PENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 6-0 TRAFFIC RESTRICTION BULLETIN (NOTE: SCHEDULES ARE SUBJECT TO WEATHER CONDITIONS) (All restrictions 24 hours/day, 7 days/week unless otherwise noted) PENNDOT ROADWAY MAINTENANCE HOTLINE 1-800-FIX- ROAD Log on to www.511pa.com or call 511 from any phone to check conditions on major highways. DATE: 02-17-2017 PHILADELPHIA 21st St. Bridge Demolition: CLOSED & DETOURED between Arch St. & Market St. Friday 10 PM thru Monday 6 AM. 2/17/17-2/20/17 Abbonizio Contractors, $15.8 million New State Rd. Roadway Construction: LANE CLOSURE between Longshore Ave. & PA 73 (Cottman Ave.). 9 AM - 3 PM & 8 PM - 5 AM. 2/19/17-2/25/17 Walsh Construction Company $212.3 million US 1 (City Ave.) N & S Curb Ramp Reconstruction: RIGHT LANE CLOSED between Kings Grant Ave. & PA 23 (Conshohocken State Rd.). 9 AM - 3 PM. 2/20/17 Armour and Sons Electric $4.7 million *I-76 East Sign Structure Repair: RIGHT LANE CLOSED between US 1 (City Ave.) & Falls Rd. 8:01 PM - 12:01 AM. 2/20/17 Collinson, $2.4 million *I-676 E & W Overhead Bridge Construction: CLOSED & DETOURED between I-76 & Broad St. (PA 611). 11 PM - 5 AM. 2/20/17-2/23/17 Buckley & Company, $64.8 million Passyunk Ave. Bridge Rehabilitation: RIGHT LANE CLOSED on Hon. Robert C. Donatucci Memorial Bridge over Schuylkill River. 9 AM - 3 PM. 2/20/17-2/24/17 Buckley & Company, $33.5 million 2/17/2017 Page 1 of 17
*I-95 N & S Overhead Shielding Installation: INTERMITTENT DOUBLE LEFT OR RIGHT LANE CLOSURES between Allegheny Ave. & Bridge St. exits. 8 PM - 5 AM. 2/20/17-2/24/17 Driscoll Construction Company, /Richard E. Pierson Construction Company, $160.2 million Aramingo Ave. Clearing Operations: LANE CLOSURES between Wheatsheaf Lane & I-95 Interchange. 9 AM - 3 PM. 2/20/17-2/24/17 A.P. Construction, $87 million Snyder Ave. Arch St. Curb Ramp Reconstruction: LANE RESTRICTIONS between Front St. & 29th St. 7 AM - 4 PM. Curb Ramp Reconstruction: LANE RESTRICTIONS between 7th St. & PA 611 (Broad St.). 7 AM - 4 PM. 2/20/17-2/24/17 James J. Anderson $13.4 million 2/20/17-2/24/17 James J. Anderson $13.4 million *I-95 South *I-76 West DMS Testing: LANE CLOSURE between Bridge St./Harbison Ave.) & Allegheny Ave./Castor Ave.). 9 AM - 3 PM. DMS Testing: LANE CLOSURE between Pattison Ave. & Mifflin St. 9 AM - 3 PM. 2/21/17 Miller Brothers $15.5 million 2/21/17 Miller Brothers $15.5 million *I-76 E & W Install DMS Structure: LANE CLOSURE between Montgomery Drive & US 1 (City Ave.). 12 AM - 5 AM. 2/21/17 Miller Brothers $15.5 million *I-76 East ramp to US 1 North Sign Structure Repair: RIGHT LANE CLOSED on ramp. 12 AM - 2 AM. 2/21/17 Collinson, $2.4 million *I-76 East ramp to US 1 North Sign Structure Repair: LEFT LANE CLOSED on ramp. 2 AM - 4 AM. 2/21/17 Collinson, $2.4 million *I-676 West ramp to I-76 East Sign Structure Repair: RIGHT LANE CLOSED on ramp. 8:01 PM - 12:01 AM. 2/21/17 Collinson, $2.4 million 2/17/2017 Page 2 of 17
*US 1 N & S (Roosevelt Extension/Blvd.) Drain Cleaning/Debris Removal: INTERMITTENT LANE RESTRICTIONS between I-76 & 9th St. 9:30 AM - 2 PM. 2/21/17-2/23/17 Maintenance *I-676 E & W Drain Cleaning/Debris Removal: INTERMITTENT 2/21/17-2/23/17 Maintenance LANE RESTRICTIONS between I-76 & I-95. 9:30 AM - 2 PM. *I-95 N & S Drain Cleaning/Debris Removal: INTERMITTENT LANE RESTRICTIONS between Phila. Int. Airport & PA 63 (Woodhaven Rd.). 