Summary Delivery Plan Control Period 4 Delivery Plan More trains, more seats. Better journeys

Similar documents
Railway Upgrade Plan Western 2017/18

POLICY SUBMISSION NETWORK RAIL SCOTLAND RAIL ROUTE UTILISATION STRATEGY. January

Update on the Thameslink programme

About Us. An introduction to Network Rail

Wales. Andy Thomas. Route Managing Director Wales. Ken Skates, Cabinet Secretary for Economy and Infrastructure, Welsh Government

An Introduction to HS2

About Us. An introduction to Network Rail

East West Rail Consortium

FirstGroup plc TransPennine Express

Arriva Rail London. Arriva Trains Wales. Chiltern Railways. Abellio ScotRail. CrossCountry. Alliance Rail. Colas Rail. ESG No. c2c.

Spending round 2013: The case for investment in transport. Mayor s Office, May 2013

Rail Fares Explained

The Edinburgh Glasgow Improvement Programme. Strategic Environmental Assessment (SEA) Consultation Document. October 2013

Airdrie - Bathgate Railway and Linked Improvements Bill. Environmental Statement Page 1

East Lancashire Highways and Transport Masterplan East Lancashire Rail Connectivity Study Conditional Output Statement (Appendix 'A' refers)

THE STOPS ARE JUST THE START

London Bridge station opens upgrade works

The Future for Rail TravelWatch NorthWest. Chris Green, Railway Forum

Edinburgh Waverley capacity upgrade

M6 CORRIDOR. Strategic Infrastructure Prospectus

TfL Planning. 1. Question 1

Introduction Government 6

Meeting the capacity challenge: The case for new lines

The West of England Partnership is the sub-regional partnership formed by the four councils working together with partners

Transport Infrastructure Construction and RMI Market Report - UK Analysis

EAST WEST RAIL EASTERN SECTION. prospectus for growth

Michèle Dix Managing Director 17 January 2018

Chapter 12. HS2/HS1 Connection. Prepared by Christopher Stokes

Llandudno Junction. Regeneration Proposals for the Future. December 2009

AUCKLAND $1.2 BILLION $1.9 BILLION $149 MILLION 15% SPEND $5.7 BILLION

GTR 2018 timetable proposals

Appendix 12. HS2/HS1 Connection. Prepared by Christopher Stokes

London and Crossrail 2. Chris Moores Transport for London

Forest Hill Society response to the draft London and South East Route Utilisation Strategy (February 2011)

Delivering a better railway for a better Britain Route Specifications 2016 Wessex

The Rail Network in Wales

Wellington $312 $49 $456 OVERVIEW WELLINGTON REGIONAL SUMMARY

Northern Powerhouse Rail

Quarterly Progress Report

The Government s Aviation Strategy Transport for the North (TfN) response

WRITTEN SUBMISSION FROM RMT 17 OCTOBER 2008

A TRANSPORT SYSTEM CONNECTING PEOPLE TO PLACES

Peninsula Rail Task Force Consultation on the replanning

The Bus Services Bill and Municipal Bus Companies

Better rail journeys arriving in 2018 The Great North Rail Project between Preston and Blackpool 12 January 2018

UNLOCKING THE BRIGHTON MAINLINE

Our new Great Western Franchise. Tarka Rail Association AGM June 2015

The case for rail devolution in London. Submission to the London Assembly Transport Committee. June Response.

