exit 133 (Route 17/Fredericksburg)

Exit 136 (Centreport Parkway/Stafford County) to Exit 130 (Route 3/Fredericksburg)

RELEASE: IMMEDIATE September 14, 2012 CONTACT: Sandy Myers (office) STA (cell)

Southeastern Pennsylvania

CONTACT: Nichole Lawrence CELL: FOR IMMEDIATE RELEASE Wednesday March 28, 2018

PennDOT MAJOR ROAD PROJECTS

PennDOT MAJOR ROAD PROJECTS

TRAFFIC ALERT FOR MARCH 26-30, 2018 Highway Work Zones in the Staunton District

Project Location MP A44.5 MP A38 PRELIMINARY. A A57 (Future Project) A42 - A44.5 (Fall Fall 2019) A38 - A42. A31 - A38 - In Design

Weekly East Tennessee Construction Report for May 31-June 6, 2018

Exit 148 (Quantico) to Exit 133 (Route 17/Falmouth)

"This is the catalyst we've been waiting for," Norristown Planning Director Jayne Musonye said of the project.

Swarthmore College. Summer Camps

LANGHORNE (PHILADELPHIA), PENNSYLVANIA

TRAFFIC ALERT FOR MARCH 5-9, 2018 Highway Work Zones in the Staunton District

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

TRAFFIC ALERT FOR DECEMBER 25, 2017 to JANUARY 5, 2018 Highway Work Zones in the Staunton District

TRAFFIC ALERT FOR JANUARY 15-19, 2018 Highway Work Zones in the Staunton District

Damage Prevention Committee Meeting Agenda December 11, Case Number Stakeholders Date and Location. Ross Electrical Construction Company

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Aug , 2016

FDOT Treasure Coast Traffic Report through

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015

* Short term resurfacing projects are not included in this listing. 4T39.07 Project: Annual Rural County Sign Improvements, Genesee/Orleans Counties

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT June 12 June 18, 2016

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015

November 21, 2012 Barbara Kelleher, (954)

March Center for Arts & Technology- Brandywine 1635 East Lincoln Highway Coatesville PA Adm Asst/Secr Sci, Gen

TRAFFIC ALERT FOR DECEMBER 10-14, 2018 Highway Work Zones in the Staunton District

Lancaster County Road Work Jan 06 through Jan 10

RELEASE: IMMEDIATE Oct. 6, 2017 CONTACT: Darragh Copley Frye (office) (cell)

Ohio Department of Transportation Construction Update

Route 29 Business Replacing bridge over river and railroad in Altavista. Signed detour in place.

Southeastern Pennsylvania 2018

SOUTHEASTERN PENNSYLVANIA TRANSPORTATION AUTHORITY TARIFF NO. 60 SUPPLEMENT NO. 12 GOVERNING THE FURNISHING OF PASSENGER TRANSPORTATION

PennDOT Announces 2016 Allegheny County Highway and Bridge Improvement Projects

District Construction Progr am. John R. Kasich, Ohio Governor Jerry Wray, ODOT Director Steve Mary, P.E., District Deputy Director

Palm Beach County Traffic Report August 24 through August 31, 2012

TRAFFIC ALERT FOR SEPTEMBER 17-21, 2018 Highway Work Zones in the Staunton District

Fiscal Year 2018 Annual Service Plan. Service Planning Department

PENNSYLVANIA SCENIC BYWAYS

REPOSITORY LIST 2018 ASTON TWP PROPERTIES SOLD "AS IS"

Road Commission for Oakland County 2016 Road and Permit Projects (6/29/16 Update) Community or Communities

TRAFFIC ALERT FOR JUNE 4-8, 2018 Highway Work Zones in the Staunton District

Palm Beach County Traffic Report July 13 through July 20, 2012

2017 Pharmacy Directory

For Immediate Release Christine Girardin January 19, 2018 SUMTER COUNTY FLORIDA S TURNPIKE AND I-75 INTERCHANGE IMPROVEMENTS

SOUTHEASTERN PENNSYLVANIA TRANSPORTATION AUTHORITY

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016

INTERSTATE MANAGEMENT PROGRAM FOR THE FY2015 TIP FOR DVRPC SUBREGION

TRAFFIC ALERT FOR FEBRUARY 4-8, 2019 Highway Work Zones in the Staunton District

PHA Contact Information

Riverside at Providence

PHILADELPHIA, PENNSYLVANIA

BUCKS COUNTY TRAILS. September 10, 2015 Presentation to:

TRAFFIC ALERT FOR FEBRUARY 11-15, 2019 Highway Work Zones in the Staunton District

Bedford County 2015 Construction Projects

TRAFFIC ALERT FOR JUNE 25-29, 2018 Highway Work Zones in the Staunton District

POTTSTOWN BYPASS (US 422) RECONSTRUCTION TRAFFIC STUDY Chester and Montgomery Counties, Pennsylvania

Looking for a better way to target Turnpike Travelers?

Project Management Portfolio

EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015

White Springs at Providence. Community Guide

State Route 8 Corridor. Northern Summit County s Path to Success

April 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014

FOR IMMEDIATE RELEASE February 22, 2019 CONTACT: Jen K. Ward, SALEM 69

2010 Planned Construction STATEWIDE

960 Harvest Drive Blue Bell, PA

Directions to Unisys East Coast Development Center (Malvern) 2476 Swedesford Road, Malvern, PA 19355

BUREAU OF TRANSPORTATION AND SAFETY SECRETARIAL LETTERS RAILROAD SAFETY DIVISION

Ohio Department of Transportation Traffic Advisory. District 4 Allen C. Biehl, P.E., Deputy Director S. Arlington Road.

ADR 19 l January Regional, County, and Municipal Employment Forecasts,

October 31, 2014 Chuck McGinness, (954)

Becky A. Bradley, AICP. Executive Director, LVPC Secretary, LVTS

WEEKLY HIGHWAY ALERT RICHMOND DISTRICT

Road Construction Ahead January-April 2015 NORTHWEST REGION

EUSTACE ICE HOCKEY TRAVEL DIRECTORY

Every Deed Tells a Story

May 1, 2015 Meredith Cruz, (561) Palm Beach County Traffic Report May 1 through May 8, 2015

U9 GIRLS - DIVISION A 8 Teams, 2 Groups of Champion: Lehigh Valley United Black

MEMORANDUM. DATE: February 1, 2007

RD INSTRUCTION 1980-D, EXHIBIT C PAGE 240 GUARANTEED HOUSING PROGRAM INCOME LIMITS

Transcription:

PENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 6-0 TRAFFIC RESTRICTION BULLETIN (NOTE: SCHEDULES ARE SUBJECT TO WEATHER CONDITIONS) (All restrictions 24 hours/day, 7 days/week unless otherwise noted) PENNDOT ROADWAY MAINTENANCE HOTLINE 1-800-FIX- ROAD Log on to www.511pa.com or call 511 from any phone to check conditions on major highways. DATE: 10-07-2016 PHILADELPHIA Princeton Ave. ramp to I-95 North Roadwork: RAMP CLOSED & DETOURED. 8 PM - 5 9/23/16-9/26/16 Walsh Construction $212.3 million AM. DETOUR Company Betsy Ross Bridge ramp to I-95 South Deck Repair: LEFT & CENTER LANE CLOSURE on ramp. 6 AM - 2 PM. 9/24/16 & 10/1/16 Maintenance Passyunk Ave. Bridge Rehabilitation: WESTBOUND RIGHT LANE CLOSED on Hon. Robert C. Donatucci Memorial Bridge over Schuylkill River. 9 AM - 3 PM. 9/24/16-10/1/16 Buckley & Company, $33.5 million Princeton Ave. ramp to I-95 North Roadwork: RAMP CLOSED & DETOURED. 8 PM - 5 AM. DETOUR 9/25/16-10/1/16 Walsh Construction Company $212.3 million *I-95 N & S Fiber Installation: SHOULDER CLOSURE between Rhawn St. & Academy Rd. 9 AM - 3 PM. 9/25/16-10/1/16 Walsh Construction Company $212.3 million *I-95 N & S New State Rd. ITS Installation: SINGLE & DOUBLE LANE CLOSURES between Bridge St. & Academy Rd. 8 PM - 5 AM. Roadwork: LANE CLOSURE between Longshore Ave. & Princeton Ave. 9 AM - 3 PM & 8 PM - 5 AM. 9/25/16-10/1/16 Walsh Construction Company 9/25/16-10/1/16 Walsh Construction Company $212.3 million $212.3 million *I-95 North ramp to Cottman Ave. (PA 73) Overhead Bridge Construction & Paving: RAMP CLOSED & DETOURED. 8 PM - 5 AM. DETOUR 9/25/16-10/1/16 Walsh Construction Company $212.3 million 10/7/2016 Page 1 of 26

