017-06 Clark County Alexander Rd, Pecos Rd to Puebla St $1,400,000 Alto Ave, Pecos Rd to Nellis Blvd $,000,000 Ann Rd, CC-15 to Durango Dr $10,680,000 Arnona Rd, Lake Mead Blvd to Alto Ave $5,000,000 Bonanza Rd, Nellis Blvd to Hollywood Blvd $1,800,000 Broadbent Blvd, Tropicana Ave to CoH Limit $4,50,000 Buffalo Dr, Blue Diamond Rd to CC-15 $1,640,000 Buffalo Dr, CC-15 to Hacienda Ave $7,00,000 Buffalo Dr, Tropicana Ave to Sahara Ave $3,500,000 Cactus Ave, Ft. Apache Rd to Buffalo Dr $8,000,000 CC-15, Airport Connector Phase 3 $70,000,000 CC-15, N. 5th St to Range Rd w/interchanges at Losee Rd, Pecos Rd, Lamb Blvd, Range Rd $9,300,000 CC-15, Pecos Rd to Windmill La and I-15 to Tropicana Ave $17,400,000 Centennial Pkwy, Durango Dr to CC-15 $7,500,000 Christy La, Carey Ave to South of Charleston Blvd $,500,000 Clark County Maintenance (898.3 miles) includes Beltway $144,910,000 Craig Rd, Jensen St to Buffalo Dr $3,000,000 Dean Martin Dr, Blue Diamond Rd to Warm Springs Rd $4,400,000 Dean Martin Dr, Cactus Ave to Blue Diamond Rd $10,400,000 Decatur Blvd, CC-15 to Tropicana Ave $9,080,000 Decatur Blvd, Tropicana Ave to Sahara Ave $3,000,000 Desert Inn Rd, Theme Rd to Hollywood Blvd $17,000,000 Flamingo Rd to Dean Martin Dr Slip Ramp $6,300,000 Flamingo Rd/Tropicana Ave Connector - Tropicana Ave to Flamingo Rd $10,000,000 Ft. Apache Rd, Alexander Rd to CC-15 $6,000,000 Ft. Apache Rd, Blue Diamond Rd to Warm Springs Rd $10,000,000 Gilespie St, Barbara La to Silverado Ranch Blvd $8,000,000 Grand Canyon Dr, Katie Ave to Desert Inn Rd $600,000 Grand Teton Dr, Buffalo Dr to Decatur Blvd $11,840,000 Harmon Ave, Maryland Pkwy to Boulder Hwy $3,000,000 Hollywood Blvd, Charleston Blvd to Lake Mead Blvd $6,000,000 Hollywood Blvd, Las Vegas Blvd to Speedway Blvd $6,00,000 Hollywood Blvd, Wetlands to Sahara Ave $10,000,000 Hualapai Wy, Russell Rd to Flamingo Rd $4,000,000 Hualapai Wy, Tropicana Ave to Charleston Blvd $3,000,000 Jones Blvd, Sunset Rd to Russell Rd $4,000,000 Las Vegas Blvd, Primm to St Rose Pkwy $44,15,000 Lindell Rd, Tropicana Ave to Harmon Ave $7,600,000 Lone Mountain Rd, CC-15 to US-95 $1,450,000 Maryland Pkwy/Paradise Rd, Pebble Rd to Warm Springs Rd $,000,000 Owens Ave, Pecos Rd to Hollywood Blvd $3,000,000 Page 1 of 9 3/31/015
017-06 Patrick La, Ft. Apache Rd to Durango Dr (Over I-15) $3,00,000 Peace Wy over CC-15 $1,000,000 Pebble Rd, Decatur Bl to Las Vegas Blvd (Over I-15) $3,000,000 Pebble Rd, Las Vegas Blvd to Eastern Ave $,700,000 Pyle Ave, Las Vegas Blvd to Bermuda Rd $3,00,000 Rainbow Blvd, Blue Diamond Rd to CC-15 $11,360,000 Robindale Rd, Durango Dr to Buffalo Dr $3,00,000 Robindale Rd, Jones Blvd to Las Vegas Blvd (Over I-15 & UPRR) $34,47,000 Robindale Rd, Las Vegas Blvd to Amigo St $4,000,000 Russell Rd, Hualapai Wy to CC-15 $16,000,000 Sandhill Rd, Tropicana Ave to Desert Inn Rd $1,400,000 Silverado Ranch Blvd, I-15 to Eastern Ave $3,00,000 Sloan La, Vegas Valley Dr to Sahara