Fall 2015 Tender Release

Similar documents
Fall 2016 Tender Release

WEEKLY PROVINCIAL HIGHWAY CONSTRUCTION UPDATE FOR THURS., AUG. 25, 2016 The law is black and white. Slow to 60 km/hr in Work Zones.

WEEKLY PROVINCIAL HIGHWAY CONSTRUCTION UPDATE FOR THURSDAY, OCTOBER 6, 2016 The law is black and white. Slow to 60 km/hr in Work Zones.

KDOT announces approved November bids

KDOT announces approved November bids

KDOT announces approved March bids

2017 Armstrong County Outreach

Tenders. Manitoba Heavy Construction Association Unit Ellice Ave. Winnipeg, MB R3H 0Z2 Tel: (204) Fax: (204)

NAIT Distance Assessment Invigilation Network

Gravel and Rock Extraction Highway Maintenance, Recapitalization and Twinning

KDOT announces approved December bids

SPRING WEIGHT RESTRICTION

City of Grand Island Tuesday, December 12, 2017 Council Session

Ohio Department of Transportation Construction Update

Pavement Strength Analysis Prepared by Molzen Corbin September 2016

Canada and Alberta announce 33 new infrastructure projects

Capital Prioritization

Road Commission for Oakland County 2016 Road and Permit Projects (6/29/16 Update) Community or Communities

FY Regional Transportation Improvement Program Basic Project List (All Values in Thousands of Dollars) All costs in current dollars

ADDENDUM NO. TWO AB

DISTRICT CONSTRUCTION PROGRAM OHIO DEPARTMENT OF TRANSPORTATION

Weekly construction update

Ann Arbor Municipal Airport Ann Arbor, MI Date of Latest ALP ACIP Airport Code - A Airport Identifier - ARB

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015

The Evolution of the YOW De-Icing Facility SWIFT Conference & Trade Show September 14-17, Hyatt Regency Montreal

PennDOT MAJOR ROAD PROJECTS

OKLAHOMA DEPARTMENT OF TRANSPORTATION DATE : August 21, 2002 BID OPENING OF August 22, 2002

MONTANA CONSTRUCTION REPORT 06 / 14 / 2016

CITY OF IMPERIAL TOTAL BID PROPOSAL. 1. Mobilization / Bonds / Insurances LS 1 $ $ 2. Preparation/Implementation Traffic Control Plan LS 1 $ $

Media Release For Immediate Release Tuesday, April 17, 2018

PRIORITIES COMMITTEE MEETING

DRAFT. Dorabelle Campground Rehabilitation

Stocked Waters Guide 2016

April 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014

Backgrounder. June 25, Paving the road to a safe construction season


District Construction Progr am. John R. Kasich, Ohio Governor Jerry Wray, ODOT Director Steve Mary, P.E., District Deputy Director

PennDOT Announces 2016 Allegheny County Highway and Bridge Improvement Projects

ADA Compliance Projects Summary Sheet

Reuse of RAP in asphalt pavements. RAP = Recycled Asphalt Pavement also called millings or grindings from:

Aloha Township Local Road Ratings Report for 2018

Stocked Waters Guide 2017

Five-Year Provincial Roads Plan Edition Transportation and Works to

OKLAHOMA DEPARTMENT OF TRANSPORTATION

Arkansas State Highway and Transportation Department JOB BB0203 HWY. 65B - HWY. 65 (F) FEDERAL AID PROJECT NHPP-530-5(4)34

Steven Bauer, Policy Advisory Committee Chairperson, Presiding

29 June Eastern Region 15/16 Program Presentation

Current Corridor Characteristics

BINBIRRI CONTRACTING PTY LTD CAPABILITY STATEMENT 2016

FY TIP Fiscal Constraint 2017 Total Commitments. agencies (the Michigan Department of programmed in the Kalamazoo Area

Wichita Falls MPO - MTP Project List 1 of 6

Pavement Management Study

WELCOME! TSPE DFW MID-CITIES. January Chapter Meeting

SPRING WEIGHT RESTRICTION

Sierra Roadwork Schedule Sunday through Saturday, October 1-7, 2017 LONG-TERM PROJECTS

BID RESULTS. April 14, Award Date April 21, COMMISSION DISTRICT 1 Bob Ruwart - Commissioner

Managing Our Legacy Together

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015

Roadside Management Manual

SPRING WEIGHT RESTRICTION. Minister s Order Pursuant to section 35(1) of The Highways and Transportation Act, 1997,

