I-94 East Corridor Performance

Similar documents
Current Corridor Characteristics

Minnesota Department of Transportation 2011 Twin Cities Metro Area Construction Projects

Metro District 10-Year Capital Highway Investment Plan ( )

Freeway Volume-Crash Summary

2009 Regional Solicitation Selected Projects*

MEMORANDUM. Open Section Background. I-66 Open Section Study Area. VDOT Northern Virginia District. I-66 Project Team. Date: November 5, 2015

CONTACT: Nichole Lawrence CELL: FOR IMMEDIATE RELEASE Wednesday March 28, 2018

Chapter 2: Entire US287 Corridor

Wichita Falls MPO - MTP Project List 1 of 6

Most people notice when ODOT builds something

2 Construction Program

108 miles/1,427 Average ADT miles/613 Average ADT miles/1,851 Average ADT

Construction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013

Non-Motorized Transportation

DALLAS HORSESHOE PROJECT. Project Update including the Margaret McDermott Bridge Transportation and Trinity River Project Committee February 22, 2016

Overview. ECO RAPID TRANSIT Meeting April 8, 2015 Don Sepulveda, P.E. Executive Officer Regional Rail

CITY OF COACHELLA CAPITAL IMPROVEMENT PROGRAM TOTAL PROJECTS REVENUE SUMMARY TABLE ES-1

TYPICAL SECTION OF IMPROVEMENT

DIRECTOR S REPORT TRANSPORTATION BOARD OCTOBER 8, 2018

FORT WORTH DISTRICT. Springtown Area Projects. Loyl C. Bussell, P.E. Acting District Engineer. Thursday, February 8, 2018 Date.

Airport Planning Area

Environmental Assessment and Final Section 4(f)

Interstate 90 and Mercer Island Mobility Study APRIL Commissioned by. Prepared by

Palm Beach County Traffic Report July 13 through July 20, 2012

IMPLEMENTATION OF COMPREHENSIVE DEVELOPMENT AGREEMENT (CDA) PROJECTS:

Appendix C Long-Range Highway and Transit Capital Project List

TRANSPORTATION SYSTEM PERFORMANCE INDICATORS

DISTRICT EXPRESS LANES ANNUAL REPORT FISCAL YEAR 2017 JULY 1, 2016 JUNE 30, FloridaExpressLanes.com

Crash and Behavioral Characteristics, and Health Outcomes, Associated with Vehicular Crashes by Tourists in Wisconsin,

2008 DEKALB COUNTY TRANSPORTATION PLAN (UPDATE)

Metro ExpressLanes April 5, 2011 Community Meeting re: Adams Blvd Improvements

INFRASTRUCTURE CAPITAL IMPROVEMENT PLAN CITY OF LAKE ELMO, MINNESOTA

ANNUAL REPORT DOING MORE KANSAS TURNPIKE AUTHORITY

San Mateo County Transportation Authority Board Meeting November 2, 2017 Item #10 1

University Region Non-Motorized Plan 2015

RELEASE: IMMEDIATE Oct. 6, 2017 CONTACT: Darragh Copley Frye (office) (cell)

TEXAS BORDER DISTRICT TRADE TRANSPORTATION ACTIVITIES

Guide to. Road Construction Projects

- Countywide - Roadway Cone Zone / Lane Closure / Sidewalk Repair Schedule

Exit 148 (Quantico) to Exit 133 (Route 17/Fredericksburg)

District Construction Progr am. John R. Kasich, Ohio Governor Jerry Wray, ODOT Director Steve Mary, P.E., District Deputy Director

Welcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program,

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT

Route 141 and I-44 Design-Build Project Community Involvement Group. March 21, 2016

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015

Basic Project Information

FINAL PAY 2012 TAX RATES

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

FHWA P/N Guidelines. Corridor Relationship. Highway 22 Segment 1 - US 169 to CSAH 2 Relevance / Documentation of Need

Ohio Department of Transportation Construction Update

United States Department of the Interior National Park Service. Boundary Expansion Listed in National Register January 11, 2017

Memorandum. Roger Millar, Secretary of Transportation. Date: April 5, Interstate 90 Operations and Mercer Island Mobility

State Route 8 Corridor. Northern Summit County s Path to Success

OFFERING MEMORANDUM East Arapahoe Road, Greenwood Village, CO. JEFF HALLBERG PRINCIPAL

1.2 Corridor History and Current Characteristics

LINK (5465) N. Robert St., St. Paul, MN 55101

Runway Roughness Evaluation- Boeing Bump Methodology

APPENDIX A DATA COLLECTION BIBLIOGRAPHY SANTA CLARA COUNTY I-680 CORRIDOR STUDY

FDOT Treasure Coast Traffic Report through

Progress Report for Projects of Regional Significance

The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP).

