INSTALLATION & MAINTENANCE MANUAL FOR FLUE RENOVATION SYSTEM - FitFire & Fitfireplus

Similar documents
MODEL DCC DOUBLE WALL CHIMNEY CONNECTOR

MODEL DCC DOUBLE WALL CHIMNEY CONNECTOR

EXCEL ULTRABlack FS 6 Clearance Connector INSTALLATION AND MAINTENANCE INSTRUCTIONS

Installation instruction

Installation Instructions

Installation Instructions

Maintenance 45 Serie CAUTION. Before resetting your electronic card that displays an error code.

Installation Instructions

Installation and operation instructions for KINEMAX burners

Installation Instructions

Mod. MONTANA WOOD BURNING STOVE USAGE AND MAINTENANCE INSTRUCTIONS

Please read this manual before installation and use. We wish you many years of pleasure and warmth.

INSTANT GARAGE MODEL NO: CIG81224 ASSEMBLY INSTRUCTIONS PART NO: ORIGINAL INSTRUCTIONS

Capacity kw. Thermal turndown from specified maximum capacity 8:1 8:1

USAGE AND MAINTENANCE MANUAL FOR A SOLID FUEL STOVE

SINGLE BURNER STOVE IMPORTANT OPERATING INSTRUCTIONS COOKING & STORAGE POSITION PARTS IDENTIFICATION

HARVIA IRON STOVE Instructions for installation and use

Installation Instructions

Check burner weight and reinforce burner mounting flange or combustion chamber/furnace back wall if necessary to take complete burner weight.

Installation Instructions

Model 205 Fireview Maintenance Kit

INSTRUCTIONS FOR INSTALLATION, USE AND MAINTENANCE YSEN

Harrie Leenders Fuga el - Instructions for Installation, Use and Maintenance INSTRUCTIONS FOR INSTALLATION, USE AND MAINTENANCE

Check burner weight and reinforce burner mounting flange or combustion chamber/furnace back wall if necessary to take complete burner weight.

Spiral Duct. Contents. Introduction 1. Duct & Fitting Range 2. Duct Sizes 3. Fittings 5. Round Duct Connector 7. Installation 8

TRAVEL-SMART AWNING SERIES » LYNX 200 LOW TOP « Model No Issue:October Document-No.: LYNX 200 LOW TOP. Top Quality Camping

Installation Guide: Round Trampoline

APPENDIX TO THE INSTALLATION AND OPERATING MANUAL OF STOVEMAN SAUNA STOVE

BRANDON PIZZA OVEN INSTALLATION GUIDE AND OWNER S MANUAL

Inspecting your combustor

Gerjak Dear Customer, You will find below information that includes: Is the caravan rail in order? Is everything in place?

INSTALLATION & OPERATING INSTRUCTIONS FOR. FIREPLACE GAS LOGS Model Numbers: MO18NG, MO24NG, SH18NG, SH24NG, CSO30NG

Installation Instructions

Installation instruction

Clay Adaptors & Insert Stove Kits

17500 VRANJE, SRBIJA Radnička 1, Tel.: 017/ INSTRUCTIONS FOR INSTALLATION, ADJUSTMENT AND USE

10 X 20 X 8 Dome Canopy

General Purpose Shelter

Product instruction manual Ream Cutting Systems RE3943, RE3946, RE3947, RE3971, RE3952E

How to use a multi fuel stove

Installation & User Manual EW5000 Outdoor Cooking Fire

Blue Series Hot Melt Hose with RediFlext II Hanger System

Lit Table Top Firepit Bio-Ethanol Fireplace. User Manual. Model: GF301650

Meat Slicer INSTRUCTION MANUAL CAUTION! ONE YEAR LIMITED WARRANTY

For Outdoor Use Only!