OPERATING REVIEW, ENGLAND AND WALES

Cornwall Great Western Railway. Luke Farley Assistant Regional Development Manager

The resignalling scheme

BACKGROUND TO THE EAST COAST MAIN LINE AND INTERCITY EAST COAST FRANCHISE

Network Rail. Making Rail Accessible: Guide to Policies and Practices. November 2017

Why does Sydney need a new fast Metro to the West? A fast Metro to the west is a vital component of this Plan

Rail Update Station Usage Statistics and Network Rail Performance

Network Rail. Making Rail Accessible: Guide to Policies and Practices. November 2017

FRONT COVER TITLE AND PICTURE

Appendix 9. Impacts on Great Western Main Line. Prepared by Christopher Stokes

RailFAIR! RailFAIR! - Castle to Castle. Castle to Castle. Nottingham to Lincoln - Proposed Train Service Improvements

CONTENTS. Introduction Government 6. Scotland and Wales 6 Regulation 7 Passenger Transport Executives Main Line Railway Infrastructure 9

Station Travel Plan Malton, Scarborough & Seamer

Rail Sta s cs Compendium Great Britain Annual

Partnership railway s transformation in numbers

Agenda Item 5: Rail East Midlands Rail Franchise Consultation

Images Revealed: Proposed HS4Air will create new transport hubs boosting regional economies and slash journey times beyond London.

GATWICK AND WANDSWORTH

Transport Delivery Committee

NR is also currently conducting two other studies, those for the Cambridgeshire Corridor and for Ely Area Capacity Enhancements.

WELLINGTON $422 MILLION $614 MILLION $83 MILLION 22% SPEND $1.9 BILLION

Emerging Strategy. Executive Summary November Midlands Connect Powering the Midlands Engine

Department for Transport

Suffolk Chamber Transport Board Greater Anglia. 16 January 2018

Welcome. Fiona Piercy Oxford City and Oxfordshire County Council

TAKING THE NORTH FURTHER

$244 $45 OVERVIEW National Land Transport Programme Bay of Plenty BAY OF PLENTY REGIONAL SUMMARY

Plugging the greater Midlands region into global wealth

Why build a third runway, when you can build a longer runway?

Jim Steer. Director Greengauge 21. HS2 and the North. Transport Times Conference. October October 2016 Transport Times, London 1

TRANSPORT UPDATE. September/October 2018

A140 study and Major Road Network

Managing Director of Transmission. Report for the year 2012

Airport Operators Association National Needs Assessment: Call for evidence

Submission by Heathrow Southern Railway Ltd.

Response to Consultation on the re-planning of Network Rail s Investment Programme

The Evergreen 3 Project

ECCLES STATION NEWS JUNE 2016 NEWS

2015/16. Council LOGO ATTRACTIVE SEAMLESS RELIABLE IMPROVED CONNECTIVITY ACCESS FOR ALL REDUCED EMISSIONS

Appendix 8. Capacity and Service Disbenefits. Prepared by Christopher Stokes

RAIL HUB FOR HEATHROW?

Tram Passenger Survey

Jim O Sullivan Chief Executive

High Speed Two: From Crewe to Manchester, the West Midlands to Leeds and beyond

Chapter 8. Capacity and Service Disbenefits. Prepared by Christopher Stokes

5 Rail demand in Western Sydney

Report to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub

Highland Mainline Journey Time Improvements Phase 2

The case for a local rail station. At Great Blakenham, Suffolk.

Open Report on behalf of Executive Director for Environment & Economy. Highways and Transport Scrutiny Committee

Crossrail Business Case Update: Summary Report July 2011

Minutes. ACTION: Ian Frost to provide the economic values study from Wandsworth at the next meeting.

Transcription:

Summary Delivery Plan Control Period 4 Delivery Plan 2009 More trains, more seats Better journeys

Network Rail aims to deliver a railway fit for the 21st century. Over the next five years (Control Period 4 or CP4) we will be spending over 34bn across the network, delivering improvements in safety, performance, capacity and availability. The improvements we are committing to in CP4 will transform the railway for our customers, as well as the end users of both passenger and freight services. As part of our plan: 8.0bn will be invested to enhance the network, including projects to relieve crowding by lengthening platforms and increasing capacity to enable more and longer trains to run. 11.5bn will be invested in renewals replacing older parts of the network (including track, signalling and bridges) with new. 9.2bn will be spent on day to day maintenance and the costs of operating and running the network. 3.7bn has been included for further investments not funded through the periodic review, such as Crossrail and the Edinburgh to Glasgow Improvements Programme. All figures quoted at 2009/10 prices.

