LOCATION RESTRICTION DATE CONTRACTOR COST PHILADELPHIA

Similar documents
LOCATION RESTRICTION DATE CONTRACTOR COST PHILADELPHIA

DATE: LOCATION TRAFFIC RESTRICTION DATE PERFORMING THE WORK PHILADELPHIA. Bridge Inspection: RIGHT SIDE CLOSED ON THE RAMP. 8 AM - 4 PM.

2966 Street Road, Suite B Bensalem, PA W. Butler Avenue Chalfont, PA W. Street Road Warminster, PA

Montgomery County Bridges 3/27/2018. Page 1 of 5

SOUTHEASTERN PENNSLYVANIA TRANSPORTATION AUTHORITY TARIFF NO. 270 GOVERNING THE FURNISHING OF PASSENGER TRANSPORTATION BY SEPTA S ROUTE 4

Transportation Summary. Project Scope. Findings. Pennsylvania Turnpike Corridor Reinvestment Project Montgomery County

Kennedy & Associates, LLC

Project Location MP A44.5 MP A38 PRELIMINARY. A A57 (Future Project) A42 - A44.5 (Fall Fall 2019) A38 - A42. A31 - A38 - In Design

Wayne Mandatory Location: Saturday, Dawn-1pm Metered parking in town OR park at WAC Indoor/ Cover

All directions are from Roman Catholic High School (301 N. Broad Street, Philadelphia, PA 19107)

Viaduct Demolition at Girard Interchange

U.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County

CONSTRUCTION PROJECTS IN CUYAHOGA COUNTY CLEVELAND EUCLID 3/9/18 RICHMOND MAYFIELD HIGHLAND HEIGHTS HEIGHTS SOUTH EAST MAYFIELD EUCLID CLEVELAND

Guide to. Road Construction Projects

Swarthmore College. Summer Camps

400 Lincoln Ave, Prospect Park

PennDOT Interstate Work next week March 30-April 3:

Southeastern Pennsylvania

Exit 148 (Quantico) to Exit 133 (Route 17/Fredericksburg)

FDOT Treasure Coast Traffic Report through

Damage Prevention Committee Meeting Agenda December 11, Case Number Stakeholders Date and Location. Ross Electrical Construction Company

REPOSITORY LIST 2018 ASTON TWP PROPERTIES SOLD "AS IS"

RELEASE: IMMEDIATE September 14, 2012 CONTACT: Sandy Myers (office) STA (cell)

TRAFFIC ALERT FOR MARCH 26-30, 2018 Highway Work Zones in the Staunton District

"This is the catalyst we've been waiting for," Norristown Planning Director Jayne Musonye said of the project.

LANGHORNE (PHILADELPHIA), PENNSYLVANIA

PennDOT Announces 2016 Allegheny County Highway and Bridge Improvement Projects

PHA Contact Information

Weekly East Tennessee Construction Report for May 31-June 6, 2018

* Short term resurfacing projects are not included in this listing. 4T39.07 Project: Annual Rural County Sign Improvements, Genesee/Orleans Counties

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT June 12 June 18, 2016

Southeastern Pennsylvania 2018

2010 Planned Construction STATEWIDE

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

TRAFFIC ALERT FOR MARCH 5-9, 2018 Highway Work Zones in the Staunton District

Exit 148 (Quantico) to Exit 133 (Route 17/Falmouth)

Road Commission for Oakland County 2016 Road and Permit Projects (6/29/16 Update) Community or Communities

SOUTHEASTERN PENNSYLVANIA TRANSPORTATION AUTHORITY TARIFF NO. 60 SUPPLEMENT NO. 12 GOVERNING THE FURNISHING OF PASSENGER TRANSPORTATION

Becky A. Bradley, AICP. Executive Director, LVPC Secretary, LVTS

INTERSTATE MANAGEMENT PROGRAM FOR THE FY2015 TIP FOR DVRPC SUBREGION

Exit 136 (Centreport Parkway/Stafford County) to Exit 130 (Route 3/Fredericksburg)

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015

TRAFFIC ALERT FOR JANUARY 15-19, 2018 Highway Work Zones in the Staunton District

PennDOT MAJOR ROAD PROJECTS

Looking for a better way to target Turnpike Travelers?

RD INSTRUCTION 1980-D, EXHIBIT C PAGE 240 GUARANTEED HOUSING PROGRAM INCOME LIMITS

Directions to Unisys East Coast Development Center (Malvern) 2476 Swedesford Road, Malvern, PA 19355

TRAFFIC ALERT FOR DECEMBER 25, 2017 to JANUARY 5, 2018 Highway Work Zones in the Staunton District

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016

Effective January 29, 2017

REGIONAL RAIL. Effective January 14, To/From Center City Philadelphia

Lancaster County Road Work Jan 06 through Jan 10

SOUTHEASTERN PENNSYLVANIA TRANSPORTATION AUTHORITY TARIFF NO. 159 SUPPLEMENT NO. 11 GOVERNING THE FURNISHING OF PASSENGER TRANSPORTATION

FOR IMMEDIATE RELEASE February 22, 2019 CONTACT: Jen K. Ward, SALEM 69

Riverside at Providence

2017 Pharmacy Directory

Fiscal Year 2018 Annual Service Plan. Service Planning Department

November 21, 2012 Barbara Kelleher, (954)

Sierra Roadwork Schedule Sunday through Saturday, October 1-7, 2017 LONG-TERM PROJECTS

PennDOT MAJOR ROAD PROJECTS

DOT 0200 HR ROAD CLOSURE REPORT

March Center for Arts & Technology- Brandywine 1635 East Lincoln Highway Coatesville PA Adm Asst/Secr Sci, Gen

RELEASE: IMMEDIATE Oct. 6, 2017 CONTACT: Darragh Copley Frye (office) (cell)

District Construction Progr am. John R. Kasich, Ohio Governor Jerry Wray, ODOT Director Steve Mary, P.E., District Deputy Director

White Springs at Providence. Community Guide

TRAFFIC ALERT FOR OCTOBER 15-19, 2018 Highway Work Zones in the Staunton District