V E N T I N G. CALGARY EDMONTON LETHBRIDGE

MODEL DL INSTALLATION AND OPERATING INSTRUCTIONS 2100º F 1150º C

» GEMINI 390 CARAVAN«

User Manual. 110 Cup (55 Cup Raw) Rice Cooker. Model: 177GRCLP, 177GRCNAT 10/2017. Please read and keep these instructions. Indoor use only.

Dry Stove Installation Guide BK545. November 2012 Rev02. EN 13240:2001+ Amd. A2:2004

INSTALLATION AND OPERATION GUIDE FOR

FISH CAT SCOUT OWNER S MANUAL

USER MANUAL. PRESSURE COOKER Ø22cm 7.6L Ref. Number: TRAS

User s Manual Trampoline 8

Kontrol Kube Advanced Owners Manual

Installation instructions

Installation Instructions. Woolly Mammoth Stoves Albert Road, Braintree, Essex, CM7 3JQ

Sigma. Did you know? Do you need? x Diameter. Pellet

STEALTH PRO OWNER S MANUAL

THE INSTALLATION MANUAL FOR GEMINI 1200 AND GEMINI 1500 WOODSTOVES. Manufactured by DROLET STOVES & FIREPLACES INC.

Written By: Sam Lionheart

Alma Mons EN Owners s manual INSTALATION, ADJUSTMENT AND OPERATING INSTRUCTION

OWNER S MANUAL 10x10 SUN SHELTER WITH NETTING

Instruction Manual. 30 Steel Fire Pit with Solid Bowl. Questions, problems, missing parts? Before returning to the store, Call Yayi Mfg.

WARNING USING AND CARING. for use in extreme or varied soil conditions. For optional sand pegs Oztent recomends use of a Bluescrew Oztent Edition.

INSTALLATION AND OPERATIONS GUIDE FOR GRAND CANYON GAS LOG FIRE PIT SERIES ONLY

EB300. Ethanol Burner. User s Manual Installation Instructions

» AQUILA 320(HIGH TOP) «

TRAVEL-SMART AWNING SERIES »LYRA 4 « Family Tent. Model No. HW Document-No.: HW Issue: August Top Quality Camping

Installation, Operation, & Safety Handbook

TITAN Fuel Tanks. INSTALLATION INSTRUCTIONS G e n e r a t i o n V

Written By: Arthur Shi

OIL BURNING STOVE EVEREST

Supersedes: AD3V (991) AD3V (1294)

Getting Started Guide

π H-3505 GARAGE CANOPY PARTS SAFETY uline.com TOOLS NEEDED 10' X 20' X 8'

Gas Conversion Kits and Instructions

Installation instructions

FEATURES & BENEFITS OF THE TOW PRO LITE :

FT054 BearMountain OWNER'S MANUAL

INSTRUCTIONS MANUAL CAST IRON STOVE

User Manual for Separera 40

Model 698/ and Model in 1 Hose Reel Owner s Manual

MULTI-FUEL STOVE INSTALLATION AND USER INSTRUCTIONS

Item # BJ2PC With 8 Leg Frame, Cover, and Enclosure Kit with Windows Size: 10 8 Wide x 20 Long (Side Height 6 8 ) (Center Peak Height 9 9 )

OW LEE CASUAL FIRESIDE Q&A

ipad mini 4 LTE Home Button Assembly Replacement

Fire's Edge Fire Pit/Fire Pit Inserts For (Automated) Model 100-A

Universal 10 x 27 Canopy

USER MANUAL PLEASE READ AND UNDERSTAND THIS MANUAL COMPLETELY BEFORE USE.