KDOT announces approved February bids

Pharmacy Name Pharmacy Address City/Town Province Postal Code Urban/ Rural RHA McKay's Arcola Pharmacy 111 Main Street Arcola Saskatchewan S0C 0G0

OKLAHOMA DEPARTMENT OF TRANSPORTATION DATE : February 20, 2013 BID OPENING OF February 21, 2013

Riverside County Transportation Department Summary of Bids

Arkansas Department of Transportation JOB WHITE RIVER STRS. DEMO. & REMOVAL (CLARENDON)(S) FEDERAL AID PROJECT NHPP-0048(23)

CAPITAL IMPROVEMENT PLAN

WEEKLY HIGHWAY ALERT RICHMOND DISTRICT

SPRING WEIGHT RESTRICTION. Minister s Order Pursuant to section 35(1) of The Highways and Transportation Act, 1997,

OKLAHOMA DEPARTMENT OF TRANSPORTATION DATE : August 24, 2000 BID OPENING OF August 24, 2000

TENDER NO. T WESTDALE ROAD SANITARY SEWER UPGRADE ADDENDUM NO. 1

Most people notice when ODOT builds something

Below you will find a suggested list of rural and regional communities outside of Saskatoon/Regina that you may consider visiting.

1964 HISD REPORTS. Highway Mileage on State, State Toll, County and Municipal Systems by County and by District

Guide to. Road Construction Projects

Recommendation: THAT the Council of the Township of Centre Wellington award the following two tenders:

TRAFFIC ALERT FOR OCTOBER 15-19, 2018 Highway Work Zones in the Staunton District

1963 HISD REPORTS. Highway Mileage on State, State Toll, County and Municipal Systems by County and by District

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

Roads Committee Agenda Wednesday, July 8, :00 o'clock a.m.

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

DISTRICT CONSTRUCTION PROGRAM PROGRAM DISTRICT CONSTRUCTION

SPRING WEIGHT RESTRICTION. Minister s Order Pursuant to section 35(1) of The Highways and Transportation Act, 1997,

Minnesota Department of Transportation 2011 Twin Cities Metro Area Construction Projects

Five-Year Provincial Roads Plan 2019 Edition. Transportation and Works

Community Clinic(s) Contact(s) Name Distance from Saskatoon/Regina

Project Start Date: Project Completion Date: July 1, Contractor: Mattson Construction Contact Information: Nate Lillemon

Report. Recommendation: Mayor and Councillors. To: District Engineer and Roading Manager. From: Date: 11 th April 2012

FDOT Treasure Coast Traffic Report through

Projected Advertisement Date

APPENDIX H Transportation Projects Considered for Cumulative Impact Analysis

MEMORANDUM NOTE DE SERVICE

1. PROJECT BACKGROUND. June 25, Alberta Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8

Pharmacy Name Pharmacy Address City/Town Province Postal Code RHA Harder's Pharmacy Box 549, 604 Herbert Ave. Herbert Saskatchewan S0H 2A0 Cypress

Welcome to Dayton Parkway Interchange Open House. November 26, 2018

Progress Report for Projects of Regional Significance

Toll Free Canada/US 24 hours

DATE : July 23, 2008

HOST KA

* Short term resurfacing projects are not included in this listing. 4T39.07 Project: Annual Rural County Sign Improvements, Genesee/Orleans Counties

A Message from the Director

Transcription:

Tender Close 001-05-00 Hwy. 1, Thin Overlay, 4km past the sintaluta access to 4km short of the JCT. Hwy 1, km 43.25 to 53.40 Thin Overlay Southern December 2015 January 2016 Length = 10.15 km Asphalt Concrete = 6 000 t 001-13-00 Hwy. 1, Rut Fill and Seal, Jct. Hwy 2 to Caronport, km 0.00 to 21.20 Rut Fill and Seal Southern January 2016 January 2016 Length = 21.20 km 001-16-00 Hwy. 1, Resurfacing, Jct. Hwy 19 to East of Herbert & East of Rush Lake, km 0.00 to 18.85 Resurfacing Southern October 2015 November 2015 Length = 24.16 km Asphalt Concrete = 32 000 t 002-17-00 002-15-00 Hwy. 2, Resurfacing, North of Wakaw / North of Jct. 5, km 6.25 to 23.00 & km 7.95 to 8.50 & km 8.80 to 9.62 & km 11.28 to 11.88 Resurfacing Central December 2015 January 2016 Length = 18.72 km Excavation = 47 000 m³ Subbase = 49 500 t Base = 27 200 t Asphalt Concrete = 45 000 t 004-04-00 Hwy. 4, Resurfacing, North of Hwy 363 to Swift Current City Limits, km 29.66 to 38.40 Resurfacing Southern December 2015 December 2015 Length = 8.74 km Asphalt Concrete = 25 000 t 006-04-00 Hwy. 6, Resurfacing, North Jct. Hwy 39 to 2.88 km North of intersection with Grid 714, km 0.00 to 18.25 Resurfacing Southern October 2015 November 2015 Length = 18.25 km Asphalt Concrete = 43 000 t Page 1 of 7