SOUTHEASTERN PENNSYLVANIA TRANSPORTATION AUTHORITY

Bedford County 2015 Construction Projects

Road Construction Ahead January-April 2015 NORTHWEST REGION

Projected Advertisement Date

TRAFFIC ALERT FOR SEPTEMBER 17-21, 2018 Highway Work Zones in the Staunton District

Long water shutdown scheduled for Tuesday, September 18

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Aug , 2016

State Project Reconstruction I-84

SOUTHEASTERN PENNSYLVANIA TRANSPORTATION AUTHORITY

TRAFFIC ALERT FOR JUNE 4-8, 2018 Highway Work Zones in the Staunton District

CONTACT: Nichole Lawrence CELL: FOR IMMEDIATE RELEASE Wednesday March 28, 2018

35(3$5(' )25 3(116</9$1,$ 78513,.( &200,66,21 83'$7(' %< '(/$:$5( 9$//(< 5(*,21$/ 3/$11,1* &200,66,21 -DQXDU\

1430 DeKalb Street, 1 st Floor Room 1164 Norristown, PA

PENNSYLVANIA SCENIC BYWAYS

PHILADELPHIA, PENNSYLVANIA

TRAFFIC ALERT FOR DECEMBER 10-14, 2018 Highway Work Zones in the Staunton District

TRAFFIC ALERT FOR FEBRUARY 11-15, 2019 Highway Work Zones in the Staunton District

POTTSTOWN BYPASS (US 422) RECONSTRUCTION TRAFFIC STUDY Chester and Montgomery Counties, Pennsylvania

MODELL S SPORTING GOODS 498 7TH AVENUE, NEW YORK, NY (212)

Governor Corbett Announces State Investment in 24 Rail Projects

A Listing of Cash Rates for All Classes of Vehicles Effective January 8, toll schedule 2017 PENNA TURN PIKE. Cash Rates. Safety starts with you.

Ohio Department of Transportation Construction Update

FISCAL YEAR 2017 ANNUAL SERVICE PLAN. Service Planning Department 2016 DRAFT COPY

April 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014

The Circuit Trails 2017 Annual Report

U9 GIRLS - DIVISION A 8 Teams, 2 Groups of Champion: Lehigh Valley United Black

Weight-Based Vehicle Class Information. Gateway to Warrendale. Overview. Turnpike Extensions. Mainline. Delaware River Bridge to Neshaminy Falls

MEMORANDUM. DATE: February 1, 2007

Construction Update. PennDOT s Rapid Bridge Replacement Project. Summer 2017

EUSTACE ICE HOCKEY TRAVEL DIRECTORY

Please click on the following product to view meetings in your area.

1430 DeKalb Street, 2 nd Floor Room 2019 Norristown, PA 19404

Transcription:

PENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 6-0 TRAFFIC RESTRICTION BULLETIN (NOTE: SCHEDULES ARE SUBJECT TO WEATHER CONDITIONS) (All restrictions 24 hours/day, 7 days/week unless otherwise noted) PENNDOT ROADWAY MAINTENANCE HOTLINE 1-800-FIX- ROAD Log on to www.511pa.com or call 511 from any phone to check conditions on major highways. DATE: 02-17-2017 PHILADELPHIA 21st St. Bridge Demolition: CLOSED & DETOURED between Arch St. & Market St. Friday 10 PM thru Monday 6 AM. 2/17/17-2/20/17 Abbonizio Contractors, $15.8 million New State Rd. Roadway Construction: LANE CLOSURE between Longshore Ave. & PA 73 (Cottman Ave.). 9 AM - 3 PM & 8 PM - 5 AM. 2/19/17-2/25/17 Walsh Construction Company $212.3 million US 1 (City Ave.) N & S Curb Ramp Reconstruction: RIGHT LANE CLOSED between Kings Grant Ave. & PA 23 (Conshohocken State Rd.). 9 AM - 3 PM. 2/20/17 Armour and Sons Electric $4.7 million *I-76 East Sign Structure Repair: RIGHT LANE CLOSED between US 1 (City Ave.) & Falls Rd. 8:01 PM - 12:01 AM. 2/20/17 Collinson, $2.4 million *I-676 E & W Overhead Bridge Construction: CLOSED & DETOURED between I-76 & Broad St. (PA 611). 11 PM - 5 AM. 2/20/17-2/23/17 Buckley & Company, $64.8 million Passyunk Ave. Bridge Rehabilitation: RIGHT LANE CLOSED on Hon. Robert C. Donatucci Memorial Bridge over Schuylkill River. 9 AM - 3 PM. 2/20/17-2/24/17 Buckley & Company, $33.5 million 2/17/2017 Page 1 of 17

*I-95 N & S Overhead Shielding Installation: INTERMITTENT DOUBLE LEFT OR RIGHT LANE CLOSURES between Allegheny Ave. & Bridge St. exits. 8 PM - 5 AM. 2/20/17-2/24/17 Driscoll Construction Company, /Richard E. Pierson Construction Company, $160.2 million Aramingo Ave. Clearing Operations: LANE CLOSURES between Wheatsheaf Lane & I-95 Interchange. 9 AM - 3 PM. 2/20/17-2/24/17 A.P. Construction, $87 million Snyder Ave. Arch St. Curb Ramp Reconstruction: LANE RESTRICTIONS between Front St. & 29th St. 7 AM - 4 PM. Curb Ramp Reconstruction: LANE RESTRICTIONS between 7th St. & PA 611 (Broad St.). 7 AM - 4 PM. 2/20/17-2/24/17 James J. Anderson $13.4 million 2/20/17-2/24/17 James J. Anderson $13.4 million *I-95 South *I-76 West DMS Testing: LANE CLOSURE between Bridge St./Harbison Ave.) & Allegheny Ave./Castor Ave.). 9 AM - 3 PM. DMS Testing: LANE CLOSURE between Pattison Ave. & Mifflin St. 9 AM - 3 PM. 2/21/17 Miller Brothers $15.5 million 2/21/17 Miller Brothers $15.5 million *I-76 E & W Install DMS Structure: LANE CLOSURE between Montgomery Drive & US 1 (City Ave.). 12 AM - 5 AM. 2/21/17 Miller Brothers $15.5 million *I-76 East ramp to US 1 North Sign Structure Repair: RIGHT LANE CLOSED on ramp. 12 AM - 2 AM. 2/21/17 Collinson, $2.4 million *I-76 East ramp to US 1 North Sign Structure Repair: LEFT LANE CLOSED on ramp. 2 AM - 4 AM. 2/21/17 Collinson, $2.4 million *I-676 West ramp to I-76 East Sign Structure Repair: RIGHT LANE CLOSED on ramp. 8:01 PM - 12:01 AM. 2/21/17 Collinson, $2.4 million 2/17/2017 Page 2 of 17

