NWARPC Congestion Management Process - January 16, 2014

Similar documents
Arkansas State Highway and Transportation Department. Bella Vista Rotary Club

Arkansas State Highway and Transportation Department. Fayetteville Commerce District

FNORTHWEST ARKANSAS WESTERN BELTWAY FEASIBILITY STUDY

Dick Trammel. Senior Democrats of Northwest Arkansas. Chad Adams. Chairman, Arkansas Highway Commission. District 4 Engineer

B. Congestion Trends. Congestion Trends

CONGESTION REPORT 1 st Quarter 2018

Scott E. Bennett, P.E. Director of Highways and Transportation ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT. Fifty for the Future

2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016

1.2 Corridor History and Current Characteristics

Our Panelists SPEAKERS MODERATOR

Elected Officials and Media Briefing I-395 Express Lanes Northern Extension

TransAction Overview. Introduction. Vision. NVTA Jurisdictions

SR 429/WEKIVA PARKWAY FTBA CONFERENCE March 20-21, Presented By Suzanne Phillips, P.E., FDOT District 5

Traffic Analysis Final Report

Transportation Improvement District (TID) Exercise New Castle County Unified Development Code

FAYETTEVILLE, ARKANSAS

US 19 Sunset Point Rd to Countryside Blvd.

APPENDIX A DATA COLLECTION BIBLIOGRAPHY SANTA CLARA COUNTY I-680 CORRIDOR STUDY

Research Report Agreement T4118, Task 24 HOV Action Plan HOV ACTION PLAN

DULLES AREA HIGHLIGHTS. Gary Garczynski Commonwealth Transportation Board Northern Virginia District. Committee for Dulles August 4, 2016

PURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40

Rappahannock-Rapidan Regional Commission 2010 Travel Time Survey

McLean Citizens Association Transportation Committee Project Briefing

Project Advisory Group. May 23, 2013

Interstate 90 and Mercer Island Mobility Study APRIL Commissioned by. Prepared by

Nashua Regional Planning Commission

TABLE OF CONTENTS. 1 P age

Evaluation of Significant Transportation Projects in Northern Virginia Transportation District. HB 599 Ratings Overview NVTA - January 22, 2015

FY Transportation Improvement Program. Ozarks Transportation Organization

Susan Jones Moses Susan Jones Moses and Associates Glen Weisbrod Economic Development Research Group

FHWA Actions on Past Interstate Requests that were approved by the USRN were presented and conditions were lifted. FHWA Approval Date

DISTRICT EXPRESS LANES ANNUAL REPORT FISCAL YEAR 2017 JULY 1, 2016 JUNE 30, FloridaExpressLanes.com

Other Principle Arterials Minor Arterial Major Collector Minor Collector Local

5.1 Traffic and Transportation

Technical Advisory Committee. May 14, 2013

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES

Freeway Volume-Crash Summary

Northwest Arkansas Heritage Trail Plan

Capital Metropolitan Transportation Authority. Monthly Performance Report

US 380 FEASIBILITY STUDY

Date: 11/6/15. Total Passengers

Building Level Planning Committee March 30, 2016

Arlington County Board Meeting Project Briefing. October 20, 2015

USE OF UAS FOR IMPROVED CRASH RECONSTRUCTION

MEMORANDUM. Lynn Hayes LSA Associates, Inc.

METROBUS SERVICE GUIDELINES

Selection of a Locally Preferred Alternative for the Interstate 405 Improvement Project Between State Route 55 and Interstate 605.

Arkansas State Highway and Transportation Department. Riverside Rotary Club North Little Rock

ENVISIONING AUSTIN s Airport of the Future

TRAFFIC IMPACT STUDY REPORT FOR PROPOSED OFFICE PROJECT AT 959 SEWARD STREET IN HOLLYWOOD SNYDER PARTNERS

APPENDIX J TRAFFIC AND PARKING DEMAND STUDIES

Update on the I-680 Transit Corridor Improvement Project HOV on/off Ramps Environmental Impact Report Community Engagement Plan

TfL Planning. 1. Question 1

Treasure Island Supplemental Information Report Addendum

INTERSTATE 35 CORRIDOR UPDATE

As part of our transport vision, Leeds City Council, working with the West Yorkshire Combined Authority and Leeds Bradford Airport Company, is