*US 1 N & S (Roosevelt Blvd.) Milling & Paving: EXPRESS LANE RESTRICTION 9/26/16 Buckley & Company, $15.5 million between Rhawn Ave. & Strahle St. 7 PM - 5 AM. *I-76 East Bridge Inspection: RIGHT LANE CLOSED between Arch St. & South St. 9 AM - 3 PM. 9/26/16 Pickering, Corts & Summerson *I-676 E & W Overhead Bridge Construction: CLOSED & DETOURED between I-76 & Broad St. (PA 611). 11 PM - 5 AM. DETOUR 9/26/16-9/29/16 Buckley & Company, $211.7 million *US 1 N & S (Roosevelt Blvd.) Drain Cleaning/Debris Removal: LANE RESTRICTIONS between I-76 & 9th St. 9:30 AM - 2 PM. 9/26/16-9/29/16 Maintenance *I-676 E & W Drain Cleaning/Debris Removal: LANE RESTRICTIONS between I-76 & I-95. 9:30 AM - 2 PM. 9/26/16-9/29/16 Maintenance *I-95 N & S Drain Cleaning/Debris Removal: LANE RESTRICTIONS between Phila. Int. Airport & PA 63 (Woodhaven Rd.). 9:30 AM - 2 PM. 9/26/16-9/29/16 Maintenance *I-76 E & W Drain Cleaning/Debris Removal: LANE RESTRICTIONS between US 1 (City Ave.) & 26th St. 9:30 AM - 2 PM. 9/26/16-9/29/16 Maintenance Whitaker Ave. Walnut St. Bridge Joint, Deck & Sidewalk Repairs: LANE CLOSURES between E. Loudon St. & E. Ruscomb St. 7 AM - 3:30 PM. 9/26/16-9/30/16 Neshaminy Constructors, Bridge Joint, Deck & Sidewalk Repairs: LANE 9/26/16-9/30/16 Neshaminy CLOSURES between N. 23rd St. & S. 32nd St. 7 AM - Constructors, 3:30 PM. $2.5 million $2.5 million City Ave. Trench Restoration: LANE CLOSURES between Wynnewood Ave. & 63rd St. 9 AM - 3 PM. 9/26/16-9/30/16 Armour & Son $2.9 million City Ave. Trench Restoration: LANE CLOSURES between Cardinal Ave. & Lapsley Ave. 9 AM - 3 PM. 9/26/16-9/30/16 Armour & Sons $2.9 million 10/7/2016 Page 2 of 26

Olney Ave. Curb Ramp Construction/Traffic Signal Foundations: CLOSED & DETOURED between 3rd St. & Mascher St. 7 AM - 3 PM. DETOUR 9/26/16-9/30/16 Armour & Sons $4.7 million Olney Ave. Curb Ramp Construction/Traffic Signal Foundations: CLOSED & DETOURED between Fairhill st. & Lawrence St. 7 AM - 3 PM. DETOUR 9/26/16-9/30/16 Armour & Sons $4.7 million PA 73 (Cottman Ave.) Bridge Cleaning: RIGHT LANE CLOSED at E. Roosevelt Blvd. 9 AM - 3 PM. 9/26/16-9/30/16 DeAngelo Brothers, $1.2 million PA 73 (Cottman Ave.) Bridge Cleaning: RIGHT LANE CLOSED between Oakley St. & Rockwell Ave. 9 AM - 3 PM. 9/26/16-9/30/16 DeAngelo Brothers, $1.2 million Bustleton Pike Bridge Cleaning: LANE CLOSURES between Philmont Ave. & Southampton Rd. 9 AM - 3 PM. 9/26/16-9/30/16 DeAngelo Brothers, $1.2 million Bustleton Ave. Bridge Cleaning: LANE CLOSURES between Laura Lane & Station Rd. 9 AM - 3 PM. 9/26/16-9/30/16 DeAngelo Brothers, $1.2 million Pennypack Circle Bridge Cleaning: LANE CLOSURES between Ashton Rd. & Welsh Rd. 9 AM - 3 PM. 9/26/16-9/30/16 DeAngelo Brothers, $1.2 million Linden Ave. Bridge Cleaning: LANE CLOSURES between Torresdale Ave. & Keystone St. 9 AM - 3 PM. 9/26/16-9/30/16 DeAngelo Brothers, $1.2 million Holme Ave. Bridge Cleaning: LANE CLOSURES between Pennypack St. & Willits Rd. 9 AM - 3 PM. 9/26/16-9/30/16 DeAngelo Brothers, $1.2 million Passyunk Ave. Baltimore Ave. Crack Sealing: LANE RESTRICTIONS between Schuylkill River & Broad St. 7 PM - 5 AM. Curb Ramp Reconstruction: LANE RESTRICTIONS between 61st St. & 39th St. 7 AM - 4 PM. 9/26/16-9/30/16 James J. Anderson $7.2 million 9/26/16-9/30/16 James J. Anderson $13.4 million 10/7/2016 Page 3 of 26

Baltimore Ave. Crack Sealing: LANE RESTRICTIONS between 9/26/16-9/30/16 James J. Anderson $7.2 million University Ave. & 61st St. 7 PM - 5 AM. Robbins Ave. Robbins Ave. Milling: LANE RESTRICTIONS between Frankford Ave. & US 1 (Roosevelt Blvd.). 7 PM - 5 AM. Prep: LANE RESTRICTIONS between Frankford Ave. & US 1 (Roosevelt Blvd.). 7 AM - 4 PM. 9/26/16-9/30/16 James J. Anderson $7.2 million 9/26/16-9/30/16 James J. Anderson $7.2 million Levick St. Levick St. Frankford Ave. Frankford Ave. Snyder Ave. Broad St. (PA 611) Milling: LANE RESTRICTIONS between Frankford Ave. & US 1 (Roosevelt Blvd.). 7 PM - 5 AM. Prep: LANE RESTRICTIONS between Frankford Ave. & US 1 (Roosevelt Blvd.). 7 AM - 4 PM. Prep: LANE RESTRICTIONS between Rhawn St. & Robbins Ave. 7 AM - 4 PM. Paving: LANE RESTRICTIONS between Rhawn St. & Robbins Ave. 7 PM - 5 AM. Curb Ramp Reconstruction: LANE RESTRICTIONS between Front St. & 29th St. 7 AM - 4 PM. Paving: LANE RESTRICTIONS between Indiana Ave. & Spring Garden St. 7 PM - 5 AM. 9/26/16-9/30/16 James J. Anderson $7.2 million 9/26/16-9/30/16 James J. Anderson $7.2 million 9/26/16-9/30/16 James J. Anderson $7.2 million 9/26/16-9/30/16 James J. Anderson $7.2 million 9/26/16-9/30/16 James J. Anderson $13.4 million 9/26/16-9/30/16 James J. Anderson $7.2 million Delaware Ave. Delaware Ave. Milling: LANE RESTRICTIONS between Allegheny Ave. & Castor Ave. 7 PM - 6 AM. Prep: LANE RESTRICTIONS between Allegheny Ave. & Castor Ave. 7 AM - 4 PM. 9/26/16-9/30/16 James J. Anderson $7.2 million 9/26/16-9/30/16 James J. Anderson $7.2 million *PA 291 ramp to I-95 South Crack Sealing: LANE RESTRICTIONS on ramp. 7 PM - 5 AM. 9/26/16-9/30/16 James J. Anderson $7.2 million 10/7/2016 Page 4 of 26

Bartram Ave. ramp to I-95 North Crack Sealing: LANE RESTRICTIONS on ramp. 7 9/26/16-9/30/16 James J. Anderson $7.2 million PM - 5 AM. Race St. ramp to I-95 North Crack Sealing: LANE RESTRICTIONS on ramp. 7 PM - 5 AM. *I-95 South ramp to Broad St. Crack Sealing: LANE RESTRICTIONS on ramp. 7 PM - 5 AM. 9/26/16-9/30/16 James J. Anderson $7.2 million 9/26/16-9/30/16 James J. Anderson $7.2 million Pennsylvania Ave. Benjamin Franklin Parkway Arch St. Median & Curb Ramp Reconstruction: LANE RESTRICTIONS between 22nd St. & N. Judson St. 9 AM - 3 PM. Sidewalk & Curb Ramp Reconstruction: LANE CLOSURE between 18th St. & 16th St. 6:30 AM - 3 PM. Sidewalk & Curb Ramp Reconstruction: LANE CLOSURE between 15th & 17th St. 6:30 AM - 3 PM. 9/26/16-9/30/16 Tony DePaul & Son $1.3 million 9/26/16-9/30/16 Tony DePaul & Son $3.3 million 9/26/16-9/30/16 Tony DePaul & Son $3.3 million Kelly Drive PA 63 (Woodhaven Rd.) Milling & Paving: LANE CLOSURE between 25th St. & Hunting Park Ave. 9:30 AM - 3:30 PM & 6:30 PM - 6:30 AM. Install Foundation for EX-Pass Tag Reader: SHOULDER CLOSURE between Thornton Rd. & US 1 (Roosevelt Blvd.). 9 AM - 3 PM. 9/26/16-10/2/16 Tony DePaul & Son $1.8 million 9/26/16-10/2/16 Miller Brothers $15.5 million PA 611 (Broad St.) *I-95 South Install Foundation for EX-Pass Tag Reader: SHOULDER CLOSURE between Pattison Ave. & 11th St. 9 AM - 3 PM. 9/26/16-10/2/16 Miller Brothers $15.5 million Install DMS Foundation: SHOULDER CLOSURE 9/26/16-10/2/16 Miller Brothers $15.5 million between Betsy Ross Bridge & Allegheny Ave. 12 AM - 5 AM. Broad St. on-ramp to I-95 North Deck Repair: RAMP CLOSED & DETOURED. 8 PM - 5 AM. DETOUR 9/27/16 Maintenance 10/7/2016 Page 5 of 26