*US 1 N & S (Roosevelt Extension/Blvd.) Drain Cleaning/Debris Removal: INTERMITTENT LANE RESTRICTIONS between I-76 & 9th St. 9:30 AM - 2 PM. 2/21/17-2/23/17 Maintenance *I-676 E & W Drain Cleaning/Debris Removal: INTERMITTENT 2/21/17-2/23/17 Maintenance LANE RESTRICTIONS between I-76 & I-95. 9:30 AM - 2 PM. *I-95 N & S Drain Cleaning/Debris Removal: INTERMITTENT LANE RESTRICTIONS between Phila. Int. Airport & PA 63 (Woodhaven Rd.). 9:30 AM - 2 PM. 2/21/17-2/23/17 Maintenance *I-76 E & W Drain Cleaning/Debris Removal: LANE RESTRICTIONS between US 1 (City Ave.) & 26th St. 9:30 AM - 2 PM. 2/21/17-2/23/17 Maintenance Torresdale Ave. Bridge Rehabilitation: LANE SHIFTS between Tolbut St. & Linden Ave. 7 AM - 3:30 PM. 2/21/17-4/17/17 Loftus Construction, $11.7 million *I-676 West ramp to I-76 East Sign Structure Repairs: LEFT LANE CLOSED on ramp. 12:01 AM - 4 AM. 2/22/17 Collinson, $2.4 million *US 1 North (Roosevelt Blvd.) Sign Structure Repairs: RIGHT LANE CLOSED between Old York Rd. & Wingohocking St. 8:01 PM - 12:01 AM. 2/22/17 Collinson, $2.4 million Walnut Lane Line Striping: LANE CLOSURE between Magdalena St. & Park Line Drive. 9 AM - 3:30 PM. 2/22/17 Buckley & Company, $14 million *I-95 South *I-76 East Guide Rail Repair: LANE CLOSURES between Cottman Ave. & Bridge St./Harbison Ave. Interchanges. 10 PM - 5 AM. Overhead Bridge Maintenance: LANE CLOSURE between South St. & University Ave./Grays Ferry. 10 PM - 4 AM. 2/23/17 Long Fence, $2.7 million 2/27/17-3/2/17 CSX 2/17/2017 Page 3 of 17

New State Rd. Roadway Construction: LANE CLOSURE between Longshore Ave. & PA 73 (Cottman Ave.). 8 PM - 5 AM. 2/12/17-2/18/17 Walsh Construction Company $212.3 million *I-76 E & W Install DMS Foundation: LANE RESTRICTIONS between Montgomery Drive & US 1 (City Ave.). 12 AM - 5 AM. 2/13/17-2/18/17 Miller Brothers $15.5 million *I-95 South Academy Rd. Install DMS Foundation: LANE RESTRICTIONS between Bridge St. & Cottman Ave. (PA 73). 12 AM - 5 AM. Bridge Rehabilitation: RIGHT LANE CLOSED between US 13 (Frankford Ave.) & I-95. Weekdays. 9 AM - 3 PM. Aramingo Ave. on-ramp to I-95 North Overhead Sign Installation: INTERMITTENT 15- MINUTE STOPPAGES on ramp. 8 PM - 5 AM. 2/13/17-2/18/17 Miller Brothers $15.5 million 2/13/17-5/12/17 Loftus Construction, 2/15/17-2/17/17 Driscoll Construction Company, /Richard E. Pierson Construction Company, $11.7 million $160.2 million JFK Blvd. East Bridge Replacement: CLOSED & DETOURED between Schuylkill Ave. & 20th St. 24-HOUR 1/23/17-8/2/18 Abbonizio Contractors, $15.8 million *US 1 N & S (Roosevelt Blvd.) Bridge Rehabilitation: RIGHT LANE CLOSED at Broad St. (PA 611). 9 AM - 3 PM. 1/9/17-2/24/17 Loftus Construction, $7.5 million West Abbotsford Rd. 22nd St. Bridge Repair: CLOSED & DETOURED between Wissahickon Ave. & Fox St. 24-HOUR DETOUR. Bridge Construction: TRAFFIC PATTERN CHANGE on bridge over I-676 between Ben Franklin Parkway & Race St. 12/21/16-2/28/17 Road-Con, $4 million 11/7/16-11/30/18 Buckley & Company, $64.8 million 21st St. Bridge Construction: TRAFFIC PATTERN CHANGE on bridge over I-676 between Ben Franklin Parkway & Race St. 11/7/16-11/30/18 Buckley & Company, $64.8 million 2/17/2017 Page 4 of 17

*I-95 South off-ramp to Aramingo $160.2 million Ave. Ramp Reconstruction: RAMP CLOSED & DETOURED. 24-HOUR DETOUR. DETOUR POSTED. 9/21/16-6/2017 Driscoll Construction Company, /Richard E. Pierson Construction Company, Berks St. Bridge Construction: CLOSED & DETOURED between East Wildey St. & Delaware Ave. 24-HOUR 7/25/16-4/1/17 James J. Anderson $211.7 million Olney Ave. Roadwork: LANE RESTRICTIONS between Broad St. (PA 611) & Rising Sun Ave. 9 AM - 3 PM. 12/2/15-11/2017 Armour and Sons Electric $4.7 million Sergeant St. Huntingdon St. Somerset St. *Aramingo Ave. ramp to I-95 South Girard Ave. on-ramp to I-95 North Richmond St. South Benjamin Franklin Parkway Bridge Work: CLOSED & DETOUR between Salmon St. & Richmond St. 24-HOUR DETOUR. DETOUR POSTED. Bridge Work: CLOSED & DETOUR between Salmon St. & Richmond St. 24-HOUR DETOUR. DETOUR POSTED. Bridge Work: CLOSED & DETOUR between Salmon St. & Richmond St. 24-HOUR DETOUR. DETOUR POSTED. Ramp Reconstruction: CLOSED & DETOURED at Betsy Ross Bridge Interchange. 24-HOUR CLOSURE. Highway and Ramp Reconstruction: RAMP CLOSED & DETOURED. 24-HOUR CLOSURE. DETOUR POSTED. Intersection Reconstruction: CLOSED & DETOURED between Lehigh Ave. & Delaware Ave. 24-HOUR CLOSURE. Bridge Construction: INNER LANES REDUCED FROM THREE LANES TO TWO between 21st St. & 20th St. 12/28/15-12/2018 James J. Anderson $211 million 12/28/15-12/2018 James J. Anderson $211 million 12/28/15-12/2018 James J. Anderson $211 million 12/21/15-2/27/17 Driscoll Construction Company, /Richard E. Pierson Construction Company, $160.2 million 12/16/15-6/2017 James J. Anderson $211 million 12/16/15-6/2017 James J. Anderson $211 million 10/23/15-6/2017 Buckley & Company, $64.8 million 2/17/2017 Page 5 of 17