Tender Close 007-02-00 Hwy. 7, Paving, Twinning West of Saskatoon to East of Vanscoy, km 4.00 to 13.00 Paving Central January 2016 January 2016 Yes Length = 9.00 km Subbase = 40 000 t Base = 60 000 t Asphalt Concrete = 25 000 t 011-07-00 Hwy. 11, Resurfacing, 11 km South of Hanley to North of Hanley, km 8.00 to 27.90 Resurfacing Central January 2016 February 2016 Yes Length = 19.90 km Excavation = 10 000 m³ Subbase = 7 500 t Base = 5 000 t Asphalt Concrete = 20 000 t 012-03-00 Hwy. 12,, Padding Creek, km 19, km 19.00 to 19.00 Northern October 2015 October 2015 Length = 0.00 km 016-18-00 Hwy. 16,, East of Lanigan over Lanigan Creek, km 30.75, km 30.75 to 30.75 Central October 2015 October 2015 Length = 0.00 km 016-20-00 Hwy. 16, Paving, Twinning Hwy 16 East of Saskatoon to East of Clavet - Paving, km 35.00 to 53.90 Paving Central October 2015 November 2015 Length = 18.90 km Subbase = 180 000 t Base = 245 000 t Asphalt Concrete = 97 000 t 021-09-00 044-08-00 Hwy. 21 & 44, Grade & Pave, Highway 21 from its junction with Hwy 44 to 16 km north and Highway 44 from Glidden to Eatonia, km 0.00 to 16.11 & km 0.00 to 19.17 Grade and Pave Central November 2015 November 2015 Yes Length = 35.28 km Excavation = 200 000 m³ Subbase = 75 000 t Base = 30 000 t Asphalt Concrete = 80 000 t Page 2 of 7

Tender Close 023-03-00 Hwy. 23,, Northwest of Chelan over the Red Deer River, km 1.88, km 1.88 to 1.88 Northern October 2015 October 2015 Length = 0.00 km 023-04-00 Hwy. 23, Rehabilitation, over Carrot River, km 42.68, km 42.68 to 42.68 Rehabilitation Northern October 2015 October 2015 Length = 0.00 km 026-05-00 Hwy. 26, Grade & Pave, Goodsoil to Jct. Hwy. 55, km 44.72 to 52.03 Grade and Pave Northern July 2016 August 2016 Length = 7.31 km Excavation = 207 000 m³ Subbase = 77 000 t Base = 34 500 t Asphalt Concrete = 13 000 t 035-04-00 Hwy. 35, Rut Fill and Seal, North UL, Weyburn to km 21.25, km 2.14 to 21.25 Rut Fill and Seal Southern January 2016 January 2016 Length = 19.11 km 042-02-00 Hwy. 42, Paving, Paving, Keeler to Eyebrow, km 1.88 to 24.40 Paving Southern November 2015 November 2015 Length = 22.52 km Subbase = 180 000 t Base = 80 000 t Asphalt Concrete = 41 000 t 055-13-00 Hwy. 55, Resurfacing, Jct. Hwy 924 to Jct. Hwy 155, km 0.00 to 27.90 Resurfacing Northern December 2015 December 2015 Length = 27.90 km Asphalt Concrete = 80 000 t Page 3 of 7

Tender Close 055-15-00 Hwy. 55, Rehabilitation, Beaver River, km 49.81, km 49.81 to 49.81 Rehabilitation Northern October 2015 October 2015 Length = 0.00 km Hwy., Culvert, locations throughout Northern region Culvert Northern October - November 2015 October - December 2015 Length = 0.00 km Hwy., Culvert, (estimated 3 locations) Culvert Central January 2016 February 2016 Length = 0.00 km Hwy., Micro Surfacing, (5 Locations) Micro Surfacing Southern & Central Length = 0.00 km Page 4 of 7