9:30 AM - 2 PM. 2/21/17-2/23/17 Maintenance *I-76 E & W Drain Cleaning/Debris Removal: LANE RESTRICTIONS between US 1 (City Ave.) & 26th St. 9:30 AM - 2 PM. 2/21/17-2/23/17 Maintenance Torresdale Ave. Bridge Rehabilitation: LANE SHIFTS between Tolbut St. & Linden Ave. 7 AM - 3:30 PM. 2/21/17-4/17/17 Loftus Construction, $11.7 million *I-676 West ramp to I-76 East Sign Structure Repairs: LEFT LANE CLOSED on ramp. 12:01 AM - 4 AM. 2/22/17 Collinson, $2.4 million *US 1 North (Roosevelt Blvd.) Sign Structure Repairs: RIGHT LANE CLOSED between Old York Rd. & Wingohocking St. 8:01 PM - 12:01 AM. 2/22/17 Collinson, $2.4 million Walnut Lane Line Striping: LANE CLOSURE between Magdalena St. & Park Line Drive. 9 AM - 3:30 PM. 2/22/17 Buckley & Company, $14 million *I-95 South *I-76 East Guide Rail Repair: LANE CLOSURES between Cottman Ave. & Bridge St./Harbison Ave. Interchanges. 10 PM - 5 AM. Overhead Bridge Maintenance: LANE CLOSURE between South St. & University Ave./Grays Ferry. 10 PM - 4 AM. 2/23/17 Long Fence, $2.7 million 2/27/17-3/2/17 CSX 2/17/2017 Page 3 of 17
New State Rd. Roadway Construction: LANE CLOSURE between Longshore Ave. & PA 73 (Cottman Ave.). 8 PM - 5 AM. 2/12/17-2/18/17 Walsh Construction Company $212.3 million *I-76 E & W Install DMS Foundation: LANE RESTRICTIONS between Montgomery Drive & US 1 (City Ave.). 12 AM - 5 AM. 2/13/17-2/18/17 Miller Brothers $15.5 million *I-95 South Academy Rd. Install DMS Foundation: LANE RESTRICTIONS between Bridge St. & Cottman Ave. (PA 73). 12 AM - 5 AM. Bridge Rehabilitation: RIGHT LANE CLOSED between US 13 (Frankford Ave.) & I-95. Weekdays. 9 AM - 3 PM. Aramingo Ave. on-ramp to I-95 North Overhead Sign Installation: INTERMITTENT 15- MINUTE STOPPAGES on ramp. 8 PM - 5 AM. 2/13/17-2/18/17 Miller Brothers $15.5 million 2/13/17-5/12/17 Loftus Construction, 2/15/17-2/17/17 Driscoll Construction Company, /Richard E. Pierson Construction Company, $11.7 million $160.2 million JFK Blvd. East Bridge Replacement: CLOSED & DETOURED between Schuylkill Ave. & 20th St. 24-HOUR 1/23/17-8/2/18 Abbonizio Contractors, $15.8 million *US 1 N & S (Roosevelt Blvd.) Bridge Rehabilitation: RIGHT LANE CLOSED at Broad St. (PA 611). 9 AM - 3 PM. 1/9/17-2/24/17 Loftus Construction, $7.5 million West Abbotsford Rd. 22nd St. Bridge Repair: CLOSED & DETOURED between Wissahickon Ave. & Fox St. 24-HOUR DETOUR. Bridge Construction: TRAFFIC PATTERN CHANGE on bridge over I-676 between Ben Franklin Parkway & Race St. 12/21/16-2/28/17 Road-Con, $4 million 11/7/16-11/30/18 Buckley & Company, $64.8 million 21st St. Bridge Construction: TRAFFIC PATTERN CHANGE on bridge over I-676 between Ben Franklin Parkway & Race St. 11/7/16-11/30/18 Buckley & Company, $64.8 million 2/17/2017 Page 4 of 17
*I-95 South off-ramp to Aramingo $160.2 million Ave. Ramp Reconstruction: RAMP CLOSED & DETOURED. 24-HOUR DETOUR. DETOUR POSTED. 9/21/16-6/2017 Driscoll Construction Company, /Richard E. Pierson Construction Company, Berks St. Bridge Construction: CLOSED & DETOURED between East Wildey St. & Delaware Ave. 24-HOUR 7/25/16-4/1/17 James J. Anderson $211.7 million Olney Ave. Roadwork: LANE RESTRICTIONS between Broad St. (PA 611) & Rising Sun Ave. 9 AM - 3 PM. 12/2/15-11/2017 Armour and Sons Electric $4.7 million Sergeant St. Huntingdon St. Somerset St. *Aramingo Ave. ramp to I-95 South Girard Ave. on-ramp to I-95 North Richmond St. South Benjamin Franklin Parkway Bridge Work: CLOSED & DETOUR between Salmon St. & Richmond St. 24-HOUR DETOUR. DETOUR POSTED. Bridge Work: CLOSED & DETOUR between Salmon St. & Richmond St. 24-HOUR DETOUR. DETOUR POSTED. Bridge Work: CLOSED & DETOUR between Salmon St. & Richmond St. 24-HOUR DETOUR. DETOUR POSTED. Ramp Reconstruction: CLOSED & DETOURED at Betsy Ross Bridge Interchange. 24-HOUR CLOSURE. Highway and Ramp Reconstruction: RAMP CLOSED & DETOURED. 