Implementation Success Through Coordination

Similar documents
RNP AR APCH Approvals: An Operator s Perspective

Airplane Navigation Capabilities

Implementation challenges for Flight Procedures

Air Navigation Bureau ICAO Headquarters, Montreal

Information Paper 2 SUMMARY

USE AND APPLICATION OF GNSS IN THE IMPLEMENTATION OF NAVIGATION BASED ON PERFORMANCE IN ECUADOR

DP-7 The need for QMS controlled processes in AIS/AIM. Presentation to QMS for AIS/MAP Service Implementation Workshop Dakar, Senegal, May 2011

PBN Performance. Based Navigation. Days 1, 2 & 3. ICAO PBN Seminar Seminar Case Studies Days 1,2,3. Seminar Case Studies

2012 Performance Framework AFI

Performance Based Navigation Implementation of Procedures

Saint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis

Aviation Noise and Emissions Reduction Symposium (ANERS): Panel on Performance-Based Navigation (PBN) Implementation

Thank you, Director Heijl and Bon Jour. It s good to be back in Montreal for this important symposium.

FLIGHT OPERATIONS PANEL (FLTOPSP)

TWELFTH AIR NAVIGATION CONFERENCE

PROGRAMME. Workshop B (Cont d) PBN and the Cockpit Regulatory and Certification Forum Technical Requirements Forum Training Forum

The Information Paper of the. Milestones of Roadmap Development International Communion and Promotion Overview of China's PBN Implementation Roadmap

Aviation Safety Information Analysis and Sharing ASIAS Overview PA-RAST Meeting March 2016 ASIAS Proprietary Do Not Distribute

PBN and RNAV concepts

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN

Quality Assurance. Introduction Need for quality assurance Answer to the need of quality assurance Details on quality assurance Conclusion A B C D E

Flight Evaluation and Validation of RNP AR/SAAAR Instrument Flight Procedures

PBN and Procedure Design training

4.1 This document outlines when a proposal for a SID Truncation may be submitted and details the submission requirements.

ICAO Activities. IFPP work on the Manual for Continuous Descent Operations. Federal Aviation Administration

AVIATION TRAINING DEVELOPMENT IN INDONESIA TO MEET THE RAPID INCREASE IN DEMAND FOR AVIATION PROFESSIONALS

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES

Required Navigation Performance (RNP) in the United States

WORLDWIDE SYMPOSIUM ON ENABLING THE NET-CENTRIC INFORMATION ENVIRONMENT:

Overview of Evolution to Performance Based Navigation. ICAO PBN Seminar Overview of Evolution to Performance Based Navigation

Nav Specs and Procedure Design Module 12 Activities 8 and 10. European Airspace Concept Workshops for PBN Implementation

FAA GBAS Program Update January 29, 2010

Session III Issues for the Future of ATM

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit

U.S. India Aviation Cooperation Program. Air Traffic Management Training Program Update March 2009

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT

PBN Syllabus Aeroplane. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

UK Implementation of PBN

INTERNATIONAL CIVIL AVIATION ORGANIZATION AFI REGION AIM IMPLEMENTATION TASK FORCE. (Dakar, Senegal, 20 22nd July 2011)

Don-Jacques OULD FERHAT VP Airspace and Airlines Services. Airbus. PBN Safety programs

Aviation System Block Upgrades (ASBU), Blocks 0 and 1

PBN Syllabus Helicopter. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

AN-Conf/12-WP/162 TWELFTH THE CONFERENCE. The attached report

PBN Hybrid Procedures as an Enabler for Airport Accessibility in Challenging Terrain

Boeing Air Traffic Management Overview and Status

Air Traffic Management

KJFK Runway 13R-31L Rehabilitation ATFM Strategies

Asia/Pacific Air Traffic Management Perspectives

WEST ATLANTIC ROUTE SYSTEM (WATRS) PLUS AIRSPACE REDESIGN AND SEPARATION REDUCTION INITIATIVE. (Presented by United States of America) SUMMARY

Performance Based Navigation (PBN) Update on ICAO APAC Regional Sub-Office, APAC Flight Procedure Programme, and COSCAP Supports

NextGen Priorities: Multiple Runway Operations & RECAT

Flight Procedure Design and Cartography

Validation & Implementation Considerations Module 14 Activities 11 to 17

Pacific Project. CPWG/8 - WP/6 Appendix A

CRITICAL IMPLEMENTATION REQUIREMENTS FOR PBN, AIM QMS, MET QMS AND AERODROME CERTIFICATION. (Presented by the Secretariat)

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT

Environmental Assessment Las Vegas Area Airspace Optimization Project

ICAO International Aviation and Environment Seminar OPERATIONAL IMPROVEMENTS. Presented by ICAO APAC RSO

European Joint Industry CDA Action Plan

(RN R A N V A V & & RN R P N

The EU as a partner for low carbon development Prospects for the aviation sector

Minneapolis-St. Paul International Airport (MSP)

Learning Objectives. By the end of this presentation you should understand:

Peter Sorensen Director, Europe Safety, Operations & Infrastructure To represent, lead and serve the airline industry

AIRSPACE. Aviation Consultancy at its best. Specialist aviation support to help solve problems for airports and airport developers

Name of Customer Representative: Bruce DeCleene, AFS-400 Division Manager Phone Number:

ICAO Young Aviation Professionals Programme

Life Cycle Solutions

Real-time route planning streamlines onboard operations, reduces fuel burn and delays, and improves on-time performance.

