Pattullo Bridge Replacement Project

Similar documents
Pattullo Bridge Replacement Project

Pattullo Bridge Replacement Project

RW Bruhn Bridge and Approaches Project

8.01 MEMORA DUM. Mayor and Council. Steven Lan, P.Eng., Director of Engineering. March 31, Pattullo Bridge Replacement Update /PBR

South of Fraser Transportation Priorities March 2017 Engagement

Status. Agreement announced: June 2004 Completed: Value for Money Report. released: Nov 2004 *CCPPP: Financing Award Agreement announced:

Engagement Summary Report. Trans-Canada Highway 1 RW Bruhn Bridge Replacement Project. Community Engagement November 15, 2016 to January 15, 2017

Welcome. Share information on the new investments and funding proposed for the Phase Two Plan

SR 934 Project Development And Environment (PD&E) Study

Engagement Summary Report. Trans-Canada Highway 1 RW Bruhn Bridge and Approaches Project Community Engagement February 1 18, 2018.

Roberts Bank Terminal 2 Project

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT

NORTH FRASER PERIMETER ROAD WEST CORRIDOR DEFINITION STUDY

MASTER PLAN UPDATE Toronto Pearson International Airport. City of Toronto Planning and Growth Management Committee September 5, 2007

BUSINESS ZONE - OPTION 400 (Western footpath) Have your say. Love the Bay Delivering on the Cycleway

Committee. Presentation Outline

1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET

Decision (Applicant claims urgent public need )

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

WELLINGTON $422 MILLION $614 MILLION $83 MILLION 22% SPEND $1.9 BILLION

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES

Public Open House. Chief Peguis Trail Project

MINISTRY OF TOURISM AND RECREATION

Memo. Orange City Trail Plan Becky Mendez, AICP Jamie Krzeminski, PE, PTOE Matt Wiesenfeld, PE, AICP. Development of the Existing and Proposed Network

Ossington Station Easier Access Project - Construction & Public Art Concept Update

Crown Corporation BUSINESS PLANS FOR THE FISCAL YEAR Trade Centre Limited. Table of Contents. Business Plan

Route 29 Solutions Projects

TRANSURBAN QUEENSLAND S $512M LOGAN ENHANCEMENT PROJECT APPROVED

A Master Plan is one of the most important documents that can be prepared by an Airport.

Implementation Plan for local governments

China Creek North Park Upgrades and Glen Pump Station. Park Board Committee Meeting Monday, July 10, 2017

BILLY BISHOP TORONTO CITY AIRPORT 2018 MASTER PLAN UPDATE

APPENDIX A: SCREENLINE SURVEY STATION DETAILS

PASSENGER TRANSPORTATION BRANCH MINISTRY OF TRANSPORTATION AND INFRASTRUCTURE LICENCE. Passenger Transportation Licence COPY

Accelerating Indigenous Tourism Growth

Open Report on behalf of Richard Wills, Executive Director for Environment and Economy

PSP 75 Lancefield Road. Northern Jacksons Creek Crossing Supplementary Information

Lafourche Parish Government REQUEST FOR QUALIFICATIONS. Landscape Architectural Services

COMMITTEE OF THE WHOLE (WORKING SESSION) APRIL 19, 2011 YORK REGION RAPID TRANSIT HIGHWAY 7 BUS RAPID TRANSIT- VMC STATION WARD 4.

TRANSPORT CANADA S NATIONAL TRADE CORRIDORS FUND. PNWER November 2018

TransAction Overview. Introduction. Vision. NVTA Jurisdictions

Building the transportation network we need for the future in Niagara Region

Roberts Bank Terminal 2 Project

Conexus is committed to innovation and bringing financial services to market with speed. We have a long history of innovation, including:

PORT OF SEATTLE MEMORANDUM. COMMISSION AGENDA Item No. 4g ACTION ITEM Date of Meeting February 9, 2016

Welcome Consultation Meeting for the Development of the Railway-Roadway Grade Crossings Regulations. May and June, 2012

NEGOTIATING FOR SUCCESS IN THE COMPETITIVE PORT AND MARINE TERMINAL INDUSTRY

Yonge Street / Highway 401 Improvements Update. Public Works and Infrastructure Committee. General Manager, Transportation Services

Route 141 and I-44 Design-Build Project Community Involvement Group. March 21, 2016