24-HOUR CLOSURE. DETOUR POSTED. Intersection Reconstruction: CLOSED & DETOURED between Lehigh Ave. & Delaware Ave. 24-HOUR CLOSURE. Bridge Construction: INNER LANES REDUCED FROM THREE LANES TO TWO between 21st St. & 20th St. 12/28/15-12/2018 James J. Anderson $211 million 12/28/15-12/2018 James J. Anderson $211 million 12/28/15-12/2018 James J. Anderson $211 million 12/21/15-2/27/17 Driscoll Construction Company, /Richard E. Pierson Construction Company, $160.2 million 12/16/15-6/2017 James J. Anderson $211 million 12/16/15-6/2017 James J. Anderson $211 million 10/23/15-6/2017 Buckley & Company, $64.8 million 2/17/2017 Page 5 of 17
Winter St. Roadwork: LANE RESTRICTIONS between 20th St. & 10/6/15-4/2/17 Buckley & Company, $64.8 million 21st St. 24-HOUR RESTRICTIONS. Benjamin Franklin Parkway East Road Construction: OUTER LANES CLOSED at 21st St. 10/6/15-6/2017 Buckley & Company, $64.8 million Delaware Ave. BUCKS COUNTY US 1 N & S (Lincoln Hwy.), Falls, Lower Makefield, Middletown twps. Reconstruction: NEW TRAFFIC PATTERN between Columbia Ave. & Aramingo Ave. 24-HOUR RESTRICTIONS. Bridge Rehabilitation: LANE CLOSURES between I-95 & Stoney Hill Rd. interchanges. 9 PM - 6 AM. 4/1/15-10/2018 James J. Anderson $211.7 million 2/19/17-2/23/17 Loftus Construction, $11.7 million PA 413 (New Rodgers Rd.), Bristol Durham Rd., Bristol Bridge Rehabilitation: CLOSED & DETOURED between Plumbridge Drive & Bath Rd./Durham Rd. 8 PM - 5 AM. Roadwork: LANE RESTRICTIONS between PA 413 & New Falls Rd. 7 AM - 3 PM. 2/19/17-3/19/17 Pennsylvania $142 million Turnpike Commission 2/19/17-3/19/17 Pennsylvania $142 million Turnpike Commission Durham Rd., Bristol Roadwork: CLOSED & DETOURED between PA 413 & New Falls Rd. 8 PM - 5 AM. 2/19/17-3/19/17 Pennsylvania $142 million Turnpike Commission Green Lane, Bristol Conduit Installation: LANE SHIFT between Airport Rd. & Pacific Ave. 7 AM - 3 PM & 8 PM - 5 AM. 2/19/17-3/19/17 Pennsylvania $142 million Turnpike Commission Chinquapin Rd., Upper Southampton Utility Installation: LANE RESTRICTIONS between Witherington Drive & East Chinquapin Rd. 9 AM - 3 PM. 2/20/17-2/21/17 PECO Energy PA 611 (Easton Rd.), Warrington Curb Ramp Installation: LANE CLOSURES at Steeplechase Drive; Turk Rd.; Almshouse Rd.; Edison Furlong Rd.; New Britain Rd./Sauerman Rd.; Bristol Rd.; Kelly Rd.; Freedoms Way/Oxford Drive; Doylestown Plaza. 9 AM - 3 PM. 2/20/17-2/24/17 James D. Morrissey $4.3 million 2/17/2017 Page 6 of 17
*I-95 N & S, Morrisville Bor. Core Boring: LANE CLOSURE between New Hope/Yardley Interchange & New Jersey state line. 9 AM - 3 PM. 2/20/17-2/24/17 Delaware River Joint Toll Bridge Commission Taylorsville Rd., Lower Makefield PA 611 South, Doylestown, Doylestown Bor. Core Boring: SHOULDER CLOSURE between Woodside Rd. & Highland Drive. 9 AM - 3 PM. Line Painting: RIGHT LANE CLOSED between N. Broad St. & W. State St. 9 AM - 3 PM. 2/20/17-2/24/17 Delaware River Joint Toll Bridge Commission 2/20/17-2/24/17 Rohm and Haas Chemicals, LLC PA 132 West (Street Rd.), Bensalem Old Lincoln Hwy, Bensalem Equipment & Material Delivery: RIGHT LANE CLOSED between Old Lincoln Hwy. & Richlieu Rd. 9 AM - 3 PM. Tree Removal: LANE RESTRICTIONS between PA 132 (Street Rd.) & Bristol Rd. 7 AM - 3 PM. 2/20/17-2/24/17 Pennsylvania Turnpike Commission 2/21/17 PennDOT Bristol Rd., Warwick Tree Removal: LANE RESTRICTIONS at Graeme Way. 7 AM - 3 PM. 2/22/17 PennDOT PA 313 (Swamp Rd.), Doylestown Tree Removal: LANE RESTRICTIONS at Columbus Day Rd. 2/22/17-2/23/17 PennDOT PA 309 North (Bethlehem Pike), Hilltown State Rd., Bristol Fiber Optic Installation: RIGHT LANE CLOSED between Hilltown Pike & Swartley Rd. Weekdays. 8 AM - 5 PM. Utility Installation: LANE RESTRICTIONS between Grant Ave. & Linton Ave. 9 AM - 3 PM. 2/22/17-3/17/17 Maintenance 2/23/17-2/24/17 PECO Energy Red Hill Rd., Tinicum Tree Removal: LANE RESTRICTIONS at Frankenfield Rd. 7 AM - 3 PM. 2/24/17 PennDOT Mill Rd., Bensalem Utility Installation: CLOSED & DETOURED between US 13 (Bristol Pike) & State Rd. Weekdays. 9 AM - 3 PM. 2/27/17-4/28/17 Aqua Pennsylvania 2/17/2017 Page 7 of 17
