Optimization of Airspace and Procedures in the Metroplex

Similar documents
SoCal Metroplex Study Area

Optimization of Airspace and Procedures in the Metroplex

An Update on Southern California Airspace Modernization November 10, 2016 Chart Publication Date San Diego International, McClellan Palomar, Brown

SoCal Metroplex Study Area

Optimization of Airspace and Procedures in the Metroplex

LAX Community Noise Roundtable Work Program A1 Review of SoCal Metroplex Proposed Procedures and Suggestions for Comment Letter.

Optimization of Airspace and Procedures in the Metroplex (OAPM) Study Team Final Report Southern California Metroplex

Federal Aviation Administration. Air Traffic 101. By: Michael Valencia & Dianna Johnston Date: Feb. 26, 2017

Honeywell.com PBN Concepts Krakow, Poland

Reference: Southern California (SoCal) Metroplex Community Outreach January and February 2017

Click to edit Master title style

SOUTHERN CALIFORNIA TRACON STANDARD OPERATING PROCEDURES VIRTUAL AIR TRAFFIC SIMULATION NETWORK LOS ANGELES ARTCC

Navigation at the. Federal Aviation Administration Crossroads

MODULE 4: SIDs and STARs. Slide <#> of

RNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood.

Southern California TRACON and Lindbergh Tower LETTER OF AGREEMENT SUBJECT: INTER-FACILITY COORDINATION AND CONTROL PROCEDURES

Los Angeles International Airport Community Noise Roundtable LAX Departure Overflights of Palos Verdes and San Pedro

Aviation Committee Meeting

2 Purpose and Need. 2.1 The Need for the CLT OAPM Project Description of the Problem

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN

ENRI International Workshop on ATM/CNS

Colombian PBN implementation: El Dorado case study

SECTOR ROUTE/STAR INSTRUCTION NOTES

Nav Specs and Procedure Design Module 12 Activities 8 and 10. European Airspace Concept Workshops for PBN Implementation

Federal Aviation Administration. Finding of No Significant Impact (FONSI) and Record of Decision (ROD)

PBN Syllabus Aeroplane. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation

NextGen. Accomplishments. Federal Aviation Administration

AERONAUTICAL INFORMATION CIRCULAR 18/18

Naples Airport Authority Board of Commissioners and Noise Compatibility Committee Special Meeting on Central/South Florida Metroplex

PBN Syllabus Helicopter. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

Controller Training Case Study Implementation of new RNP AR APCH for RWY07 (North Circuit) at HKIA

SUPPLEMENT A33 TO THE AIRPLANE FLIGHT MANUAL DA 40 NG. Integrated Avionics System Garmin G1000,

Don-Jacques OULD FERHAT VP Airspace and Airlines Services. Airbus. PBN Safety programs

Saint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis

RNAV - RNP. July 2010

PBN AIRSPACE CONCEPT WORKSHOP. SIDs/STARs/HOLDS. Continuous Descent Operations (CDO) ICAO Doc 9931

PBN Performance. Based Navigation. Days 1, 2 & 3. ICAO PBN Seminar Seminar Case Studies Days 1,2,3. Seminar Case Studies

LAS PILOT BRIEFING MCCARRAN INTERNATIONAL AIRPORT

Required Navigation Performance (RNP) in the United States

SOUTHERN CALIFORNIA TRACON BURBANK AREA STANDARD OPERATING PROCEDURES VIRTUAL AIR TRAFFIC SIMULATION NETWORK LOS ANGELES ARTCC

Federal Aviation. Administration. FAA Overview. Federal Aviation. Administration

#1 Semi Valley VFR and Air Carrier Transitions : The area over Semi Valley that is another hotspot is where the Fernando 5 Arrival to Burbank brings j

2 Purpose and Need. 2.1 The Need for the Proposed Action Description of the Problem

Required Navigation Performance at Alaska Airlines

System Oriented Runway Management: A Research Update

New York Aviation Management Association Conference

PROCEDURES SPECIAL OPERATIONS

DSNA NAVIGATION STRATEGY

SID/STAR phraseology FAQ Canadian implementation April 27, 2017

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez

Appendix E NextGen Appendix

Contextual note SESAR Solution description form for deployment planning

Practical Experiences & ATM Workshop. ATM Requirements. Setting the Scene. Many Issues (and many solutions) This Forum s central theme MIXED MODE

