UNCLASSIFIED. FY 2016 Base FY 2016 OCO FY 2016 OCO. FY 2016 Base

Similar documents
UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 23 P-1 Line #27

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 P-1 Line #35

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. UNCLASSIFIED United States Special Operations Command Page 1 of 6 P-1 Line #53

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 P-1 Line #55

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 16 P-1 Line #15

UNCLASSIFIED FY 2016 OCO. FY 2016 Base. FY 2016 Base FY 2016 OCO

UNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Total Cost ($ M)

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 10 P-1 Line #47

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 24 P-1 Line #55

UNCLASSIFIED FY 2015 FY 2015 OCO. FY 2015 Base FY 2015 FY Base

UNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. FY 2014 Base. OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. FY 2016 Base FY 2016 OCO FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 5 P-1 Line #21

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 18 P-1 Line #12

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 16 P-1 Line #57

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 17 P-1 Line #121

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 17 P-1 Line #55

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 18 P-1 Line #56

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. FY 2017 Base FY 2017 OCO. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 21 P-1 Line #19

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 31 P-1 Line #41

UNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Unit Cost ($ M) Qty (Each)

UNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. FY 2016 Base FY 2016 OCO FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Total Cost ($ M) Unit Cost ($) Qty (Each)

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

UNCLASSIFIED FY 2015 FY 2015 OCO. FY 2015 Base FY 2015 FY Base

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 33 P-1 Line #94

UNCLASSIFIED. FY 2017 Base FY 2017 OCO. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 30 P-1 Line #36

UNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. FY 2014 Base. OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 34 P-1 Line #51

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE A: AIRCRAFT CERTIFICATION FY 2012 OCO

UNCLASSIFIED. UNCLASSIFIED Page 1 of 5. EXHIBIT R-2, RDT&E Budget Item Justification RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-5

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 151 P-1 Line #32

UNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Total Cost ($ M) Unit Cost ($) Qty (Each)

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 27 P-1 Line #2

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 17 P-1 Line #13

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 31 P-1 Line #2

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Communication, Navigation, Surveillance/Air Traffic Management (CNS/ATM) FY 2012 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 126 P-1 Line #32

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit)

Your Trusted Special Missions Partner

Aeros 40D Sky Dragon. TYPE CERTIFIED BY: United States Federal Aviation Administration Civil Aviation Authorities: Europe and Asia

Presidential Aircraft Recapitalization

TDR Mode S and ADS-B Transponders

July 29-30, 2010 Washington, D.C Procurement Agencies. Coast Guard Agencies

JOHN WAYNE AIRPORT SECURITY

UNCLASSIFIED UNCLASSIFIED

Why Ohio? Research and Development: Test Infrastructure: Expertise and Workforce:

AIRCRAFT SERVICE CHANGE

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 39 P-1 Line #54

European Aviation Safety Agency

Unmanned Aircraft Systems (UAS): Manufacturing Trends

Gegaso Ltd. Company Presentation

Announcing the Sale of Manufacturing Rights, assets, and FAA/CAAC Type Certificates for the Lake Amphibian

Post 816 News Nayak Aviation Corporation San Antonio, Texas December, 2004

April 3, Subject: Instructions for Continued Airworthiness. To Whom It May Concern:

Gabelli Asset Management Aircraft Supplier Conference

Change to Automatic Dependent Surveillance Broadcast Services. SUMMARY: This action announces changes in ADS-B services, including Traffic Information

Military Aviation Fleet & MRO Forecast

UNMANNED AIRCRAFT PROVISIONS IN FAA REAUTHORIZATION BILL

REPUBLIC of SAN MARINO CIVIL AVIATION AUTHORITY

Airworthiness considerations for UAVs

Aircraft Specification Summary Convair CV580 SN: 42 Registration: ZK KFH

Aircraft Specification Summary Convair CV580 SN: 372 Registration: ZK KFL

Aircraft Specification Summary Convair CV580 SN: 168 Registration: ZK FTA

What Is The 29Palms Training Land Acquisition and Airspace Establishment Project Frequently Asked Questions Airspace Related July 2015

SYSTEM DEVELOPMENT AND FLIGHT TEST SOLUTIONS

Joe Randell President and Chief Executive Officer Jolene Mahody Executive Vice President and Chief Financial Officer