Bellevue Ave., Penndel Bor. Utility Installation: LANE RESTRICTIONS at Crescent 2/6/17-2/24/17 PECO Energy Ave. Weekdays. 9 AM - 3 PM. PA 152 (Limekiln Pike), Warrington, Oxford Valley Rd., Falls, Lower Makefield, Middletown twps. Pine Grove Rd., Falls, Morrisville Bor. Utility Installation & Paving: CLOSED & DETOURED between Westminster Drive & County Line Rd. 24- HOUR Bridge Rehabilitation: LANE CLOSURES between Big Oak Rd. & Cabot Blvd. 7 AM - 3:30 PM & 9 PM - 5AM. Road Widening & Drainage: LANE RESTRICTIONS between West Trenton Ave. & Valley View Drive. Weekdays. 9 AM - 3 PM. 12/13/16-10/12/17 James D. Morrissey, 11/14/16-5/2017 Loftus Construction, 10/11/16-6/30/17 Buckingham Retail Properties, LLC & Falls Township $14.8 million $11.7 million W. Trenton Ave., Falls, Morrisville Bor. Road Widening & Drainage: LANE RESTRICTIONS between Pine Grove Rd. & Sweet Briar Rd. Weekdays. 9 AM - 3 PM. 10/11/16-6/30/17 Buckingham Retail Properties, LLC Allentown Rd., Trumbauersville Bor. Pole Replacement & Install New Wire: LANE CLOSURE between Creamery Rd. & Oak Drive. Monday thru Friday 9 AM - 3 PM. Saturday. 8 AM - 5 PM. 9/29/16-2/24/17 PP&L Utilities Allentown Rd., Trumbauersville Bor. County Line Rd., Warrington, Horsham, Montgomery twps. Pole Replacement & Install New Wire: LANE CLOSURE between Creamery Rd. & Milford Square Pike. Monday thru Friday. 9 AM - 3 PM. Saturday. 8 AM - 5 PM. Utility Installation: LANE RESTRICTIONS between East Kulp Rd. & Stump Rd. 7 AM - 3 PM. 9/29/16-2/24/17 PP&L Utilities 3/7/16-9/2018 James D. Morrissey, $14.8 million Oxford Valley Rd. South, Falls, Lower Makefield twps. *US 202 North, Buckingham, Doylestown Bor. *PA 263 (York Rd.), Warwick Bridge Damage: SOUTHBOUND LEFT TURN LANE RESTRICTED at US 1 Interchange. 24-HOUR RESTRICTIONS. Road Construction: LANE RESTRICTIONS between PA 313 (Swamp Rd.) & Mechanicsville Rd. 9 AM - 3 PM. Road Reconstruction: LANE CLOSURES between Bristol Rd. & Sugar Bottom Rd. 24-HOUR RESTRICTIONS. 6/29/15-Indef. PennDOT 4/13/15-11/9/18 James D. Morrissey $11 million 3/17/14-6/2017 J.D. Eckman, $31.6 million 2/17/2017 Page 8 of 17
Headquarters Rd., Tinicum Bridge Damage: CLOSED & DETOURED between 3/2/11-Indef. Red Hill Rd. & Tankhannen Rd. CHESTER COUNTY *US 30 E & W,, Valley, Caln twps. Median Stabilization: LANE RESTRICTIONS between Airport Rd. & PA 340 (Kings Hwy.). 9 AM - 3 PM. 2/21/17-2/23/17 Maintenance PA 926 (Street Rd.), Westtown, Birmingham twps. Crack Sealing: LANE RESTRICTIONS between PA 3 (West Chester Pike) & Creek Rd. 9 AM - 3 PM. 2/21/17-2/24/17 Maintenance Sugartown Rd., Easttown PA 926 (Street Rd.), Pocopson, Birmingham twps. Edenton Rd., Upper Oxford Utility Installation: LANE CLOSURE between Black Swan Lane & Rock Creek Circle. Weekdays. 9 AM - 3 PM. Bridge Replacement: CLOSED & DETOURED between Pocopson Rd. & Creek Rd. 24-HOUR Bridge Rehabilitation: CLOSED & DETOURED between Hawkins Rd. & Saw Mill Rd. Weekdays. 7 AM - 3:30 PM. 2/13/17-2/20/17 PECO Energy 2/13/17-9/1/17 Clearwater Construction 2/6/17-3/17/17 Loftus Construction, $8.6 million $11.7 million Paoli Pike, Willistown Utility Installation: LANE RESTRICTIONS at Grubb Rd. Weekdays. 