TRAFFIC ALERT FOR FEBRUARY 4-8, 2019 Highway Work Zones in the Staunton District

Similar documents
TRAFFIC ALERT FOR FEBRUARY 11-15, 2019 Highway Work Zones in the Staunton District

TRAFFIC ALERT FOR DECEMBER 10-14, 2018 Highway Work Zones in the Staunton District

TRAFFIC ALERT FOR JANUARY 15-19, 2018 Highway Work Zones in the Staunton District

TRAFFIC ALERT FOR MARCH 5-9, 2018 Highway Work Zones in the Staunton District

TRAFFIC ALERT FOR DECEMBER 25, 2017 to JANUARY 5, 2018 Highway Work Zones in the Staunton District

TRAFFIC ALERT FOR OCTOBER 15-19, 2018 Highway Work Zones in the Staunton District

TRAFFIC ALERT FOR MARCH 26-30, 2018 Highway Work Zones in the Staunton District

RELEASE: IMMEDIATE September 14, 2012 CONTACT: Sandy Myers (office) STA (cell)

TRAFFIC ALERT FOR SEPTEMBER 17-21, 2018 Highway Work Zones in the Staunton District

TRAFFIC ALERT FOR SEPTEMBER 10-14, 2018 Highway Work Zones in the Staunton District

TRAFFIC ALERT FOR APRIL 23-27, 2018 Highway Work Zones in the Staunton District

TRAFFIC ALERT FOR JUNE 4-8, 2018 Highway Work Zones in the Staunton District

TRAFFIC ALERT FOR JUNE 25-29, 2018 Highway Work Zones in the Staunton District

Route 29 Business Replacing bridge over river and railroad in Altavista. Signed detour in place.

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Aug , 2016

Important Lane Closures, April 3 9, 2011

Road Construction Ahead January-April 2015 NORTHWEST REGION

RELEASE: IMMEDIATE Oct. 6, 2017 CONTACT: Darragh Copley Frye (office) (cell)

FOR IMMEDIATE RELEASE February 22, 2019 CONTACT: Jen K. Ward, SALEM 69

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

Exit 148 (Quantico) to Exit 133 (Route 17/Fredericksburg)

Exit 148 (Quantico) to Exit 133 (Route 17/Falmouth)

Exit 136 (Centreport Parkway/Stafford County) to Exit 130 (Route 3/Fredericksburg)

PennDOT Interstate Work next week March 30-April 3:

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

CONTACT: Nichole Lawrence CELL: FOR IMMEDIATE RELEASE Wednesday March 28, 2018

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT June 12 June 18, 2016

Important Lane Closures March 1 5, 2010

WEEKLY HIGHWAY ALERT RICHMOND DISTRICT

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016

FDOT Treasure Coast Traffic Report through

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015

OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS 9/5/2018 2:12:06 PM

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015

OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS 10/11/2018 5:24:09 PM

Sierra Roadwork Schedule Sunday through Saturday, October 1-7, 2017 LONG-TERM PROJECTS

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

Florida Department of Transportation MIKE DEW SECRETARY

April 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014

FDOT Treasure Coast Traffic Impact Report

Weekly East Tennessee Construction Report for May 31-June 6, 2018

WEEKLY HIGHWAY ALERT RICHMOND DISTRICT

WEEKLY HIGHWAY ALERT RICHMOND DISTRICT

OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS 9/14/ :00:05 PM

FDOT Treasure Coast Traffic Impact Report

Ohio Department of Transportation Construction Update

For Immediate Release Christine Girardin January 19, 2018 SUMTER COUNTY FLORIDA S TURNPIKE AND I-75 INTERCHANGE IMPROVEMENTS

May 1, 2015 Meredith Cruz, (561) Palm Beach County Traffic Report May 1 through May 8, 2015

November 21, 2012 Barbara Kelleher, (954)

GO 10 is planning to switch I 10 Eastbound traffic lanes after Sunland Park. The switch is set for Sunday, April 2. Details continue to develop.