*US 1 N & S (Roosevelt Blvd.) Milling & Paving: EXPRESS LANE CLOSURE between Rhawn Ave. & Strahle St. 7 PM - 5 AM. DETOUR 9/27/16-9/29/16 Buckley & Company, $15.5 million *I-95 North (Girard Point Bridge) Guide Rail Repair: RIGHT LANE CLOSED between Enterprise Rd. & Broad St. (PA 611). 10 PM - 11 PM. 9/29/16 Long Fence $2.2 million PA 63 (Woodhaven Rd.) Guide Rail Repair: LEFT LANE CLOSED between Knights Rd. & I-95 Interchange. 11:30 PM - 12:30 AM. *I-76 West Guide Rail Repair: LEFT LANE CLOSED at US 1 (Roosevelt Blvd.). 1 AM - 2 AM. 9/29/16-9/30/16 Long Fence $2.2 million 9/30/16 Long Fence $2.2 million *US 1 North (Roosevelt Blvd.) Aramingo Ave. N & S Guide Rail Repair: LEFT LANE CLOSED between Schuylkill River Bridge & Wissahickon Ave. 2:15 AM - 4 AM. Bridge Beam Installation: CLOSED & DETOURED between Delaware Ave. & I-95. 10 PM - 5 AM. DETOUR 9/30/16 Long Fence $2.2 million 9/30/16 James J. Anderson $211.7 million Princeton Ave. ramp to I-95 North Drainage Work: RAMP CLOSED & DETOURED. 8 PM - 5 AM. DETOUR 10/1/16-10/3/16 Walsh Construction Company $212.3 million Bridge St. Castor Ave. *I-95 South off-ramp to Aramingo Ave. Frankford Ave. Crack Sealing: LANE RESTRICTIONS between Jackson St. & US 1 (Roosevelt Blvd.). 7 PM - 5 AM. Crack Sealing: LANE RESTRICTIONS between Delaware Ave. & US 1 (Roosevelt Blvd.). 7 PM - 5 AM. Ramp Reconstruction: RAMP CLOSED & DETOURED. 24-HOUR DETOUR. DETOUR Paving: LANE RESTRICTIONS between Rhawn St. & Robbins St. 7 PM - 5 AM. 9/19/16-9/23/16 James J. Anderson $7.2 million 9/19/16-9/23/16 James J. Anderson $7.2 million 9/21/16-6/2017 Driscoll Construction Company, /Richard E. Pierson Construction Company, $160.2 million 9/22/16-9/23/16 James J. Anderson $7.2 million 10/7/2016 Page 6 of 26

*I-95 N & S Overpass Bridge Demolition: INTERMITTENT LANE CLOSURES between Allegheny Ave. & Bridge St. 8 PM - 5 AM. 9/12/16-9/30/16 Driscoll Construction Company, /Richard E. Pierson Construction Company, $160.2 million 33rd St. Utility Installation: LANE RESTRICTIONS between Cecil B. Moore Ave. & Clifford St. 9 AM - 3 PM. 9/12/16-9/30/16 City of Philadelphia Water Department Walnut Lane Road Reconstruction: CLOSED & DETOURED at Park Line Drive. 24-HOUR DETOUR. DETOUR 8/27/16-10/21/16 Buckley & Company, $14.7 million Berks St. Bridge Construction: CLOSED & DETOURED between East Wildey St. & Delaware Ave. 24-HOUR DETOUR. DETOUR 7/25/16-4/1/17 James J. Anderson $211.7 million Adams Ave. Bridge Reconstruction: CLOSED & DETOURED 5/9/16-11/16/16 Loftus Construction, between Newtown Ave. & Crescentville Rd. 24-HOUR DETOUR. DETOUR $2.8 million Walnut Lane Bridge Rehabilitation: CLOSED & DETOURED between Wissahickon Ave. & Henry Ave. 24-HOUR DETOUR. DETOUR 4/1/16-9/27/16 Buckley & Company, $14.7 million Olney Ave. Roadwork: LANE RESTRICTIONS between Broad St. (PA 611) & Rising Sun Ave. 9 AM - 3 PM. 12/2/15-11/2017 Armour and Sons Electric $4.7 million Sergeant St. Bridge Work: CLOSED & DETOUR between Salmon St. & Richmond St. 24-HOUR DETOUR. DETOUR 12/28/15-12/2018 James J. Anderson $211 million Huntingdon St. Bridge Work: CLOSED & DETOUR between Salmon St. & Richmond St. 24-HOUR DETOUR. DETOUR 12/28/15-12/2018 James J. Anderson $211 million 10/7/2016 Page 7 of 26

Somerset St. Bridge Work: CLOSED & DETOUR between Salmon St. & Richmond St. 24-HOUR DETOUR. DETOUR 12/28/15-12/2018 James J. Anderson $211 million *Aramingo Ave. ramp to I-95 South Ramp Reconstruction: CLOSED & DETOURED at Betsy Ross Bridge Interchange. 24-HOUR CLOSURE. DETOUR 12/21/15-11/30/16 Driscoll Construction Company, /Richard E. Pierson Construction Company, $160.2 million Girard Ave. ramp to I-95 North Richmond St. South Highway and Ramp Reconstruction: RAMP CLOSED & DETOURED. 24-HOUR CLOSURE. DETOUR Intersection Reconstruction: CLOSED & DETOURED between Lehigh Ave. & Delaware Ave. 24-HOUR CLOSURE. DETOUR 12/16/15-6/2017 James J. Anderson $211 million 12/16/15-6/2017 James J. Anderson $211 million Benjamin Franklin Parkway Bridge Construction: INNER LANE REDUCED FROM THREE LANES TO TWO between 21st St. & 20th St. 10/23/15-6/2017 Buckley & Company, $64.8 million Winter St. Roadwork: LANE RESTRICTIONS between 20th St. & 21st St. 24-HOUR RESTRICTIONS. 10/6/15-4/2/2017 Buckley & Company, $64.8 million Benjamin Franklin Parkway East Road Construction: OUTER LANES CLOSED at 21st St. DETOUR 10/6/15-6/2017 Buckley & Company, $64.8 million 19th Street Bridge Construction: CLOSED & DETOURED between Vine St. & Logan Circle. 24-HOUR DETOUR. DETOUR 10/1/15-5/2017 Buckley & Company, $64.8 million Delaware Ave. Reconstruction: NEW TRAFFIC PATTERN between Columbia Ave. & Aramingo Ave. 24-HOUR RESTRICTIONS. 4/1/15-10/2018 James J. Anderson $211.7 million BUCKS COUNTY PA 313 (Swamp Rd.), Doylestown Bor. Intersection Resurfacing: CLOSED & DETOURED at US 202. 8 PM Friday thru 5 PM Saturday. DETOUR 9/23/16-9/24/16 James D. Morrissey, $11 million 10/7/2016 Page 8 of 26