LODGE 460 CABIN. Part No ASSEMBLY & CARE INSTRUCTIONS

ASSEMBLY & CARE INSTRUCTIONS

TUBULAR BURNER CONVERSION KIT AGCK-TBXX / AECK-UBXX

INSTALLATION AND OPERATIONS GUIDE FOR GRAND CANYON GAS JUMBO/JUMBO SLIMLINE LOG SYSTEMS

Contents. Company Background FLOWSTOPPER Plugging Device Kit and Replacement Parts Key Features & Benefits... 4

Corn Flame Energy Corn Stove Model 5000

Installation and Maintenance Manual

Installation instruction

Read all instructions and warnings before using this fireplace. WARNING

Installation Guide Cable

Transcription:

INSTALLATION & MAINTENANCE MANUAL FOR FLUE RENOVATION SYSTEM - FitFire & Fitfireplus Edition Revision Approved by Written by 1 1.2 C. Lezzi C. Lezzi Date 14/02/2011 Page 12 Code 01_01 Manuale_inst_Fitfire-plus File Name 01_01.2_Manuale inst_ FitFire_.docx

Page 2 of 12 Table of contents TABLE OF CONTENTS... 2 PURPOSE... 3 INTRODUCTION... 3 USE... 4 GOOD OCCUPATIONAL HEALTH PRACTICES:... 4 INSTALLATION... 4 LIST OF MATERIALS AND EQUIPMENT NEEDED FOR PROPER INSTALLATION... 6 PREPARATION OF BOILER ROOM AND ROOF.... 6 HOW TO INSERT THE SHEATH:... 7 POSITIONING ACCESSORIES SUCH AS TEES OR STUB PIPES... 8 HOW TO INFLATE THE SHEATH:... 10 MAINTENANCE... 12

Page 3 of 12 Purpose The purpose of this document is to offer FitFire installers a clear and unambiguous document that specifies instructions and steps to properly install the system. Introduction FitFire is an innovative system to renew old flues of gas-fired boilers by lining an old duct using a new sheath. The FitFire system is 100% not suitable for solid fuel burning boilers, stoves and chimneys, in fact Beca Engineering has especially designed HT1000, a 100% inert system, for this kind of fuel. The FitFire sheath mainly consists of thermo-hardening, heat-resistant, water-based resins that does not contain furan, furfuryl alcohol and antimony trioxide. FitFire is environmentally friendly and not toxic for installers. Interlocking tube-shaped sleeve for installation Fibreglass & thermo-hardening resins prepeg Liner made of special fabric, non elastic Thermo-hardening, water-based resins are intrinsically reactive; therefore, the following instructions should be strictly observed: The product must not be stored to direct sunlight or temperatures over 30 C. Do not wash the sheath with water before installing. Otherwise, it can get damaged and no longer suitable for installation. Only once polymerised can the sheath get in contact with water. Do not wet the sheath with any other kind of liquids before installing it. Store in a dry place. Do not store longer than 3 weeks at 15-17 C.

Page 4 of 12 Use FitFire is suitable for conveying combustion gases of gas and condensing boilers outdoors. The system features the characteristics below and has been certified as compliant to them: N1 negative pressures P1 positive pressures T300 maximum temperature class Condensate present conditions It is highlighted that the FitFire system is category O soot-fire resistance. To renew flues for solid and liquid fuel heating appliances it is advisable to use HT1000, a 100% inert system, A1 fire reaction class and category G soot-fire resistance. Good Occupational Health Practices: Wear suitable gloves when handling/working with the sheath If your hands are dirty with the product, do not use them to eat. Strictly observe the instructions specified in the MSDS. Installation Video inspect the status of existing flues so that you can successfully apply the sheath. The flue interiors should not be rough, show blunt points or any other defect that may damage the sheath while it is being inserted. Flues should not have 90 bends; only two 45 bend s or two 30 bends maximum are allowed.

Page 5 of 12 The interiors should not show any water leaks or drips; otherwise, the sheath itself and the polymerisation are compromised.