USE AND APPLICATION OF GNSS IN THE IMPLEMENTATION OF NAVIGATION BASED ON PERFORMANCE IN ECUADOR

TWELFTH AIR NAVIGATION CONFERENCE

Optimized Profile Descents A.K.A. CDA A New Concept RTCA Airspace Working Group

Air Navigation Bureau ICAO Headquarters, Montreal

ZTL ARTCC / CLT ATCT LETTER OF AGREEMENT. EFFECTIVE: July 10, SUBJECT: APPROACH CONTROL SERVICE

SDM WORKSHOP ON PBN (19/10/2017)

Near Term Potential for System Capacity Gains from RNP and RNAV Procedures

Atlanta NextGen PBN Activities

SUPPLEMENT A33 TO THE AIRPLANE FLIGHT MANUAL DA 62. Integrated Avionics System Garmin G1000 and. G1000 NXi, SBAS and P-RNAV Operation

Part 150 Update Status and Recommendation

AREA NAVIGATION RNAV- MANAGEMENT

Russian Federation ATM modernization program

Noise-Based Use Restrictions

Framework Brief. Edinburgh SIDs

FILE EARLY FILE ACCURATELY CHECK THE NAS PARTNERED WITH.

Título ponencia: Introduction to the PBN concept

Federal Aviation Administration DCA. By: Terry Biggio, Vice President Air Traffic Services Date: June 18, Federal Aviation Administration


Effective: GOLD COAST (YBCG) NEW PROCEDURES FOR INTRODUCTION OF ILS ON RWY 14

Practical Experiences & ATM Workshop. ATM Requirements. Setting the Scene

Updates to Procedures at St. John s International Airport

UPDATE ON THE 6 IDEAS (1-4) NAV CANADA

Trajectory Based Operations

PBN Implementation inside Italian Airspace Status update Summer 2013

Standards and procedures for the approval of performance-based navigation operations. (Presented by Colombia) SUMMARY

Safety Enhancement RNAV Safe Operating and Design Practices for STARs and RNAV Departures

Continuous Descent? And RNAV Arrivals

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES

P-RNAV GENERAL INFO NOTICE. 1. Background

NAM/CAR Regional Safety/Air Navigation/Aviation Security Implementation Matters 5.2 Effectiveness of air navigation implementation mechanisms

KSFO RNAV TO GLS DEMONSTRATION

AREA NAVIGATION (B-RNAV & P-RNAV) Online Course

South Dakota Airports Conference

LA Basin Hot Spots. Southern California Airspace Users Working Group Education Subcommittee

NextGen: New Technology for Improved Noise Mitigation Efforts: DFW RNAV Departure Procedures

VATSIM LOS ANGELES ARTCC STANDARD OPERATING PROCEDURES

Performance Based Navigation Implementation of Procedures

Implementation of PBN in Armenian airspace

Naples Noise and FAA Updates

PBN Operational Approval Continental En Route Navigation Specifications

NextGen Trajectory-Based Operations Status Update Environmental Working Group Operations Standing Committee

EXPLANATION OF TPP TERMS AND SYMBOLS

Learning Objectives. By the end of this presentation you should understand:

NATS. SAIP AD3 Jersey Interface Change Stage 1 Assessment Meeting. Friday 2 nd February x NATS presenters.

RNP AR and Air Traffic Management

Draft Environmental Assessment for the Cleveland-Detroit Metroplex Project

Transcription:

Optimization of Airspace and Procedures in the Metroplex Administration November 10, 2016 Chart Date To: By: Dispatchers Rob Henry, SoCal D&I Integration Manager Jose Gonzalez, SoCal NATCA D&I Lead Administration 1

Implementation Plan/Dates SIDs and STARs (Impacts) Approach Procedure Updates (Information) Expectation for Implementation Day Potential Playbook /SWAP Issues Flight Planning Future Chart Date Agenda Administration 2

SoCal Metroplex Events Activity Date Complete Draft EA 6/10/2015 EA Decision Document 9/2/2016 Phase 1 Implementation 11/10/2016 Phase 1A Implementation 1/5/2017 Phase 2 Implementation 3/02/2017 Phase 3 Implementation 4/27/2017 Administration 3

