Construction Open Evening

Similar documents
Appendix. Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Gatwick Airport Limited

A63 Castle Street, Hull HullBID Network Lunch 24 August 2017

Wheatlands House, Fleet Hill, Finchampstead, Berkshire

The Coach House, Mill Lane, Cookham, Berkshire

Chapter 2 Route window W25 Maidenhead station. Transport for London

The Old Shire Horse Centre, Bath Road, Woolley Green, Maidenhead, Berkshire

STRONGER CHRISTCHURCH INFRASTRUCTURE REBUILD TEAM (SCIRT) REAAA

Cholesbury New House, Parrots Lane, Cholesbury, Buckinghamshire

Public Information Center August 12, 2010

Holyport Manor Special School, Highfield Lane, Cox Green, Maidenhead, Berkshire

ST JOHN S WOOD LONDON

REPORT 2014/065 INTERNAL AUDIT DIVISION. Audit of air operations in the United. Nations Assistance Mission in Afghanistan

Victoria Station Upgrade

BUILD. In this issue: NEW AERIALS OF CONSTRUCTION NEW PROJECT IN CONSTRUCTION PAC K AG E 4. August 2018

Construction News. Fit-out works have commenced!

Los Angeles International Airport (LAX) Airside $907M

Cell: (408) Release MA June 25, 2012

25 th Avenue Grade Separation. December 13, 2017

Night work update: Hills M2 Motorway and westbound on ramp at Pennant Hills Road

Chapter 6 Route Window NE5 Seven Kings station. Transport for London

Exposition Light Rail Transit Project

D L R C C T R A F F I C N E W S

DOVER WESTERN DOCKS REVIVAL (DWDR) NEWSLETTER AUTUMN 2016

GSP TERMINAL IMPROVEMENT PROGRAM PRESS KIT

DOVER WESTERN DOCKS REVIVAL (DWDR) NEWSLETTER. Spring 2016

Dublin Airport Update Presented by Pat Molloy

NORTH GOWER STREET, LONDON NW1 A CENTRAL LONDON UNBROKEN RESIDENTIAL INVESTMENT OPPORTUNITY

Gorse Stacks, Bus Interchange Excavations Interim Note-01

Jobcentre Plus advisers giving guidance to a job seeker at the Crossrail Visitor Information centre

Ferrybridge Community Liaison Group. 18 th July 2018

RAILWAY LANDS SUB-COMMITTEE

Metrolinx Projects: Temporary Delegation for Long- Term Road Closures

High Speed Two: From Crewe to Manchester, West Midlands to Leeds and beyond

Bus Priority Package. Presentation to Leigh Business Forum. 11 December 2015

Maximising Beneficial Reuse through the use of a Novel Dredging Contract

ENTER EXCEPTIONAL RESIDENTIAL DEVELOPMENT OPPORTUNITY

Industry briefing NOVEMBER 2017

FERRY TERMINAL ST LUCIA

SESSION 1: Q&A summary of session with Will Apps (Head of Energy Development) and Helen Elphick (Senior Development Manager)

UNIQUE CENTRAL LONDON FREEHOLD INTEREST

A21 TONBRIDGE TO PEMBURY DUALLING. Statement of Case

Report to the Strategic Development Committee. Ronald Reagan Washington National Airport Project Journey. June 2018

Chapter 25 Route Window SE6 Plumstead portal. Transport for London

Archaeological Monitoring at Ham Farm, Ham Road, Faversham, Kent

Energy from Waste and Recycling Facility Trident Park, Cardiff. Planning History. January 2010 SLR Ref: B

Blue badge parking. in Camden. Your guide to parking with a blue badge in Camden. holders. badge. Blue

Update Presented by Siobhan O Donnell. 27 th July 2017

M4 Junctions 3 to 12 Smart motorway

Fellow of the Royal Institution of Charted Surveyors (FRICS) since Member of the Royal Institution of Charted Surveyors (MRICS) since 1986

US Operations Overview. Shane Tilka General Manager US Operations May 2014

King s Cross Construction Impact Group Quarterly Monitoring Report 8 th June 2009

Day and night time road closures and traffic changes on Campbell Street and surrounding streets, St Peters from Monday 9 April to Friday 13 April