*I-95 N & S, Various Municipalities Bridge Cleaning: MOVING OPERATION between New Jersey state line & Philadelphia County line. 10 PM - 5 AM. 9/25/16-9/29/16 DeAngelo Brothers, $1.2 million US 13 E & W, Falls Bridge Cleaning: LANE RESTRICTIONS between Penn Valley Rd. & US 1. 10 PM - 5 AM. 9/2516-9/29/16 DeAngelo Brothers, $1.2 million *US 1 (Lincoln Hwy.) N & S, Various Municipalities Bridge Cleaning: LANE RESTRICTIONS between PA 13 & PA 132 (Street Rd.). 10 PM - 5 AM. 9/25/16-9/29/16 DeAngelo Brothers, $1.2 million *US 202 South, Doylestown, Doylestown Bor. Line Painting: RIGHT LANE CLOSED between Green St. & Swamp Rd. 9 AM - 3 PM. 9/26/16-9/30/16 Rohm and Haas Chemicals, PA 611 South, Doylestown, Doylestown Bor. Line Painting: RIGHT LANE CLOSED between N. Broad St. & W. State St. 9 AM - 3 PM. 9/26/16-9/30/16 Rohm and Haas Chemicals, Taylorsville Rd., Lower Makefield *I-95 N & S, Morrisville Bor. Falls, Middletown, Lower Makefield twps., Doylestown Bor. Core Boring: SHOULDER CLOSURE between Woodside Rd. & Highland Drive. 9 AM - 3 PM. Core Boring: LANE CLOSURE between Taylorsville Rd. & PA 32 (River Rd.). 9 AM - 3 PM. Line Painting: SLOW MOVING OPERATION to paint traffic lines. MOTORISTS ARE ADVISED TO REMAIN AN AMPLE DISTANCE BEHIND THE PAINTING TRUCK & STAY OFF TRAFFIC LINES. 9 AM - 3 PM. 9/26/16-9/30/16 Delaware River Joint Toll Bridge Commission 9/26/16-9/30/16 Delaware River Joint Toll Bridge Commission 9/26/16-9/30/16 PennDOT PA 611 (Easton Rd.), Warrington Curb Ramp Installation: LANE CLOSURES at Steeplechase Drive; Turk Rd.; Almshouse Rd.; Edison Furlong Rd.; New Britain Rd./Sauerman Rd.; Bristol Rd.; Kelly Rd.; Freedoms Way/Oxford Drive; Doylestown Plaza. 9 AM - 3 PM. 9/26/16-9/30/16 James D. Morrissey $4.3 million Blooming Glen Rd., Hilltown Base Repair: CLOSED & DETOURED between PA 113 & Branch Rd. 7 AM - 5 PM. DETOUR 9/27/16-10/4/16 Maintenance 10/7/2016 Page 9 of 26

*I-95 North, Bristol, Bensalem twps. Pothole Patching: LANE RESTRICTIONS between PA 9/28/16 Pennsylvania 413 (Veterans Highway) & US 1 (Lincoln Highway). 9 AM - 3 PM. Turnpike Commission Allentown Rd., Trumbauersville Bor. Allentown Rd., Trumbauersville Bor. Deerwood Lane/Sawmill Rd./Stony Garden Rd., Haycock Pole Replacement & Install New Wire: LANE CLOSURE between Creamery Rd. & Oak Drive. Monday thru Saturday. 9 AM - 3 PM. Pole Replacement & Install New Wire: LANE CLOSURE between Creamery Rd. & Milford Square Pike. Monday thru Saturday. 9 AM - 3 PM. Milling & Paving: LANE RESTRICTIONS between PA 212 (Church Rd.) & PA 412 (Harrow Rd.). Weekdays. 9 AM - 3 PM. 9/29/16-12/30/16 PP&L Utilities 9/29/16-12/30/16 PP&L Utilities 9/19/16-9/29/16 James D. Morrissey, $2.3 Million *I-95 North, Lower Makefield Tree Clearing: SHOULDER CLOSURE between PA 332 (Yardley Newtown Rd.) & Taylorsville Rd. 9 AM - 3 PM. 9/19/16-1/6/17 Delaware River Joint Toll Bridge Commission Bristol Rd., Warminster Diamond St., Hilltown Brown Ave., Bensalem Durham Rd., Bristol Roadway Reconstruction: CLOSED & DETOURED between PA 263 (York Rd.) & Brennan Drive. 24- HOUR DETOUR. DETOUR Base Repair: CLOSED & DETOURED between PA 113 (Main St./Souderton Rd.) & Hilltown Pike. 7 AM - 5 PM. DETOUR Utility Installation: LANE RESTRICTIONS between Dunks Ferry Rd. & Hulmeville Rd. Weekdays. 9 AM - 3 PM. Roadwork: LANE RESTRICTIONS between PA 413 & New Falls Rd. 7 AM - 3 PM. Durham Rd., Bristol Roadwork: CLOSED & DETOURED between PA 413 & New Falls Rd. 8 PM - 5 AM. DETOUR New Rodgers Rd., Bristol Bridge Rehabilitation: LANE RESTRICTIONS & 15- MINUTE STOPPAGES between Plumbridge Drive & Bath Rd./Durham Rd. 7 AM - 3 PM. 9/20/16-11/4/16 J.D. Eckman, $31.6 million 9/12/16-9/30/16 Maintenance 9/12/16-11/30/16 PECO Energy 8/22/16-10/2/16 Pennsylvania Turnpike Commission 8/22/16-10/2/16 Pennsylvania Turnpike Commission 8/22/16-10/2/16 Pennsylvania Turnpike Commission $142 million $142 million $142 million 10/7/2016 Page 10 of 26

PA 263 (York Rd.), Warminster, Roadwork: LANE RESTRICTIONS between Ivyland 4/26/16-10/17/17 J.D. Eckman, $31.6 million Warwick twps. Rd. & Meetinghouse Rd. 24-HOUR RESTRICTIONS. County Line Rd., Warrington, Horsham, Montgomery twps. Utility Installation: LANE RESTRICTIONS between East Kulp Rd. & Stump Rd. 7 AM - 3 PM. 3/7/16-9/2018 James D. Morrissey, $14.8 million PA 32 (River Rd.), Solebury US 13 (Bristol Pike), Bristol, Tullytown Bor. Retaining Wall Replacement: CLOSED & DETOURED between Cuttalossa Rd. & Laurel Rd. 7 AM - 5 PM. DETOUR Reconstruction: LANE RESTRICTION at Levittown Parkway. 7 AM - 3 PM. 2/29/16-10/3/16 H&K Group, $3.9 million 7/27/15-10/7/16 James D. Morrissey, $36.5 million Oxford Valley Rd. South, Falls Bridge Damage: SOUTHBOUND LEFT TURN LANE RESTRICTED at US 1 Interchange. 24-HOUR RESTRICTIONS. 6/29/15-Indef. PennDOT *US 202 North, Buckingham, Doylestown Bor. US 13, Bristol *PA 263 (York Rd.), Warwick US 13 (Bristol Pike), Bristol, Bristol, Tullytown bors. Headquarters Rd., Tinicum Road Construction: LANE RESTRICTIONS between PA 313 (Swamp Rd.) & Mechanicsville Rd. 9 AM - 3 PM. Roadwork: LANE RESTRICTIONS between Green Lane & Levittown Parkway. 9 AM - 3 PM. Road Reconstruction: LANE CLOSURES between Meyer Way & Sugar Bottom Rd. 24-HOUR RESTRICTIONS. Road Reconstruction: LANE RESTRICTIONS between PA 413 & Pennsylvania Turnpike. 9 AM - 3 PM. Bridge Damage: CLOSED & DETOURED between Red Hill Rd. & Tankhannen Rd. DETOUR 4/13/15-11/9/18 James D. Morrissey $11 million 10/20/14-10/2016 James D. Morrissey $36.5 million 3/17/14-6/2017 J.D. Eckman, $31.6 million 1/21/13-10/2016 James D. Morrissey $36.5 million 3/2/11-Indef. CHESTER COUNTY 10/7/2016 Page 11 of 26

East Nottingham, New London, Line Painting: SLOW MOVING OPERATION to paint 9/24/16-9/30/16 PennDOT Franklin, Upper Oxford, Londonderry traffic lines. MOTORISTS ARE ADVISED TO twps. REMAIN AN AMPLE DISTANCE BEHIND THE PAINTING TRUCK & STAY OFF TRAFFIC LINES. 9 AM - 2:30 PM. PA 29 (Moorehall Rd.), East Whiteland Pole Maintenance: LANE RESTRICTIONS between Liberty Blvd. & Swedesford Rd. 6 AM - 10:30 AM. 9/25/16 Sunesys PA 401 (Conestoga Rd.), West Nantmeal Paving: LANE RESTRICTIONS between French Bridge & Iron Stone Lane. 7 PM - 6 AM. 9/25/16-9/29/16 Allan Myers $3.3 million PA 100 N & S, Uwchlan, West Whiteland twps. Pavement Patches: LANE RESTRICTION between PA 113 & Shoen Rd. 7 AM - 5 PM. 9/26/16-9/27/16 Allan Myers $17.4 million PA 401 (Conestoga Rd.), E & W, East Nantmeal, West Nantmeal twps. PA 401 (Conestoga Rd.), East Whiteland Base Repair: LANE RESTRICTIONS between PA 82 (Manor Rd.) & Bulltown Rd. 6 AM - 4 PM. Road Reconstruction: POSSIBLE LANE RESTRICTIONS at US 202 Interchange. 9 AM - 3 PM. 9/26/16-9/29/16 Maintenance 9/26/16-9/30/16 Allan A. Myers $63.3 million *US 422 E & W, Tredyffrin Sign Structure Construction: RIGHT LANE CLOSURES between US 202 & First Ave. 9 AM - 2:30 PM. 9/26/16-9/30/16 J.D. Eckman, $97.4 million Planebrook Rd., East Whiteland US 30 (Lincoln Highway), Valley, Caln twps., City of Coatesville Newark Rd., New Garden Overhead Bridge Construction: LANE CLOSURES at US 202 overpass. 9 AM - 3 PM. Curb Ramp Construction: LANE RESTRICTIONS between Airport Rd. & Veterans Drive. Weekdays. 9 AM - 3 PM. Core Boring: LANE RESTRICTIONS between Buck Toe Rd. & Maple Lane. 9 AM - 3 PM. 9/26/16-9/30/16 Allan A. Myers $63.3 million 9/26/16-9/30/16 Allan Myers $5.5 million 9/26/16-9/30/16 CGC Geoservices, 10/7/2016 Page 12 of 26