Construction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013

M621. Junctions 1 to 7 Improvement scheme. Share your views

CHRISTCHURCH MOTORWAYS. Project Summary Statement February 2010

Urban Beach Demonstration Project: Annexure A (Specification)

KING STREET PILOT STUDY PUBLIC MEETING

OPEN HOUSE WELCOME. YPK Runway Enhancement & Safety Upgrades

Waterfront Concept Plan: Community Survey Summary

Chapleau Mining Readiness and Growth Strategy Addendum Number 1 February 27 th, 2017

Union Station Queens Quay Transit Link Study

Transit Network Review translink.ca

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JANUARY 25, 2011

US 380 FEASIBILITY STUDY

Roadmapping Breakout Session Overview

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport

Chapter 1: Introduction Draft

TERMINAL DEVELOPMENT PLAN

2016 Regional Transportation Alternatives Program (TAP) Grant Application

Stephanie Sinnott, Executive Director, Finance, Office of the City Manager

N4 Carrick-on-Shannon to Dromod Road Project. 2.1 Introduction

Major Scheme Business Case Summary Report for Programme Entry

Public-Private Partnerships (P3) for Social Infrastructure. Alberta Schools Alternative Procurement (ASAP Team) Alberta Infrastructure

Public Informational Meeting

ateway NOW UNDER CONSTRUCTION! 1777 Clearbrook Road Abbotsford, BC 65,000 SF in Building 1 Available Q ,229 SF in Building 2 Available Q2 2019

Port Metro Vancouver Facilitating our nation s trade

INLAND RAIL. Connecting Australia. 5 June 2018 National Infrastructure Summit inlandrail.com.au

Frequently Asked Questions on the Route 29 Solutions Improvements Projects

2016 Development Cost Charges (DCC) UPDATE

Client: BC Hydro Partnerships BC s Role: Procurement Manager. Client: Interior Health Authority

Calgary River Access Strategy Priority Sites and Proposed Funding

Implementation Strategy for the Lethbridge Destination Management Organization (LDMO)

Federal Budget Submission. Prepared for the House of Commons Standing Committee on Finance. Greater Toronto Airports Authority

ENVIRONMENT ACTION PLAN

3.0 LEARNING FROM CHATHAM-KENT S CITIZENS

A. CONCLUSIONS OF THE FGEIS

Charlotte Regional Express Lane Facilities: I-485 and US 74. North Carolina Turnpike Authority March 21, 2018

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT

2018 Airport Master Plan. Public Meeting and Open House February 7, 2018

NATIONAL AIRSPACE POLICY OF NEW ZEALAND

FEDERAL BUDGET PRIORITIES FOR THE SOUTH WEST METROPOLITAN REGION 2018 TO 2022

Strategic Transport Forum

CAA Stakeholder Survey Results. Part 139 Aerodromes. Introduction:

UNFCCC Facilitative Dialogue on Enhancing Ambition and Support (Marrakech, Morocco, 16 November 2016)

LESLIE BARNS & CONNECTION TRACK. Project Update Construction and Traffic Management Consultation

8 CROSS-BOUNDARY AGREEMENT WITH BRAMPTON TRANSIT

Airlines UK 24 May 2018: Speech by Richard Moriarty

Grade Crossing Regulations

A303. Sparkford to Ilchester Dualling Scheme. Public consultation. Welcome. Highways England -- creative MCR18_0016

RE: Victoria Road upgrade (RTA December 2007). Thank you for the briefing from your department and the invitation to comment on the above.

Rapid Transit From Arbutus Street to UBC. Policy and Strategic Priorities Council Meeting January 30, 2019

PART VIII APPLICATION FOR REVISED SOUTH SIDE TRAFFIC MANAGEMENT WORKS TO FACILITATE LUAS BXD PLANNING REPORT ROADS & TRAFFIC DEPARTMENT

Transcription:

FEBRUARY 2019 PROJECT OVERVIEW Pattullo Bridge Replacement Project engage.gov.bc.ca/pattullobridge Artist s rendering of the proposed new Pattullo Bridge Pattullo Bridge Replacement Project 1