90 I-90 Snoqualmie Pass East September Annual Mega-Project Report. Project Benefits

Sheraton Centre Toronto Hotel Motor Court - Relocation of Taxi Facilities

Wellington International Airport Runway Overlay

Moxon Street Car Park Community Liaison Group meeting #10 - Minutes

Chapter 8 Route Window NE7 Chadwell Heath station. Transport for London

Henderson Mess, RAF Halton, Buckinghamshire

Islay Offshore Wind Farm

TUESDAY, 17 DECEMBER 2013

1. CONTINUATION OF RIGHT LANE CLOSURE TOWARDS SLIP ROAD OF JALAN KUCHAI LAMA & NEW PANTAI EXPRESSWAY (NPE) (NORTH-BOUND)

Dublin Airport Update Presented by Pat Molloy

Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content

12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization

SOUTH GLOS COUNCIL UPDATE FOR SUSCOM - JANUARY 2016

QUARTERLY ACTIVITIES REPORT 31 JANUARY 2019

CHAPTER 1: INTRODUCTION

L1584-D1 North Service Area Improvements Program

New Orleans Municipal Yacht Harbor

Depot. Chapel. El Sub Sta. 43 to 53 to to m

PRESENTED TO Town of Middlebury, VT. PRESENTED BY VTrans, VHB, Fitzgerald & Halliday, Inc., and Kubricky Construction

Long water shutdown scheduled for Tuesday, September 18

C. APPROACH FOR IDENTIFYING THE BEST ROUTES FOR THE NEEDED TRANSMISSION SYSTEM IMPROVEMENTS

TECHNICAL BRIEFING WORK ON THE RÉSEAU EXPRESS MÉTROPOLITAIN APRIL 25, 2018

Chapter 4 Route window W23 Taplow station. Transport for London

College Park, Georgia; and Hartsfield-Jackson International Airport (ATL) City of College Park

Harrogate Road, Eccleshill, BD2 3NS

Dallas/Fort Worth International Airport Winter Weather Season Kick-Off Meeting

Planning & Development Group

Chapleau Mining Readiness and Growth Strategy Addendum Number 1 February 27 th, 2017

Smart Motorways Programme

FREEING UP MELBOURNE'S BIGGEST BOTTLENECK

Aberdeen Exhibition and Conference Centre

1.2 If the Council is satisfied that traffic on a road should be prohibited for the purpose of:

Breathing new life into your railway

Executive Directors Review

Spencer Environmental Appendix A: Alternative Analysis for Construction Access Route

Aircraft Maintenance Run Procedures. Date: 1 June 2015 Version: 3.0

RESOLUTION No APPROVAL OF WAYNE COUNTY AIRPORT AUTHORITY FISCAL YEAR 2018 BUDGET. By Board Member Mark Ouimet

Greenwich Peninsula Investor and Analyst Day 12 March 2013 Quintain Estates and Development PLC

Open Report on behalf of Richard Wills, Executive Director for Environment and Economy

25 th Avenue Grade Separation. September 13, 2017

Update on the Thameslink programme

Importing/Certifying an Aircraft

Archaeological Watching Brief at the Brick Stables and Wagon Lodge, Abbey Barns, Abbey Road, Faversham, Kent September 2010

An Introduction to HS2

South Fremantle Solar Farm Agenda 1 March 2018

Improving rail links to Heathrow from the West and beyond

Minutes. ACTION: Ian Frost to provide the economic values study from Wandsworth at the next meeting.

Regional Connector Transit Project Community Leadership Council. 2 nd Hope Station & Flower St Committees January 17, 2017

Transcription:

Construction Open Evening 16 February 2017 www.gov.uk/hs2

Forward Look www.gov.uk/hs2

Euston Station and Approach four week look ahead Week 1 Commencing 13 February 42 Water Main trial trenches Albany Street, Cumberland Market, Gloucester Gate and Zoo Car Park Overhead Line Equipment (OHLE) & DB Schenker Shed decommissioning works Installing new OHLE foundations and moving OHLE clear of DB Schenker Shed to enable demolition Thames Water CCTV & Flow Meter asset survey in Euston Week 2 Commencing 20 February 2017 42 Water Main trial trenches Albany Street, Cumberland Market, Gloucester Gate and Zoo Car Park OHLE & DB Schenker Shed decommissioning works Installing new OHLE foundations and moving OHLE clear of DBS Shed to enable demolition Thames Water CCTV & Flow Meter asset survey in Euston Listed Building Consents Surveys in buildings in Park Village East, Mornington Terrace, Mornington Crescent and Delancy Street Structural Demolition of National Temperance Hospital (NTH) Vezey Strong Wing Use of main compound for ground investigations (GI) operations Granby Terrace Listed Building Consents surveys in buildings in Park Village East, Mornington Terrace, Mornington Crescent and Delancy Street Structural Demolition of NTH Vezey Strong Wing Use of main compound for GI operations Granby Terrace