With the railways more popular than they have ever been, Network Rail is increasing capacity across the network for extra freight and passenger journeys. In Scotland for example, we are reopening the Airdrie Bathgate Rail Link after 50 years of closure. This project also involves upgrading the existing lines between Bathgate and Edinburgh and between Airdrie and Drumgelloch. The new railway will bring considerable social and economic benefits for communities along the route, by creating a direct link from these communities to Edinburgh and East Scotland and to Glasgow and West Scotland. We have undertaken a full Environmental Impact Assessment and are working with stakeholders such as the Scottish Environment Protection Agency to protect the environment during construction. We are also creating a new cycle path alongside the railway, which will be integrated with new stations to encourage a shift to public transport. This project and many others in England, Scotland and Wales are helping to have a positive effect on communities throughout Britain.

Working together to build a better railway More passengers are using Britain s railways than at any time in the last 60 years. More trains run on the network now than at any time previously. They are the safest they have ever been. And punctuality, at over 90 per cent, is the highest since records began. Our challenge is to build on this success and deliver a bigger, safer, more reliable railway, available when our customers want to use it. The next five years will see unprecedented investment in expanding the network and improving services for passenger and freight users. The task is a tough one, with ambitious savings to be made and further service improvements to deliver, but we are determined to succeed. The plans for CP4 were developed with our customers. The railway industry now needs to work together to deliver these plans. We have proved we can succeed. Our turnaround and successful completion of the West Coast Main Line modernisation is now delivering Britain s largest timetable expansion in a generation, with increased speed and capacity for passengers and freight users alike. Building on that success, our aim is to create a better way of running the railway. We want to create a way of doing business whereby we place the needs of rail users and our customers at the core of what we do; that we are transparent and easy to do business with; and our stakeholders tell us that they have experienced a step-change improvement in the service provided. We will: Deliver 8bn worth of rail enhancement projects. Increase train punctuality to record levels an average of 92.6 per cent of trains on time over a 12 month period by 2014 in England and Wales, and 92 per cent in Scotland. Reduce disruption to passengers by 37 per cent. Reduce costs by a further 21 per cent on top of the 27 per cent savings we have already achieved since 2004. Improve safety still further by reducing the risk of death or injury from accidents on the railway for passengers and rail workers by three per cent.

Control Period 4 Delivery Plan We will meet the expectations of our customers and stakeholders and deliver the required outputs for the funding available, without compromising safety and in a sustainable way. The targets and improvements that we have agreed with government and the Office of Rail Regulation represent both an opportunity and a challenge. The investment programme required is huge, significantly more than at any time since privatisation. We have funding for specific high profile schemes such as the Thameslink Programme, the redevelopment of Reading and Birmingham New Street stations, Glasgow Airport Rail Link, and the Airdrie Bathgate Rail Link. Working with our train operator customers, we also have to increase capacity, particularly at peak periods, in order to accommodate increased passenger numbers. We will enable the running of longer trains through a significant programme of platform lengthening and power supply upgrades. We also have funding to begin the implementation of a strategic freight network to provide a network of trunk routes to accommodate future freight flows, particularly from the major sea container ports. Expenditure trend ( bn, 2009/10 prices) 7 CP3 CP4 6 5 4 3 2 1 0 2004/05 2005/06 2006/07 2007/08 2008/09 2009/10 2010/11 2011/12 2012/13 20013/14 Controllable opex and maintenance Non-controllable opex Renewals Periodic Review 2008 enhancements