SIDs & STARs for November 10, 2106 Implementation SIDs/STARs November 10, 2016 BUR/VNY WEESL ONE STAR (RNAV) SAN LUCKI ONE STAR (RNAV) LAS STAAV SEVEN SID (RNAV) SAN ZZOOO ONE SID (RNAV) LAS TRALR SEVEN SID (RNAV) SBA GAUCH ONE SID (RNAV) LAX/SMO WAYVE ONE STAR (RNAV) SBA MISHN ONE SID (RNAV) LGB/SNA/SLI/FUL/TOA KAYOH SIX (Conventional) SBA PITBL ONE STAR (RNAV)* ONT/ONT Satellites SETER FOUR STAR (Conventional) SDM CHASR ONE STAR (RNAV) SAN BAYVU FIVE STAR (RNAV) * NOTE: NA until April 27, 2017 Administration 4

Approach Procedures for November 10, 2106 Implementation (1 of 2) Approaches: November 10, 2016 BUR RNP Y RWY 8 (RNAV) LAX GPS Y RWY 06L (RNAV) BUR GPS Z RWY 8 (RNAV) LAX ILS or LOC RWY 07R (Conventional) BUR ILS Z or LOC Z RWY 8 (Conventional) LAX GPS Y RWY 07R (RNAV) BUR ILS Y or LOC Y RWY 8 (Conventional) LAX RNP Z RWY 07R (RNAV) CRQ RNP Z RWY 06 (RNAV) LAX ILS or LOC RWY 07L (Conventional) CRQ RNAV/GPS Y RWY 06 (RNAV) LAX GPS Y RWY 07L (RNAV) LAX ILS or LOC RWY 06R (Conventional) LAX RNP Z RWY 07L (RNAV) LAX GPS Y RWY 06R (RNAV) LGB RNP RWY 12 (RNAV) LAX GPS Z RWY 06R (RNAV) LGB RNP RWY 25R (RNAV) LAX ILS or LOC RWY 06L (Conventional) LGB RNP Y RWY 30 (RNAV) LAX RNP Z RWY 06L (RNAV) LGB VOR TAC RWY 30 (Conventional) Administration 5

Approach Procedures for November 10, 2106 Implementation (2 of 2) Approaches: November 10, 2016 LGB ILS or LOC RWY 30 (Conventional) SAN LOC RWY 27 (Conventional) LGB GPS Z RWY 30 (RNAV) SMO VOR-A (Conventional) PSP RNP RWY Z 13R (RNAV) SNA GPS Y RWY 02L (RNAV) SAN GPS Y RWY 27 (RNAV) SNA RNP Z RWY 02L (RNAV) SAN RNP Z RWY 27 (RNAV) SNA RNP Z RWY 20R (RNAV) Administration 6

BUR/VNY WEESL ONE STAR (RNAV) The WEESL STAR de-conflicts BUR/VNY prop arrivals from the LAX WAYVE STAR The design moved tracks away from historical tracks to segregate BUR/VNY traffic from LAX WAYVE traffic The procedure transitions over high terrain in a sparsely populated area The STAR reduces flight miles Administration 7

LAS STAAV SEVEN SID (RNAV) Modified to incorporate Metroplex waypoint(s) No impact to Industry for November 10, 2016 chart date Administration 8

LAS TRALR SEVEN SID (RNAV) Modified to incorporate Metroplex waypoint(s) No impact to Industry for November 10, 2016 chart date Administration 9

LAX/SMO WAYVE ONE STAR (RNAV) The current LAX STAR prop STAR is a conventional ground based procedure Lateral path is inefficient and does not follow the procedure The Design Team developed a procedure without vertical navigation due to complex interaction with other SIDs and STARS and added SMO as a benefit The STAR provides a segregated route from BUR and VNY airports entering the terminal area LAX traffic on this procedure are props only Vertical navigation is by LOA Administration 10

LGB/SNA/SLI/FUL/TOA KAYOH SIX (Conventional) Modified to incorporate Metroplex waypoint(s) No impact to Industry for November 10, 2016 chart date Administration 11

ONT & ONT Satellites SETER FOUR STAR (Conventional) Modified to incorporate Metroplex waypoint(s) No impact to Industry for November 10, 2016 chart date Administration 12

SAN BAYVU FIVE STAR (RNAV) Updated BAYVU FOUR to BAYVU FIVE to tie into SAN RNAV/RNP Runway 27 approach SAN COMIX STAR will replace the BAYVU FIVE STAR on the March 2, 2017 chart date Administration 13

SAN LUCKI ONE STAR (RNAV) The LUCKI STAR is an OPD The STAR is deconflicted from the SAN ZZOOO SID and the SDM/NZY CHASR STAR The lateral path was modified to avoid SAA Administration 14