Public Information Meetings. October 5, 6, 7, and 15, 2015

Tolling in Washington State. Craig J. Stone, P.E. Assistant Secretary, Toll Division

Update on Route 1 Efforts

Att. A, AI 46, 11/9/17

Enterprise Integration: A Framework for Connecting the Dots

Project Deliverable 4.1.3d Individual City Report - City of La Verne

6. HIGHWAY MATTERS A. U.S. ROUTE 58 CORRIDOR STUDY

Northwest Arkansas Heritage Trail Plan

300 West Industrial Park Drive Westville, Oklahoma

Memorandum. Roger Millar, Secretary of Transportation. Date: April 5, Interstate 90 Operations and Mercer Island Mobility

Club Officers Secretary Nancy Layton

Federal Aviation Administration Flight Plan Presented at the Canadian Aviation Safety Seminar April 20, 2004

Fayetteville/Springdale, AR II July 27-29, 2012

Overview of Highway 37 Project. Novato Rotary November 4, 2016

CRISIS COALITION. Regional Projects Analysis February 2, 2015

Word Count: 3,565 Number of Tables: 4 Number of Figures: 6 Number of Photographs: 0. Word Limit: 7,500 Tables/Figures Word Count = 2,250

rtc transit Before and After Studies for RTC Transit Boulder highway UPWP TASK Before Conditions

Dulles Corridor Metrorail Project Update Dulles Area Transportation Association August 25, 2009

TRANSPORTATION PROGRAMS

APPENDIX J MODIFICATIONS PERFORMED TO THE TOR

TRANSPORTATION ELEMENT

Road School. Project Overview. March 8, 2011

Baltimore Ravens Egress Study

7272 WISCONSIN AVENUE LOCAL AREA TRANSPORTATION REVIEW

Transform66 Transportation Management Plan: Transit & TDM Strategies

10.0 Recommendations Methodology Assumptions

Assessment of Travel Trends

The Transportation Corridor Overlay District

HDR itrans Consulting Inc. 100 York Blvd., Suite 300 Richmond Hill, ON L4B 1J8 Tel: (905) Fax: (905)

PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor

DRAFT Service Implementation Plan

95 Express Managed Lanes Consolidated Analysis Technical Report

I-70/I-71 Project Public Meeting Presented By

ATM Network Performance Report

NEVADA DEPARTMENT OF TRANSPORTATION

Chapter 1: Introduction Draft

Memorandum. Fund Allocation Fund Programming Policy/Legislation Plan/Study Capital Project Oversight/Delivery Budget/Finance Contract/Agreement Other:

TBARTA: 2015 Master Plan and Tampa Bay Express Project

Item #7. 10 members of the public stopped by to ask questions, review the maps and make comments. The comments received were:

ANA Traffic Growth Incentives Programme Terms and Conditions

Flying Cloud Airport (FCM) Zoning Process: Informing a Mn/DOT Path Forward

U.S.A. PARKWAY EXTENSION TO US 50

Imagine the result. Bus Rapid Transit Feasibility Study. Laredo Urban Transportation Study. August 31 st, 2011

NATIONAL TOLL FACILITIES USAGE ANALYSIS RECORD-BREAKING YEAR FOR TOLL FACILITIES ACROSS THE U.S.

Transcription:

Northwest Arkansas Regional Planning Commission Congestion Management Process (CMP) Update Regional Objectives for Congestion Management, CMP Network, Performance Measures, and Data Collection/System Performance

NWARPC CONGESTION MANAGEMENT PROCESS Moving Ahead for Progress in the 21st Century Act (MAP-21) requires a Transportation Management Area (TMA) to develop and implement a Congestion Management Process (CMP). 1. Develop Regional Objectives for Congestion Management 2. Define the CMP Network 3. Develop Performance Measures 4. Collect Data/Monitor System Performance 5. Analyze Congestion Problems and Needs 6. Identify and Assess CMP Strategies 7. Program and Implement CMP Strategies 8. Evaluate Strategy Effectiveness

NWARPC REGIONAL OBJECTIVES Objective One: Objective Two: Objective Three: Develop procedures for evaluating the relative congestion of facilities; Develop procedures to determine if congestion mitigation strategies should be implemented for a particular facility; Develop a procedure or procedures for evaluating the effectiveness of congestion mitigation strategies implemented.