Aero Design Battery Shop

Thales on the Civil Aerospace market

AE 452 Aeronautical Engineering Design II Cost of an Airplane. Prof. Dr. Serkan Özgen Dept. Aerospace Engineering April 2017

07 July 2014 U.S. ARMED FORCES PAO DECISION TOOL***

AE 452 Aeronautical Engineering Design II Cost Analysis. Prof. Dr. Serkan Özgen Dept. Aerospace Engineering

Federal Aviation Administration Flight Plan Presented at the Canadian Aviation Safety Seminar April 20, 2004

Cal UAS Portal. Eileen Shibley UAS Lead, Inyokern Airport

7/27/ CHG 605 VOLUME 4 AIRCRAFT EQUIPMENT AND OPERATIONAL AUTHORIZATIONS

UBS Aerospace and Defense Boston Investor Day. May 14, 2008

EQUIP General Aviation Equipage Work Group Briefing. Date: November 28, 2017

U.S. NAVY CNS/ATM Program Status

WFP Chad SPECIAL OPERATION SO

Hawker 850XP. Supplement Pack

Annex III to ED Decision 2017/023/R. AMC and GM to Part-CAT Issue 2, Amendment 13

Surveillance Opportunities and Challenges

FALCON. F A L C O NProgram

STOCKTON POLICE DEPARTMENT GENERAL ORDER UNMANNED AIRCRAFT SYSTEM SUBJECT. DATE: November 14, 2017 NO: V-6

Transcription:

Exhibit P-40, Budget Line Item Justification: PB 2016 Army Date: February 2015 2031A: Aircraft Procurement, Army / BA 02: Modification of Aircraft / BSA 10: Modification of Aircraft ID Code (A=Service Ready, B=Not Service Ready) : Program Elements for Code B Items: Other Related Program Elements: 0305206A Resource Summary Prior Years FY 2014 FY 2015 Procurement Quantity (Units in Each) - - - - - - - - - - - - Gross/Weapon System Cost ($ in Millions) - - - 16.302 32.000 48.302 33.933 21.364 21.780 22.194-147.573 Less PY Advance Procurement ($ in Millions) - - - - - - - - - - - - Net Procurement (P1) ($ in Millions) - - - 16.302 32.000 48.302 33.933 21.364 21.780 22.194-147.573 Plus CY Advance Procurement ($ in Millions) - - - - - - - - - - - - tal Obligation Authority ($ in Millions) - - - 16.302 32.000 48.302 33.933 21.364 21.780 22.194-147.573 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - 12,075.500-12,075.500 - - - - - 5,270.464 Description: The budget line supports the conversion of Special Electronic Mission Aircraft (SEMA) Government Owned Contractor Operated (G) Quick Reaction Capability (QRC) Aerial Intelligence Surveillance & Reconnaissance (AISR) systems; four (4) Saturn Arch (SA), two (2) Desert Owl (DO) and three (3) commercially procured aircraft to be determined at a later date to Airborne Reconnaissance Low-Enhanced (ARL-E) AISR systems. The updates and modernizations include communication, navigation, surveillance, and Department of Defense (DoD) mandated safety equipment to current and evolving international and Army Flight Standards and Engineer, Furnish and Install (EF&I) of modifications as a complete contractual effort. The budget line provides for the procurement of replacement and spare engines for the aircraft as well as the procurement and associated testing of civil and military aircraft modification equipment for ISR Mission Equipment Packages (MEP). Federal Aviation Administration (FAA) supplemental type certificates (STC) that are already in existence and apply to STCs to the aircraft modification will be leveraged. Modifications supported by this budget line ensure continued worldwide deployment capability and safe operations. The associated modifications supported within this budget line ensure worldwide deployability for those required to deploy. tal Army tal: Secondary Distribution Secondary Distribution FY 2014 FY 2015 tal Obligation Authority - - 16.302 32.000 48.302 33.933 21.364 21.780 22.194 tal Obligation Authority - - 16.302 32.000 48.302 33.933 21.364 21.780 22.194 Army Page 1 of 5 P-1 Line #22 214