Tender Close Other Contracts Patching 20,000 tonnes (5 contracts) Patching Central January 2016 January 2016 Patching = 20,000 t Bitmix - Contract #1 Bituminous Mix Central January 2016 February 2016 2,000 liquid asphalt t Bitmix - Contract #2 Bituminous Mix Central January 2016 February 2016 2,000 liquid asphalt t Engineered Seal Coat - North, Central, South Seal Coat November 2015 December 2015 Seal Coat = 1500 000 m² Rubber Asphalt Crack Sealing (7 Projects) RACS Central November 2015 December 2015 Crack Sealing = 525,000 m Aggregate Stockpiling (2 Projects) Aggregate Stockpiling Northern November 2015 December 2015 80 000 t Page 5 of 7

Tender Close Aggregate Stockpiling Aggregate Stockpiling Northern October 2015 November 2015 33 000 t Loading, Hauling, and screening of sand aggregate, mixing screened aggregate with salt at various locations in the northern region Aggregate Stockpiling Northern Advanced Advanced 15 500 t Excavation (m 3 ) Granular (t) Asphalt Concrete (t) Seal Coat (m 2 ) http://www.highways.gov.sk.ca/tenderpost/ Total 464 000 1 090 700 507 000 1 500 000 Types of Projects include 3 Paving, 2 Grade & Pave, 6 Resurfacing, 5 s, Culverts, 8 Medium Preservation Projects and several other Preservation projects. Projects Announced on Previous Tender Plans 002-20-00 Hwy. 2, Resurfacing, N. Urban Limit Prince Albert to 1.34 km N. of single lane (Both lanes and undivided), km 6.92 to 8.26 & km 1.87 to 6.92 & km 1.87 to 6.92 Resurfacing Northern December 2015 December 2015 EPS Length = 7.95km Asphalt Concrete = 35 000 t 002-20-00 Hwy. 2, Resurfacing, Repaving, 16.02 kms South of Junction Highway No. 263 to 0.7 kms South of Junction Highway No. 263, km 22.31 to 37.63 Resurfacing Northern December 2015 December 2015 EPS Length = 15.32 km Asphalt Concrete = 45 000 t Page 6 of 7

Tender Close 003-11-00 Hwy. 3, Resurfacing, Repaving, 27.25 kms West of Junction Highway No. 2 to 42.67 kms West of Junction Highway 2, km 27.25 to 42.67 Resurfacing Northern January 2016 February 2016 EPS Length = 15.42 km Asphalt Concrete = 40 000 t 011-10-00 012-01-00 Hwy. 11 & 12, Interchange, Design-Build of Two Interchanges on Hwy. 11 at Warman and Hwy. 12 at Martensville Interchange Central December 2015 June 2016 016-23-00 Hwy. 16, Resurfacing, Eastbound Lanes West of Langham, km 28.55 to 41.47 Resurfacing Central November 2015 December 2015 Length = 12.92 km Asphalt Concrete = 30 000 t 021-08-00 Hwy. 21, Paving, South of Jct. Hwy. 44, km 13.44 to 41.09 Paving Southern October 2015 October 2015 Length = 27.65 km Subbase = 50 000 t Base = 15 000 t Asphalt Concrete = 61 000 t Haul = 9 270 000 t-km 027-01-00 Hwy. 27, Grading, Vonda to Junction at Highway 41, km 22.77 to 33.96 Grading Central November 2015 December 2015 Length = 12.04 km Excavation = 350 000 m³ 039-01-00 039-02-00 Hwy. 39, Grade & Pave, Twinning East of Estevan to Bienfait, km 25.00 to 27.00 & km 0.00 to 7.00 Grade and Pave Southern November 2015 December 2015 EPS Length = 9.00 km Excavation = 1,010,000 m³ Subbase = 162,000 t Base = 85,000 t Asphalt Concrete = 43,500 t 039-05-01 Hwy. 39, Resurfacing, Resurfacing, 2.7 km west of McTaggart to Yellowgrass, km 16.40 to 26.73 Resurfacing Southern 2017 2017 EPS Length = 10.33 km Asphalt Concrete = 33 500 t Page 7 of 7