Euston Station and Approach four week look ahead cont. Week 3 Commencing 27 February 2017 42 Water Main trial trenches Albany Street, Cumberland Market, Gloucester Gate and Zoo Car Park OHLE & DBS Shed decommissioning works Installing new OHLE foundations and moving OHLE clear of DB Schenker Shed to enable demolition Thames Water CCTV & Flow Meter asset survey in Euston Week 4 Commencing 6 March 2017 42 Water Main trial trenches Albany Street, Cumberland Market, Gloucester Gate and Zoo Car Park OHLE & DBS Shed decommissioning works Installing new OHLE foundations and moving OHLE clear of DB Schenker Shed to enable demolition Thames Water CCTV & Flow Meter asset survey in Euston Listed Building Consents Surveys in buildings in Park Village East, Mornington Terrace, Mornington Crescent and Delancy Street Structural Demolition of NTH Vezey Strong Wing Use of main compound for GI operations Granby Terrace Inspection pitting, Rotary drilling and Cable percussion surveys in Winchester Road, Adelaide Road, Springfield Lane, Mortimer Place, Priory Terrace, Langtry Road, Fellows Road & Park Village East Listed Building Consents Surveys in buildings in Park Village East, Mornington Terrace, Mornington Crescent and Delancy Street St James Gardens GPR surveys Structural Demolition of NTH Vezey Strong Wing Use of main compound for GI operations Granby Terrace Inspection pitting, Rotary drilling and Cable percussion surveys in Winchester Road, Adelaide Road, Springfield Lane, Mortimer Place, Priory Terrace, Langtry Road, Fellows Road & Park Village East

Euston Station and Approach 12 Month look ahead Winter (from 1 December 2016) Intrusive GI surveys Inspection pitting, Rotary drilling and Cable percussion surveys in Winchester Road, Adelaide Road, Springfield Lane, Mortimer Place, Priory Terrace, Langtry Road, Fellows Road & Park Village East Use of Main compound for GI operations Granby Terrace Structural Demolition of NTH Vezey Strong Wing 42 Water Main Trial Trenches in Albany Street, Cumberland Market, Park Village East, Zoo Car Park and Gloucester Gate Thames Water CCTV and Flow Meter asset survey Euston wide Listed Building Consents Surveys in buildings in Park Village East, Mornington Terrace, Mornington Crescent and Delancy Street OHLE & DB Schenker Shed decommissioning works Installing new OHLE foundations and moving OHLE clear of DBS Shed including recoveries

Euston Station and Approach 12 Month look ahead cont. Spring (from 1March 2017) Intrusive GI surveys Inspection pitting, Rotary drilling and Cable percussion surveys in Winchester Road, Adelaide Road, Springfield Lane, Mortimer Place, Priory Terrace, Langtry Road, Fellows Road, Park Village East, Mornington Terrace, Albany Street, Hampstead Road, Mornington Street Bridge, Euston Station, Cardington Street, Melton Street & Euston Street. Use of Main compound for GI operations Granby Terrace Structural Demolition of NTH Vezey Strong Wing 42 Water Main Trial Trenches in Albany Street, Cumberland Market, Park Village East, Zoo Car Park and Gloucester Gate 42 Water Main 3 rd party utility diversions in Park Village East & Cumberland Market Thames Water CCTV and Flow Meter asset survey Euston wide Commence utility enabling works in Euston Including trial trenches & surveys to validate designs Listed Building Consents Surveys in buildings in Park Village East, Mornington Terrace, Mornington Crescent and Delancy Street Independent assessment of representative samples, survey and assessment of Phase 1 noise mitigation & commence manufacture OHLE & DBS Shed decommissioning works Installing new OHLE foundations & moving OHLE clear of DBS Shed including recoveries Pre-demolition surveys of properties to be demolished in Euston St James Gardens GPR Surveys & enabling works including site clearance, trial pits, archaeology & exhumations Euston Square Gardens Enabling works including site clearance, trial pits, heritage works & temporary taxi rank construction DB Schenker Shed pre-demolition surveys & soft strip/asbestos removal

Euston Station and Approach 12 Month look ahead cont. Summer (from 1 June 2017) Intrusive GI surveys Inspection pitting, Rotary drilling and Cable percussion surveys in Winchester Road, Adelaide Road, Springfield Lane, Mortimer Place, Priory Terrace, Langtry Road, Fellows Road, Park Village East, Mornington Terrace, Albany Street, Hampstead Road, Mornington Street Bridge, Euston Station, Cardington Street, Melton Street & Euston Street. Use of Main compound for GI operations Granby Terrace Take possession of NTH Insull Wing Soft strip asbestos removal & structural demolition. NTH Construction of new HS2 Site offices 42 Water Main 3 rd party utility diversions in Park Village East North & Cumberland Market 42 Water Main Installation in Albany Street and Cumberland Market Utility enabling works in Euston Including trial holes & surveys to validate designs St James Gardens Enabling works including site clearance, trial pits, archaeology & exhumations Euston Square Gardens Enabling works including site clearance, trial pits, heritage works & temporary taxi rank construction Continue pre-demolition surveys of properties to be demolished, take possession of and commence asbestos removal & soft strip Independent assessment of representative samples, survey and assessment of Phase 1 noise mitigation measure & manufacture. Commence survey, assessment and manufacture for Phase 2&3 NR enabling works Construct new sub-station in Ampthill Estate DB Schenker Shed Structural demolition & temporary ramp installation