Florida Department of Transportation ERIK FENNIMAN INTERIM SECRETARY

Guide to. Road Construction Projects

October 31, 2014 Chuck McGinness, (954)

EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015

Palm Beach County Traffic Report July 13 through July 20, 2012

FREDERICKSBURG DISTRICT. District Engineer Marcie Parker, P.E. May 8, 2018

Night work update: Hills M2 Motorway and westbound on ramp at Pennant Hills Road

NEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release

Florida Department of Transportation Daniels Parkway Fort Myers, FL 33913

Georgia 400 Tolls to End Friday, November 22 Toll collection scheduled to end after rush hour

* Short term resurfacing projects are not included in this listing. 4T39.07 Project: Annual Rural County Sign Improvements, Genesee/Orleans Counties

CONSTRUCTION PROJECTS IN CUYAHOGA COUNTY CLEVELAND EUCLID 3/9/18 RICHMOND MAYFIELD HIGHLAND HEIGHTS HEIGHTS SOUTH EAST MAYFIELD EUCLID CLEVELAND

35EXPRESS PROJECT UPDATE FOR DENTON COUNTY COMMISSIONERS

APPENDIX F List of Commitments

NEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release

BROWARD COUNTY TRAFFIC IMPACT REPORT March 13 through March 20, March 13, 2015 Chuck McGinness,

El Dorado County / Tahoe Roadwork Schedule

Pardon Our Dust Public Information Meeting

Springettsbury Township. Road Improvement Projects

Construction Update. ODOT District Two Construction Update. For Immediate Release Thursday, October 18, Lucas County

Palm Beach County Traffic Report August 24 through August 31, 2012

May 16, 2014 Chuck McGinness, (954) BROWARD COUNTY TRAFFIC IMPACT REPORT May 16 through May 23, 2014

Replace Traffic Signal By Others (will accommodate longer arm for dual left turn lane) Install New Sign Structure

Ohio Department of Transportation Traffic Advisory. District 4 Allen C. Biehl, P.E., Deputy Director S. Arlington Road.

DISTRICT CONSTRUCTION PROGRAM PROGRAM DISTRICT CONSTRUCTION

May 1, 2015 Chuck McGinness, BROWARD COUNTY TRAFFIC IMPACT REPORT May 1 through May 8, 2015

NEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release

I-270 Bridge Renovation at New Florissant Road

U.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County

2 Construction Program

NEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release.

MONTANA CONSTRUCTION REPORT 06 / 14 / 2016

State Project Reconstruction I-84

El Dorado County / Tahoe Roadwork Schedule Sunday through Saturday September 9 September 15, 2012

EXTERNAL COMMUNICATIONS COMMITTEE MEETING APRIL 2015

Welcome to the Business Owners Task Force. Perry Leonard Blagg Tire and Service President/COO

PennDOT Announces 2016 Allegheny County Highway and Bridge Improvement Projects

I-10 will close overnight Sunday through Thursday next week. Crews continue to make progress on Sunland s new bridges and ramps.

Weekly construction update

Possible traffic snarls ahead for 60 Freeway with lane/ramp closures on the weekends in Diamond Bar

PROGRESS PARK CONNECTOR

State Route 8 Corridor. Northern Summit County s Path to Success

FEASIBILITY STUDY REFINED CONCEPT 1 PROJECT A

FOR IMMEDIATE RELEASE Fiorella Teodista January 5, 2018 SOUTH FLORIDA AND TREASURE COAST WEEKLY LANE CLOSURES AND WORK ZONE ADVISORY

5.1 Traffic and Transportation

September 1, 2017 I-10 night closures scheduled for September hour full closure of I-10 West happens Sunday, Sept. 10

3529 Souris River Flood Plan (Phase MI-1)

ROUTE 630 DIVERGING DIAMOND INTERCHANGE

Road widening from 2 lanes to 4 lanes. Bridge removal and piping of the canal. Lane closures are not expected.

Which was your favorite Exchange Point & why? Your Team s favorite part of the KT82?