9 AM - 3 PM. 2/6/17-3/6/17 PECO Energy *US 422 East, North Coventry *US 422 West, North Coventry Road & Bridge Construction: LANE CLOSURES between PA 724 (Schuylkill Rd.) & Sanatoga interchanges. 9 AM - 2 PM & 5 PM - 5 AM. Road & Bridge Construction: LANE CLOSURES between Sanatoga & PA 724 (Schuylkill Rd.) interchanges. 7 PM - 1 PM. 12/28/16-2/28/17 J.D. Eckman, $73.3 million 12/28/16-2/28/17 J.D. Eckman, $73.3 million PA 82 (Doe Run Rd.), East Fallowfield Bridge Rehabilitation: CLOSED & DETOURED between Valley Rd. & Strasburg Rd. 24-HOUR 1/17/17-6/21/17 Loftus Construction, $11.7 million Hollow Rd., West Vincent, East Vincent twps. Bridge Damage: CLOSED & DETOURED between French Creek Rd. & Pughtown Rd. 24-HOUR 11/20/16-Indef. PennDOT 2/17/2017 Page 9 of 17
Main St., Parkesburg Bor. Utility Installation: CLOSED & DETOURED between Culvert St. & Bridge St. Weekdays. 8 AM - 4:30 PM. 10/3/16-4/30/17 Pennsylvania American Water Green Valley Rd., Newlin Bridge Damage: CLOSED & DETOURED between Powell Rd. & Brandywine Creek Rd. 24-HOUR 5/11/16-Indef. PennDOT Ross Fording Rd., West Fallowfield Bridge Damage: CLOSED & DETOURED between Creek Rd. & Bryson Rd. 24-HOUR DETOUR. 7/2/15-Indef. PennDOT PA 724 ramp to US 422 East, East Coventry Ramp/Bridge Construction: RAMP CLOSED & DETOURED. 5/27/15-3/2018 J.D. Eckman, $73.3 million *US 422 E & W, North Coventry *US 422 E & W, North Coventry Bridge Construction: REDUCED TO ONE LANE between Stowe & PA 100 Interchange. 24-HOUR RESTRICTION. Road Construction: TRAFFIC PATTERN SHIFT between Sanatoga & PA 724 (Schuylkill Rd.) interchanges. 24-HOUR PATTERN. 11/27/14-9/2018 J.D. Eckman, $36 million 2/2/13-8/2018 J.D. Eckman, $73.3 million DELAWARE COUNTY E. Baltimore Ave., Nether Providence, Upper Providence twps., Media Bor. Utility Installation: LANE RESTRICTIONS between S. Edgmont St. & Randor St. 9 AM - 3 PM. 2/20/17-2/24/17 Aqua Pennsylvania Baltimore Ave., Lansdowne Bor. Traffic Signal Upgrade: LANE RESTRICTIONS at Lansdowne Ave.; Wycombe Ave.; Union Ave.; Martin Drive; Walsh Rd. & Mansfield Ave. 9 AM - 3 PM. 2/20/17-2/24/17 Lenni Electric $4.1 million Baltimore Ave., Upper Darby, Lansdowne Bor. Traffic Signal Upgrade: LANE RESTRICTIONS between Lansdowne Ave.; Penn Blvd./4th St.; Wycombe Ave.; Burmont Rd.; Scottdale Rd. & Church Lane. 9 AM - 3 PM. 2/20/17-2/24/17 Lenni Electric $4.1 million Baltimore Ave., Clifton Heights Bor., Upper Darby Road Widening: LANE RESTRICTIONS at Springfield Rd.; Church Lane; Delmar Drive; Diamond St. & Home Depot Drive. 9 AM - 3 PM. 2/20/17-2/24/17 Lenni Electric $4.1 million 2/17/2017 Page 10 of 17
Springfield Ave., Clifton Heights Bor. Curb Ramp Reconstruction: LANE CLOSURE at Diamond St.; Madison St.; Woodlawn Ave.; Clifton Ave. & Broadway Ave. 9 AM - 3 PM. 2/20/17-2/24/17 L.C. Costa Contractors, $4.1 million US 1 (Baltimore Ave.), Clifton Heights Bor. Curb Ramp Reconstruction: LANE CLOSURES at Church St.; Marple Ave.; Jackson Ave.; Springfield Ave.; Bishop Ave. & Glenwood Ave. 9 AM - 3 PM. 2/20/17-2/24/17 L.C. Costa Contractors, $4.1 million PA 3 (West Chester Pike), Haverford, Upper Darby twps. Curb Ramp Reconstruction: LANE CLOSURE at Brief Ave., Carol Blvd.; State Rd.; Copley Rd.; Terminal Square & Pennock Ave. 9 AM - 3 PM. 2/20/17-2/24/17 L.C. Costa Contractors, $5.9 million PA 3 (Market St.), Millbourne Bor. Curb Ramp Reconstruction: LANE CLOSURE at Chatham Rd.; Forge Rd.; Copley Rd.; Terminal Square & Millbourne Ave. 9 AM - 3 PM. 2/20/17-2/24/17 L.C. Costa Contractors, $5.9 million US 1 South (Baltimore Pike), Middletown Pipeline Maintenance: LANE CLOSURE between Valley Rd. & S. Pennell Rd. Weekdays. 