Priority Need for a New Pattullo Bridge Strategically located between the Port Mann and Alex Fraser/Queensborough bridges, the Pattullo Bridge provides a direct connection between New Westminster and Surrey. The central location of the bridge makes it a vital link in the regional transportation network for people, goods and services. Opened in 1937, the 80-year-old structure does not meet modern design standards and would be at risk in the event of a moderate earthquake or ship collision. Its piers are at risk of being undermined by river scour and many bridge components have surpassed their useful lives. Existing sidewalks, barriers and connections for pedestrians and cyclists do not provide the level of protection from traffic that a newer bridge would provide. A regular maintenance program has extended the existing bridge s lifespan but escalating efforts to prolong its use are no longer cost effective. An assessment of maintenance needs has revealed that upgrading the existing bridge to meet modern safety standards would be extremely challenging, both technically and financially. Replacing the existing bridge is essential for maintaining a critical river crossing for both people and goods between the cities of New Westminster and Surrey. The current Pattullo Bridge 1 Pattullo Bridge Replacement Project

Artist s rendering of the proposed new Pattullo Bridge Pattullo Bridge Replacement The Pattullo Bridge is a key connection between the communities of Surrey and New Westminster. The new four-lane bridge will provide important improvements for everyone using the bridge, including people who are driving, cycling or walking, as well as communities on either side of the bridge: A safer crossing for all bridge users with modern, wider lanes, separated by a centre median barrier Dedicated walking and cycling lanes, separated from traffic by a barrier on both sides of the bridge Better connections to, from and near the bridge Construction will begin in 2019 and the new bridge will open in 2023. The Project will cost $1.377 billion and be delivered, funded and owned by the Province of B.C. For more information, visit engage.gov.bc.ca/pattullobridge Pattullo Bridge Replacement Project 2

A New Pattullo Bridge Three general goals guide the Project: Provide a structurally sound bridge crossing to maintain a critical local and regional connection; Improve safety for all users with modern lane widths, road curvature, centre median and separated pedestrian and cycling lanes; and The new bridge will improve safety and reliability for drivers, cyclists and walkers, as well as goods movement. It will be designed to meet modern seismic, structural, and roadway design standards. Improve connectivity, reliability and modal choice while supporting environmental objectives. The new bridge will be located just north and upstream of the existing bridge and will connect to the existing road network in New Westminster and Surrey. Constructing a new bridge next to the existing bridge will allow the existing bridge to continue operating until the new one is open. Once the new bridge is open, the existing bridge will be removed. Bridge Connections The project will also improve connections to regional road networks and cycling and walking paths on either side of the bridge. In New Westminster, the new bridge will continue to connect directly to McBride Boulevard and new direct ramps will connect the bridge to East Columbia Street. In Surrey, the new bridge will continue to connect directly to King George Boulevard, and a new off ramp will connect the bridge to westbound Highway 17. In addition, Highway 17 will be grade-separated over Old Yale Road. These new connections will reduce the reliance on local residential streets to access the bridge. 3 Pattullo Bridge Replacement Project

Artist s rendering of the walking and cycling lane on the new proposed Pattullo Bridge Pattullo Bridge Replacement Project 4

Project Timeline 2012 2014 Strategic Review 2016 2019 Environmental Review COMPLETED: Strategic Review narrowed 25 location and lane options to two Determined new bridge upstream of existing crossing location Mayors Council s agreement to build a 4-lane bridge, potentially expandable to 6 lanes in the future COMPLETED: BCEAO and VFPA defined requirements for a harmonized environmental review process Conducted baseline studies on key areas of interest First Public Comment Period Conducted assessment of potential effects of the new bridge Submitted an application for an Environmental Assessment Certificate BCEAO and VFPA acceptance of Application Second public comment period Respond to comments and questions on the Application UPCOMING: Third public comment period BCEAO and VFPA decision on Environmental Assessment Certificate and VFPA PER permit 2016 2017 Project Planning 2018 2019 Procurement Process COMPLETED: Improved connections for vehicles, cyclists and pedestrians in New Westminster and Surrey New direct connections to E. Columbia Street and westbound Hwy 17 Protected pedestrian and cyclist paths on both sides of the bridge Developed a Project concept Define technical requirements Issue Request for Qualifications Shortlist proponents Issue 2-stage Request for Proposals Evaluate proposals and award contract 2019 2023 Construction Period Construct the bridge and connections 2023 New Bridge Opens New bridge open (2023) Removal of the existing bridge once the new bridge is open (2024) 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 5 5 Pattullo Bridge Replacement Project