Page 6 of 12 List of materials and equipment needed for proper installation The following materials and equipment are needed for installing the sheath properly: FitFire sheath of suitable size and diameter for the flue to be renewed. In general it should be around 2 m longer than the existing flue. Sockets of suitable diameter for the sheath to be installed Check that the pressure gauge on the upper socket works properly. Socket clamps and protective rubber rings (at least 3 per socket) As many steam boilers as needed for sheath polymerisation. Diesel fuel and distilled water as required for proper boiler functioning. Steam suitable pipes and fittings to connect the boiler sockets. Tripods to anchor the sheath to the roof. Assorted supporting devices such as assorted tools and condensate collection bucket. Digital thermometer, if necessary, to check sheath temperature at polymerisation. Standard-compliant grinders to cut sheath at both ends once the polymerisation process finishes. Preparation of boiler room and roof. It is of utmost importance to properly prepare the boiler room for a successful installation. a) Boiler room: Work so that the existing flue is easily reached; the mouth through which the FitFire sheath will be introduced should be wide enough to facilitate insertion operations. If the already existing flue has a union tee, use a new tee fitting for the sheath to go through. It is advisable that the insertion mouth be as straight as possible, thus avoid 90º accesses, so that the sheath can expand/extend easily when inflated. b) Roof: Position the sheath anchoring system at the mouth; extend tripod legs according to the sheath diameter and the existing flue mouth. Put a tensioning cable through the existing flue up to the lower mouth. This cable will be needed when the sheath is inserted.

Page 7 of 12 How to insert the sheath: Inserting the sheath is a highly delicate, key operation and the success of a proper installation totally depends on it. Strictly follow the steps below. A sheath can be inserted either by pulling it from bottom to top or by lowering it from top to bottom. The first solution is often used when the sheath is heavy and has proven useful when it is not safe or too difficult to work on the roof. The second solution is used in less complex and demanding cases. Anyway, the installer should be able to assess each case and choose the most suitable solution for the flue to be renewed. While the sheath is being inserted (by either method above), pay utmost attention so that the sheath is as straight as possible, does not get coiled or twisted in a candy-wrapper -like manner. While the sheath is being inserted, always follow it through the duct and fold it to form a U-shape. Caution. Do not use cold or hot water trying to soften the sheath. Under no circumstances can a wet sheath be used as it is irreparably damaged. Should this occur, the warranty shall be rendered void. Follow the steps below: 1. If you are inserting the sheath from bottom to top, fasten tight the sheath to the cable already fitted inside the flue at the boiler room. 2. The installer on the roof is to operate the winch (it is advisable to do so at a low speed) or pull the sheath slowly by hand. 3. The installer in the room must always follow the sheath through the duct and fold it to form a U-shape. 4. When the end of the sheath reaches the roof, insert the socket plus the pressure gauge needed to inflate the sheath. 5. Fit the pipe clamps (3 minimum) to fasten the sheath to the socket. Also fit as many rubber rings as needed between clamp and sheath; if these rings are used the sheath is not pinched and the internal plastic sleeve is not damaged. Caution: Before fitting the clamp around the sheath already on the socket, carefully fold the excess sheath around the socket so that no wrinkles are formed when the clamps are tightened.

Page 8 of 12 6. Couple the socket, already connected to the sheath, to the anchoring system already installed on the roof. Always be careful not to twist the sheath. 7. In the boiler room, connect the other end of the sheath to the lower socket as shown in point 5. All clamps must be well tightened so that they do not get unexpectedly detached at the inflation stage and compromise the whole installation. 8. Now the sheath is ready to be inflated. Positioning accessories such as Tees or stub pipes Follow the steps below to properly position a T-shaped element at the base of the flue that will connect the fumes duct to the sheath: 1. Before inserting the sheath, position a commercially available steel or plastic stub pipe suitable for the boiler type; its diameter should match that of the sheath. Also fit the gaskets supplied together with the stub pipe. 2. While the sheath is being inserted into the existing flue, also cause it to go through the stub pipe as shown in the figure below. STUB PIPE POSITIONING Sealing gaskets for a steel or plastic stub pipe Due to the vapour injected into it, the thermo-hardening sheath expands against the sealing gaskets. Once the polymerisation process finishes, the new composite flue is fully adhered to the gaskets and the result is perfect sealing. Only after all the steps described are carried out and completed can you install on the stub pipe a T-shaped element or condensate collection accessories. Positioning intermediate T-shaped elements: Follow the steps below to properly position intermediate T-shaped elements.