Ave $10,53,000 Stewart Ave, Hollywood Blvd to Los Feliz St $,000,000 Sunset Rd, Ft. Apache Rd to Decatur Blvd $14,000,000 Traffic Improvements $6,75,000 Tropicana Ave Bus Turn-Outs $1,000,000 Tropicana Ave/Broadbent Blvd, Boulder Hwy to Russell Rd $8,400,000 Valley View Dr, Blue Diamond Rd to Sunset Rd $8,640,000 Warm Springs Rd, Ft. Apache Rd to I-15 $8,000,000 Washington Ave, Nellis Blvd to Los Feliz St $10,000,000 $740,104,000 ADDITIONAL NEEDS CC-15/Summerlin Pky Interchange $35,000,000 Desert Inn Rd, Hualapai Wy to Valley View Blvd $6,500,000 Grand Canyon Dr, Maule Ave to Peace Wy $4,000,000 Hacienda Ave, Swenson St to Lamb Blvd $,500,000 Mountain Vista St, Whitney Mesa Dr to Tropicana Ave $1,000,000 Spencer St, Cactus Ave to Windmill La $,100,000 Torry Pines Dr, Russell Rd to Sahara Ave $,800,000 Twain Ave, Hualapai Wy to Rainbow Blvd $,800,000 Walnut Ave, Owens Ave to Craig Rd $,500,000 Warm Springs Rd, Pecos Rd to Las Vegas Blvd $3,600,000 Windmill La, Durango Dr to Jones Blvd $,700,000 Windmill La, Jones Blvd to Decatur Blvd (with UPRR Crossing) $19,000,000 ADDITIONAL TOTAL $84,500,000 CLARK COUNTY TOTAL $84,604,000 Page of 9 3/31/015
017-06 City of Las Vegas Bridger Ave/Lewis Ave to Symphony Park UPRR Vehicular Overpass $35,000,000 City of Las Vegas Maintenance (1467.43 miles) $73,371,500 Citywide Traffic Signals $5,000,000 Cultural Vista Pkwy, Veterans Memorial Dr to Maryland Pkwy $5,000,000 Downtown Expansion Area (Ogden Ave, Stewart Ave, 7th St, 8th St, 9th St, 10th St, 11th St, California Ave, Colorado Ave) $60,000,000 Downtown Las Vegas to Downtown Summerlin Alt Transportation Mode (AA/NEPA) $60,000,000 Downtown to Strip People Mover (Roadway Improvement) $15,000,000 I-15 Frontage Road, Washington Ave to Lake Mead Blvd and Owens Ave $35,000,000 Las Vegas Blvd, Stewart Ave to Owens Ave $18,57,000 Las Vegas Blvd, Stewart Ave to Sahara Ave $40,000,000 Pinto La, Rancho Dr to ML King Blvd $5,000,000 Symphony Park Interstate Access (US-95/I-515 City Pkwy Interchange) $5,000,000 Tonopah Dr, Charleston Blvd to Alta Dr $5,000,000 ADDITIONAL NEEDS $401,898,500 Alta Dr/Bonneville Ave, Rancho Dr to Main St $8,773,684 Buffalo Dr, Charleston Blvd to Sahara Ave $3,775,590 Charleston Blvd, Grand Central Pkwy to Fremont St $30,000,000 Charleston Blvd, Rancho Dr to Valley View Blvd $15,000,000 Charleston Blvd, Valley View Blvd to Rainbow Blvd $15,000,000 Citywide Bike Lane Master Plan Pinch Point Widening $10,000,000 Citywide Bike Lane Master Plan Sawtooth Infill $5,000,000 Citywide Elementary and Middle School Traffic Safety Upgrades $5,000,000 Citywide Traffic Sign Upgrades $5,000,000 Citywide Traffic Signal Detection and ITS Upgrades $40,000,000 Citywide Transit Stop Pedestrian Crossing Upgrades $5,000,000 Decatur Blvd, Sahara Ave to US-95 BRT $15,000,000 Main St, I-515 to Owens Ave $15,000,000 ML King Blvd, Oakey Blvd to Rancho Dr/Meade Ave $60,000,000 Northwest Expansion Area Arterial Masterplan $0,000,000 Outer Beltway - Western Leg $40,000,000 Pedestrian Pathways to Transit Stops (ADA) Upgrades $7,000,000 Rancho Dr, Charleston Blvd to Alta Dr $10,000,000 Rancho Dr, US-95 to Rainbow Blvd $34,640,000 Summerlin Pkwy US-95 to CC-15 $30,080,000 Symphony Park Pedestrian Bridge at Main St/Fremont St $15,000,000 Symphony Park Pedestrian Bridges () at Main St/Lewis Ave $10,000,000 US-95 Overpass at Grand Teton Dr $0,000,000 US-95 Overpass Completion at Alexander Rd $5,000,000 US-95 Overpass Completion at Lone Mountain Rd $5,000,000 US-95 Overpass Completion at Vegas Dr $5,000,000 US-95 Pecos / Stewart Interchange $50,000,000 US-95/Elkhorn Rd HOV Direct Connect $1,895,000 US-95/Smoke Ranch Rd HOV Direct Connect $15,000,000 Page 3 of 9 3/31/015
017-06 Wyoming Ave, Industrial Rd to Las Vegas Blvd $5,000,000 ADDITIONAL TOTAL $517,164,74 CITY OF LAS VEGAS TOTAL $919,06,774 City of North Las Vegas Ann Rd Pedestrian Bridge $3,500,000 Carey Ave, Revere St to Pecos Rd $,478,000 City of North Las Vegas Maintenance (661.61 miles) $33,080,500 Clayton St, Centennial Pkwy to Hammer La $13,500,000 Clayton St/CC-15 Overpass $1,000,000 Commerce St, Cheyenne Ave to Duchess Ave $1,800,000 Deer Springs Wy, Losee Rd to Lamb Blvd $6,500,000 Downtown Complete Streets & Pedestrian Improvements $10,79,000 N. 5th St/Cheyenne Ave Urban Interchange, Brooks St to Colton Ave $8,463,000 Pecos Rd, Washburn Rd to Moccasin Rd $0,000,000 Revere St, Carey Ave to Colton Ave $3,000,000 School Safety Program $6,000,000 Sloan La, Las Vegas Blvd to Tropical Pkwy $3,41,000 Walnut Rd/CC-15 Overpass $1,000,000 $156,534,500 ADDITIONAL NEEDS ADA Upgrades Program $10,000,000 Alexander Rd, Simmons St. to N. 5th St $15,000,000 Allen La, Craig Rd to Centennial Pkwy $,64,000 Ann Rd, Camino Al Norte to Lamb Blvd $5,339,000 Clayton St, Cheyenne Ave to Craig Rd $4,500,000 Craig Rd Pedestrian Bridge at Upper Las Vegas Wash $5,000,000 Hollywood Blvd, Las Vegas Blvd to Tropical Pkwy $6,000,000 I-15/Cheyenne Ave Interchange Improvements $30,000,000 Lamb Blvd, Centennial Pkwy to CC-15 Connectivity $8,916,000 Lone Mountain Rd, Losee Rd to Commerce St $,649,000 Sawtooth Improvements $3,55,000 Traffic Signal Improvements $3,100,000 Tropical Pkwy, Lamb Blvd to Pecos Rd $,370,000 Washburn Rd, Valley Dr to Willis St $,000,000 ADDITIONAL TOTAL $101,068,000 CITY OF NORTH LAS VEGAS TOTAL $57,60,500 Page 4 of 9 3/31/015
017-06 City of Henderson Appaloosa Rd, Wagonwheel Dr to Equestrian Dr $3,50,000 Athenian Dr, Sunset Rd to Olympic Ave $1,50,000 Boulder Hwy, Wagonwheel Dr to Gibson Rd $5,000,000 Carnegie St, Paseo Verde Pkwy to Green Valley Pkwy $3,400,000 City of Henderson Maintenance (850.47 miles) $4,53,500 College Dr, Mission Dr to Boulder Hwy $3,400,000 Coronado Center Pkwy, Eastern Ave to Sunridge Heights Pkwy $,50,000 Downtown Henderson Phase II (Major Ave, Minor Ave, Victory Rd, Texas Ave, Ocean Ave) $7,500,000 Eastern Ave, St. Rose Pkwy to I-15 PH