R.M. OF GULL LAKE NO. 139
Reeve & Councillors REEVE Division 1 Division 2 Division 3 Division 4 Division 5 Division 6 -Doug Steele & Phyllis -John Slabik & Norma -Terry Winter & Marj -Pat Simpson -Bob Hansen & Diane -Gwenda Ellis & Grant -Katelyn Toney & Paul
Staff 2011 Year: Foreman: Grader Operator: Grader Operator: Seasonal Operator: Administrator: Janitor: -Rob Myers & Doreen -Matt Jones & Emily -Glen Little & Kim -Steve Retzlaff & Diane -Jeanette Kerr & Doug -Pam Hassard & Rick
Matt Jones has moved on; and we wish him the very best!
Assessment and Tax Roll
2011 Municipality Mill Rate: 7.50
Total Assessment $96,362,236 2011 Budget was $978,240
2011 Assessment By Property Class
Statistics Canada 2011 Census Population in R.M. 201 Residents
TransCanada Keystone Pipeline Project
Started moving pipe through our R.M. roughly end of June. Finished up by September 19, 2012 Secured a bond that covered extra maintenance costs that contributed to the haul.
Pioneer Truck Lines moved 300 km of pipe to the Shaunavon and Piapot sites. It took 1500 loads, each pipe measuring 36 in diameter and 80 feet long.
TransCanada Keystone donated $5,000.00 to Autumn House
CTP Primary Corridor Project Now Complete Adlem Road Construction Project 459 W 5 13-19 W3M
Adlem Road before construction, looking south
Adlem Road after construction, looking South
Adlem Road after construction, looking North
Looking SE from intersection
Looking South from old rail bed
Looking South from old rail bed
Looking East from West side of intersection South Boundary and Adlem
Looking North from South Boundary
Looking East from intersection
Looking East from ditch block
Looking East from ditch block
East from ditch block
East from ditch block
East from intersection
Cost of Project $230,741.25 We Received a Grant worth 50% of Eligible Cost
2011 Emergency Flood Damage
Through Government Program Funding We Received $13,916.57 to assist with the cleanup
Rented pump
Stan Weston s road
Stan Weston s road
Sand Road
Sand Road
Back road by Martindale s
Next Completed Project Bradley Road & Bridge N 12-13-19 W3M
Glen & Matt putting up temporary fence at Bradley Bridge location.
Matt in deep!
View of Bradley Bridge before construction
In Spring Bradley Bridge before construction
Bradley Bridge closer view
Culverts ready for Bradley Bridge
Let the construction begin!
Bradley bridge after installation
Bradley Bridge
Installed culverts at Bradley Bridge
New Bradley Road
This total project cost was $123,800.40 100% Municipal Funds
Saskatchewan Ministry of Highways Mowing Contract Mowed along highways #1 and North/South of #37
There were 8 miles of shoulder pulls done this year.
Before shoulder pull looking south George Harvey s
North of George Harvey s before shoulder pull
Road north of George Harvey s before shoulder pull
After shoulder pull George Harvey s
After shoulder pull looking north George Harvey s
Shoulder pull done on Toney Road
100 th Anniversary Council has set date for celebration on Saturday, July 14, 2012. Please check our web site for further information.
Lapel Pins $2.00 Each Available at the R.M. Office in Gull Lake
100 th Anniversary! Incorporation Date: January 1, 1913
www.rmgulllake.ca A special thanks to Cal Deobald for setting up site and all his help
R.M. Piapot Reeve s new fifth wheel camper!