Workshop. SESAR 2020 Concept. A Brief View of the Business Trajectory

Performance Based Navigation (PBN) Implementation Plan. The Gambia

ATM STRATEGIC PLAN VOLUME I. Optimising Safety, Capacity, Efficiency and Environment AIRPORTS AUTHORITY OF INDIA DIRECTORATE OF AIR TRAFFIC MANAGEMENT

Second MID Regional Runway Safety Seminar (MID-RRSS/2) 2-4 June 2014 Dubai, UAE

RNP AR and Air Traffic Management

Trajectory Based Operations

FLIGHT PATH FOR THE FUTURE OF MOBILITY

PBN AIRSPACE CONCEPT WORKSHOP. SIDs/STARs/HOLDS. Continuous Descent Operations (CDO) ICAO Doc 9931

Operators may need to retrofit their airplanes to ensure existing fleets are properly equipped for RNP operations. aero quarterly qtr_04 11

PBN, ADQ, ADQ2 IR EUROCONTROL Activities Status

PBN Implementation in the UK

Toronto Pearson: Toronto Pearson:

AERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point : Gen

Implementation of PBN in Armenian airspace

International Civil Aviation Organization. Aviation System Block Upgrade (ASBU) Methodology An Overview

Colombian PBN implementation: El Dorado case study

LR IFP REGULATION DRAFT INESE LIEGE

COMPANY INTRODUCTION

Federal Aviation Administration DCA. By: Terry Biggio, Vice President Air Traffic Services Date: June 18, Federal Aviation Administration

PBN/TF/7 DRAFT Appendix D to the Report D-1

Federal Aviation Administration. Air Traffic Control System Command Center (ATCSCC)

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport

Considerations for. RNP to xls. Operations. Juergen Ruppert. Regional Director Air Traffic Optimisation Services GE Aviation

PBN ROUTE SPACING AND CNS REQUIREMENTS (Presented by Secretariat)

34 th Airline/ATS Safety Forum

Key Issues for the Critical Path Approach, Landing and Go-Arounds

SDM Workshop on PBN Airborne Perspective. Michael Hopp, Lufthansa Group Brussels,

Flight Operations Inspector Manual

RNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood.

EASA RNP (AR) Workshop The Landscape Working Together

Bangkok, Thailand, July State PBN Plan and Status of PBN Implementation THAILAND PBN IMPLEMENTATION PLAN. (Presented by Thailand)

Transcription:

ICAO PBN Symposium Workshop - Operations 17 October 2012 Montreal, Canada Implementation Success Through Coordination Jon Tree Director of Industry Affairs Jeppesen

Stakeholder Involvement The key element in collaboration Requires close coordination Effective communication is essential Educational process throughout Defined goals and results driven Sharing of different perspectives Transparency at all levels Proactive integration Excellence in Program Management Evolving effort Be prepared and open to changes Focused - share information/ideas 2

Jeppesen/Boeing Global Effort for PBN Regionally based initiatives Use of global standards Procedure design team in Atlanta, GA Support Jeppesen/DEN, FRA and Regional Offices Boeing/SEA and Regional Offices Globally Ongoing efforts: China North America Asia/Russia and CIS Europe Australia/New Zealand Latin America STEP 1: Apply para 2-2 Segment Initial Fix 2 RNP 2 RNP a R Segment Terminating Fix STEP 4 STEP 3 c STEP 5 Tangent Points b R Tangent Points a=r b=r+(2xrnp) c=r-(2xrnp) STEP 2: Locate Turn Center 2 RNP 2 RNP 3

Flight Procedure Design Service Provider Quality Assurance Processes Independent review of procedures Ground validation Criteria verification Determine level of safety impact Develop safety documentation Flight validation Data verification Conduct continuous maintenance Conduct periodic reviews Training Use of validated systems and tools Official State approvals 4

Indonesia 5

Indonesia Goals: Enhance safety Decrease flight track miles Improve Maximum Gross Takeoff Weight for departures Challenging environment: Ongoing improvements to infrastructure Restricted airspace nearby Obstacle data limited and out of date Lion Air flight crews professional and knowledgeable Jeppesen familiarization training provided to ATC Successfully delivered 8 approach procedures, including charting and printing Key element was coordination with all stakeholders: Lion Air, DGCA of Indonesia, ATC, Boeing, Jeppesen 6

RNP Approach Procedures Manado (MDC) 7

RNP Approach Procedures Ambon (AMQ) 8

Panama Goals: Enhance safety Decrease flight track miles and improve operational efficiencies Technological improvements at the airports 8 procedures at Tocumen and 2 at Balboa, including charting and coding ATC and flight crew training provided Close coordination among all stakeholders on planning and procedure design Copa Airlines Panamanian DGAC Air Traffic Control Boeing and Jeppesen 9

Panama RNAV (RNP) procedures Tocumen (PTY) Balboa (BLB) 10

United States Airport Partnered with the FAA in conceptual design of RNAV/RNP procedures at a major airport Constituent airlines desire to benefit from PBN Safety and efficiency improvements Desire to realize benefits of equipage investments Jeppesen provided PD drafting assistance to the FAA Coded for flight simulator use Close coordination with ATM units Actively engaged 10 airlines Accumulated valuable input from operators and ATC Collaboration critical in gaining approval for continued development of actual procedures Operations begin 3 Dec 2012 11

In Summary Effective collaboration is crucial to PBN success All stakeholders engaged in early stages Effective communication Transparency Flexibility Proactive integration Excellence in program management 12