NWARPC CONGESTION MANAGEMENT PROCESS NETWORK The adopted NWARPC CMP network is approximately 160 centerline miles for data collection, congestion analysis, and system performance and reliability. The adopted NWARPC CMP Network contains all roadways as shown on the October 2012 National Highway System Map plus several additional facilities as approved by the NWARPC Policy Board.

Northwest Arkansas Congestion Management Process Facilities Note: Facilities Described from North to South and from West to East US71/I-540 Segment From To Length Operating Facility Type Posted Speed Conditions US71 UA Boundary -Jane MO US71B - Bentonville Interrupted Urban Street 45 to 55 US71 US71B - Bentonville US62 - Rogers Uninterrupted Freeway 70 I-540 US62 - Rogers US71B - Fulbright North Fayetteville Uninterrupted Freeway 70 I-540 US71 - Fulbright North Fayetteville US71B - Fulbright South Fayetteville Uninterrupted Freeway 65 I-540 US71 - Fulbright South Fayetteville UA Boundary - Greenland Uninterrupted Freeway 70 US71B/Walton Blvd./Walnut/8th Street/Thompson/College/School Segment From To Length Operating Facility Type Posted Speed Conditions US71B/Walton Blvd US71/Walton Blvd - Bentonville I-540/US62 - Rogers Interrupted Urban Street 45 US71B/Walnut I-540/US71B/Walnut Street - Rogers US71B/8th Street - Rogers Interrupted Urban Street 45 US71B/8th/Thompson US62/Hudson - Rogers US412/Sunset - Springdale Interrupted Urban Street 45 US71B/Thompson/College US412/Sunset - Springdale Joyce Blvd - Fayetteville Interrupted Urban Street 45 US71B/College Joyce Blvd - Fayetteville North Street -Fayetteville Interrupted Urban Street 45 US71B/College/School North Street -Fayetteville US71B Fulbright South -Fayetteville Interrupted Urban Street 45 US71B/School US71B Fulbright South -Fayetteville Wilson - Greenland Interrupted Urban Street 45 Fulbright Expressway Segment From To Length Operating Facility Type Posted Speed Conditions US71B Fulbright North I-540 -Fayetteville US71B/College -Fayetteville Uninterrupted Freeway 60 US71B Fulbright South I-540 - Fayetteville US71B/School - Fayetteville Uninterrupted Freeway 65 AR265/Old Missouri/Old Wire Segment From To Length Operating Facility Type Posted Speed Conditions AR265 Old Wire/Old Missouri AR264/Wagon Wheel - Springdale US412/Robinson -Springdale Interrupted Urban Street 45 AR265 Old Missouri/Crossover US412/Robinson -Springdale AR45/Mission - Fayetteville Interrupted Urban Street 45 AR265/Crossover AR45/Mission - Fayetteville AR16E/Fayetteville Interrupted Urban Street 45 AR102-US62/Centerton Blvd/ 14th/Hudson Segment From To Length Operating Facility Type Posted Speed Conditions AR102/US62/Centerton/14th/Hudson AR102/Main -Centerton I-540 Interrupted Urban Street 45 AR102/US62/Centerton/14th/Hudson I-540 UA Boundary Interrupted Urban Street 45 AR264/Wagon Wheel Road Segment From To Length Operating Facility Type Posted Speed Conditions Wagon Wheel Road I-540 AR265/Old Wire Interrupted Urban Street 45 US412/Henri De Tonti/Sunset/Robinson Segment From To Length Operating Facility Type Posted Speed Conditions US412/Henri De Tonti/Sunset/Robinson Wildcat Creek/Taylor - Tontitown I-540 - Springdale Interrupted Urban Street 45 US412/Henri De Tonti/Sunset/Robinson I-540 - Springdale US71B - Springdale Interrupted Urban Street 45 US412/Robinson US71B/Thompson Tulip Tree Drive - Springdale Interrupted Urban Street 45 AR16W/AR45/Wedington/North/Mission Segment From To Length Operating Facility Type Posted Speed Conditions AR16W/AR45/Wedington/North/Mission Red Fox Drive - Fayetteville I-540 - Fayetteville Interrupted Urban Street 45 AR16W/AR45/Wedington/North/Mission I-540 - Fayetteville US71B/College -Fayetteville Interrupted Urban Street 35 AR16W/AR45/Wedington/North/Mission US71B/College Aspen Drive - Fayetteville Interrupted Urban Street 35 US62/AR180/Main/MLK Segment From To Length Operating Facility Type Posted Speed Conditions US62/AR180/Main/MLK Double Springs Road - Farmington I-540 Interrupted Urban Street 45 US62/AR180/Main/MLK I-540 -Fayetteville US71B/School -Fayetteville Interrupted Urban Street 45 AR16E/15th/Happy Hollow/Huntsville Segment From To Length Operating Facility Type Posted Speed Conditions AR16E/15th/Happy Hollow/Huntsville AR112/Razorback Road AR265/Crossover Interrupted Urban Street 40 AR16E/15th/Happy Hollow/Huntsville AR265/Crossover UA Boundary Interrupted Urban Street 40 AR112/Razorback/Maple/Garland Segment From To Length Operating Facility Type Posted Speed AR112/Razorback/Maple/Garland AR112 Spur/Wedington - Fayetteville AR180/MLK Interrupted Urban Street 40 AR112/Razorback/Maple/Garland AR180 MLK - Fayetteville I-540 Interrupted Urban Street 40

