Astoria Boulevard ADA and Station Renewal Track Improvements. January 30, 2019

Similar documents
Astoria Boulevard ADA Upgrade and Station Renewal. January 7, 2019

25 th Avenue Grade Separation. December 13, 2017

25 th Avenue Grade Separation. September 13, 2017

Main Street Station Upgrades

NEW YORK CITY TRANSIT AND INFRASTRUCTURE THE G LOOP

Better rail journeys arriving in 2018 The Great North Rail Project between Preston and Blackpool 12 January 2018

NEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release

25 th Avenue Grade Separation. Community Meeting November 13, 2018

EXTERNAL COMMUNICATIONS COMMITTEE MEETING APRIL 2015

0.0 10am Start NW Corner Penn Station, photos, Depart 10:15am, East on 34 th Street, pass Herald Square. (Map 1) 0.6 Turn left (North) onto Fifth

Regional Connector Transit Project Community Leadership Council. 2 nd Hope Station & Flower St Committees January 17, 2017

Public Information Center August 12, 2010

New Orleans Municipal Yacht Harbor

I-10 West and Sunland Park Drive southbound will close July 13 at night. Detour onto North Mesa will be required.

November 21, 2012 Barbara Kelleher, (954)

EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015

Commonwealth Avenue Bridge Deck Replacement Project. Legislative and Stakeholder Briefing. April 13, 2017

2600 COLORADO ENTRY DESIGN

RELEASE: IMMEDIATE Oct. 6, 2017 CONTACT: Darragh Copley Frye (office) (cell)

All closures this week happen at night, including full closures of Mesa and I-10

Sound Transit Operations March 2018 Service Performance Report. Ridership

PROJECT UPDATES: March 15, th Street Water Tower Painting Project:

LONG ISLAND CITY - NEW YORK ROOSEVELT ISLAND MANHATTAN NORTHERN BLVD EAST RIVER. Shop Dine Work Play

Milestone: Bridge to Nowhere scheduled for demolition Aug 14

Full I-35E Mainlane Closure at Beckley Avenue - July 27-30

Pre-Construction Public Meeting July 2017

RELEASE: IMMEDIATE September 14, 2012 CONTACT: Sandy Myers (office) STA (cell)

Atlantic Street Bridge Project Update CTDOT Project Nos & (Phase 2)

NEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release.

Trails, steps, & P-Patch to be south of I- 5 Colonnade

Neighbourhood Committee NDG - Westmount. September 12, 2016

35 Bee Tree Park Planning Zone 3

For Immediate Release Christine Girardin January 19, 2018 SUMTER COUNTY FLORIDA S TURNPIKE AND I-75 INTERCHANGE IMPROVEMENTS

Welcome to the Business Owners Task Force. Perry Leonard Blagg Tire and Service President/COO

Hospital Link Project Project Update September 2015

B-LINE SERIES. Safety Grating GSMSG-17. Safety gratings. product line overview. Safety gratings. product line overview

MBTA WOLLASTON. Station Improvements Public Meeting. January 14, 2016

Work in 2015 and Annual Mobility- Management Plan

Monday, September 18, 2017 Sunday, October 1, 2017

1339, 1431, TH AVENUE NE TH STREET NE

Exit 136 (Centreport Parkway/Stafford County) to Exit 130 (Route 3/Fredericksburg)

3529 Souris River Flood Plan (Phase MI-1)

Long water shutdown scheduled for Tuesday, September 18

STAGE 2 & 3 Pavement reconstruction within viaduct footprint, pavement widening and resurfacing N/S of viaduct footprint, sidewalk

I-10 will close overnight Sunday through Thursday next week. Crews continue to make progress on Sunland s new bridges and ramps.

Crenshaw/LAX Transit Project Construction Update Community Meeting. November 15, 2018

Q72. Rego Park and LaGuardia Airport. Between. Local Service. Bus Timetable. Effective Spring MTA Bus Company

Datum on benchmarks All benchmarks with a Township name and number are on 1929 datum:. All benchmarks with a four-digit number are on 1988 datum:

US 19 Sunset Point Rd to Countryside Blvd.

Palm Beach County Traffic Report August 24 through August 31, 2012

October 31, 2014 Chuck McGinness, (954)

PERIMETER SIX Carrington Mill Blvd morrisville, nc PERIMETERPARKOFFICE.COM

WEEKLY HIGHWAY ALERT RICHMOND DISTRICT

Chicago St. Louis High-Speed Rail. Braidwood Construction. Local Officials Briefing August 7, 2014

Important Lane Closures, April 3 9, 2011

Exit 148 (Quantico) to Exit 133 (Route 17/Fredericksburg)

Crenshaw/LAX Transit Project Construction Update Community Meeting September 27 th, 2017

Ocean Way at U.S. #1 (Town of Jupiter) Installation of a new traffic signal.