PA 100 (Pottstown Pike), Whiteland ADA Curb Replacement: LANE RESTRICTIONS at WaterlooRd./Swedesford Rd. & Town Center Mall Entrance/Exton Square Mall Entrance. 9 AM - 3 PM. 9/26/16-10/1/16 Allan A. Myers $5.5 million Bridge St., Phoenixville Bor. Ross Lane, West Caln Downingtown Pike, East Bradford Upper Gulph Rd., Tredyffrin ADA Curb Replacement: LANE RESTRICTIONS at Ringold Ave./Pennsylvania Ave.; Columbia Ave. & Chester Ave. 9 AM - 3 PM. Utility Installation: LANE CLOSURE between Ross Lane & Wagontown Rd. 9 AM - 3 PM. Core Boring: LANE RESTRICTIONS between Skelp Level Rd. & Sugars Bridge Rd. 9 AM - 3 PM. Utility Installation: LANE CLOSURE between Old Eagle School Rd. & West Valley Rd. 9 AM - 3 PM. 9/26/16-10/1/16 Allan A. Myers $5.5 million 9/26/16-10/3/16 PECO Energy 9/27/16 PennDOT 9/27/16-10/3/16 PECO Energy Boot Rd., West Whiteland Utility Installation: LANE CLOSURE between Burke Rd. & Whiteland Drive. 9 AM - 3 PM. 9/28/16-10/5/16 PECO Energy Ship Rd., West Whiteland Pipeline Maintenance: LANE CLOSURES between Boot Rd. & Constitution Drive. Monday thru Thursday. 9 AM - 3 PM. 9/28/16-11/23/16 Sunoco Logistics Boot Rd., West Goshen Pipeline Maintenance: LANE CLOSURES between US 202 & Phoenixville Pike. 9 AM - 3 PM. 9/28/16-11/23/16 Sunoco Logistics *US 30 E & W, West Whiteland Roadwork: LANE CLOSURES between Quarry Rd. Interchange & PA 100 Interchange. 7 PM - 5 AM. 9/29/16-9/30/16 Road-Con, $2.9 million Grove Rd., West Whiteland Utility Installation: LANE CLOSURE between Southern Drive & Stewart Drive. 9 AM - 3 PM. 9/29/16-10/6/16 PECO Energy *US 202 South, East Whiteland Fiber Optic Cable Installation: LANE CLOSURE between PA 401 & US 30. 8 PM - 10 AM. 9/30/16 Allan A. Myers $63.3 million 10/7/2016 Page 13 of 26

*US 422 East, North Coventry Road & Bridge Construction: LANE CLOSURES between PA 724 (Schuylkill Rd.) & Sanatoga Interchanges. 9 AM - 2 PM & 5 PM - 5 AM. 9/30/16-10/29/16 J.D. Eckman, $73.3 million *US 422 West, North Coventry Main St., Parkesburg Bor. Road & Bridge Construction: LANE CLOSURES between Sanatoga & PA 724 (Schuylkill Rd.) Interchanges. 7 PM - 1 PM. Utility Installation: CLOSED & DETOURED between Culvert St. & Bridge St. Weekdays. 8 AM - 4:30 PM. DETOUR 9/30/16-10/29/16 J.D. Eckman, $73.3 million 10/3/16-4/30/17 Pennsylvania American Water E. Market St., West Chester Bor. Utility Installation: LANE RESTRICTIONS at Franklin St. 9 AM - 3 PM. 9/19/16-9/30/16 Aqua Pennsylvania Boot Rd., West Whiteland Paving: LANE RESTRICTIONS between Quarry Rd. & Copeland School Rd. 7 PM - 5 AM. 9/20/16-9/24/16 J.D. Eckman, $4.7 million King Rd., Williamstown Corby Rd., Penn PA 10, Highland PA 41 (Gap Newport Pike), Londonderry PA 926 (Street Rd.), Londonderry Utility Installation: LANE CLOSURE between Line Rd. & Kings Circle. 9 AM - 3 PM. Utility Installation: LANE CLOSURE between Keno Lane & Larchmont Lane. 9 AM - 3 PM. Pipeline Construction: LANE RESTRICTIONS between Gumtree Rd. & Freeman Rd. Monday thru Saturday. 9 AM - 3 PM. Pipeline Construction: LANE RESTRICTIONS between Keller Rd. & Bernard Ave. Monday thru Saturday. 9 AM - 3 PM. Pipeline Construction: LANE RESTRICTIONS between Daleville Rd. & Baker Rd. Monday thru Saturday. 9 AM - 3 PM. 9/21/16-9/28/16 PECO Energy 9/22/16-9/29/16 PECO Energy 9/6/16-12/30/16 Eastern Shore Natural Gas 9/6/16-12/30/16 Eastern Shore Natural Gas 9/6/16-12/30/16 Eastern Shore Natural Gas Gum Tree, Highland Pipeline Construction: LANE RESTRICTIONS 9/6/16-12/30/16 Eastern Shore between Limestone Rd. & Fernwood Rd. Monday thru Natural Gas Saturday. 9 AM - 3 PM. 10/7/2016 Page 14 of 26

PA 41 (Gap Newport Pike), Londonderry Pipeline Construction: LANE RESTRICTIONS between Bernard Ave. & Keller Rd. Monday thru Saturday. 9 AM - 3 PM. 9/6/16-12/30/16 Eastern Shore Natural Gas Daleville Rd., Londonderry Pipeline Construction: LANE RESTRICTIONS 9/6/16-12/30/16 Eastern Shore between Fernwood Rd. & Birchwood Rd. Monday thru Natural Gas Saturday. 9 AM - 3 PM. PA 926 (Street Rd.), Londonderry Pipeline Construction: LANE RESTRICTIONS between Daleville Rd. & Baker Rd. 9 AM - 3 PM. Monday thru Saturday. 9 AM - 3 PM. 9/6/16-12/30/16 Eastern Shore Natural Gas US 30 E & W (Lincoln Hwy.), Sadsbury Roadwork: LANE RESTRICTIONS between Octorara 9/7/16-10/29/16 Marino Corporation $741,000.00 Rd. & Old Wilmington Rd. Weekdays. 7:30 AM - 3:30 PM. PA 472 (East Lancaster Ave.), Oxford Bor. Devon Rd., Willistown Roadwork: CLOSED & DETOURED between Vernon St. & Pine St. 24-HOUR DETOUR. DETOUR Utility Installation: LANE RESTRICTIONS between Valley Rd. & Grubb Rd. Weekdays. 9 AM - 3 PM. 8/1/16-11/1/16 Presbyterian Homes, 6/27/16-9/30/16 Aqua Pennsylvania S. First Ave., City of Coatesville Utility Installation: LANE RESTRICTIONS between Oak St. & Modena Rd. Weekdays. 9 AM - 3 PM. 6/13/16-9/30/16 Pennsylvania American Water Green Valley Rd., Newlin Bridge Damage: CLOSED & DETOURED between Powell Rd. & Brandywine Creek Rd. 24-HOUR DETOUR. DETOUR 5/11/16-Indef. PennDOT PA 401 (Conestoga Rd.), West Vincent Bridge Damage: REDUCED TO ONE LANE at St. Matthews Rd. 24-HOUR RESTRICTIONS 4/21/16-Indef. PennDOT Evergreen St./Prospect Ave., West Grove Bor. Storm Drainage, Curb, Sidewalk, Traffic Signal: LANE CLOSURES between Chatham Rd.& Summit Ave. 7:30 AM - 3:30 PM. 4/11/16-10/21/16 Marino Corporation $1.3 milliom 10/7/2016 Page 15 of 26