CONGESTION MEASURES - NWARPC AVERAGE TRAVEL TIME DATA Policy Committee approved consultant services to acquire average travel time data (2012) (e.g. Inrix, Navteq/Nokia) and develop the NWARPC CMP methodology and associated documentation for the CMP report. Travel time Congestion and Reliability measures will be developed for the a.m. and p.m. peak travel times and will include: Delay Rate Per Mile Travel Time Index Observed to Posted Speed Observed to 85th Percentile Speed Planning Time Index The average travel speed will be used to compare the a.m. and p.m. peak period travel speeds to posted speed limit and/or 85 percentile speed. The delay in speed, based on the data, will then be used to identify congested freeway and arterial facilities. This type of data and analysis is currently being used in Kansas City and Austin and is being considered by Oklahoma City as part of their CMP process.

NWARPC Consultant Selection Staff drafted and presented the Letters of Interest and Scope of Work to the CMP Committee on June 11, 2013 with a submittal LOI deadline of July 29, 2013 at 4 pm. Three firms submitted LOI S Alliance, Cambridge Systematics, and CoPLAN LLC. The CMP LOI Committee met on August 1, 2013 and scored the LOI s. All three firms were sent the RFP and two firms submitted proposals. The RFP deadline was August 23, 2013 The CMP RFP Committee met on September 4, 2013 and selected CoPLAN LLC. The draft contract with CoPLAN LLC was sent to AHTD for review on October 17, 2013.

The Interstate I-540 Improvement Study prepared by Parsons Transportation Group in 2006 considered the needed Interstate widening and focused on an analysis of nineteen interchanges The study developed the following: 2024 travel demand forecast for I-540 Identified Congestion Segments Calculated 2006 and 2024 Level of Service Recommended Interstate widening Analyzed nineteen interchanges

STP-A Project Selection Projects will be evaluated and scored based on the six categories listed below: A. Congestion Management B. Regional Significance/Connectivity C. Safety D. Overall Improvement to the Transportation System E. Project Design F. Project Continuation, Partnership, Cost-Sharing Rupple Road FY2013 STP-A I-540 Don Tyson Interchange FY2013 STP-A

STP-A 2013 and 2014 Funded Projects

Live Traffic, Construction Zones, Traveler Information, Travel Conditions, Winter Road Conditions - AHTD Link http://www.idrivearkansas.com/#construction Advancing Metropolitan Planning for Operations An Objectives-Driven, performance Based Approach the factors that impact traffic congestion and reliability have been grouped into six categories. Of the six factors, 60% of congestion is caused by other factors other than bottlenecks.