Virtual Air Traffic Simulation Network (VATSIM) United States Division Fort Worth vartcc (ZFW)

Similar documents
ERIE ATCT STANDARD OPERATING PROCEDURES

VATUSA PHOENIX TRACON and VATUSA PHOENIX ATCT LETTER OF AGREEMENT. SUBJECT: Interfacility Coordination Procedures

Denver ARTCC Colorado Springs ATCT & TRACON STANDARD OPERATING PROCEDURES

RALEIGH-DURHAM ATCT/TRACON STANDARD OPERATING PROCEDURES

ZTL ARTCC. Asheville Regional. Air Traffic Control Tower. Standard Operating Procedures AVL B. Effective: May 1, 2011

Virtual Jacksonville Air Route Traffic Control Center Tallahassee ATCT Standard Operating Procedures

VIRTUAL AIR TRAFFIC SIMULATION NETWORK UNITED STATES DIVISION. SUBJ: Phoenix (PHX) Air Traffic Control Tower (ATCT) Standard Operating Procedures

Burlington ATCT Standard Operating Procedures

Albany ATCT Standard Operating Procedures

Piedmont Triad International Airport

Charlotte - Douglas International Airport Traffic Control Tower

Letter of Agreement by and between Jacksonville ARTCC and Miami ARTCC

- Updated formatting - Re-drawn airspace delegation diagram

ZTL ARTCC. Augusta Regional

Greenville Spartanburg International

Standard Operating Procedures Atlanta Intl Airport (ATL) Air Traffic Control

BOSTON ARTCC (vzbw) STANDARD OPERATING PROCEDURE KALB) ALBANY APPROACH (ALB

Providence ATCT Standard Operating Procedures

9/23/2010 RDU B. Raleigh-Durham Air Traffic Control Tower. Standard Operating Procedures

RELEASE RECORD. Version Date Author Notes Dec 2006 SK Initial Release

San Juan CERAP. Standard Operation Procedures. Version 2.2 May 5th, Welcome to San Juan CERAP (ZSU ARTCC, TJZS FIR)

VATUSA C90 TRACON AND O HARE ATCT LETTER OF AGREEMENT

PITTSBURGH ATCT STANDARD OPERATING PROCEDURES

VIRTUAL AIR TRAFFIC SIMULATION NETWORK NORTH AMERICA REGION - USA DIVISION vzkc KANSAS CITY ARTCC

Cape Area Airports Standard Operating Procedures

VATUSA-VATNZ-VATPAC OCEANIC PARTNERSHIP OAKLAND OCEANIC FSS GENERAL SOP 1 OCT 2012

Chapter 6. Airports Authority of India Manual of Air Traffic Services Part 1

AIR TRAFFIC ROUTE CONTROL CENTER

Anchorage ARTCC Phraseology Guide. Clearance Delivery Operations

VATUSA Approval 3/21/18

Charlotte - Douglas International

VIRTUAL AIR TRAFFIC SIMULATION NETWORK CARIBBEAN DIVISION ZSU SAN JUAN CERAP

Unit II Clearance Delivery

Virtual Jacksonville Air Route Traffic Control Center Daytona Beach ATCT Standard Operating Procedures

ORDER MSY V. New Orleans. Standard Local Operating Procedures. Rev 3 December 7, 2011

Standard Operating Procedures

Letter of Agreement (LOA)

10-February 2019 ZTL JO B VIRTUAL AIR TRAFFIC SIMULATION NETWORK ATLANTA CENTER

USE OF RADAR IN THE APPROACH CONTROL SERVICE

SECTION 4 - APPROACH CONTROL PROCEDURES

1.2 An Approach Control Unit Shall Provide the following services: c) Alerting Service and assistance to organizations involved in SAR Actions;

FEDERAL AVIATION ADMINISTRATION CENTRAL EN ROUTE AND OCEANIC AREA OPERATIONS FORT WORTH ARTC CENTER, MAJORS ATCT, AND SKYDIVE TANDEM GREENVILLE, LLC

