Palm Beach County Traffic Report July 13 through July 20, 2012

Similar documents
Palm Beach County Traffic Report August 24 through August 31, 2012

May 1, 2015 Meredith Cruz, (561) Palm Beach County Traffic Report May 1 through May 8, 2015

November 21, 2012 Barbara Kelleher, (954)

Palm Beach County Traffic Report. Aug. 25 through Sept. 1, 2017

April 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015

October 31, 2014 Chuck McGinness, (954)

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016

FDOT Treasure Coast Traffic Report through

FDOT Treasure Coast Traffic Impact Report

BROWARD COUNTY TRAFFIC IMPACT REPORT March 13 through March 20, March 13, 2015 Chuck McGinness,

May 1, 2015 Chuck McGinness, BROWARD COUNTY TRAFFIC IMPACT REPORT May 1 through May 8, 2015

FDOT Treasure Coast Traffic Impact Report

May 16, 2014 Chuck McGinness, (954) BROWARD COUNTY TRAFFIC IMPACT REPORT May 16 through May 23, 2014

Road widening from 2 lanes to 4 lanes. Bridge removal and piping of the canal. Lane closures are not expected.

Ocean Way at U.S. #1 (Town of Jupiter) Installation of a new traffic signal.

For Immediate Release Christine Girardin January 19, 2018 SUMTER COUNTY FLORIDA S TURNPIKE AND I-75 INTERCHANGE IMPROVEMENTS

FOR IMMEDIATE RELEASE Fiorella Teodista January 5, 2018 SOUTH FLORIDA AND TREASURE COAST WEEKLY LANE CLOSURES AND WORK ZONE ADVISORY

IST FUNDING THROUGH CURRENT FISCAL YEAR ONLY

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

State Route 8 Corridor. Northern Summit County s Path to Success

Florida Department of Transportation Daniels Parkway Fort Myers, FL 33913

Florida Department of Transportation ERIK FENNIMAN INTERIM SECRETARY

Ohio Department of Transportation Traffic Advisory. District 4 Allen C. Biehl, P.E., Deputy Director S. Arlington Road.

CONTACT: Nichole Lawrence CELL: FOR IMMEDIATE RELEASE Wednesday March 28, 2018

Ohio Department of Transportation Construction Update

Florida Department of Transportation MIKE DEW SECRETARY

- Countywide - Roadway Cone Zone / Lane Closure / Sidewalk Repair Schedule

RELEASE: IMMEDIATE September 14, 2012 CONTACT: Sandy Myers (office) STA (cell)

Guide to. Road Construction Projects

CONSTRUCTION PROJECTS IN CUYAHOGA COUNTY CLEVELAND EUCLID 3/9/18 RICHMOND MAYFIELD HIGHLAND HEIGHTS HEIGHTS SOUTH EAST MAYFIELD EUCLID CLEVELAND

Draft Year 2040 Cost Feasible Plan

2 Construction Program

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Aug , 2016

PennDOT Interstate Work next week March 30-April 3:

Important Lane Closures, April 3 9, 2011

FOR IMMEDIATE RELEASE February 22, 2019 CONTACT: Jen K. Ward, SALEM 69

TRAFFIC ALERT FOR JANUARY 15-19, 2018 Highway Work Zones in the Staunton District

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT June 12 June 18, 2016

TRAFFIC ALERT FOR DECEMBER 25, 2017 to JANUARY 5, 2018 Highway Work Zones in the Staunton District

TRAFFIC ALERT FOR MARCH 5-9, 2018 Highway Work Zones in the Staunton District

* Short term resurfacing projects are not included in this listing. 4T39.07 Project: Annual Rural County Sign Improvements, Genesee/Orleans Counties

EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015

WEEKLY HIGHWAY ALERT RICHMOND DISTRICT

Palm Beach County Infrastructure Sales Tax Program Project Tracking. FY 2017 Projects

Public Information Center August 12, 2010

Route 29 Solutions Projects

Exit 148 (Quantico) to Exit 133 (Route 17/Fredericksburg)