TREASURE ISLAND FERRY SHELTER & BUS SHELTERS. Arts Commission Civic Design Review APRIL 18, 2016

Northeast Anthony Henday Drive Edmonton Ring Road Update. Strathcona Chamber of Commerce March 18, 2015

LESLIE BARNS & CONNECTION TRACK. Project Update Construction and Traffic Management Consultation

TORONTO TRANSIT COMMISSION REPORT NO.

Capital Program 2011 Commitments and Completions Year End Review

TWO BALLSTON PLAZA AVAILABLE SPACE AMENITIES. Leasing Information: 1110 N. Glebe Road, Arlington, VA 22201

Crenshaw/LAX Transit Project Construction Update Community Meeting November 29 th, 2017

WORKING WITH BIAS ON TTC PROJECTS

Why your brand should BE HERE.

Better rail journeys arriving in 2018 The Great North Rail Project between Preston and Blackpool 19 January 2018

NDG/Westmount Neighbourhood Committee. May 16, 2016

A. CONCLUSIONS OF THE FGEIS

NFTA Access Enhancement Study for Canalside and Cobblestone Alternatives Discussion. Alternative A South Park Avenue

35EXPRESS PROJECT UPDATE FOR DENTON COUNTY COMMISSIONERS

First rail. August 2011

COLLEGE GREEN EXECUTIVE PLAZA 8785 & 8795 FOLSOM BOULEVARD, SACRAMENTO, CA

THE AIRTRAIN AIRPORT ACCESS SYSTEM JOHN F. KENNEDY INTERNATIONAL AIRPORT AIRPORT ACCESS SERVICE

PERIMETER SIX Carrington Mill Blvd morrisville, nc PERIMETERPARKOFFICE.COM

TORONTO TRANSIT COMMISSION REPORT NO.

COMPLETE TRANSPORTATION GUIDE TO SUPER BOWL LII IN THE BOLD NORTH

PennDOT Interstate Work next week March 30-April 3:

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015

State Route 8 Corridor. Northern Summit County s Path to Success

TORONTO TRANSIT COMMISSION REPORT NO.

San Francisco International Terminal 3 /Boarding Area E San Francisco International Airport Civic Design Review Informational Package.

PERIMETER SEVEN Carrington Mill Blvd morrisville, nc PERIMETERPARKOFFICE.COM

HIGH LINE VENUES. Chelsea Market Passage

TORONTO TRANSIT COMMISSION REPORT NO.

The Light Rail System Safety & Grade Crossing Equipment

Route 29 Business Replacing bridge over river and railroad in Altavista. Signed detour in place.

Palm Beach County Traffic Report July 13 through July 20, 2012

Pattullo Bridge Replacement Project

Northwest Triangle. Redevelopment Proposal. Property Acquisition, Engineering, and Demolition. December, 2005 REDEVELOPMENT AUTHORITY OF THE

Breathing new life into your railway

Construction Update. ODOT District Two Construction Update. For Immediate Release Thursday, October 18, Lucas County

Dawlish & South West rail

2018 Investment in Infrastructure Expo February 27, 2018 Jason Jonas, P.E. Public Works Director

JANUARY MODERNIZATION UPDATE: MAJOR PROJECTS ON TAP AT LAX AS NEW YEAR BEGINS

Welcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program,

Northeast Corridor Transportation Update

SCOPING INFORMATION PACKET

REVISED DRAFT Integrated Hurricane Sandy General Reevaluation Report and Environmental Impact Statement. Atlantic Coast of New York

Transcription:

Astoria Boulevard ADA and Station Renewal Track Improvements January 30, 2019

Major Scope of Work Replace Street and Platform Stairs Work Description Install Two Street-to-Mezzanine Elevators Install Two Mezzanine-to-Platform Elevators Demolish and Rebuild Entire Mezzanine. Raise Underside of Mezzanine and Lower Street Surface to Prevent Future Vehicular Hits Reinforce Street Columns and Foundations For Additional Loads due to Elevators and New Facilities Replace Platform Roofs (Wooden Canopies) and Mezzanine Overpass Walkway Roofs

New Sidewalk bump out Hoyt Avenue South Street Elevator at Columbus Triangle 31 st Street North New Street Elevator