I $5,000,000 Eastern Ave/I-15 Interchange Improvements PH I $7,500,000 Eastgate Rd, Middlegate Rd, Parkson Rd, Cape Horn Dr $4,000,000 Fiesta Henderson Blvd, Waterwheel Falls Dr to Lake Mead Pkwy $,50,000 Foster St, Sunset Rd to Moser Dr $,500,000 Gibson Rd, I-15 to Boulder Hwy PH I $,570,000 Gilespie St, Volunteer Blvd to St. Rose Pkwy $,790,000 Grand Hills Dr, Seven Hills Dr to Eastern Ave $1,750,000 Green Valley Pkwy, Sunset Rd to CoH Limits $,500,000 Greenway Rd, Mission Dr to Boulder Hwy $,700,000 Heather Dr, Greenway Rd to College Dr $1,500,000 Horizon Ridge Pkwy, Green Valley Pkwy to Stephanie St PH I $,500,000 Horizon Ridge Pkwy, Viento Puntero Dr to Paradise Hills Dr PH I $3,000,000 Marks St/Sunset Rd Intersection Improvements $600,000 Mission Dr, CoH Limits to College Dr PH I $1,000,000 Nevada State College Access at I-515 Interchange PH I $4,000,000 Nevada State Dr, Paradise Hills Dr to I-515 $3,500,000 Olympic Ave, Green Valley Pkwy to Mountain Vista St $3,000,000 Paradise Hills Dr, Dawson Ave to Old Vegas Trail $1,000,000 Paseo Verde Pkwy, St. Rose Pky to Gibson Rd $4,500,000 Pebble Rd, Pecos Rd to Wigwam Pkwy $,50,000 Pecos Rd, I-15 to Windmill La $4,500,000 Pedestrian Safety Improvements $8,000,000 Pueblo Blvd, Concord Wy to Lake Mead Pkwy $4,000,000 Ramrod Ave, Green Valley Pkwy to Mountain Vista St $,500,000 Robindale Rd, Green Valley Pkwy to Eastern Ave $3,100,000 Seven Hills Dr, Grand Hills Dr to St. Rose Pkwy and Loop $5,000,000 St. Rose Pkwy/Pecos Rd/I-15 Interchange Improvements PH I $4,000,000 Stephanie St, I-15 to Galleria Dr $5,500,000 Sun City Anthem Dr/Anthem Pkwy, Eastern Ave to Reunion Dr $6,000,000 Sunridge Heights Pkwy, Seven Hills Dr to Horizon Ridge Pkwy $4,000,000 Sunset Rd, I-515 to Pabco Rd $3,500,000 Traffic Signal: Paseo Verde Pkwy/Desert Shadow Trail $450,000 Traffic Signals, Various Locations $1,750,000 Wagonwheel Dr, I-515 to Foothills Dr $1,750,000 Wagonwheel Dr/I-515 Interchange Improvements PH I $4,000,000 Page 5 of 9 3/31/015
017-06 Warm Springs Rd, Lake Mead Pkwy to Racetrack Rd $4,000,000 Water St, Major Ave to Lake Mead Pkwy $4,400,000 Wigwam Pkwy, Eastern Ave to Gibson Rd $4,500,000 Windmill La, Arroyo Grande Pkwy to Green Valley Pkwy $3,50,000 $3,183,500 ADDITIONAL NEEDS Anthem Highlands Dr, Democracy Dr to Bicentennial Pkwy $,500,000 Arroyo Grande Blvd, Horizon Ridge Pkwy to Lynbrook St $1,000,000 Athol Dr, Foster Ave to Rolly St $4,000,000 Bermuda Rd, Volunteer Blvd to St. Rose Pkwy $3,50,000 Boulder Hwy Backside Frontage Roads $4,500,000 Bruner Ave, Gilespie St to Executive Airport Dr $3,780,000 Bus Turnouts at Various Locations $,000,000 Compassion Dr, Paradise Hills Dr to Nevada State Dr $1,50,000 Conestoga Wy/Dawson Ave, UPRR to Paradise Hills Dr $3,50,000 Democracy Dr, Anthem Highlands Dr to Eiffel Park Terrace $4,000,000 Democracy Dr, Anthem Highlands Dr to Via Inspirada $8,580,000 Downtown Henderson Phase III (Major Ave, Minor Ave, Victory