Page 9 of 12 1. Before inserting the sheath, position a commercially available steel or plastic T- shape element suitable for the boiler type; its diameter should match that of the sheath. Also fit the gaskets supplied together with the stub pipe. 2. While the sheath is being inserted into the existing flue, also cause it to go through the stub pipe as shown in the figure below. T-SHAPED ELEMENT POSITIONING Sealing gaskets for a steel or plastic Tee Due to the vapour injected into it, the thermohardening sheath expands against the sealing gaskets. Once the polymerisation process finishes, the new composite flue is fully adhered to the gaskets and the result is perfect sealing. 3. Only after all the steps described are carried out and completed can you cut an opening in the sheath (using a hollow cutter) matching the T-shaped element and connect the fumes duct to this T or as planned.

Page 10 of 12 How to inflate the sheath: You must give this step your utmost attention. All equipment such as pressure gauges that detect and read pressure at the upper socket must work properly. Make sure that boilers work properly and use distilled water. If the pressure gauge does not work properly, pressure may go beyond the maximum working value allowed and so the sheath can get irreparably damaged. Pressure must be checked throughout the inflation procedure. 1. Take the vapour pipe coming from the gyser generator nearby and screw in the fitting to the lower socket on the mouth in order to inject vapour 2. Switch on the vapour generator as described in the user manual for the Gyser generator 3. Cause the vapour maximum temperature on the generator to reach 150 C. 4. Once the generator is under pressure and has reached the desired temperature, open the cock about ¼ of a turn to slowly start inflating the sheath. 5. Once the pressure starts to expand, take the inflation pressure to 0.15 bar:

Page 11 of 12 First, fully open the vapour vent cock at the upper socket Open the vapour cock a little more, up to ¾ of a turn Adjust the vent cock at the upper socket and check pressure level on the pressure gauge on the upper socket. CAUTION: Follow these rules so that heat is not disperse: If there are gaps or interspaces between the sheath and the existing flue, put some cloth either from the boiler room side or the roof side. This will prevent a constant air flow through the interspaces that transfers heat to the sheath. Never use vapour pipes longer than 10 m from the sheath to the generator, especially in winter. In case you do, insulate pipes so that not much heat is lost before they reach the sheath. 6. Keep the pressure indicated above until the sheath starts to have a gummy consistency. When this occurs, take the pressure indicated by the pressure gauge to 0.18 bar and keep it until the resin is completely polymerised (about 2h). Always make sure that the resin has hot hardened by checking it is fully hard and not 'sticky'; it should be firm when touched or hammered manually or by using a durometer with indentor. 7. CAUTION: The polymerisation time mentioned is indicative only under normal conditions. This time normally depends on several factors: External temperature Boiler proper functioning: Use of distilled water, clean combustion chamber Moisture at the existing duct. Therefore, make sure that the sheath has hardened properly by touching it or by using a durometer with indentor. CAUTION: Do not turn off the boiler if the sheath has not polymerised since if it is hot and still soft, once it cools off, it may seem to be hard when it is not, and therefore proper functioning is compromised. That is the reason why you should wait until it hot hardens. 8. Once the sheath has completely polymerised, use a grinder to cut it on the roof side below the socket on the circular section, and cut the insulation at the centre, above the socket.

Page 12 of 12 9. Remove the internal plastic sleeve from the polymerised sheath. If you are installing a Fitfireplus system, do not attempt removing the plastic sleeve from the sheath. 10. Now the flue is totally renewed. Once you finish installing the system, carry out the P1 or N2 tightness test according to the intended use of the flue and the requirements of the UNI 10845:2000 standard. Maintenance Maintaining a FITFIRE system implies cleaning the flue whenever necessary using plastic, not metal, brushes so that the system is not damaged. It also includes checking the system for proper condition regularly.