Transcription:

RELEASE: IMMEDIATE February 1, 2019 CONTACT: Sandy Myers 540-332-9201 (office) STA19 020 540-292-2500 (cell) Sandy.Myers@VDOT.virginia.gov Ken Slack 540-332-9264 (office) 540-414-5670 (cell) Ken.Slack@VDOT.virginia.gov TRAFFIC ALERT FOR FEBRUARY 4-8, 2019 Highway Work Zones in the Staunton District STAUNTON The following is a list of highway work that may affect traffic in the Staunton transportation district during the coming weeks. The Staunton district consists of 11 counties from the Alleghany Highlands to the northern Shenandoah Valley: Alleghany, Bath, Rockbridge, Highland, Augusta, Rockingham, Page, Shenandoah, Frederick, Clarke and Warren. Scheduled work is subject to change due to inclement weather and material supplies. Motorists are advised to watch for slow-moving tractors during mowing operations. When traveling through a work zone, be alert to periodic changes in traffic patterns and lane closures. (NEW) or (UPDATE) indicates a new entry or a revised entry since last week s report. ALLEGHANY COUNTY (NEW) Mile marker 9 to 29, eastbound and westbound Right lane and shoulder closures as needed for guardrail maintenance at various locations, February 4 from 9 a.m. to 9 Mile marker 15 to 18, eastbound and westbound Right shoulder closures for sign installations, 9 a.m. to 3 through February 15. Various roads Flagger traffic control for brush cutting and pipe replacements. Monday to Friday from 8:30 a.m. to 4 Route 638 (Natural Well Road) Road closed for Jackson River bridge replacement between Route 687 (Jackson River Road) and Route 666 (East Morris Hill Road). Follow posted detour. Estimated project completion summer 2019. Route 3605 (South Durant Road/West Jackson Street), Covington Flagger traffic control as needed for utility work between Thacker Avenue and South Byrd Avenue. Weekdays from 6:30 a.m. to 5:30 through February 2019.

Various roads Flagger traffic control for brush cutting and pipe replacements. Monday to Friday from 8:30 a.m. to 4 BATH COUNTY Various roads Flagger traffic control for brush cutting. Monday to Friday from 8:30 a.m. to 4 ROCKBRIDGE COUNTY (NEW) Exit 55 (Route 11, Lexington), eastbound and westbound Right shoulder closures for sign work along exit ramp. February 4-8 from 9 a.m. to 3 (NEW) Mile marker 184 to 179, southbound Nighttime lane and shoulder closures as needed for guardrail repairs from 8 February 4 to 10 February 5. (NEW) Exit 188B (at Route 60), northbound Right shoulder closures for sign work along exit ramp. February 4-8, 9 a.m. to 3 (NEW) Mile marker 195 to 197, southbound Overnight lane and shoulder closure for soil work from 5:30 February 1 to 4 a.m. February 2. (NEW) Mile marker 195 to 197, northbound and southbound Overnight alternating lane closures for inspection of bridges over Route 716 and Mill Creek. February 7-8 from 8 to 7 a.m. (UPDATE) Mile marker 199 to 205, northbound and southbound Right shoulder closures for sign installations, 9 a.m. to 3 through February 22. Various roads Flagger traffic control for pipe replacement, ditch work, tree removal, shoulder repairs and brush cutting. Monday to Friday from 8:30 a.m. to 4 (NEW) Route 716 (Mount Atlas Road) Flagger traffic control for inspection of I-64 overpass bridges from 8 February 7 to 7 a.m. February 8. Various roads Flagger traffic control for pipe replacement, ditch work, tree removal, shoulder repairs and brush cutting. Monday to Friday from 8:30 a.m. to 4 HIGHLAND COUNTY Various roads Flagger traffic control for brush cutting. Monday to Friday from 8:30 a.m. to 4