Rd, Texas Ave, Ocean Ave) $3,000,000 Eastern Ave, St. Rose Pkwy to I-15 PH II $5,000,000 Eastern Ave/I-15 Interchange Improvements PH II $17,500,000 Equestrian Rd, Foothills Dr to Boulder Hwy $1,989,000 Galleria Dr, W. of Stephanie St to Patrick La $3,750,000 Gibson Rd, I-15 to Boulder Hwy PH II $4,180,000 Green Valley Pkwy/I-15 Interchange Improvements $10,000,000 Horizon Ridge Pkwy, Green Valley Pkwy to Stephanie St PH II $,608,000 Horizon Ridge Pkwy, Viento Puntero Dr to Paradise Hills Dr PH II $4,600,000 I-11 Frontage Road, Eldorado Valley to Dawson Ave $7,500,000 I-15/Sloan Interchange Upgrades $60,000,000 I-515 NB Auxiliary Lane, Horizon Dr to I-15 $15,000,000 I-515 SB Auxiliary Lane, I-15 to Horizon $0,000,000 I-515 SB Improvements, Sunset Rd to I-15 $5,000,000 Jeffreys St, Sunridge Heights Pkwy to St. Rose Pkwy $1,750,000 Larson La, Las Vegas Blvd to Via Inspirada $3,600,000 Magic Wy, Boulder Hwy to Newport Dr $,90,000 Maryland Pkwy, Volunteer Blvd to St. Rose Pkwy $10,500,000 Merlayne Dr, Sunset Rd to Haren Dr $4,500,000 Mission Dr, CoH Limits to College Dr PH II $4,000,000 Nawghaw Poa, CoH Limits to Demcoracy Dr $3,500,000 Nevada State College Access at I-515 Interchange PH II $70,000,000 Old Vegas Trail, Paradise Hills Dr to Wagonwheel Dr $1,50,000 Olsen St, Lake Mead Pkwy to Calico Ridge Dr $,000,000 Pabco Rd, Warm Springs Rd to Galleria Dr $,50,000 Paradise Hills Dr, Compassion Dr to Old Vegas Trail $6,000,000 Pedestrian Bridge: Eastern Ave @ St. Rose Pkwy $3,500,000 Pedestrian Bridge: Lake Mead Pkwy @ Boulder Hwy $4,500,000 Pedestrian Bridge: Lake Mead Pkwy @ Water St $,500,000 Roundabouts at Various Locations $7,500,000 Page 6 of 9 3/31/015
017-06 Sawtooth Program at Various Locations $,000,000 SB to WB & EB to NB I-15/I-515 System to System Ramps & Weaving Areas $35,000,000 Siena Heights Dr, Jeffreys St to Coronado Center Dr $,500,000 St. Rose Pkwy/Eastern Ave Intersection Improvements $30,000,000 St. Rose Pkwy/Pecos Rd/I-15 Interchange Improvements PH II $0,738,000 Starr Rd Interchange & Roadway, I-15 to Las Vegas Blvd $3,081,000 Stephanie St, Cielo Abierto Wy to I-15 $5,000,000 Traffic Signal: Galleria Dr/Olivia Pkwy/Water St $350,000 Via Centro, Via Inspirada to Bruner Ave $7,00,000 Via Nobila, Las Vegas Blvd to Via Inspirada $9,000,000 Via Seranova, Las Vegas Blvd to Via Centro $5,100,000 Volunteer Blvd/I-15 Connector at St. Rose Pkwy Interchange $0,000,000 Wagonwheel Dr/I-515 Interchange Improvements PH II $48,000,000 Warm Springs Rd, Pecos Rd to Arroyo Grande Blvd $3,500,000 ADDITIONAL TOTAL $539,958,000 CITY OF HENDERSON TOTAL $763,141,500 City of Boulder City City of Boulder City Maintenance (199.8 miles) $9,964,000 San Felipe Dr, Adams Blvd to Corral Rd $3,148,000 $13,11,000 ADDITIONAL NEEDS Black Hills Dr, US-95 to US-95 $900,000 Buchanan Blvd, Georgia Ave to WAPA Limits $3,000,000 Clubhouse Dr/Bristlecone St, Adams Blvd to Buchanan Blvd $1,000,000 Pueblo Dr Improvements $4,000,000 Quail Dr Improvements $1,000,000 San Felipe Dr, Corral Rd to Mendota Dr $3,35,000 US-93 Traffic Calming, Veterans Memorial Dr to SR17 $54,000,000 US-95 Interchanges (Silverline Rd & Facility Access Rd) $50,000,000 Utah St Extension $3,000,000 ADDITIONAL TOTAL $10,5,000 CITY OF BOULDER CITY TOTAL $133,364,000 Page 7 of 9 3/31/015