GENERAL OPERATING PROCEDURES FINLAND(GOP)

Northern Regional Training Scheme. EGNT Newcastle Aerodrome Pilot s Guide. REVISION 2 (Wednesday, 03 August 2011 at 15:51)

Clearance & Ground Air Traffic Control. Clearance Delivery An Introduction to Ground Control... 2

PTK AIR TRAFFIC CONTROL TOWER OPERATION GOOD CHEER PROCEDURES 2018 (rev A, 12/05/18)

INTERNATIONAL VIRTUAL AVIATION ORGANISATION CANADIAN AIR TRAFFIC CONTROL PHRASEOLOGY ATC OPERATIONS DECEMBER 2016 BY: MATHIEU LAFLAMME

CHICAGO MIDWAY INTERNATIONAL AIRPORT (KMDW) STANDARD OPERATING PROCEDURES

VATSIM JORDAN vacc QUICK REFERENCE HANDBOOK QUICK REFERENCE - STANDARD FORMATS FOR COMMUNICATION

- Initial. - Added MCRAY and new PDC s. - General update. - Added ATIS frequency - Added gate diagram appendix - Typo fixes - Minor formatting changes

Northern Regional Training Scheme. EGBB Birmingham Airport Pilot s Guide. REVISION 1 (Monday, 30 January 2012)

IVAO Switzerland Division

INSTRUMENT RATING (SENIOR PRIVATE PILOT) UK FLIGHT TEST STANDARDS

MARCH Resources ZMA ATC Terminal Layout Passenger Feedback

GENERAL INFORMATION The aerodrome consists of three runways (04L-22R, 04R-22L, 12-30) and four aprons.

IFR SEPARATION USING RADAR

ATC Training Syllabus Philippines vacc Version 1.1 September 25, 2016

MILWAUKEE MKE TRACON GEN. MITCHELL INTL AIRPORT (KMKE) MKE TRACON SATELLITE AIRPORTS STANDARD OPERATING PROCEDURES

D01 TERMINAL RADAR APPROACH CONTROL

Salem Airport Solar Eclipse Event (SASEE) Notice to Pilots McNary Field Salem, OR August 21, 2017

Jacksonville ARTCC. F11 TRACON Standard Operating Procedures

HOUSTON AIR ROUTE TRAFFIC CONTROL CENTER VATSIM United States Division. Letter of Agreement. Revised: July 25, 2004 Effective: July 25, 2004

FSBREAK $100 Hamburger Fly in to KSAN

IVAO Switzerland Division

Pilot Briefing Document Cross The Pond 2013 Heathrow Airport EGLL/LHR

SID/STAR phraseology FAQ Canadian implementation April 27, 2017

Version O January 21, 2019

Benefits Analysis of a Runway Balancing Decision-Support Tool

Temporary Radio Mandatory Zone

ZTL ARTCC / CLT ATCT LETTER OF AGREEMENT. EFFECTIVE: July 10, SUBJECT: APPROACH CONTROL SERVICE

UNIVERSITY OF ALABAMA FOOTBALL

V.B. Compliance with Departure, En Route, and Arrival Procedures and Clearances

JAX NAVY FLYING CLUB COURSE RULES EXAM


Understanding the Jeppesen. Updates: Changes, Errata and What s New

LETTER OF AGREEMENT. Between

IFR SEPARATION WITHOUT RADAR

CTP PILOT BRIEFING EDDK 2015

A PILOT S GUIDE To understanding ATC operations at Lancaster Airport

NATIONAL BUSINESS AVIATION ASSOCIATION (NBAA) CONVENTION

Standard Operating Procedures (SOPs) for BAGHDAD (ORBI)