Winter St. Roadwork: LANE RESTRICTIONS between 20th St. & 10/6/15-4/2/17 Buckley & Company, $64.8 million 21st St. 24-HOUR RESTRICTIONS. Benjamin Franklin Parkway East Road Construction: OUTER LANES CLOSED at 21st St. 10/6/15-6/2017 Buckley & Company, $64.8 million Delaware Ave. BUCKS COUNTY US 1 N & S (Lincoln Hwy.), Falls, Lower Makefield, Middletown twps. Reconstruction: NEW TRAFFIC PATTERN between Columbia Ave. & Aramingo Ave. 24-HOUR RESTRICTIONS. Bridge Rehabilitation: LANE CLOSURES between I-95 & Stoney Hill Rd. interchanges. 9 PM - 6 AM. 4/1/15-10/2018 James J. Anderson $211.7 million 2/19/17-2/23/17 Loftus Construction, $11.7 million PA 413 (New Rodgers Rd.), Bristol Durham Rd., Bristol Bridge Rehabilitation: CLOSED & DETOURED between Plumbridge Drive & Bath Rd./Durham Rd. 8 PM - 5 AM. Roadwork: LANE RESTRICTIONS between PA 413 & New Falls Rd. 7 AM - 3 PM. 2/19/17-3/19/17 Pennsylvania $142 million Turnpike Commission 2/19/17-3/19/17 Pennsylvania $142 million Turnpike Commission Durham Rd., Bristol Roadwork: CLOSED & DETOURED between PA 413 & New Falls Rd. 8 PM - 5 AM. 2/19/17-3/19/17 Pennsylvania $142 million Turnpike Commission Green Lane, Bristol Conduit Installation: LANE SHIFT between Airport Rd. & Pacific Ave. 7 AM - 3 PM & 8 PM - 5 AM. 2/19/17-3/19/17 Pennsylvania $142 million Turnpike Commission Chinquapin Rd., Upper Southampton Utility Installation: LANE RESTRICTIONS between Witherington Drive & East Chinquapin Rd. 9 AM - 3 PM. 2/20/17-2/21/17 PECO Energy PA 611 (Easton Rd.), Warrington Curb Ramp Installation: LANE CLOSURES at Steeplechase Drive; Turk Rd.; Almshouse Rd.; Edison Furlong Rd.; New Britain Rd./Sauerman Rd.; Bristol Rd.; Kelly Rd.; Freedoms Way/Oxford Drive; Doylestown Plaza. 9 AM - 3 PM. 2/20/17-2/24/17 James D. Morrissey $4.3 million 2/17/2017 Page 6 of 17

*I-95 N & S, Morrisville Bor. Core Boring: LANE CLOSURE between New Hope/Yardley Interchange & New Jersey state line. 9 AM - 3 PM. 2/20/17-2/24/17 Delaware River Joint Toll Bridge Commission Taylorsville Rd., Lower Makefield PA 611 South, Doylestown, Doylestown Bor. Core Boring: SHOULDER CLOSURE between Woodside Rd. & Highland Drive. 9 AM - 3 PM. Line Painting: RIGHT LANE CLOSED between N. Broad St. & W. State St. 9 AM - 3 PM. 2/20/17-2/24/17 Delaware River Joint Toll Bridge Commission 2/20/17-2/24/17 Rohm and Haas Chemicals, LLC PA 132 West (Street Rd.), Bensalem Old Lincoln Hwy, Bensalem Equipment & Material Delivery: RIGHT LANE CLOSED between Old Lincoln Hwy. & Richlieu Rd. 9 AM - 3 PM. Tree Removal: LANE RESTRICTIONS between PA 132 (Street Rd.) & Bristol Rd. 7 AM - 3 PM. 2/20/17-2/24/17 Pennsylvania Turnpike Commission 2/21/17 PennDOT Bristol Rd., Warwick Tree Removal: LANE RESTRICTIONS at Graeme Way. 7 AM - 3 PM. 2/22/17 PennDOT PA 313 (Swamp Rd.), Doylestown Tree Removal: LANE RESTRICTIONS at Columbus Day Rd. 2/22/17-2/23/17 PennDOT PA 309 North (Bethlehem Pike), Hilltown State Rd., Bristol Fiber Optic Installation: RIGHT LANE CLOSED between Hilltown Pike & Swartley Rd. Weekdays. 8 AM - 5 PM. Utility Installation: LANE RESTRICTIONS between Grant Ave. & Linton Ave. 9 AM - 3 PM. 2/22/17-3/17/17 Maintenance 2/23/17-2/24/17 PECO Energy Red Hill Rd., Tinicum Tree Removal: LANE RESTRICTIONS at Frankenfield Rd. 7 AM - 3 PM. 2/24/17 PennDOT Mill Rd., Bensalem Utility Installation: CLOSED & DETOURED between US 13 (Bristol Pike) & State Rd. Weekdays. 9 AM - 3 PM. 2/27/17-4/28/17 Aqua Pennsylvania 2/17/2017 Page 7 of 17