Exhibit P-40, Budget Line Item Justification: PB 2016 Army Date: February 2015 2031A: Aircraft Procurement, Army / BA 02: Modification of Aircraft / BSA 10: Modification of Aircraft ID Code (A=Service Ready, B=Not Service Ready) : Program Elements for Code B Items: Other Related Program Elements: 0305206A Exhibits Schedule Prior Years FY 2014 FY 2015 tal Title* Exhibits ID CD Quantity / tal Cost Quantity / tal Cost Quantity / tal Cost Quantity / tal Cost Quantity / tal Cost Quantity / tal Cost (Unclassified) P-3a - / - - / - - / - - / 16.302 - / 32.000 - / 48.302 tal Gross/Weapon System Cost - / - - / - - / - - / 16.302 - / 32.000 - / 48.302 Exhibits Schedule FY 2017 FY 2018 FY 2019 FY 2020 tal Title* Exhibits ID CD Quantity / tal Cost Quantity / tal Cost Quantity / tal Cost Quantity / tal Cost Quantity / tal Cost Quantity / tal Cost (Unclassified) P-3a - / 33.933 - / 21.364 - / 21.780 - / 22.194 - / - - / 147.573 tal Gross/Weapon System Cost - / 33.933 - / 21.364 - / 21.780 - / 22.194 - / - - / 147.573 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: tals in this Exhibit P-40 set may not be exact or add due to rounding. Justification: The $32.000 million will be utilized to accelerate the installation of four (4) cockpit and aviation survivability equipment (ASE) modifications that will be ongoing for the newly acquired DeHavilland dash 8 aircraft that are replacing the legacy obsolete DeHavilland dash 7 aircraft. By accelerating these modifications with the funding the base procurement dollars of $16.302 million will be utilized to procure the required spares for the DeHavilland dash 8 aircraft. This funding will aid in accelerating the fielding of the DeHavilland dash 8 aircraft, increasing the Army's capability to detect, locate, classify/identity and track surface targets in day/night and near-all-weather conditions as well as save money by accelerating the replacement of an obsolete aircraft. Army Page 2 of 5 P-1 Line #22 215

Resource Summary Prior Years FY 2014 FY 2015 Procurement Quantity (Units in Each) - - - - - - - - - - - - Gross/Weapon System Cost ($ in Millions) - - - 16.302 32.000 48.302 33.933 21.364 21.780 22.194-147.573 Less PY Advance Procurement ($ in Millions) - - - - - - - - - - - - Net Procurement (P1) ($ in Millions) - - - 16.302 32.000 48.302 33.933 21.364 21.780 22.194-147.573 Plus CY Advance Procurement ($ in Millions) - - - - - - - - - - - - tal Obligation Authority ($ in Millions) - - - 16.302 32.000 48.302 33.933 21.364 21.780 22.194-147.573 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - 12,075.500-12,075.500 - - - - - 5,270.464 tal Description: The $32.000 million will be utilized to accelerate the installation of four (4) cockpit and aviation survivability equipment (ASE) modifications that will be ongoing for the newly acquired DeHavilland dash 8 aircraft that are replacing the legacy obsolete DeHavilland dash 7 aircraft. By accelerating these modifications with the funding the base procurement dollars of $16.302 million will be utilized to procure the required spares for the DeHavilland dash 8 aircraft. This funding will aid in accelerating the fielding of the DeHavilland dash 8 aircraft, increasing the Army's capability to detect, locate, classify/identity and track surface targets in day/night and near-all-weather conditions as well as save money by accelerating the replacement of an obsolete aircraft. Army tal: Secondary Distribution Secondary Distribution FY 2014 FY 2015 tal Obligation Authority - - 16.302 32.000 48.302 33.933 21.364 21.780 22.194 tal Obligation Authority - - 16.302 32.000 48.302 33.933 21.364 21.780 22.194 Army Page 3 of 5 P-1 Line #22 216