9 AM - 3 PM. 2/20/17-3/3/17 Sunoco Logistics PA 452 North (South Pennell Rd.), Middletown Pipeline Maintenance: LANE CLOSURE at Wildwood Lane. Weekdays. 9 AM - 3 PM. 2/20/17-3/3/17 Sunoco Logistics Valley Rd., Edgmont Township Line Rd., Upper Darby *I-95 North, Tinicum PA 452 (Pennell Rd.), Middletown Pipeline Maintenance: LANE CLOSURE at Birchwood Lane. Weekdays. 9 AM - 3 PM. Utility Installation: LANE RESTRICTIONS between Bella Vista Rd. & Dermond Rd. Weekdays. 9 AM - 3 PM. DMS Testing: LANE RESTRICTIONS between PA 420 (Wanamaker Ave.) & PA 291 (Gov. Printz Blvd.). 9 AM - 3 PM. Utility Installation: LANE RESTRICTIONS between US 1 (Baltimore Pike) & Hunter St. 9 AM - 3 PM. 2/20/17-3/3/17 Sunoco Logistics 2/20/17-3/31/17 Aqua Pennsylvania 2/21/17 Miller Brothers $15.5 million 2/21/17-2/22/17 Aqua Pennsylvania 2/17/2017 Page 11 of 17
*US 322 E & W (Conchester Hwy.), Concord, Bethel, Upper Chichester twps. Patching: LANE CLOSURES between US 1 (Baltimore Pike) & I-95. 9 AM - 3 PM. 2/22/17 Maintenance Wayne Ave., Radnor *I-95 South, Tinicum, Ridley, Chester, Upper Chichester, Lower Chichester twps., Upland Bor., Chester City Concord Rd., Bethel Utility Installation: LANE CLOSURE between Audubon Ave. & Pembroke Ave. 9 AM - 3 PM. Patching: INTERMITTENT LANE CLOSURES between Philadelphia County line & Delaware state line. 9 AM - 3 PM. Bridge Repair: CLOSED & DETOURED between Valleybrook Rd. & Mattson Rd. 24-HOUR DETOUR. 2/22/17-3/1/17 PECO Energy 2/23/17 Maintenance 3/6/17-3/10/17 Maintenance Darby Rd., Haverford Morton St., Lower Chichester Blueball Ave., Upper Chichester Telephone Pole Installation: LANE RESTRICTIONS between PA 320 (Sproul Rd.) & Radnor Rd. Weekdays. 9 AM - 3 PM. Drainage Work: CLOSED & DETOURED between Green St. & Market St. Weekdays. 9 AM - 3 PM. Bridge Repair: CLOSED & DETOURED between Columbia Ave. & Scott Ave. 24-HOUR DETOUR. 2/13/17-5/31/17 PECO Energy 2/15/17-3/2/17 Road-Con, $19.9 million 2/15/17-8/15/17 PennDOT Conestoga Rd., Radnor Calcon Hook Rd., Darby, Sharon Hill Bor. Blueball Ave., Upper Chichester Utility Installation: CLOSED & DETOURED between US 30 (Lancaster Ave.) & Church Rd. Weekdays. 9 AM - 3 PM. Utility Installation: CLOSED & DETOURED between Bonsall Ave. & Hook Rd. Weekdays. 9 AM - 3 PM. Utility Installation: CLOSED & DETOURED between Columbia Ave. & Scott Ave. 24-HOUR DETOUR. 1/23/17-6/30/17 PECO Energy 1/24/17-2/24/17 Aqua Pennsylvania 12/27/16-2/24/17 Chester Water Authority 2/17/2017 Page 12 of 17
College Ave., Haverford Bridge Construction: CLOSED & DETOURED between Spring Mill Rd. & Haverford Rd. 24-HOUR 11/29/16-11/7/17 Road-Con, $5.2 million Springfield Rd, Springfield, Upper Darby twps., Clifton Heights Bor. Utility Installation: CLOSED & DETOURED between Saxer Ave. & Oak Ave. Weekdays. 9 AM - 3 PM. 9/19/16-4/8/17 Aqua Pennsylvania U.S. 13 (10th St./Post Road), Marcus Hook Bor. Streetscape & Traffic Signal Improvements/Curb, Sidewalk, ADA Ramp Installation: LANE RESTRICTIONS between Blueball Ave. & Penn Ave./Walnut St. Weekdays. 9 AM - 3 PM. 3/21/16-3/31/17 Marino Corporation $1,661,612.00 MONTGOMERY COUNTY *I-76 East, Lower Merion Litter & Debris removal: MOVING OPERATION between I-476 & Belmont exits. 7 AM - 2 PM. 2/18/17 Maintenance US 1 (City Ave.) N & S, Lower Merion Curb Ramp Reconstruction: RIGHT LANE CLOSED between Kings Grant Ave. & PA 23 (Conshohocken State Rd.). 