Yellow Springs Rd., Tredyffrin Utility Installation: CLOSED & DETOURED between Wilson Rd. & PA 252. 24-HOUR DETOUR. DETOUR 4/1/16-9/30/16 Tredyffrin Township Authority PA 252 (Valley Forge Rd.), Upper Merion, Tredyffrin twps. Utility Installation: CLOSED & DETOURED between Yellow Springs Rd. & PA 23. 24-HOUR DETOUR. DETOUR 4/1/16-9/30/16 Tredyffrin Township Authority Frog Hollow Rd., East Fallowfield, West Marlborough twps. Covered Bridge Rehabilitation: CLOSED & DETOURED between Concord Bridge Rd. & Strasburg Rd. 24-HOUR CLOSURE. DETOUR 12/14/15-10/21/16 Eastern Highway Specialists, $3.2 million Ross Fording Rd., West Fallowfield Bridge Damage: CLOSED & DETOURED between Creek Rd. & Bryson Rd. 24-HOUR DETOUR. DETOUR 7/2/15-Indef. PennDOT PA 724 ramp to US 422 East, E. Coventry *US 422 E & W, West Pottsgrove, North Coventry twps. Ramp/Bridge Construction: RAMP CLOSED & DETOURED. DETOUR Bridge Construction: REDUCED TO ONE LANE between Stowe & PA 100 Interchange. 24-HOUR RESTRICTION. 5/27/15-3/2018 J.D. Eckman, $73.3 million 11/27/14-9/2018 J.D. Eckman, $36 million Burnt Mill Rd., Kennett Bridge Damage: CLOSED & DETOURED between Norway Rd. & Spring Mill Rd. 24 HOUR DETOUR. DETOUR 4/25/14-Indef. PennDOT *US 422 E & W, North Coventry Road Construction: TRAFFIC PATTERN SHIFT between Sanatoga & PA 724 (Schuylkill Rd.) interchanges. 24-HOUR PATTERN. 2/2/13-8/2018 J.D. Eckman, $73.3 million DELAWARE COUNTY US 13 (10th St.), Marcus Hook Bor. Pipe Installation: LANE RESTRICTIONS between Green St. & Hewes Ave. Weekdays. 7 PM - 5 AM. 9/25/16-10/13/16 Sunoco 10/7/2016 Page 16 of 26

PA 452 N & S (Pennell Rd.), Middletown Bridge Steel Girder Repairs: LANE RESTRICTIONS between Parkmount Rd. & Glendale Blvd. 9 AM - 3 PM. 9/26/16-9/28/16 J.D. Eckman, $6,573,713.00 *I-476 North, Various Municipalities Bridge Cleaning: MOVING OPERATION between MacDade Blvd. & US 30. 10 PM - 5 AM. 9/26/16-9/29/16 DeAngelo Brothers, $1.2 million Paxon Hollow Rd., Marple Ramp Constructon: LANE RESTRICTIONS between Maclaire Lane & PA 320 (Sproul Rd.). 9 AM - 3 PM. 9/26/16-9/30/16 Allan Myers $3.8 million Cedar Grove Rd., Marple Ramp Construction: LANE RESTRICTIONS between Kingswood Rd. & PA 320 (Sproul Rd.). 9 AM - 3 PM. 9/26/16-9/30/16 Allan Myers $3.8 million PA 3 (West Chester Pike), Upper Darby Median Curb Adjustment: LANE RESTRICTIONS at State Rd.. 9 AM - 3 PM. 9/26/16-9/30/16 Allan Myers $5.8 million *US 30 (Lancaster Ave.) E & W, Rador Powell Rd., Springfield 13th Ave., Prospect Park Bor. Setting Poles/Signal Mast Arms: RIGHT LANE CLOSED between PA 320 & Ithan Ave. 9 AM - 3 PM. Utility Installation: CLOSED & DETOURED between Woodland Ave. & Thomson Ave. 9 AM - 3 PM. DETOUR Utility Installation: CLOSED & DETOURED between Lincoln Ave. & Swarthmore Ave. 9 AM - 3 PM. 9/26/16-9/30/16 Villanova University 9/26/16-9/30/16 Aqua Pennsylvania 9/26/16-9/30/16 Aqua Pennsylvania PA 3 (West Chester Pike), Haverford, Upper Darby twps. Curb Ramp Reconstruction: LANE CLOSURE at Brief Ave., Carol Blvd.; State Rd.; Copley Rd.; Terminal Square & Pennock Ave. 9 AM - 3 PM. 9/26/16-9/30/16 L.C. Costa Contractors, $5.9 million PA 3 (Market St.), Millbourne Bor. Curb Ramp Reconstruction: LANE CLOSURE at Chatham Rd.; Forge Rd.; Copley Rd.; Terminal Square & Millbourne Ave. 9 AM - 3 PM. 9/26/16-9/30/16 L.C. Costa Contractors, $5.9 million 10/7/2016 Page 17 of 26

Springfield Ave., Clifton Heights Bor. Curb Ramp Reconstruction: LANE CLOSURE at Diamond St.; Madison St.; Woodlawn Ave.; Clifton Ave. & Broadway Ave. 9 AM - 3 PM. 9/26/16-9/30/16 L.C. Costa Contractors, $4.1 million Baltimore Ave., Clifton Heights Bor. Curb Ramp Reconstruction: LANE CLOSURES at Church St.; Marple Ave.; Jackson Ave.; Springfield Ave.; Bishop Ave. & Glenwood Ave. 9 AM - 3 PM. 9/26/16-9/30/16 L.C. Costa Contractors, $4.1 million Baltimore Ave., Clifton Heights, Upper Darby bors. Baltimore Ave., Lansdowne Bor. Road Widening: LANE RESTRICTIONS at Springfield Rd.; Church Lane; Delmar Drive; Diamond St. & Home Depot Drive. 9 AM - 3 PM. Traffic Signal Upgrade: LANE RESTRICTIONS at Lansdowne Ave.; Wycombe Ave.; Union Ave.; Martin Drive, Walsh Rd. & Mansfield Ave. 9 AM - 3 PM. 9/26/16-9/30/16 Lenni Electric $4.1 million 9/26/16-9/30/16 Lenni Electric $4.1 million Baltimore Ave., Upper Darby, Lansdowne Bor. Traffic Signal Upgrade: LANE RESTRICTIONS between Lansdowne Ave.; Penn Blvd./4th St.; Wycombe Ave.; Burmont Rd.; Scottdale Rd. & Church Lane. 9 AM - 3 PM. 9/26/16-9/30/16 Lenni Electric $4.1 million *I-95 North, Tinicum *I-476 N & S, Various Municipalities PA 3 West (West Chester Pike), Haverford Install DMS Foundation: SHOULDER CLOSURE between PA 420 (Wannamaker Ave.) & PA 291 (Gov. Printz Blvd.). 12 AM - 5 AM. Fiber Optic Cable Installation: SHOULDER CLOSURE between I-76 & I-95. 9 AM - 3 PM. Guiderail Installation: LANE CLOSURE between Lawrence Rd. & I-476 North ramp. 9 AM - 4 PM. 9/26/16-10/2/16 Miller Brothers $15.5 million 9/26/16-10/2/16 Miller Brothers $15.5 million 9/27/16 Maintenance *I-95 North ramp to I-476, Ridley Surface Treatment Installation: LANE CLOSURES on ramp. 9 AM - 3 PM. 9/27/16-9/28/16 Tony DePaul & Son $2 million US 13 (10th St.), Marcus Hook Bor. Pipe Installation: CLOSED & DETOURED between Green St. & Hewes Ave. 10 PM - 1 AM. DETOUR 10/4/16 Sunoco 10/7/2016 Page 18 of 26