N NN R WEST R R WEST WEST 1 1 1 NO NONO R R NORTH NORTH NORTH ANM ANM ANMORE ANMORE ANMORE ANMORE R RT RT MOODY MOODY MOODY MOODY P R R R PATTULLO PATTULLO BRIDGE BRIDGE NABY BUBUNABY BURNABY BURNABY d Blvd ide lv Br e B Mc rid B Mc PATTULLO BRIDGE MEADOWS MEADOW Brunette Brunette AveAve NEW NEW E Columbia E Columbia St St e ve NABY BU v WESTMINSTER WESTMINSTER BURNABY R Rl A l A NEW WESTMINSTER International International Airport Airport 91 91 International Airport 17 17 l ya Ro SURRE SURRE 91 17 A number of models were assessed to identify the best delivery model for the Project. This assessment identified a Design-Build-Finance model as the preferred model to: The steps to assess and identify a Design-BuildFinance partner will include: manage and mitigate key Project risks; Respondents will be asked to demonstrate their experience, qualifications, capacity and capability to undertake the Project maximize cost and schedule certainty; and provide value for money. e Av Highways Procurement R Request for Qualifications An interactive two-stage Request for Proposal process, including: A technical proposal, which will be evaluated for compliance with stated performance requirements; and A financial proposal. Pattullo Bridge Replacement Project Brunette Ave E Columbia S Scott Rd / 120 St Major Road Network King George Blvd King George Blvd Highways Highways International Airport Scott Rd / 120 St Scott Rd / 120 St Major MajorRoad Road Network Network SURREY SURREY SURREY SURREY d Blv International International Airport Airport ide Br Mc ya ya Ro Ro COQU COQUI PITT PITT PITT PITT MEADOWS MEADOW 6

Public and Stakeholder Consultation The Pattullo Bridge Replacement Project has undergone extensive public and stakeholder consultation including: Strategic Review Consultation: June 3 to 28, 2013 Sought input from residents, businesses, local and regional stakeholders, and bridge users about the Problem Statement of the Pattullo Bridge Review, the objectives, and the initial screening of 25 alternatives for rehabilitating or replacing the bridge. Community Connections Phase 1 Consultation: June 13, to July 11, 2016 Sought input from residents, businesses, local and regional stakeholders, and bridge users about community connections, including road network improvements on both sides of the bridge in New Westminster and Surrey. Community Connections Phase 2 Consultation: October 3 to 31, 2016 Sought input from residents, businesses, local and regional stakeholders, and bridge users about pedestrian and cyclist connections on both sides of the new bridge in Surrey and New Westminster. Public Open House in Surrey Public consultation materials from the Community Connections consultations in 2016. 7 Pattullo Bridge Replacement Project

Environmental Review The B.C. Environmental Assessment Office (EAO) and the Fraser Port Authority have agreed to a coordinated provincialfederal environmental assessment process for the proposed Project, with the Environmental Assessment Office as the lead agency. The harmonized environmental assessment process will incorporate the port authority s federal requirements to meet both the Province and the port authority s respective assessment processes. Upon completion of the application review stage, the EAO provides an assessment report and recommendations to the Minister of Environment and Climate Change Strategy and the Minister of Municipal Affairs and Housing, who, under the provincial process, will make a determination on issuing an Environmental Assessment Certificate. At the conclusion of the harmonized environmental assessment process, the port authority will make a determination under section 67 of the Canadian Environmental Assessment Act, 2012 of whether the Project has the potential to result in significant adverse environmental effects. The proposed Project is required to obtain a Project and Environmental Review project permit from the port authority to proceed and is categorized as a Category D Project. Identified Indigenous Group Consultation Consultation with Identified Indigenous groups is ongoing in accordance with direction provided by the Project s regulators (EAO and the port authority). These groups have also been invited by the EAO to participate in a project working group and related discussions have been ongoing. Public Comment Periods Members of the public have an opportunity to provide comments and ask questions of the EAO and Project Team. For more information on the public comment periods, visit the BC Environmental Assessment Office website: eao.gov.bc.ca. Pattullo Bridge Replacement Project 8

Stay in touch For ongoing information and updates about the Pattullo Bridge Replacement Project, please email PattulloBridgeProject@gov.bc.ca or visit engage.gov.bc.ca/pattullobridge. Artist s rendering of the proposed new Pattullo Bridge