9 AM - 3 PM. 2/20/17 Armour and Sons Electric $4.7 million PA 73 (Skippack Pike), Skippack Utility Installation: LANE RESTRICTIONS between Cross Rd. & Hudnut Rd. 9 AM - 3 PM. 2/20/17-2/21/17 PECO Energy *US 422 East off-ramp to PA 23, Upper Merion, West Norriton twps. Material/Equipment Delivery: LANE RESTRICTIONS on the ramp. 9 AM - 3:30 PM. 2/20/17-2/24/17 J.D. Eckman, $97.4 million *US 202 N & S (DeKalb Pike), Whitpain Test Holes: LANE RESTRICTIONS between PA Turnpike & Township Line Rd. Weekdays. 9 AM - 3 PM. 2/20/17-2/24/17 So-Deep, Meyers Rd., Perkiomen PA 73 (Skippack Pike), Skippack Utility & Fiber Optic Installation: LANE 2/20/17-2/24/17 Reading Site RESTRICTIONS between Seitz Rd. & Miller Rd. 9 AM Contractors - 3 PM. Clearing & Grubbing: LANE RESTRICTIONS between 2/20/17-2/24/17 Reading Site Squirrel Hill Rd. & Perkiomen Creek Rd. 9 AM - 3 PM. Contractors $11 million $11 million 2/17/2017 Page 13 of 17
PA 29 (Gravel Pike), Perkiomen Pole Relocations: LANE RESTRICTIONS between 2/20/17-2/24/17 Reading Site $11 million Miller Rd. & Harrison Ave. 9 AM - 3 PM. Contractors Plank Rd., Perkiomen Pole Relocations: LANE RESTRICTIONS between PA 29 (Gravel Pike) & PA 73 (Skippack Pike). 9 AM - 3 PM. 2/20/17-2/24/17 Reading Site Contractors $11 million Willow Grove Ave., Springfield Curb Ramp Construction: LANE CLOSURE at Ardmore Ave.; Pleasant Ave.; Flourtown Ave.; Traymore Ave. & Pine Rd. 9 AM - 3:30 PM. 2/20/17-2/24/17 Allan Myers, LP $6,395,555.00 Buchert Rd., Pottsgrove Curb Ramp Construction: LANE CLOSURE at Pleasantview Rd.; N. Washington St. & Mervine St. 9 AM - 3 PM. 2/20/17-2/24/17 Highway Materials, $4.8 million Mervine St., Lower Pottsgrove Twp, Pottstown Bor. Curb Ramp Construction: LANE CLOSURE at N. Franklin St. 9 AM - 3:30 PM. 2/20/17-2/24/17 Highway Materials, $4.8 million Norristown Rd., Lower Gwynedd Germantown Pike, East Norriton, Plymouth twps. ITS Installation: LANE CLOSURES between Bethlehem Pike & Tennis Ave. 9 AM - 3 PM. ITS Installation: LANE CLOSURES between I-476 & Swede Rd. 9 AM - 3 PM. 2/20/17-2/24/17 Carr & Duff, $3.6 million 2/20/17-2/24/17 Carr & Duff, $3.6 million PA 63 (Sumneytown Pike), Lower Salford, Towamencin, Upper Gwynedd, Lower Gwynedd, Montgomery twps.; North Wales Bor. ITS Installation: LANE CLOSURES between Harleysville Pike & Bethlehem Pike. 9 AM - 3 PM. 2/20/17-2/24/17 Carr & Duff, $3.6 million Bethlehem Pike, Montgomery, Hatfield twps. *US 422 East, Upper Merion, West Norriton twps. ITS Installation: LANE CLOSURES between McLaughlin Rd. & Bergey Rd. 9 AM - 3 PM. Sign Installation: RIGHT LANE CLOSED between PA 23 & First Ave. Interchanges. 10 AM - 3:30 PM. 2/20/17-2/24/17 Carr & Duff, $3.6 million 2/21/17-2/22/17 J.D. Eckman, $97.4 million *I-476 N & S, Plymouth, Lower Merion twps., West Conshohocken Bor. Litter & Debris Removal: MOVING OPERATION between Turnpike Interchange & County Line Rd. 9 AM - 3 PM. 2/21/17-2/23/17 Maintenance 2/17/2017 Page 14 of 17
PA 309 N & S, Cheltenham, Springfield, Upper Dublin, Lower Gwynedd twps. Sweeping & Debris Removal: MOVING OPERATION between Cheltenham Ave. & PA 63 (Welsh Rd.). 7 AM - 3 PM. 2/21/17-2/23/17 Maintenance *I-76 E & W, Upper Merion, Lower Merion twps., Conshohocken Bor. *US 422 E & W, Lower Providence, Upper Providence, Limerick, Lower Pottsgrove twps. Litter & Debris Removal: MOVING OPERATION WITH LANE CLOSURES between PA Turnpike & US 1 (City Ave.). 9 AM - 3 PM. Liter & Debris Removal: MOVING OPERATION between PA 100 (Pottstown Pike) & PA 363 (Trooper Rd.). 