* Short term resurfacing projects are not included in this listing. 4T39.07 Project: Annual Rural County Sign Improvements, Genesee/Orleans Counties

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016

City of Madison, Buckeye Road Monona Drive to Stoughton Road County AB Dane County Public Involvement Meeting

Exit 148 (Quantico) to Exit 133 (Route 17/Falmouth)

PUBLIC TRANSIT IN KENOSHA, RACINE, AND MILWAUKEE COUNTIES

Canada and Alberta announce 33 new infrastructure projects

ITS. Intermountain Transportation Solutions Traffic Studies Transportation Analysis Signal Design Site Planning. January 9, 2013

B. Congestion Trends. Congestion Trends

JACIP-AIRPORT PROJECT DETAIL REPORT August 15, 2007

Highways: Interstate. Highways: State Highways

Steven Bauer, Policy Advisory Committee Chairperson, Presiding

Project Deliverable 4.1.3f Individual City Report - City of San Dimas

LOST HILLS ROAD INTERCHANGE PROJECT CONSTRUCTION UPDATE. CALABASAS CITY COUNCIL April 26, 2017

Chapter 4: Existing Regional Transportation System Strengths and Weaknesses

South of Fraser Transportation Priorities March 2017 Engagement

FY Regional Transportation Improvement Program Basic Project List (All Values in Thousands of Dollars) All costs in current dollars

Public Informational Meeting

Update on Top 10 Issues Facing South Niagara

Sierra Roadwork Schedule Sunday through Saturday, October 1-7, 2017 LONG-TERM PROJECTS

Susan Jones Moses Susan Jones Moses and Associates Glen Weisbrod Economic Development Research Group

CITY OF PALMDALE. REPORT to the Mayor and Members of the City Council from the City Manager

Exit 136 (Centreport Parkway/Stafford County) to Exit 130 (Route 3/Fredericksburg)

November 21, 2012 Barbara Kelleher, (954)

Head to University Avenue and save!

Creating Connections in Niagara Region

Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd

Word Count: 3,565 Number of Tables: 4 Number of Figures: 6 Number of Photographs: 0. Word Limit: 7,500 Tables/Figures Word Count = 2,250

Transportation Improvement District (TID) Exercise New Castle County Unified Development Code

Arkansas State Highway and Transportation Department. Fayetteville Commerce District

The Transportation Corridor Overlay District

CALIFORNIA HIGH-OCCUPANCY VEHICLE LANE DEGRADATION ACTION PLAN

Anatomy of Traffic Safety Sheboygan Co. Bureau of Transportation Safety

Washington County Ostrum Trail North/Broadway Street (CSAH 4)

Arkansas State Highway and Transportation Department. Bella Vista Rotary Club

Mason Street Bike/Pedestrian Trail Project

CITY OF BROOKFIELD Capital Improvement Fund Budget

NCDOT, DIVISION SIX HIGHWAY INCIDENT MANAGEMENT PROGRAM

Base Governor (Updated 4/20/17) First Special Session HF 3 Transportation - Ch. 3. Conference Position 5/1/2017. Conf Position Changes FY 18-19

Transcription:

Corridor Context The corridor runs 16 miles between downtown St. Paul and the Wisconsin state border. The corridor serves as an important East-West connection for the Metro area, serving the communities of Saint Paul, Maplewood, Oakdale, Woodbury, Lake Elmo, Afton, and Lakeland. I-94 East Corridor Performance Population Trends City Population 2000 2010 Lakeland 1,917 1,796 Lake Elmo 6,863 8,069 Maplewood 34,947 38,018 Oakdale 26,653 27,378 St. Paul 287,151 285,068 Woodbury 46,463 61,961 403,994 422,290 Measure Result Infrastructure Preservation Statewide Result Condition--% Good and satisfactory (by deck area) 100% 86.9% 0% 3.2% Ride Quality Good--% of miles 64.5% 70.2% Ride Quality Poor--% of miles 10.3% 3.7% Condition--% Poor (by deck area) Pavement Current Corridor Characteristics Highway: I-94 2009 AADT: 79,000 153,000 2009 HCADT: 4,100 9,900 Number of lanes: 6-8 Key highway connections: I-35E, I494, US 61, MN 95 Public Transit Rail One Park and Ride lot with a capacity of 400 parking spaces Amtrak line to Chicago BNSF line