Investing for all our futures We are embarking on an investment programme that is bigger than any seen for a generation. It will provide the necessary infrastructure to run more and longer trains when demand is at its greatest, reducing crowding for passengers on their journeys to work into major cities such as London, Birmingham, Manchester, Leeds and Cardiff. In London, the Thameslink Programme involves major redevelopments at London Bridge, Blackfriars and Farringdon stations, and in outer London a wider programme of investment in platform lengthening and power supply strengthening, to get the most out of the new rolling stock planned to be introduced in CP4. At King s Cross, the major redevelopment will provide increased station capacity to handle passengers at peak times by providing a new western concourse, a new 12-car platform and better links with London Underground and St Pancras International. In Birmingham, New Street station will be completely redeveloped, providing increased capacity to reduce overcrowding and improve access. We will improve links between major cities with significant investment on the main line corridors to increase the capacity of key junctions, provide additional track capacity, enhance power supply, increase linespeeds and lengthen platforms. This includes preparing the infrastructure for the introduction of the new Intercity Express trains on the East Coast and Great Western routes, as well as major projects such as Reading redevelopment, capacity relief on the East Coast and linespeed improvements on London to Sheffield and Manchester to Leeds routes. There will be improvements to at least 150 stations across the network in England and Wales, and as part of our delivery of the Access for All programme accessibility will be improved at about 100 stations selected by DfT and Transport Scotland. In Scotland, we will deliver new rail infrastructure including the Airdrie Bathgate and Glasgow Airport Rail Link projects. We are working with Transport Scotland on the development of its investment programme for the longer term, including electrification of the network, major enhancements on the Edinburgh to Glasgow corridor to reduce journey times, and improvements to the Highland Main Line to increase service frequency and reduce journey times. We will take steps toward delivery of the strategic freight network which will provide capacity and capability specifically for freight services. The first stage of this is to provide enhanced capacity between Ipswich and Peterborough and to create a large container diversionary route between Southampton and Basingstoke. Other projects There is a wide range of other schemes not funded through the periodic review that are planned for CP4, among them: Crossrail work will start on this major east/west link. Network Rail is undertaking a large element of this work at Paddington and other stations east and west of London. London 2012 a number of projects will take place to enhance the rail infrastructure to accommodate forecast demand during the London 2012 Olympic and Paralympic games. Edinburgh to Glasgow improvements will provide faster and more frequent services. Southampton to the West Coast Main Line W10 gauge clearance (for larger containers) will be provided, involving work on some 50 separate structures.

Towards a seven day railway We complete thousands of projects every year without disruption, while continuing to run Europe s busiest railway. But the scale of some of our major renewals and enhancement projects means there will be some inconvenience going forward. But in all this work we consult with our stakeholders and we are investing in more innovative ways to deliver the work with the minimum disruption to passengers. By the end of CP4 we are aiming to move from a whole weekend possession (54 hours) to 16 hours for much of our track renewal activity. This will allow train operators to run their existing services with less disruption. It will also provide the opportunity to run more services, particularly at weekends, where there is a demand. Increased efficiency will drive further savings in operating and maintenance costs. During the last control period we achieved efficiency savings of 27 per cent. Our plan is to achieve further savings of 21 per cent during CP4. Services will be more reliable than ever, with our overall Public Performance Measure planned to reach 92.6 per cent in England and Wales and 92.0 per cent in Scotland, and delay minutes attributable to us set to fall by nearly 25 per cent. This means more trains on time and less disruption to passengers and freight users. Investment expenditure trend ( bn, 2009/10 prices) 5 4 3 1.0 0.5 0.6 1.1 1.5 1.9 2.2 2 2.7 2.5 2.4 1 0 3.0 2.9 2.9 2.9 3.2 2.7 2.5 2.2 2.0 1.9 2004/05 2005/06 2006/07 2007/08 2008/09 2009/10 2010/11 2011/12 2012/13 20013/14 Renewals expenditure Enhancements expenditure

To see our full Control Period 4 Delivery Plan 2009 and individual Route Plans visit our website: www.networkrail.co.uk Network Rail Kings Place 90 York Way London N1 9AG Tel: 020 3356 9595 Printed on Revive Pure White Silk, a 100% recycled paper. Produced at a mill accredited with the ISO14001 standard for environmental management. CDS010/March 2009