Bellevue Ave., Penndel Bor. Utility Installation: LANE RESTRICTIONS at Crescent 2/6/17-2/24/17 PECO Energy Ave. Weekdays. 9 AM - 3 PM. PA 152 (Limekiln Pike), Warrington, Oxford Valley Rd., Falls, Lower Makefield, Middletown twps. Pine Grove Rd., Falls, Morrisville Bor. Utility Installation & Paving: CLOSED & DETOURED between Westminster Drive & County Line Rd. 24- HOUR Bridge Rehabilitation: LANE CLOSURES between Big Oak Rd. & Cabot Blvd. 7 AM - 3:30 PM & 9 PM - 5AM. Road Widening & Drainage: LANE RESTRICTIONS between West Trenton Ave. & Valley View Drive. Weekdays. 9 AM - 3 PM. 12/13/16-10/12/17 James D. Morrissey, 11/14/16-5/2017 Loftus Construction, 10/11/16-6/30/17 Buckingham Retail Properties, LLC & Falls Township $14.8 million $11.7 million W. Trenton Ave., Falls, Morrisville Bor. Road Widening & Drainage: LANE RESTRICTIONS between Pine Grove Rd. & Sweet Briar Rd. Weekdays. 9 AM - 3 PM. 10/11/16-6/30/17 Buckingham Retail Properties, LLC Allentown Rd., Trumbauersville Bor. Pole Replacement & Install New Wire: LANE CLOSURE between Creamery Rd. & Oak Drive. Monday thru Friday 9 AM - 3 PM. Saturday. 8 AM - 5 PM. 9/29/16-2/24/17 PP&L Utilities Allentown Rd., Trumbauersville Bor. County Line Rd., Warrington, Horsham, Montgomery twps. Pole Replacement & Install New Wire: LANE CLOSURE between Creamery Rd. & Milford Square Pike. Monday thru Friday. 9 AM - 3 PM. Saturday. 8 AM - 5 PM. Utility Installation: LANE RESTRICTIONS between East Kulp Rd. & Stump Rd. 7 AM - 3 PM. 9/29/16-2/24/17 PP&L Utilities 3/7/16-9/2018 James D. Morrissey, $14.8 million Oxford Valley Rd. South, Falls, Lower Makefield twps. *US 202 North, Buckingham, Doylestown Bor. *PA 263 (York Rd.), Warwick Bridge Damage: SOUTHBOUND LEFT TURN LANE RESTRICTED at US 1 Interchange. 24-HOUR RESTRICTIONS. Road Construction: LANE RESTRICTIONS between PA 313 (Swamp Rd.) & Mechanicsville Rd. 9 AM - 3 PM. Road Reconstruction: LANE CLOSURES between Bristol Rd. & Sugar Bottom Rd. 24-HOUR RESTRICTIONS. 6/29/15-Indef. PennDOT 4/13/15-11/9/18 James D. Morrissey $11 million 3/17/14-6/2017 J.D. Eckman, $31.6 million 2/17/2017 Page 8 of 17

Headquarters Rd., Tinicum Bridge Damage: CLOSED & DETOURED between 3/2/11-Indef. Red Hill Rd. & Tankhannen Rd. CHESTER COUNTY *US 30 E & W,, Valley, Caln twps. Median Stabilization: LANE RESTRICTIONS between Airport Rd. & PA 340 (Kings Hwy.). 9 AM - 3 PM. 2/21/17-2/23/17 Maintenance PA 926 (Street Rd.), Westtown, Birmingham twps. Crack Sealing: LANE RESTRICTIONS between PA 3 (West Chester Pike) & Creek Rd. 9 AM - 3 PM. 2/21/17-2/24/17 Maintenance Sugartown Rd., Easttown PA 926 (Street Rd.), Pocopson, Birmingham twps. Edenton Rd., Upper Oxford Utility Installation: LANE CLOSURE between Black Swan Lane & Rock Creek Circle. Weekdays. 9 AM - 3 PM. Bridge Replacement: CLOSED & DETOURED between Pocopson Rd. & Creek Rd. 24-HOUR Bridge Rehabilitation: CLOSED & DETOURED between Hawkins Rd. & Saw Mill Rd. Weekdays. 7 AM - 3:30 PM. 2/13/17-2/20/17 PECO Energy 2/13/17-9/1/17 Clearwater Construction 2/6/17-3/17/17 Loftus Construction, $8.6 million $11.7 million Paoli Pike, Willistown Utility Installation: LANE RESTRICTIONS at Grubb Rd. Weekdays. 9 AM - 3 PM. 2/6/17-3/6/17 PECO Energy *US 422 East, North Coventry *US 422 West, North Coventry Road & Bridge Construction: LANE CLOSURES between PA 724 (Schuylkill Rd.) & Sanatoga interchanges. 9 AM - 2 PM & 5 PM - 5 AM. Road & Bridge Construction: LANE CLOSURES between Sanatoga & PA 724 (Schuylkill Rd.) interchanges. 7 PM - 1 PM. 12/28/16-2/28/17 J.D. Eckman, $73.3 million 12/28/16-2/28/17 J.D. Eckman, $73.3 million PA 82 (Doe Run Rd.), East Fallowfield Bridge Rehabilitation: CLOSED & DETOURED between Valley Rd. & Strasburg Rd. 24-HOUR 1/17/17-6/21/17 Loftus Construction, $11.7 million Hollow Rd., West Vincent, East Vincent twps. Bridge Damage: CLOSED & DETOURED between French Creek Rd. & Pughtown Rd. 24-HOUR 11/20/16-Indef. PennDOT 2/17/2017 Page 9 of 17