017-06 City of Mesquite City of Mesquite Maintenance (61.9 miles) $13,064,500 Pioneer La, Horizon Blvd to Calais Dr $1,000,000 Signal - Falcon Ridge Pkwy & Hardy Wy $350,000 Signal - Pioneer La & Grapevine Rd $350,000 Signal - Pioneer La & Turtleback Rd $350,000 Signal - Riverside Rd & Hafen La $350,000 Signal Coordination, ITS communication for existing and future signals $611,000 $16,075,500 ADDITIONAL NEEDS Hafen/I-15 Underpass $5,000,000 ADDITIONAL TOTAL $5,000,000 CITY OF MESQUITE TOTAL $41,075,500 Outlying Bunkerville $174,000 Cold Creek $50,000 Goodsprings $50,000 Indian Springs $66,000 Jean $50,000 Laughlin $1,954,000 Moapa Town (Warm Springs Area) $499,000 Moapa Valley (Logandale / Overton) $790,000 Mt. Charleston $05,000 Nelson $50,000 Sandy Valley $50,000 Searchlight $154,000 $4,09,000 OUTLYING TOTAL $4,09,000 FAST AMS Communications upgrade along all arterials to fiber optic and ITS Equipment $30,000,000 Full ITS deployment along all portions of 15 Beltway (from I-15 North to I-515) $0,000,000 Improved Traffic Signal Vehicle Detection Systems in the entire Las Vegas Valley $30,000,000 ITS deployment along Existing portions of 15 Beltway (from I-15 North to I-515) $10,000,000 Upgrade signalized intersections for enhanced and centralized management of Emergeny Vehicle Preemption $5,000,000 $95,000,000 FAST TOTAL $95,000,000 Page 8 of 9 3/31/015
017-06 RTC Arterial BRT Lanes $5,000,000 Maryland Pkwy Fixed Guideway, Airport to Stewart Ave $15,000,000 Transportation Investment Business Plan (TIBP-Valley Wide Projects) $00,000,000 $350,000,000 RTC TOTAL $350,000,000 NDOT Future I-11 Corridor (NEPA/PE) $0,000,000 I-15 North/CC-15 Interchange/Construct Full System Interchange $50,000,000 I-15 Tropicana Ave Interchange/Reconstruct Interchange $150,000,000 I-15/Apex and US-93 Interchange Improvements $10,000,000 I-515, Charleston Blvd to ML King Blvd Capacity Improvements $400,000,000 I-515/I-15/I-11 Interchange Operational Improvements $100,000,000 US-95/CC-15 Interchange (Includes Local Roadway Access) $155,000,000 $1,085,000,000 ADDITIONAL NEEDS Clark County Pavement Preservation $783,19,00 Future I-11 Corridor Phase I (Construction) $350,000,000 ADDITIONAL TOTAL $1,133,19,00 NDOT TOTAL $,18,19,00 RTC and Member Entities Projects Priority Projects Additional Unfunded Projects NDOT Projects Priority Projects Additional Unfunded Projects Grand Total All Projects Priority Projects Additional Unfunded Projects $3,387,94,74 $,000,000,000 $1,387,94,74 $,18,19,00 $1,085,000,000 $1,133,19,00 $5,606,134,474 $3,085,000,000 $,51,134,474 Page 9 of 9 3/31/015