AUGUSTA COUNTY (NEW) Mile marker 88 to 91, eastbound and westbound Overnight alternating lane closures for inspection of Christians Creek bridges. February 3-5 from 7 to 7 a.m. (UPDATE) Mile marker 98 to 88, westbound Overnight lane or shoulder closures for guardrail repair. February 5-7 from 8 to 7 a.m. (NEW) Mile marker 95 to 98, eastbound and westbound Overnight alternating lane closures for inspection of South River bridges. February 5-7 from 7 to 7 a.m. (UPDATE) Mile marker 207 to 205, southbound Shoulder closures as needed for sign installations, 9 a.m. to 3 through February 22. (NEW) Mile marker 208 to 211, northbound and southbound Overnight alternating lane closures for inspection of bridges over Route 662. February 10-11 from 8 to 7 a.m. (NEW) Mile marker 219 to 222, northbound and southbound Overnight lane and shoulder closures for inspection of Route 262 overpass bridges. February 10-11 from 8 to 7 a.m. Mile marker 221 to 223, northbound and southbound Right shoulder closed 24/7 through February 28 for ramp extension work. Occasional lane closures possible during overnight hours. Interchange ramps remain open. (UPDATE) Mile marker 227 to 229, northbound Alternating overnight lane closures for bridge work over Middle River. February 4-8 from 8 to 7 a.m. (NEW) Mile marker 228 to 229, northbound Overnight left lane closure for guardrail repairs, 8 February 7 to 7 a.m. February 8. (NEW) Route 262, eastbound Overnight right shoulder closure for inspection of bridge over I- 81 at exit 220. February 10-11 from 8 to 7 a.m. Route 616 (Dam Town Road) Flagger traffic control for roadway improvements between Route 777 (Knightly Lane) and Route 926 (River Bend Drive), 8 a.m. to 4 through May 2019. ROCKINGHAM COUNTY (UPDATE) Mile marker 246 to 249, northbound and southbound Right shoulder closures for sign installations, through February 22 from 9 a.m. to 3 (UPDATE) Route 11 Mobile lane closures with intersection flaggers for soil testing between Route 704 (Oakwood Drive) and Route 701 (Pike Church Road), through February 7 from 9 to 5 a.m. (UPDATE) Route 33 (Spotswood Trail) Left shoulder closures between Routes 655 (Lawyer Road) and 996 (McGaheysville Road) for pipe repairs in the median, Through February 4 from 7 a.m. to 7

PAGE COUNTY (UPDATE) Route 211 Flagger controlled single lane closures for maintenance of bridges over South Fork Shenandoah River at White House Landing, through February 8 from 7 a.m. to 5 Route 211 Business (West Main Street, Luray) Road closed through June 2019 for replacement of Hawksbill Creek bridge. Follow posted detours. (NEW) Route 340 Business (Alma/Stanley) Flagger controlled single lane closures for maintenance of bridge over South Fork Shenandoah River. Through February 8 from 7 a.m. to 5 SHENANDOAH COUNTY (UPDATE) Mile marker 283 to 284, northbound Right shoulder closure at north end of exit 283 on-ramp for soil work February 5 from 8:30 a.m. to 4:30 FREDERICK COUNTY (NEW) Route 11 (Valley Pike) Right shoulder closures for sign installations at various locations between Route 840 (Water Plant Road) and Skirmisher Lane. February 4-8, from 9 a.m. to 3:30 (NEW) Route 50 (Millwood Pike) Left lane closures as needed for construction of crossover between Route 1092 (Independence Road) and Route 723 (Carpers Valley Road). February 4-8 from 7 a.m. to 4 (NEW) Route 277 (Fairfax Street) Flagger controlled lane closures and lane shifts as needed at intersection with Double Church Road for utility work, 9 a.m. to 3 through February 8.

CLARKE COUNTY WARREN COUNTY INTERSTATE 66 Vegetation management may take place district wide on various routes. Motorists are reminded to use extreme caution when traveling through work zones. Traffic alerts and traveler information can be obtained by dialing 511. Traffic alerts and traveler information also are available at http://www.511virginia.org. The VDOT Customer Service Center can assist with reporting road hazards, asking transportation questions, or getting information related to Virginia s roads. Call 800-FOR- ROAD (800-367-7623) or use its mobile friendly website at https://my.vdot.virginia.gov/. Agents are available 24 hours-a-day, seven days a week. The Staunton District Twitter feed is at @VaDOTStaunton. VDOT can be followed on Facebook, Flickr, Twitter and YouTube. RSS feeds are also available for statewide information. The VDOT Web page is located at http://www.virginiadot.org. (END)