9 AM - 3 PM. 2/21/17-2/23/17 Maintenance 2/21/17-2/23/17 Maintenance Cowpath Rd., Hatfield Troutman Rd., Upper Providence Utility Installation: LANE RESTRICTIONS between Lenhart Rd. & Walnut St. 9 AM - 3 PM. Bridge Inspection: LANE CLOSURE between Ashenfelter Rd. & Arcole Rd. 9 AM - 3 PM. 2/21/17-2/24/17 PECO Energy 2/24/17 AECOM Township Line Rd., Jenkintown Bor. Utility Installation: CLOSED & DETOURED between Greenwood Ave. & Washington Lane. Weekdays. 8 AM - 3 PM. Township Line Rd., Jenkintown Bor. Utility Installation: LANE RESTRICTIONS between Washington Lane & PA 611 (Old York Rd.). Weekdays. 8 AM - 3 PM. *US 422 East, Upper Providence 2/28/17-5/26/17 Aqua Pennsylvania 2/28/17-5/26/17 Aqua Pennsylvania DMS Structure Foundation Installation: LANE 2/13/17-2/18/17 Miller Brothers $15.5 million CLOSURES between PA 29 & Black Rock Rd. 9 PM - 5 AM. Swedeland Rd., Upper Merion *US 422 East, Lower Pottsgrove *US 422 West, Lower Pottsgrove Utility Installation: CLOSED & DETOURED between Trinity Rd. & Holstein Rd. Weekdays. 9 AM - 3 PM. Road & Bridge Construction: LANE CLOSURES between PA 724 (Schuylkill Rd.) & Sanatoga interchanges. 5 PM - 5 AM. Road & Bridge Construction: WEEKEND LANE CLOSURES between Sanatoga & PA 724 (Schuylkill Rd.) interchanges. 7 PM - 1 PM. 2/13/17-3/31/17 Aqua Pennsylvania 1/28/17-2/28/17 J.D. Eckman, $73.3 million 1/28/16-2/28/17 J.D. Eckman, $73.3 million 2/17/2017 Page 15 of 17
PA 63 (Sumneytown Pike), Upper Salford Soil Borings: LANE RESTRICTIONS between Gerryville Pike & Cedar Hill Rd. Weekdays. 9 AM - 3 PM. 1/30/17-2/24/17 TRC Solutions Edge Hill Rd., Abington Bridge Rehabilitation: CLOSED & DETOURED between Ferndale Ave. & Hamilton Ave. 24-HOUR 1/9/17-11/1/17 J.D. Eckman, $3.6 million Allentown Rd., Towamencin Curb Ramp Replacement: LANE RESTRICTIONS at Valley Forge Rd. & Woodlawn Drive. Weekdays. 9 AM - 3 PM. 1/3/17-2/24/17 Highway Materials, $4.8 million PA 63 (Welsh Rd.), Lower Gwynedd Curb Ramp Replacement: LANE RESTRICTIONS at Howe Lane. Weekdays. 9 AM - 3 PM. 1/3/17-2/24/17 Highway Materials, $4.8 million Montgomery Ave., Upper Merion Sidewalk Replacement: LANE RESTRICTIONS at Matsonford Rd. Weekdays. 9 AM - 3 PM. 12/5/16-3/3/17 SEPTA PA 663 (Layfield Rd.), Upper Hanover Bridge Rehabilitation: CLOSED & DETOURED between Kutztown Rd. & Schoolhouse Rd. 24-HOUR 11/14/16-8/2017 Loftus Construction, $11.7 million East Walnut St., Hatfield Bridge Replacement: CLOSED & DETOURED between PA 309 & County Line Rd. 24-HOUR 10/24/16-9/28/17 Hatfield Township PA 63 (Old Welsh Rd.), Abington Utility Installation: CLOSED & DETOURED between Paper Mill Rd. & Huntingdon Rd. Weekdays. 9 AM - 3 PM. 10/12/16-2/24/17 Abington Township Municipal Authority County Line Rd., Warrington, Horsham, Montgomery twps. Utility Installation: LANE RESTRICTIONS between Kulp Rd. & Stump Rd. 7 AM - 3 PM. 3/7/16-9/2018 James D. Morrissey, $14.8 million Baligomingo Rd., West Conshohocken Bor. Slope Stabilization: CLOSED & DETOURED between PA 23 (Front St.) & Portland Rd. 24-HOUR DETOUR. 6/27/15-Indef. PA 724 ramp to US 422 East, Lower Pottsgrove Roadwork: RAMP CLOSED & DETOURED. 24- HOUR CLOSURE. 5/27/15-3/2018 J.D. Eckman, $73.3 million 2/17/2017 Page 16 of 17
*US 422 E & W, Lower Pottsgrove Road Construction: TRAFFIC PATTERN SHIFT between Sanatoga & PA 724 (Schuylkill Rd.) Interchanges. 24-HOUR PATTERN. 2/2/13-8/2018 J.D. Eckman, $73.3 million *US 422 E & W, West Pottsgrove Bridge Construction: REDUCED TO ONE LANE between Stowe & PA 100 Interchange. 24-HOUR RESTRICTION. County Line Rd., Upper Merion Road Work: CLOSED & DETOURED WEEKDAYS between PA 23 & Gulph Rd. 7 AM Mondays thru 5 PM Fridays. 24-HOUR CLOSURE. 11/27/14-9/2018 J.D. Eckman, $36 million 5/9/14-12/29/17 Valley Forge National Historical Park 2/17/2017 Page 17 of 17