SAN ZZOOO ONE SID (RNAV) The RNAV off-theground ZZOOO SID replaces the current POGGI SID The design circumnavigates a busy PAJA The SID is deconflicted from the SAN LUCKI/TOPGN and SDM/NZY CHASR STARs Administration 15

SBA GAUCH ONE SID (RNAV) There is no current procedure for north bound departures The SID was designed as RNAV-off-the ground Concurrence of the design was achieved with the airport operator, pilot groups and ATC in this noise sensitive area Administration 16

SBA MISHN ONE SID (RNAV) The current east bound procedure is radar vectors The SID was designed as RNAV-off-the ground Concurrence of the design was achieved with the airport operator, pilot groups and ATC in this noise sensitive area Administration 17

SBA PITBL ONE STAR (RNAV)* There is no existing published procedure for SBA This STAR will reduce complexity and verbiage between ATC and flight crews providing a repeatable and predictable path for SBA arrivals. The STAR was not designed with an OPD, but contains altitude restrictions to de-conflict from SAN departures and LAX arrivals This procedure will be N/A until April 27, 2017 Administration 18

SDM CHASR ONE STAR (RNAV) The CHASR STAR was designed to segregate SDM and NZY arrivals from SAN arrivals The STAR was designed as a RNAV procedure with OPD benefits To reduce complexity for ATC, the CHASR STAR shares the same route as the SAN TOPGN STAR (SAN east flow) which moves the flow away from other SAN arrival flight tracks Administration 19

Traffic Management for Implementation No national traffic management initiatives are expected to be requested for the November 10, 2016 chart cycle On a day-to-day basis, ZLA periodically initiates MIT TMIs to adajacent en route facilities to manage the SAN arrival rate Periodic TMIs may be slightly higher than normal during peak traffic periods for implementation of Metroplex procedures ZLA typically applies 10 MIT from the east, 15 MIT from the north, or increased stream settings when metering Current TMI s may increase by 5-10 miles, as needed, during times of heavy traffic The periodic application of increased MITs may be in effect for up to two weeks after the November 10 chart date There is potential for periodic departure flow restrictions over IPL/TRM for the ZLA area(s) most impacted by Phase 1 procedures Expectation is there would be no delays that would exceed 15 minutes Administration 20

CDR and Playbook Changes for San Diego LUCKI1 (RNAV) STAR November 10, 2016 Replaces the BARET5 and LYNDI4 in the CDR and Playbook databases. Individual facility modifications may be made in the Route Management Tool (RMT) beginning 9/15/2016 through 10/5/2016 Administration 21

Administration 22

Route Changes November 10, 2016 OLD: ROUTES VIA MLF REV: MLF ZAINY Q73 LVELL LUCKI1 KSAN OLD: ROUTES VIA BCE REV: BCE GARDD LAKRR Q73 LVELL LUCKI1 KSAN OLD: ROUTES VIA TBC REV: TBC PLNDL Q86 TTRUE LUCKI1 KSAN OLD: ROUTES VIA PKE REV: PKE LUCKI1 KSAN OLD: ROUTES VIA J6 DRK OR J6 EED REV: J6 DRK J78 PKE LUCKI1 KSAN OLD: ROUTES VIA J2 IPL REV: J2 HOGGZ LUCKI1 KSAN OLD: ROUTES VIA J18 IPL REV: J18 HOGGZ LUCKI1 KSAN OLD: ROUTES VIA DECAS MOMAR LYNDI4 REV: DECAS MOMAR LUCKI1 KSAN OLD: ROUTES VIA J60 BLD TNP REV: J60 BCE GARDD LAKRR Q73 LVELL LUCKI1 KSAN OLD: ROUTES VIA DAAYE EED REV: DAAYE TBC PLNDL Q86 TTRUE LUCKI1 KSAN OLD: ROUTES VIA JKPOT EED REV: JKPOT PKE LUCKI1 KSAN Non RNAV equipped will be assigned the BARET STAR Administration 23

QUESTIONS? Administration 24

Points of Contact Rob Henry, SoCal D&I Integration Manager Robert.Henry@faa.gov Jose Gonzalez, SoCal NATCA D&I Lead Jose.J.Gonzalez@faa.gov Ken Brissenden, ZLA Management D&I Lead Ken.Brissenden@faa.gov Walt Alexis, ZLA NATCA D&I Lead Walter.F.Alexis@faa.gov Shawn Kozica, SCT Management D&I Lead Shawn.M.Kozica@faa.gov Mike Taylor, SCT NATCA D&I Lead Michael.J.Taylor@faa.gov Administration 25