Models of Systems Affected: ARL SEMA Modifications Procurement Financial Plan Modification Item 1 of 1: ARL SEMA Mods A Kits Recurring Modification Type: Unclassified Prior Years FY 2014 FY 2015 tal Cost ($ M) tal Cost ($ M) tal Cost ($ M) tal Cost ($ M) tal Cost ($ M) Related RDT&E PEs: tal Cost ($ M) tal Cost ($ M) tal Cost ($ M) tal Cost ($ M) tal Cost ($ M) tal Cost ($ M) tal tal Cost ($ M) Program Management - / - - / - - / - 1 / 4.355 4 / 4.444 5 / 8.799 1 / 5.575 1 / 4.531 1 / 4.622 1 / 5.917 - / - 9 / 29.444 ECP - / - - / - - / - - / 1.037 - / - - / 1.037 - / 0.295 - / 0.299 - / 0.305 - / 1.041 - / - - / 2.977 Spares - / - - / - - / - - / 7.042 - / - - / 7.042 - / - - / - - / - - / - - / - - / 7.042 DATA - / - - / - - / - - / 1.024 - / - - / 1.024 - / 0.289 - / 0.293 - / 0.299 - / 1.020 - / - - / 2.925 Support Equipment - / - - / - - / - - / 0.445 - / - - / 0.445 - / 0.023 - / - - / - - / 0.162 - / - - / 0.630 System Test & Evaluation - / - - / - - / - - / 2.399 - / - - / 2.399 - / 9.732 - / 2.816 - / 1.422 - / 0.216 - / - - / 16.585 Training - / - - / - - / - - / - - / - - / - - / 0.059 - / 0.061 - / 0.037 - / 0.038 - / - - / 0.195 Sensor Integration - / - - / - - / - - / - - / - - / - - / 10.933 - / 13.364 - / 15.095 - / 6.343 - / - - / 45.735 Subtotal: Recurring - / - - / - - / - - / 16.302 - / 4.444 - / 20.746 - / 26.906 - / 21.364 - / 21.780 - / 14.737 - / - - / 105.533 Subtotal: ARL SEMA Mods - / - - / - - / - 1 / 16.302 4 / 4.444 5 / 20.746 1 / 26.906 1 / 21.364 1 / 21.780 1 / 14.737 - / - 9 / 105.533 Subtotal: Procurement, All Modification Items - / - - / - - / - 1 / 16.302 4 / 4.444 5 / 20.746 1 / 26.906 1 / 21.364 1 / 21.780 1 / 14.737 - / - 9 / 105.533 Installation Modification Item 1 of 1: ARL SEMA Mods - / - - / - - / - - / - - / 27.556 - / 27.556 - / 7.027 - / - - / - - / 7.457 - / - - / 42.040 Subtotal: Installation - / - - / - - / - - / - - / 27.556 - / 27.556 - / 7.027 - / - - / - - / 7.457 - / - - / 42.040 tal tal Cost (Procurement + Support + Installation) - - - 16.302 32.000 48.302 33.933 21.364 21.780 22.194-147.573 Army Page 4 of 5 P-1 Line #22 217

Modification Item 1 of 1: ARL SEMA Mods Manufacturer Information Manufacturer Name: Various Manufacturer Location: Various Administrative Leadtime (in Months): 2 Production Leadtime (in Months): 12 Dates FY 2014 FY 2015 FY 2017 FY 2018 FY 2019 FY 2020 Contract Dates Feb 2016 Feb 2017 Feb 2018 Feb 2019 Delivery Dates Feb 2017 Feb 2018 Feb 2019 Installation Information Method of Implementation: ARL SEMA Modifications Installation Cost Prior Years FY 2014 FY 2015 tal Cost ($ M) tal Cost ($ M) tal Cost ($ M) tal Cost ($ M) tal Cost ($ M) tal Cost ($ M) tal Cost ($ M) tal Cost ($ M) tal Cost ($ M) tal Cost ($ M) tal Cost ($ M) tal tal Cost ($ M) Prior Years - / - - / - - / - - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 FY 2014 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2015 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 27.556 - / 27.556 - / - - / - - / - - / - - / - - / 27.556 FY 2017 - / - - / - - / - - / - - / - - / - - / 7.027 - / - - / - - / - - / - - / 7.027 FY 2018 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2019 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2020 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 7.457 - / - - / 7.457 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - tal - / - - / - - / - - / - - / 27.556 - / 27.556 - / 7.027 - / - - / - - / 7.457 - / - - / 42.040 Installation Schedule FY 2014 FY 2015 FY 2017 FY 2018 FY 2019 FY 2020 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC t In - - - - - - 2 - - - 4 - - - 1 - - - - - - - - - - - 1 - - 1 9 Out - - - - - - - - - - 2 - - - 4 - - - 1 - - - - - - - - - - 2 9 Army Page 5 of 5 P-1 Line #22 218