Street Elevator at Columbus Triangle New Street Elevator Locations

Hoyt Avenue North Street Elevator at Intersection of 31st Street and Hoyt Avenue North Stairs moved to accommodate elevator North Removal of two trees is required for elevator installation New Street Elevator 31 st Street

Street Elevator at Intersection of 31st Street and Hoyt Avenue North

Replacement of Street-to-Mezzanine and Mezzanine-to-Platform Stairs

Concrete Slab and Topping Repair

Steel Repair

Replacement of Mezzanine Walkways at Hoyt Avenue North and South

West Elevation Art Glass Panels

East Elevation Art Glass Panels

Platform Scope of Work Work Description ADA Boarding Zone New Platform Edges Replace Damaged Platform Precast Planks and Repair Concrete Cast in Place Slab Repair Damaged Steel Replace Existing Platform Canopies Damaged during Hurricane Sandy Replace Existing Stair Refuge Enclosure with New Glass Enclosure at all Four Platform Stairs Replace Platform Light Posts, Signs, Gates, Railings, Benches, Sandboxes and Refuse Bins

Damaged Platform Precast Panels

Cross Section through New Proposed Mezzanine New Elevator New Canopy New Canopy Platform Mezzanine Reinforce street columns and foundation Section A-A Street Use shallower beam to raise underside of mezzanine

North Fall 2018 March 2019

Traffic Stipulations Work Hours Monday-Friday 9:30 AM to 2:30 PM Saturday-Sunday 7:00 AM to 8:00 PM Traffic Enforcement Agents at these Intersections Hoyt Ave. North at 31 st Street Hoyt Ave. South at 31 st Street Astoria Blvd. at 31 st Street Monday-Friday 9:30 AM to 2:30 PM Saturdays 8:00 AM to 5:00 PM Sundays 9:00 AM to 5:00 PM Travel Lanes 31 st Street One Lane in each direction during Work Hours Two Lanes in each direction during Non-Work Hours Hoyt Ave. North 4 Travel Lanes and One Bus Lane at all times Hoyt Ave. South 5 Travel Lanes at all times

Intersection Closure 31st Street and Hoyt Avenue South 20 Weekends in 2019 Required for elevator installation and to demolish and rebuild the mezzanine Signage, Traffic Enforcement Agents, and Crossing Guards will be provided

Detour During Complete Intersection Closure

Current Work 39 Av-Dutch Kills and Broadway Reopened January 2019 Finished June 2019 Ditmars Boulevard Station Major work complete March 2019 Ditmars Blvd Major Construction finished March 2019 (Station stays open through construction) Astoria Blvd closed Mar-Dec 2019 (after all other stations reopen) Finished June 2019 Astoria Boulevard Station Closing March 2019 Station Reopens December 2019 (9 months) Elevators Operational August 2020 Finished November 2020

Train Service During the Closure Nine month full closure; March-December During the closure Ditmars Blvd and 30th Av provide alternate subway service During 13 Weekends, N/W service will not run north of Queensboro Plaza. Shuttle buses will be provided during these weekends. March 16-18, March 23-24, April 6-7, April 13-14, June 15-16, and June 22-23. (Feb 16-17, Feb 23-24) Ditmars Blvd Major Construction finished March 2019 (Station stays open through construction) Astoria Blvd closed Mar-Dec 2019 (after all other stations reopen)

Track Work Improves the reliability of the track and signal equipment Fewer delays for customers Replaced 2,496 feet of track and ten track switches since 2017 Queensboro 39 Av Ditmars Astoria Blvd ADA compliant platform gaps

Track Work Winter/Spring 2019: Replacing nearly 5,000 feet of track on the northbound track between 36 Av and 30 Av. Track is over 35 years old Work will overlap with station work Requires northbound trains to run express during weekdays, skipping stations in one direction ADA compliant platform gaps Increase reliability and reduce delays

Track Work Work Hours Monday-Friday 9:45 AM to 3:30 PM February 4 April 19 (except Presidents Day, Feb 18) Two weekends: March 9-10 & March 30-April 1 Service Plan Northbound N trains run express from Queensboro Plaza to Astoria Blvd (express to Ditmars Blvd after Astoria Blvd closure) W Trains run along the Q line to 96 St Work is weather dependent

Work Performed to Date Astoria Blvd

Asbestos Material Removed from the Platform Roofs

Relocated Bus Stop and Detoured Walkway to Facilitate Work

Removed Stair at Hoyt Playground

Relocated M60 Bus Stop From Columbus Triangle to Astoria Blvd.

Removed Stair at Columbus Triangle

New Website: https://new.mta.info /system_modernization /astoria