Main St., Parkesburg Bor. Utility Installation: CLOSED & DETOURED between Culvert St. & Bridge St. Weekdays. 8 AM - 4:30 PM. 10/3/16-4/30/17 Pennsylvania American Water Green Valley Rd., Newlin Bridge Damage: CLOSED & DETOURED between Powell Rd. & Brandywine Creek Rd. 24-HOUR 5/11/16-Indef. PennDOT Ross Fording Rd., West Fallowfield Bridge Damage: CLOSED & DETOURED between Creek Rd. & Bryson Rd. 24-HOUR DETOUR. 7/2/15-Indef. PennDOT PA 724 ramp to US 422 East, East Coventry Ramp/Bridge Construction: RAMP CLOSED & DETOURED. 5/27/15-3/2018 J.D. Eckman, $73.3 million *US 422 E & W, North Coventry *US 422 E & W, North Coventry Bridge Construction: REDUCED TO ONE LANE between Stowe & PA 100 Interchange. 24-HOUR RESTRICTION. Road Construction: TRAFFIC PATTERN SHIFT between Sanatoga & PA 724 (Schuylkill Rd.) interchanges. 24-HOUR PATTERN. 11/27/14-9/2018 J.D. Eckman, $36 million 2/2/13-8/2018 J.D. Eckman, $73.3 million DELAWARE COUNTY E. Baltimore Ave., Nether Providence, Upper Providence twps., Media Bor. Utility Installation: LANE RESTRICTIONS between S. Edgmont St. & Randor St. 9 AM - 3 PM. 2/20/17-2/24/17 Aqua Pennsylvania Baltimore Ave., Lansdowne Bor. Traffic Signal Upgrade: LANE RESTRICTIONS at Lansdowne Ave.; Wycombe Ave.; Union Ave.; Martin Drive; Walsh Rd. & Mansfield Ave. 9 AM - 3 PM. 2/20/17-2/24/17 Lenni Electric $4.1 million Baltimore Ave., Upper Darby, Lansdowne Bor. Traffic Signal Upgrade: LANE RESTRICTIONS between Lansdowne Ave.; Penn Blvd./4th St.; Wycombe Ave.; Burmont Rd.; Scottdale Rd. & Church Lane. 9 AM - 3 PM. 2/20/17-2/24/17 Lenni Electric $4.1 million Baltimore Ave., Clifton Heights Bor., Upper Darby Road Widening: LANE RESTRICTIONS at Springfield Rd.; Church Lane; Delmar Drive; Diamond St. & Home Depot Drive. 9 AM - 3 PM. 2/20/17-2/24/17 Lenni Electric $4.1 million 2/17/2017 Page 10 of 17

Springfield Ave., Clifton Heights Bor. Curb Ramp Reconstruction: LANE CLOSURE at Diamond St.; Madison St.; Woodlawn Ave.; Clifton Ave. & Broadway Ave. 9 AM - 3 PM. 2/20/17-2/24/17 L.C. Costa Contractors, $4.1 million US 1 (Baltimore Ave.), Clifton Heights Bor. Curb Ramp Reconstruction: LANE CLOSURES at Church St.; Marple Ave.; Jackson Ave.; Springfield Ave.; Bishop Ave. & Glenwood Ave. 9 AM - 3 PM. 2/20/17-2/24/17 L.C. Costa Contractors, $4.1 million PA 3 (West Chester Pike), Haverford, Upper Darby twps. Curb Ramp Reconstruction: LANE CLOSURE at Brief Ave., Carol Blvd.; State Rd.; Copley Rd.; Terminal Square & Pennock Ave. 9 AM - 3 PM. 2/20/17-2/24/17 L.C. Costa Contractors, $5.9 million PA 3 (Market St.), Millbourne Bor. Curb Ramp Reconstruction: LANE CLOSURE at Chatham Rd.; Forge Rd.; Copley Rd.; Terminal Square & Millbourne Ave. 9 AM - 3 PM. 2/20/17-2/24/17 L.C. Costa Contractors, $5.9 million US 1 South (Baltimore Pike), Middletown Pipeline Maintenance: LANE CLOSURE between Valley Rd. & S. Pennell Rd. Weekdays. 9 AM - 3 PM. 2/20/17-3/3/17 Sunoco Logistics PA 452 North (South Pennell Rd.), Middletown Pipeline Maintenance: LANE CLOSURE at Wildwood Lane. Weekdays. 9 AM - 3 PM. 2/20/17-3/3/17 Sunoco Logistics Valley Rd., Edgmont Township Line Rd., Upper Darby *I-95 North, Tinicum PA 452 (Pennell Rd.), Middletown Pipeline Maintenance: LANE CLOSURE at Birchwood Lane. Weekdays. 9 AM - 3 PM. Utility Installation: LANE RESTRICTIONS between Bella Vista Rd. & Dermond Rd. Weekdays. 9 AM - 3 PM. DMS Testing: LANE RESTRICTIONS between PA 420 (Wanamaker Ave.) & PA 291 (Gov. Printz Blvd.). 9 AM - 3 PM. Utility Installation: LANE RESTRICTIONS between US 1 (Baltimore Pike) & Hunter St. 9 AM - 3 PM. 2/20/17-3/3/17 Sunoco Logistics 2/20/17-3/31/17 Aqua Pennsylvania 2/21/17 Miller Brothers $15.5 million 2/21/17-2/22/17 Aqua Pennsylvania 2/17/2017 Page 11 of 17

*US 322 E & W (Conchester Hwy.), Concord, Bethel, Upper Chichester twps. Patching: LANE CLOSURES between US 1 (Baltimore Pike) & I-95. 9 AM - 3 PM. 2/22/17 Maintenance Wayne Ave., Radnor *I-95 South, Tinicum, Ridley, Chester, Upper Chichester, Lower Chichester twps., Upland Bor., Chester City Concord Rd., Bethel Utility Installation: LANE CLOSURE between Audubon Ave. & Pembroke Ave. 9 AM - 3 PM. Patching: INTERMITTENT LANE CLOSURES between Philadelphia County line & Delaware state line. 9 AM - 3 PM. Bridge Repair: CLOSED & DETOURED between Valleybrook Rd. & Mattson Rd. 24-HOUR DETOUR. 2/22/17-3/1/17 PECO Energy 2/23/17 Maintenance 3/6/17-3/10/17 Maintenance Darby Rd., Haverford Morton St., Lower Chichester Blueball Ave., Upper Chichester Telephone Pole Installation: LANE RESTRICTIONS between PA 320 (Sproul Rd.) & Radnor Rd. Weekdays. 9 AM - 3 PM. Drainage Work: CLOSED & DETOURED between Green St. & Market St. Weekdays. 9 AM - 3 PM. Bridge Repair: CLOSED & DETOURED between Columbia Ave. & Scott Ave. 24-HOUR DETOUR. 2/13/17-5/31/17 PECO Energy 2/15/17-3/2/17 Road-Con, $19.9 million 2/15/17-8/15/17 PennDOT Conestoga Rd., Radnor Calcon Hook Rd., Darby, Sharon Hill Bor. Blueball Ave., Upper Chichester Utility Installation: CLOSED & DETOURED between US 30 (Lancaster Ave.) & Church Rd. Weekdays. 9 AM - 3 PM. Utility Installation: CLOSED & DETOURED between Bonsall Ave. & Hook Rd. Weekdays. 9 AM - 3 PM. Utility Installation: CLOSED & DETOURED between Columbia Ave. & Scott Ave. 24-HOUR DETOUR. 1/23/17-6/30/17 PECO Energy 1/24/17-2/24/17 Aqua Pennsylvania 12/27/16-2/24/17 Chester Water Authority 2/17/2017 Page 12 of 17