Euston Station and Approach 12 Month look ahead cont. Autumn (from 1 September 2017) 42 Water Main 3 rd party utility diversions in Park Village East North & Cumberland Market 42 Water Main installation in Albany Street, Cumberland Market, Zoo Car Park and Park Village East Utility enabling works in Euston Including trial trenches & surveys to validate designs, and commence utility diversions around Granby Terrace Bridge St James Gardens Enabling works including site clearance, trial pits, archaeology & exhumations Euston Square Gardens Enabling works including site clearance, trial pits, heritage works & temporary taxi rank construction Complete pre-demolition surveys of properties to be demolished, asbestos removal & soft strip and commence structural demolitions DB Schenker Shed Structural demolition & temporary ramp installation Complete Independent assessment of representative samples, manufacture & installation of Phase 1 noise mitigation measures. Continue survey & assessment, manufacture & installation for Phase 2&3 NR enabling works Construct new sub-station in Ampthill Estate NR GI Surveys in Euston throat Take possession of NTH Insull Wing Soft strip, asbestos removal & structural demolition. NTH Construction of new HS2 Site offices

DB Schenker Shed Colin Thomas www.gov.uk/hs2

DB Schenker Shed Granby Terrace

Overview of the shed demolition works Historically the shed has been used as a train maintenance depot The freehold is owned by Network Rail The facility is leased by DB Cargo The building is currently accessed by both NR and DBC infrequently for maintenance The building is to be demolished to make way for the new HS2 tracks and will be used as a main construction compound throughout the works HS2 will commence ecology and pre-demolition surveys in the building in April 2017 HS2 are scheduled to take ownership of the building in April 2017 with structural demolition commencing in the Summer of 2017

DBC Shed Granby Terrace Construction Compound Extents of future HS2 work area at track level (in blue) Extents of the shed to be demolished and used as a main construction compound (in yellow)

Demolition of the shed Granby Terrace

Overview of the programme This area must be clear by February 2018 to provide a construction compound for work to the Granby Terrace Bridge scheduled for April 2018. All early works on the shed will be managed by the Costain Skanska Joint Venture (CSJV) on behalf of HS2. The Area will then be used as a main construction compound by our Main Works Contractor (yet to be awarded). Pre-demolition surveys will be focused within the building and will therefore cause minimal disruption to the local community. Pre-demolition surveys will inform the demolition methodology. Details on how the facility will be demolished and how this will effect the local community will be discussed in this forum when the information is available expected May / June 2017.

Demolition of the shed Granby Terrace Summary of recent works Network Rail removed Over Head Line Equipment (OLE) from the side of the DBC Shed over the 2016 Christmas period. Much of HS2 s early works to this building will be similar to those already carried out by Network Rail.

Ground Investigations Javier Escandon www.gov.uk/hs2

Ground Investigation (GI) works in Camden What a typical site setup will look like in the highway What a rotary drilling site setup looks like from inside Inspection pit excavation required at all locations, one of the noisiest operations associated with GI, take approx. 1-2 days What HS2 are trying to achieve? Cores, showing the geological profile of the area What a cable percussion drilling setup looks like this is the noisier of the two drilling methods.

Ground Investigation in the Euston Approach Scheduled from March 2017 to June 2017

Ground Investigation works in Camden Hole relocated HS2 have liaised directly with the Head Teacher of Primrose Hill School regarding works in Princess Road

Ground Investigation works in Camden

Ground Investigation works in Camden

Ground Investigation works in Camden HS2 have liaised directly with Langtry Children's Centre Nursery Manager regarding works in proximity to Nursery. HS2 have liaised with the Camden Education team regarding work in proximity to Alexandra College of Further Education

Ground Investigation works in Camden four week look ahead Week 1 Commencing 13 February 2017 No GI works planned for this week in Camden. Week 3 Commencing 27 February 2017 Inspection pitting works at 28-32 Winchester Road. Parking suspensions, single file traffic, partial pavement closure. Inspection pitting works at Mortimer Place (near Hillsborough Court). Parking suspensions, single file traffic. Inspection pitting works at Springfield Lane (near Falcon House). Partial pavement closure. Week 2 Commencing 20 February 2017 No GI works planned for this week in Camden. Week 4 Commencing 6 March 2017 Rotary drilling works at 28-32 Winchester Road. Parking suspensions, single file traffic, partial pavement closure. Rotary drilling works at Mortimer Place (near Hillsborough Court). Parking suspensions, single file traffic. Rotary drilling works at Springfield Lane (near Falcon House). Partial pavement closure. Inspection pitting works at Langtry Road. Parking suspensions. Inspection pitting works at 111-121 Fellows Road. Parking suspensions, single file traffic.