I-94 East Existing Conditions - Safety Safety Needs [_ CMSP Problem Locations CMSP Problem Segments Trunk Highways County Highways Class 1 Railroads County Boundaries Map S Maplewood Lake Elmo _ [_ [_ 149³ 10³ E 0 Ramsey Co. 35E 694 Dakota Co. Saint Paul 156³ 5 ³ See District Highway Safety Plan for additional issues and strategies Metro To Be Completed May South Saint Paul 120³ Newport 494 Toward Zero Deaths Efforts County TZD Safe Roads Grant Oakdale TZD Enforcement Grant Woodbury TZD Region Year Established (ATP) 0.350.7 1.4 2.1 2.8 Miles County Safety Plan Completion Date Ramsey No Yes Metro, Planned (ATP 5) Jan. Washington No Yes Metro, Planned (ATP 5) Jan. Washington Co. 94 I 94 Corridor Safety Performance (WI Border to Downtown St. Paul) Lakeland Measure Fatal and Serious Percent of All Injury Crashes in Severe Crashes Corridor in Corridor Top Four Driver Related Crash Issues Impaired Driver* 10 32.3% Unbelted Driver* 9 29.0% Speed 7 22.6% Invalid License 6 19.4% Top Three Infrastructure Related Crash Issues Lane Departure Crashes Afton 12 38.7% Interchange 8 25.8% Head-on Crashes 3 9.7% In Corridor Statewide for Interstates Fatal and Serious Injury Crashes 31 518 Miles 18 916 Fatal and Serious Injury Crashes per Mile Corridor Comparison to State Crashes 1.72 0.57 * Crashes may be under reported as this number is according to officer's first impression. Note. Data presented include all fatal and serious injury crashes betw een 2006-2010.

Planned Transit Investments Manning Ave Park and Ride $ 12 Million $ 12 Million I-94E Projects Investment Area Pavement, Signing Storm Sewer Project Mill and Overlay, Access Management, Auxiliary lane Brookview Dr to 4th Length (Miles) Fiscal Year Cost 0.6 $ 1.7 Million Investment Area 7.7 $ 500,000 Cayuga N/A $ 2.2 Million Signing St Replace signing John Ireland Blvd to I-694/I-494 Deck Sealant (WisDOT let) over St. Croix River Repair or replace deteriorating pipes, structures & aprons 1.4 $ 610,000 TH61 to McKnight Add aux lane, noisewall, drainage, pond, TMS, signing, lighting, guardrail 1.3 2015 $ 3.5 Million EB from 7th St to Mounds Blvd Traffic Mgmt Traffic Management System CSAH-15 to St Croix River 5.0 2015 $ 350,000 : $ 8.5 Million I-94E Adjacent Projects Storm Sewer Traffic Mgmt Project Road construction, retaining walls, bridges Replace Signing TH 55 to I-94 Repair or replace deteriorating pipes, structures & aprons MN120 Conway to I-94 (and on I-94 TH61 to McKnight) Freeway Management System Length (Miles) Route Fiscal Year Cost 3.3 I-35E 2014 $ 147 Million 9.4 US 52 2014 $ 500,000 1.4 MN 120 $ 610,000 18.3 US 61 2014 $ 3.7 Million $ 151.8 Million

Corridor Performance Based Needs (2016-2021) Preservation Pavement Preservation Culvert Preservation Pipe Replacement Safety Improvements* 2 s 17 miles of poor pavement Potential Transit Investments 0 0 Poor pipes 2 CMSP Locations 0 CMSP Segments *Assumes completion of 12-15 STIP projects. *Systematic safety improvements are included as part of most highway projects. Refer to safety map for additional safety information Park and Rides Woodbury Theatre Park and Ride Expansion 450 New Spaces

Recent Investments (2002-2011)* Project Description Cost Projects 2011-2014: Lafayette replacement (US 52) Painting $ 132 Million Recent Transit Investments Guardian Angels Park and Ride $ 1.2 Million $ 1.2 Million Pavement Projects 2008: Frontage Rd Construction, and on-ramp to I-94 (City of Woodbury) 2009: Concrete pavement repair (TH120 to West end of St Croix 2004: Concrete roadway repair; replace joints and misc. repairs on two bridges (TH52 to Ruth St) 2004: Concrete retrofit $ 550,000 $ 10.6 Million Other Infrastructure 2011: Aux lane EB, retaining wall, storm sewers, storm water ponds (NB TH61 to White Bear Ave) 2010: New Signals at I-94 ramps and traffic signal at MN 95 2002: Incident Management System (I-35E to TH95) $ 3.4 Million *Only includes projects over $500,000. Systematic safety improvements are routinely included as part of most highway projects $ 146.6 Million