College Ave., Haverford Bridge Construction: CLOSED & DETOURED between Spring Mill Rd. & Haverford Rd. 24-HOUR 11/29/16-11/7/17 Road-Con, $5.2 million Springfield Rd, Springfield, Upper Darby twps., Clifton Heights Bor. Utility Installation: CLOSED & DETOURED between Saxer Ave. & Oak Ave. Weekdays. 9 AM - 3 PM. 9/19/16-4/8/17 Aqua Pennsylvania U.S. 13 (10th St./Post Road), Marcus Hook Bor. Streetscape & Traffic Signal Improvements/Curb, Sidewalk, ADA Ramp Installation: LANE RESTRICTIONS between Blueball Ave. & Penn Ave./Walnut St. Weekdays. 9 AM - 3 PM. 3/21/16-3/31/17 Marino Corporation $1,661,612.00 MONTGOMERY COUNTY *I-76 East, Lower Merion Litter & Debris removal: MOVING OPERATION between I-476 & Belmont exits. 7 AM - 2 PM. 2/18/17 Maintenance US 1 (City Ave.) N & S, Lower Merion Curb Ramp Reconstruction: RIGHT LANE CLOSED between Kings Grant Ave. & PA 23 (Conshohocken State Rd.). 9 AM - 3 PM. 2/20/17 Armour and Sons Electric $4.7 million PA 73 (Skippack Pike), Skippack Utility Installation: LANE RESTRICTIONS between Cross Rd. & Hudnut Rd. 9 AM - 3 PM. 2/20/17-2/21/17 PECO Energy *US 422 East off-ramp to PA 23, Upper Merion, West Norriton twps. Material/Equipment Delivery: LANE RESTRICTIONS on the ramp. 9 AM - 3:30 PM. 2/20/17-2/24/17 J.D. Eckman, $97.4 million *US 202 N & S (DeKalb Pike), Whitpain Test Holes: LANE RESTRICTIONS between PA Turnpike & Township Line Rd. Weekdays. 9 AM - 3 PM. 2/20/17-2/24/17 So-Deep, Meyers Rd., Perkiomen PA 73 (Skippack Pike), Skippack Utility & Fiber Optic Installation: LANE 2/20/17-2/24/17 Reading Site RESTRICTIONS between Seitz Rd. & Miller Rd. 9 AM Contractors - 3 PM. Clearing & Grubbing: LANE RESTRICTIONS between 2/20/17-2/24/17 Reading Site Squirrel Hill Rd. & Perkiomen Creek Rd. 9 AM - 3 PM. Contractors $11 million $11 million 2/17/2017 Page 13 of 17

PA 29 (Gravel Pike), Perkiomen Pole Relocations: LANE RESTRICTIONS between 2/20/17-2/24/17 Reading Site $11 million Miller Rd. & Harrison Ave. 9 AM - 3 PM. Contractors Plank Rd., Perkiomen Pole Relocations: LANE RESTRICTIONS between PA 29 (Gravel Pike) & PA 73 (Skippack Pike). 9 AM - 3 PM. 2/20/17-2/24/17 Reading Site Contractors $11 million Willow Grove Ave., Springfield Curb Ramp Construction: LANE CLOSURE at Ardmore Ave.; Pleasant Ave.; Flourtown Ave.; Traymore Ave. & Pine Rd. 9 AM - 3:30 PM. 2/20/17-2/24/17 Allan Myers, LP $6,395,555.00 Buchert Rd., Pottsgrove Curb Ramp Construction: LANE CLOSURE at Pleasantview Rd.; N. Washington St. & Mervine St. 9 AM - 3 PM. 2/20/17-2/24/17 Highway Materials, $4.8 million Mervine St., Lower Pottsgrove Twp, Pottstown Bor. Curb Ramp Construction: LANE CLOSURE at N. Franklin St. 9 AM - 3:30 PM. 2/20/17-2/24/17 Highway Materials, $4.8 million Norristown Rd., Lower Gwynedd Germantown Pike, East Norriton, Plymouth twps. ITS Installation: LANE CLOSURES between Bethlehem Pike & Tennis Ave. 9 AM - 3 PM. ITS Installation: LANE CLOSURES between I-476 & Swede Rd. 9 AM - 3 PM. 2/20/17-2/24/17 Carr & Duff, $3.6 million 2/20/17-2/24/17 Carr & Duff, $3.6 million PA 63 (Sumneytown Pike), Lower Salford, Towamencin, Upper Gwynedd, Lower Gwynedd, Montgomery twps.; North Wales Bor. ITS Installation: LANE CLOSURES between Harleysville Pike & Bethlehem Pike. 9 AM - 3 PM. 2/20/17-2/24/17 Carr & Duff, $3.6 million Bethlehem Pike, Montgomery, Hatfield twps. *US 422 East, Upper Merion, West Norriton twps. ITS Installation: LANE CLOSURES between McLaughlin Rd. & Bergey Rd. 9 AM - 3 PM. Sign Installation: RIGHT LANE CLOSED between PA 23 & First Ave. Interchanges. 10 AM - 3:30 PM. 2/20/17-2/24/17 Carr & Duff, $3.6 million 2/21/17-2/22/17 J.D. Eckman, $97.4 million *I-476 N & S, Plymouth, Lower Merion twps., West Conshohocken Bor. Litter & Debris Removal: MOVING OPERATION between Turnpike Interchange & County Line Rd. 9 AM - 3 PM. 2/21/17-2/23/17 Maintenance 2/17/2017 Page 14 of 17