SOUTHERN CALIFORNIA TRACON STANDARD OPERATING PROCEDURES VIRTUAL AIR TRAFFIC SIMULATION NETWORK LOS ANGELES ARTCC

LOS ANGELES TOWER STANDARD OPERATING PROCEDURES

SHARM ELSHEIKH INTERNATIONAL AIRPORT (SSH/HESH) BRIEFING & AERODROME CHARTS

VFR Arrival and Departure Procedures Rocky Mountain Airshow 2012 Rocky Mountain Metropolitan Airport (KBJC)

LETTER OF AGREEMENT (LOA)

SECTION 6 - SEPARATION STANDARDS

Instrument Refresher Course. Airfield Operations Flight Tower 412 OSS/OSAT

Albuquerque Center Standard Operating Procedures

TRANSPONDER WITH IVAC

IVAO Flight Operations Department Indonesia (ID) Division Procedures

BFR WRITTEN TEST B - For IFR Pilots

FLIGHT ADVISORY WASHINGTON D.C. SPECIAL FLIGHT RULES AREA LEESBURG MANUVERING AREA

VATSIM MINNEAPOLIS ARTCC MINNEAPOLIS TRACON LETTER OF AGREEMENT

Holland-America Line Pilot Briefing. December 14, bvartcc.com

INDEMNITY APPLICATION FORM

Chapter 6. Brize Radar, Speedbird 213 Heavy, request radar advisory. Speedbird 123 change call sign to BA 123

AERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point: Gen

COLLEGE FOOTBALL PLAYOFF NATIONAL CHAMPIONSHIP

CLEARANCE INSTRUCTION READ BACK

Transcription:

Virtual Air Traffic Simulation Network (VATSIM) United States Division Fort Worth vartcc (ZFW) KDAL Dallas Love International Airport ATCT Standard Operating Procedures Rev. December 17, 2014 Approved: January 1, 2015 Purpose: This handbook supplements all other vzfw, VATUSA, VATSIM, and applicable FAA directives. It prescribes air traffic control services and defines the operational responsibilities for personnel providing air traffic control services for Dallas Love International Airport ATCT. All vzfw controllers are required to be familiar with the provisions of this directive and to exercise their best judgment when they encounter situations that are not covered. Signed: Brighton McMinn Air Traffic Manager Virtual Fort Worth Air Route Traffic Control Center Approved: //signed// Kevin Copeland VATUSA8 Southern Regional Director

1) GENERAL a) CALLSIGN AND FREQUENCY USAGE: Position Name Frequency Callsign Relief Callsign Voice Room ATIS 120.150 KDAL_ATIS - KDAL_ATIS Delivery 127.900 DAL_DEL DAL_1_DEL DAL_DEL Ground 121.750 DAL_GND DAL_1_GND DAL_GND Tower 123.700 DAL_TWR DAL_1_TWR DAL_TWR b) POSITION SPLITS AND COMBINATIONS: i) During normal operations, all local positions are combined under DAL_TWR. There are no split positions at Dallas Love. c) CONTROLLERS SHOULD: i) Ensure all departures have the current ATIS code or altimeter for DAL. ATIS code is the preferred method when a voice ATIS is in place. ii) Ensure all departures are routed and vectored through appropriate departure gates and within the departure controller s horizontal and vertical airspace in accordance with the airspace maps. iii) Ensure that the first RNAV departure fix is inserted into the scratchpad using approved entries. 2) RUNWAY FLOWS a) South Flow (Standard) i) Departing runways 13L/R ii) Arriving runways 13L/R iii) During event level traffic, DAL may optionally depart 13L only and arrive 13R only. b) North Flow i) Departing runways 31L/R ii) Arriving runways 31L/R iii) During event level traffic, DAL may optionally depart 31R only and arrive 31L only. c) Dallas Love always flows in the same direction as DFW. Coordinate with DFW_TWR when necessary. 3) OPERATING PROCEDURES a) CLEARANCE DELIVERY: i) Whenever possible, aircraft should be cleared via a valid departure procedure (SID). ii) Aircraft who do not file a valid SID, and cannot except one, should be assigned to depart the D10 airspace through one of sixteen departure gates. (LOWGN, BLECO, GRABE, AKUNA, NOBLY, TRISS, SOLDO, CLARE, DARTZ, ARDIA, JASPA, NELYN, PODDE, CEOLA, SLOTT and FERRA) Assigned departure gates to get the aircraft on the most direct route possible to their destination.