Springfield Rd, Springfield, Upper Darby twps., Clifton Heights Bor. Utility Installation: CLOSED & DETOURED between Saxer Ave. & Oak Ave. Weekdays. 9 AM - 3 PM. DETOUR 9/19/16-4/8/17 Aqua Pennsylvania Orange St., Upper Providence, Media Bor. Trench Restoration: CLOSED & DETOURED between 9/12/16-10/14/16 Aqua Pennsylvania Baltimore Pike & Ridley Creek Rd. Weekdays. 9 AM - 3 PM. DETOUR Blue Ball Ave., Upper Chichester Bishop Hollow Rd., Newtown Chester Pike, Sharon Hill Bor. Utility Installation: CLOSED & DETOURED between Scott Ave. & Columbia Ave. 24-HOUR DETOUR. DETOUR Utility Installation: CLOSED & DETOURED between Smedly Lane & Ellis Ave. Weekdays. 9 AM - 3 PM. DETOUR Utility Installation: LANE RESTRICTIONS between Folcroft Ave. & Cherry St. Weekdays. 9 AM - 3 PM. 9/12/16-11/18/16 Chester Water Authority 9/14/16-11/25/16 Aqua Pennsylvania 9/15/16-12/16/16 PECO Energy US 30 (Lancaster Ave.), Radnor Calcon Hook Rd., Darby, Sharon Hill Bor. Duttons Mill Rd., Middletown PA 452 (Market St.), Upper Chichester, Lower Chichester twps., Marcus Hook Bor. Utility Installation: LANE CLOSURE between PA 320 (Spring Mill Rd.) & Barley Cone Lane. Weekdays. 9 AM - 3 PM. Utility Installation: CLOSED & DETOURED between Bonsall Ave. & Hook Rd. Weekdays. 9 AM - 3 PM. DETOUR Utility Installation: CLOSED & DETOURED between New Middletown Rd. & Creek Rd. Weekdays. 8 AM - 4 PM. DETOUR Utility Installation: LANE RESTRICTIONS between Johnson Ave. & West 10th St. Monday thru Saturday. 9 AM - 3 PM. 8/25/16-12/1/16 Villanova University 7/28/16-9/30/16 Aqua Pennsylvania 7/12/16-10/1/16 Middletown Township Sewer Authority 3/28/16-9/30/16 Chester Water Authority 10th St./Post Road, Marcus Hook Bor. Streetscape & Traffic Signal Improvements/Curb, Sidewalk, ADA Ramp Installation: LANE RESTRICTIONS between Blueball Ave. & Penn Ave./Walnut St. Weekdays. 9 AM - 3 PM. 3/21/16-9/30/16 Marino Corporation $1,661,612.00 MONTGOMERY COUNTY 10/7/2016 Page 19 of 26

PA 463 (Horsham Rd.), Horsham Milling: CLOSED & DETOURED between Hartman Rd., & Lower State Rd. 7 PM - 4 AM. DETOUR 9/25/16-9/26/16 Maintenance PA 100 N & S, Upper Pottsgrove, Pottstown Bor. Bridge Cleaning: LANE RESTRICTIONS between Matawny St. & Mauger's Mill Rd. 10 PM - 5 AM. 9/25/16-9/29/16 DeAngelo Brothers, $2.1 million *US 422 E & W, Various Municipalities Bridge Cleaning: LANE RESTRICTIONS between US 202 & Berks County line. 10 PM - 5 AM. 9/25/16-9/29/16 DeAngelo Brothers, $2.1 million *US 422 E & W, Various Municipalities Bridge Cleaning: LANE RESTRICTIONS between PA 100 & PA 724. 10 PM - 5 AM. 9/25/16-9/29/16 DeAngelo Brothers, $2.1 million *US 422 West ramp to Armand Hammer Blvd., Lower Pottsgrove *US 422 West ramp to Armand Hammer Blvd., Lower Pottsgrove *US 202 South (DeKalb Pike), Whitpain Intersection Reconstruction: LANE CLOSURES on ramp. 6 PM - 6 AM. Intersection Reconstruction: LANE CLOSURES on ramp. 9 AM - 2 PM. Pavement Core: SHOULDER CLOSURE between Yost Rd. & McDivitt Drive. 7 AM - 4 PM. 9/26/16-9/27/16 J.D. Eckman, $73.3 million 9/26/16-9/27/16 J.D. Eckman, $73.3 million 9/26/16-9/27/16 Allied Geoscience & Engineering, *US 202 South (DeKalb Pike), Whitpain Pavement Core: SHOULDER CLOSURE between Cherry Rd. & Jolly Rd. 7 AM - 4 PM. 9/26/16-9/27/16 Allied Geoscience & Engineering, *US 202 South (DeKalb Pike), Whitpain *US 202 South (DeKalb Pike), Whitpain Pavement Core: TRAFFIC LANE SHIFT between Tournament Drive & PA 73 (Skippack Pike). 7 AM - 4 PM. Pavement Core: TRAFFIC LANE SHIFT between Morris Rd. & Tournament Drive. 7 AM - 4 PM. 9/26/16-9/27/16 Allied Geoscience & Engineering, 9/26/16-9/27/16 Allied Geoscience & Engineering, 10/7/2016 Page 20 of 26

PA 73 West (Skippack Pike), Core Boring: LANE SHIFT between Crestline Drive & 9/26/16-9/27/16 Allied Geoscience & Whitpain Ttp. US 202 (DeKalb Pike). 7 AM - 4 PM. Engineering, PA 152 (Limekiln Pike), Horsham Milling: CLOSED & DETOURED between Horsham Rd. & County Line Rd. 7 PM - 4 AM. DETOUR 9/26/16-9/27/16 Maintenance PA 309 (Bethlehem Pike) N & S, Cheltenham, Springfield, Upper Dublin, Lower Gwynedd twps. Sweeping & Debris Removal: LANE RESTRICTIONS between Cheltenham Ave. & PA 63 (Welsh Rd.). 9 AM - 3 PM. 9/26/16-9/29/16 Maintenance *US 422 West, Limerick, Pottstown Bor. Sweeping & Debris Removal: LEFT LANE CLOSED between Evergreen Rd. & Grosstown Rd. 9 AM - 3 PM. 9/26/16-9/30/16 Maintenance *US 422 West, Upper Merion, West Norriton twps. Norristown Rd., Lower Gwynedd Crane Moving & Roadwork: RIGHT LANE CLOSURES between First Ave. & Trooper Rd. Exits. 9 AM - 2:30 PM. ITS Installation: LANE CLOSURES between Bethlehem Pike & Tennis Ave. 9 AM - 3 PM. 9/26/16-9/30/16 J.D. Eckman, $97.4 million 9/26/16-9/30/16 Carr & Duff, $3.6 million Germantown Pike, East Norriton, Plymouth twps. ITS Installation: LANE CLOSURES between I-476 & Swede Rd. 9 AM - 3 PM. 9/26/16-9/30/16 Carr & Duff, $3.6 million PA 63 (Sumneytown Pike), Lower Salford, Towamencin, Upper Gwynedd, Lower Gwynedd, Montgomery twps.; North Wales Bor. ITS Installation: LANE CLOSURES between Harleysville Pike & Bethlehem Pike. 9 AM - 3 PM. 9/26/16-9/30/16 Carr & Duff, $3.6 million Bethlehem Pike, Montgomery, Hatfield twps. ITS Installation: LANE CLOSURES between McLaughlin Rd. & Bergey Rd. 9 AM - 3 PM. 9/26/16-9/30/16 Carr & Duff, $3.6 million Meyers Rd., Perkiomen Fiber Optic Relocation: LANE RESTRICTIONS between Seitz Rd. & Miller Rd. 9 AM - 3 PM. 9/26/16-9/30/16 H&K Group, $11 million 10/7/2016 Page 21 of 26

PA 73 (Skippack Pike) East, Shoulder Work: LANE RESTRICTIONS between 9/26/16-9/30/16 H&K Group, $11 million Skippack Squirrel Hill Rd. & Perkiomen Creek Rd. 9 AM - 3 PM. City Ave., Lower Merion Trench Restoration: LANE CLOSURES between Wynnewood Ave. & 63rd St. 9 AM - 3 PM. 9/26/16-9/30/16 Amour & Sons $4.7 million City Ave., Lower Merion Trench Restoration: LANE CLOSURES between Cardinal Ave. & Lapsley Ave. 9 AM - 3 PM. 9/26/16-9/30/16 Armour & Son $4.7 million *I-476 N & S, Various Municipalities Fiber Optic Cable Installation: SHOULDER CLOSURE between I-76 & I-95. 9 AM - 3 PM. 9/26/16-10/2/16 Miller Brothers $15.5 million Markley St., Norristown Bor. Utility Installation: LANE RESTRICTIONS between Marshall St. & Elm St. Weekdays. 7 PM - 5 AM. 9/26/16-11/11/16 Pennsylvania American Water Old Gulph Rd., Lower Merion Utility Installation: LANE RESTRICTIONS between N. Roberts Rd. & Airdale Rd. 9 AM - 3 PM. 9/27/16-9/28/16 PECO Energy Norristown Rd., Lower Gwynedd Milling: CLOSED & DETOURED between Bethlehem Pike & Tennis Ave. 7 PM - 4 AM. DETOUR 9/27/16-9/28/16 Maintenance Lederach Cross Rd., Lower Salford, Skippack twps. Milling & Paving: LANE RESTRICTIONS between Spencer Drive & Tyson Rd. Weekdays. 9 AM - 3 PM. 9/27/16-10/14/16 North Penn Water Authority Montgomery Ave., Upper Moreland Utility Installation: LANE RESTRICTIONS between Jacksonville Ave. & Penn St. 9 AM - 3 PM. 9/28/16-9/29/16 Gorden H. Baver Edge hill Rd., Upper Moreland Washington Lane, Lower Moreland Milling: CLOSED & DETOURED between Moreland Rd. & Terwood Rd. 7 PM - 4 AM. DETOUR Milling: CLOSED & DETOURED between Herbert Rd. & Terwood Rd. 7 PM - 4 AM. 9/28/16-9/29/16 Maintenance 9/29/16-9/30/16 Maintenance 10/7/2016 Page 22 of 26