PA 309 N & S, Cheltenham, Springfield, Upper Dublin, Lower Gwynedd twps. Sweeping & Debris Removal: MOVING OPERATION between Cheltenham Ave. & PA 63 (Welsh Rd.). 7 AM - 3 PM. 2/21/17-2/23/17 Maintenance *I-76 E & W, Upper Merion, Lower Merion twps., Conshohocken Bor. *US 422 E & W, Lower Providence, Upper Providence, Limerick, Lower Pottsgrove twps. Litter & Debris Removal: MOVING OPERATION WITH LANE CLOSURES between PA Turnpike & US 1 (City Ave.). 9 AM - 3 PM. Liter & Debris Removal: MOVING OPERATION between PA 100 (Pottstown Pike) & PA 363 (Trooper Rd.). 9 AM - 3 PM. 2/21/17-2/23/17 Maintenance 2/21/17-2/23/17 Maintenance Cowpath Rd., Hatfield Troutman Rd., Upper Providence Utility Installation: LANE RESTRICTIONS between Lenhart Rd. & Walnut St. 9 AM - 3 PM. Bridge Inspection: LANE CLOSURE between Ashenfelter Rd. & Arcole Rd. 9 AM - 3 PM. 2/21/17-2/24/17 PECO Energy 2/24/17 AECOM Township Line Rd., Jenkintown Bor. Utility Installation: CLOSED & DETOURED between Greenwood Ave. & Washington Lane. Weekdays. 8 AM - 3 PM. Township Line Rd., Jenkintown Bor. Utility Installation: LANE RESTRICTIONS between Washington Lane & PA 611 (Old York Rd.). Weekdays. 8 AM - 3 PM. *US 422 East, Upper Providence 2/28/17-5/26/17 Aqua Pennsylvania 2/28/17-5/26/17 Aqua Pennsylvania DMS Structure Foundation Installation: LANE 2/13/17-2/18/17 Miller Brothers $15.5 million CLOSURES between PA 29 & Black Rock Rd. 9 PM - 5 AM. Swedeland Rd., Upper Merion *US 422 East, Lower Pottsgrove *US 422 West, Lower Pottsgrove Utility Installation: CLOSED & DETOURED between Trinity Rd. & Holstein Rd. Weekdays. 9 AM - 3 PM. Road & Bridge Construction: LANE CLOSURES between PA 724 (Schuylkill Rd.) & Sanatoga interchanges. 5 PM - 5 AM. Road & Bridge Construction: WEEKEND LANE CLOSURES between Sanatoga & PA 724 (Schuylkill Rd.) interchanges. 7 PM - 1 PM. 2/13/17-3/31/17 Aqua Pennsylvania 1/28/17-2/28/17 J.D. Eckman, $73.3 million 1/28/16-2/28/17 J.D. Eckman, $73.3 million 2/17/2017 Page 15 of 17

PA 63 (Sumneytown Pike), Upper Salford Soil Borings: LANE RESTRICTIONS between Gerryville Pike & Cedar Hill Rd. Weekdays. 9 AM - 3 PM. 1/30/17-2/24/17 TRC Solutions Edge Hill Rd., Abington Bridge Rehabilitation: CLOSED & DETOURED between Ferndale Ave. & Hamilton Ave. 24-HOUR 1/9/17-11/1/17 J.D. Eckman, $3.6 million Allentown Rd., Towamencin Curb Ramp Replacement: LANE RESTRICTIONS at Valley Forge Rd. & Woodlawn Drive. Weekdays. 9 AM - 3 PM. 1/3/17-2/24/17 Highway Materials, $4.8 million PA 63 (Welsh Rd.), Lower Gwynedd Curb Ramp Replacement: LANE RESTRICTIONS at Howe Lane. Weekdays. 9 AM - 3 PM. 1/3/17-2/24/17 Highway Materials, $4.8 million Montgomery Ave., Upper Merion Sidewalk Replacement: LANE RESTRICTIONS at Matsonford Rd. Weekdays. 9 AM - 3 PM. 12/5/16-3/3/17 SEPTA PA 663 (Layfield Rd.), Upper Hanover Bridge Rehabilitation: CLOSED & DETOURED between Kutztown Rd. & Schoolhouse Rd. 24-HOUR 11/14/16-8/2017 Loftus Construction, $11.7 million East Walnut St., Hatfield Bridge Replacement: CLOSED & DETOURED between PA 309 & County Line Rd. 24-HOUR 10/24/16-9/28/17 Hatfield Township PA 63 (Old Welsh Rd.), Abington Utility Installation: CLOSED & DETOURED between Paper Mill Rd. & Huntingdon Rd. Weekdays. 9 AM - 3 PM. 10/12/16-2/24/17 Abington Township Municipal Authority County Line Rd., Warrington, Horsham, Montgomery twps. Utility Installation: LANE RESTRICTIONS between Kulp Rd. & Stump Rd. 7 AM - 3 PM. 3/7/16-9/2018 James D. Morrissey, $14.8 million Baligomingo Rd., West Conshohocken Bor. Slope Stabilization: CLOSED & DETOURED between PA 23 (Front St.) & Portland Rd. 24-HOUR DETOUR. 6/27/15-Indef. PA 724 ramp to US 422 East, Lower Pottsgrove Roadwork: RAMP CLOSED & DETOURED. 24- HOUR CLOSURE. 5/27/15-3/2018 J.D. Eckman, $73.3 million 2/17/2017 Page 16 of 17

*US 422 E & W, Lower Pottsgrove Road Construction: TRAFFIC PATTERN SHIFT between Sanatoga & PA 724 (Schuylkill Rd.) Interchanges. 24-HOUR PATTERN. 2/2/13-8/2018 J.D. Eckman, $73.3 million *US 422 E & W, West Pottsgrove Bridge Construction: REDUCED TO ONE LANE between Stowe & PA 100 Interchange. 24-HOUR RESTRICTION. County Line Rd., Upper Merion Road Work: CLOSED & DETOURED WEEKDAYS between PA 23 & Gulph Rd. 7 AM Mondays thru 5 PM Fridays. 24-HOUR CLOSURE. 11/27/14-9/2018 J.D. Eckman, $36 million 5/9/14-12/29/17 Valley Forge National Historical Park 2/17/2017 Page 17 of 17