iii) Preferred routings are not required for normal operations on VATSIM, however during events or where otherwise requested, pilots should be cleared via a preferred route when possible. iv) Aircraft filing an IFR flight plan including a Standard Instrument Departure (SID) shall be instructed to "Climb via the SID" as a part of their IFR clearance. v) Issue and ensure receipt of IFR and Class B clearances to aircraft departing KDAL. vi) Jet/turboprop aircraft on an IFR flight plan not including a SID and requesting a cruise altitude above 10,000 feet shall be issued an initial altitude of 5,000 feet and instructed to expect their filed cruise altitude 10 minutes after departure. Jet aircraft requesting a cruise altitude of less than 10,000 feet shall be issued an initial altitude of 5,000 feet and instructed to expect their filed cruise altitude 10 minutes after departure. Turboprop and piston aircraft requesting a cruise altitude of less than 10,000 feet and requesting any altitude on IFR flight plans not including a SID shall be given an initial altitude of 2,000 feet and instructed to expect their field cruise altitude 10 minutes after departure. vii) Ensure all departures have the correct ATIS information any time ATIS is available. viii) Ensure any necessary altitude or departure amendments are completed. ix) Ensure IFR aircraft are assigned an altitude which is valid for the direction of flight. b) GROUND CONTROL: i) Ensure scratch pad entries are complete and correct. ii) Issue taxi clearances and instructions for aircraft operating on the airport movement areas. c) LOCAL CONTROL: i) Aircraft departing on an RNAV Standard Instrument Departures (SID) shall be given their first RNAV fix in their takeoff clearance. (1) Example: Southwest 123, RNAV to DRSET, runway 13L, cleared for takeoff. (2) See current SID chart or current DAL SID cheat sheet for appropriate RNAV fixes. ii) Aircraft departing on a non RNAV SID shall be assigned an appropriate departure heading in accordance with their SID, current flows, etc. (1) Example: Southwest 456, after departure fly heading 160, runway 13L, cleared for takeoff. (2) See current SID chart or current DAL SID cheat sheet for appropriate departure headings. iii) Ensure aircraft is squawking mode C and the correct code before departure. iv) Ensure scratch pad entries are complete and correct. v) Automatically release and retain control of departures while standard separation exists.

vi) Ensure aircraft are either established on the issued departure heading or their filed RNAV route prior to handing them off to Departure. vii) Responsible for selection of flow and active runways (in accordance with current DFW flows), ATIS broadcast, and coordination of flow changes to adjacent controllers. viii) Tower controllers should not set temporary altitudes for departing aircraft. ix) Tower controllers should not radar track or handoff an aircraft unless they are radar certified (ie. S3 or above) x) Aircraft wishing to fly the traffic pattern at DAL are warmly welcome, and under any circumstances should not be denied. xi) All VFR aircraft shall fly a right hand traffic pattern for runway 13R and 31R. xii) All VFR aircraft shall fly a left hand traffic pattern for runway 13L and 31L. xiii) Missed Approach Procedures: (1) Aircraft should first be instructed to fly the published missed approach procedure and then handed off to the appropriate approach controller. (2) When aircraft are not able to fly the published missed approach procedure, advise jets to maintain 5000 and props to maintain 2000. Assign the following heading (according to runway) and handoff to appropriate approach controller. (a) 13L/R runway heading (b) 31L/R heading 010

4) AIRSPACE DIAGRAMS a) SOUTH FLOW: The shaded orange area is the final airspace for 13L/R at DAL. During south flow, this area is ceded from DFW_TWR to REG_APP.

b) NORTH FLOW: The shaded orange area is the departure airspace for 31L/R at DAL. During north flow, this area is ceded from DFW_TWR to REG_DEP.