*US 422 East, Lower Pottsgrove Road & Bridge Construction: LANE CLOSURES between PA 724 (Schuylkill Rd.) & Sanatoga interchanges. 5 PM - 5 AM. 9/30/16-10/29/16 J.D. Eckman, $73.3 million *US 422 West, Lower Pottsgrove Road & Bridge Construction: WEEKEND LANE CLOSURES between Sanatoga & PA 724 (Schuylkill Rd.) interchanges. 7 PM - 1 PM. 9/30/16-10/29/16 J.D. Eckman, $73.3 million Pen-Ambler Rd., Lower Gwynedd Pipe Replacement: CLOSED & DETOURED between Spring Garden St. & Penlyn Blue Bell Pike. 6 AM - 3 PM. DETOUR 10/1/16 Maintenance *US 422 West ramp to Armand Hammer Blvd., Lower Pottsgrove *US 422 West ramp to Armand Hammer Blvd., Lower Pottsgrove PA 63 (Red Lion Rd.), Lower Moreland PA 332 (Montgomery Ave.), Hatboro Bor. Byberry Rd., Hatboro Bor. Intersection Reconstruction: LANE CLOSURES on ramp. 6 PM - 6 AM. Intersection Reconstruction: LANE CLOSURES on ramp. 9 AM - 2 PM. Railroad Crossing Surface Replacement: CLOSED & DETOURED between Dale Rd. & Philmont Ave. Monday 9 AM thru Friday 7 PM. DETOUR Paving Railroad Approaches: CLOSED & DETOURED between Jacksonville St. & Penn St. Saturday 8 AM - 8 PM. DETOUR Railroad Crossing Surface Replacement: CLOSED & DETOURED between New St. & Penn St. Monday 9 AM thru Friday 7 PM. DETOUR 10/3/16-10/4/16 J.D. Eckman, $73.3 million 10/3/16-10/4/16 J.D. Eckman, $73.3 million 10/3/16-10/7/16 SEPTA 10/8/16 SEPTA 10/10/16-10/14/16 SEPTA PA 63 (Moreland Rd., Upper Moreland, Abington twps. Railroad Crossing Surface Replacement: CLOSED & DETOURED between Cherry St. & Davisville Rd. 8 PM Friday thru 8 AM Saturday. DETOUR 10/14/16-10/15/16 SEPTA 10/7/2016 Page 23 of 26

Hanover St., Pottstown Bor. Emergency Rail Crossing Repair: CLOSED & DETOURED between South St. & Queen St. Monday 9 AM thru Saturday 7 PM. 24-HOUR DETOUR. DETOUR 9/19/16-9/24/16 Norfolk Southern *I-476 N & S, Various Municipalities Stenton Ave., Whitemarsh Fiber Optic Cable Installation: SHOULDER CLOSURE between I-76 & I-95. 9 AM - 3 PM. Utility Installation: LANE RESTRICTIONS at Butler Pike. 9 AM - 3 PM. 9/19/16-9/25/16 Wampole-Miller, $15.5 million 9/19/16-9/30/16 PECO Energy N. Gulph Rd., Upper Merion Utility Installation: CLOSED & DETOURED between Freedom Drive & Guthrie Rd. Weekdays. 8 PM - 6 AM. DETOUR 9/19/16-10/21/16 Aqua Pennsylvania Matsonford Rd., West Conshohocken Bor. ADA Ramp Reconstruction/Signal Adjustments/Barrier Adjustments: LANE RESTRICTIONS at Front St. Weekdays. 9 AM - 3 PM & 9 PM - 6 AM. 9/12/16-10/31/16 Suncap Property Group PA 29 (South Collegeville Rd.), Upper Providence ADA Ramp Reconstruction: LANE RESTRICTIONS between Black Rock Rd. & US 422. Weekdays. 9 AM - 3 PM. 9/12/16-12/9/16 Glaxo Smith Kline Black Rock Rd., Upper Providence Install Right Turn Lane: LANE RESTRICTIONS between Troutman Rd. & PA 29 (South Collegeville Rd.). Weekdays. 9 AM - 3 PM. 9/12/16-12/9/16 Glaxo Smith Kline PA 63 (Welsh Rd.), Horsham Joshua Rd., Whitemarsh Utility Installation: LANE RESTRICTIONS at Electronic Drive. Weekdays. 9 AM - 3 PM. Utility Installation: LANE RESTRICTIONS between Emerson Drive & Flourtown Rd. Weekdays. 9 AM - 3 PM. 8/26/16-9/30/16 PECO Energy 8/26/16-11/30/16 Whitemarsh Township Authority *US 202 N & S, Upper Merion Utility Improvements: LANE CLOSURES at Mall Blvd. Sundays thru Thursdays. 8 PM - 6 AM. 8/14/16-10/21/16 Aqua Pennsylvania 10/7/2016 Page 24 of 26

Trewigtown Rd., Hatfield Bridge Rehabilitation: CLOSED & DETOURED between Anthony Drive & Line Lexington Rd. 24- HOUR CLOSURE. DETOUR 7/18/16-10/28/16 J.D. Eckman, $2.6 million Old Welsh Rd., Abington New Second St., Cheltenham Remington Rd., Lower Merion Utility Installation: CLOSED & DETOURED between Fitzwatertown Rd. & Lukens Ave. Weekdays. 9 AM - 3 PM. DETOUR Utility Installation: CLOSED & DETOURED between Tookany Creek Parkway & Church Rd. Weekdays. 9 AM - 3 PM. DETOUR Bridge Replacement: CLOSED & DETOURED between Minden Way & Roslyn Lane. Monday thru Thursday. 7 AM - 5 PM. DETOUR 7/20/16-11/30/16 Aqua Pennsylvania 7/21/16-11/30/16 Aqua Pennsylvania 7/11/16-10/21/16 J.D. Eckman, $2.6 million PA 29 (Gravel Pike), Lower Frederick Bridge Rehabilitation: LANE RESTRICTIONS between Meng Rd. & Zieglerville Rd. 7 AM - 5 PM. 5/2/16-12/22/16 J.D. Eckman, $2 million PA 73 (Skippack Pike), Skippack, Perkiomen twps; Schwenksville Bor. Bridge Rehabilitation: CLOSED & DETOURED between Main St. & Haldeman Rd. 24-HOUR DETOUR. DETOUR 4/25/16-12/2016 Loftus Construction, $7.5 million PA 252 (Valley Forge Rd.), Upper Merion, Tredyffrin twps. Utility Installation: CLOSED & DETOURED between Yellow Springs Rd. & PA 23. 24-HOUR DETOUR. DETOUR 4/1/16-9/31/16 Tredyffrin Township Authority County Line Rd., Warrington, Horsham, Montgomery twps. Utility Installation: LANE RESTRICTIONS between Kulp Rd. & Stump Rd. 7 AM - 3 PM. 3/7/16-9/2018 James D. Morrissey, $14.8 million PA 23 (River Rd.), Upper Merion Balligomingo Rd., West Conshohocken Bor. PA 724 ramp to US 422 East, Lower Pottsgrove Road Widening: LANE CLOSURES between 3rd St. & McCoy Lane. Weekdays. 9 AM - 3 PM & 7 PM - 6 AM. Slope Stabilization: CLOSED & DETOURED between PA 23 (Front St.) & Portland Rd. 24-HOUR DETOUR. DETOUR Roadwork: RAMP CLOSED & DETOURED. 24- HOUR CLOSURE. DETOUR 11/16/15-9/30/16 Upper Merion Township 6/27/15-Indef. 5/27/15-3/2018 J.D. Eckman, $73.3 million 10/7/2016 Page 25 of 26

*US 422 E & W, Lower Pottsgrove Road Construction: TRAFFIC PATTERN SHIFT between Sanatoga & PA 724 (Schuylkill Rd.) Interchanges. 24-HOUR PATTERN. 2/2/13-8/2018 J.D. Eckman, $73.3 million *US 422 E & W, West Pottsgrove Bridge Construction: REDUCED TO ONE LANE between Stowe & PA 100 Interchange. 24-HOUR RESTRICTION. 11/27/14-9/2018 J.D. Eckman, $36 million County Line Rd., Upper Merion Road Work: CLOSED & DETOURED WEEKDAYS between PA 23 & Gulph Rd. 7 AM Mondays thru 5 PM Fridays. 24-HOUR CLOSURE. DETOUR 5/9/14-12/31/16 Valley Forge National Historical Park 10/7/2016 Page 26 of 26