35EXPRESS PROJECT UPDATE FOR DENTON COUNTY COMMISSIONERS

Land Use Context Definitions

Exit 136 (Centreport Parkway/Stafford County) to Exit 130 (Route 3/Fredericksburg)

TRAFFIC ALERT FOR MARCH 26-30, 2018 Highway Work Zones in the Staunton District

Construction Update. ODOT District Two Construction Update. For Immediate Release Thursday, October 18, Lucas County

STAGE 2 & 3 Pavement reconstruction within viaduct footprint, pavement widening and resurfacing N/S of viaduct footprint, sidewalk

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

Major Projects Overview

RELEASE: IMMEDIATE Oct. 6, 2017 CONTACT: Darragh Copley Frye (office) (cell)

PALM BEACH MPO. May 3, Valerie Neilson, AICP Multimodal Manager Palm Beach MPO

Route 29 Business Replacing bridge over river and railroad in Altavista. Signed detour in place.

Weekly East Tennessee Construction Report for May 31-June 6, 2018

TRAFFIC ALERT FOR FEBRUARY 11-15, 2019 Highway Work Zones in the Staunton District

Hospital Link Project Project Update Winter 2018

LESLIE BARNS & CONNECTION TRACK. Project Update Construction and Traffic Management Consultation

TRAFFIC ALERT FOR OCTOBER 15-19, 2018 Highway Work Zones in the Staunton District

Forest Hill Blvd. at Kirk Road Widening Project FM#:

Toll Rates for Florida Turnpike System and Florida Department of Transportation (FDOT) Toll Facilities. South Florida

Night work update: Hills M2 Motorway and westbound on ramp at Pennant Hills Road

District Construction Progr am. John R. Kasich, Ohio Governor Jerry Wray, ODOT Director Steve Mary, P.E., District Deputy Director

Exit 148 (Quantico) to Exit 133 (Route 17/Falmouth)

TRAFFIC ALERT FOR DECEMBER 10-14, 2018 Highway Work Zones in the Staunton District

PALM BEACH COUNTY INFRASTRUCTURE SURTAX REVENUES As of November 30, 2017

NEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release

Long water shutdown scheduled for Tuesday, September 18

El Dorado County / Tahoe Roadwork Schedule

Appendix 4.1 L. No-Build Project Descriptions

TRAFFIC ALERT FOR FEBRUARY 4-8, 2019 Highway Work Zones in the Staunton District

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 9

MUNICIPAL COMMISSION/COUNCIL TERMS, TERM LIMITS, SALARIES AND BENEFITS SURVEY

Welcome Wednesday News

Weekly construction update

Milestone: Bridge to Nowhere scheduled for demolition Aug 14

Welcome to the Business Owners Task Force. Perry Leonard Blagg Tire and Service President/COO

Day and night time road closures and traffic changes on Campbell Street and surrounding streets, St Peters from Monday 9 April to Friday 13 April

EXTERNAL COMMUNICATIONS COMMITTEE MEETING APRIL 2015

DISTRICT CONSTRUCTION PROGRAM PROGRAM DISTRICT CONSTRUCTION

5.1 Traffic and Transportation

DISTRICT EXPRESS LANES ANNUAL REPORT FISCAL YEAR 2017 JULY 1, 2016 JUNE 30, FloridaExpressLanes.com

U.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County

PRIORITIES COMMITTEE MEETING

Constructor: Joseph B. Fay

PennDOT Announces 2016 Allegheny County Highway and Bridge Improvement Projects

Hospital Link Project Project Update September 2015

MEMORANDUM VILLAGE OF NORTHBROOK

OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS 9/5/2018 2:12:06 PM

Palm Beach County Redevelopment Sites State Road 7, Delray Beach, FL 33446

Project Update to Treasure Coast Regional Planning Council

2018 Investment in Infrastructure Expo February 27, 2018 Jason Jonas, P.E. Public Works Director

Second Street Improvements Project Project Update Archive

Transcription:

For Immediate Release July 13, 2012 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report July 13 through July 20, 2012 Palm Beach County Palm Beach County traffic will be affected this week by ongoing construction projects and maintenance work, Florida Department of Transportation (FDOT) officials report. Weather permitting; closures will be in effect on I-95 and in other areas throughout Palm Beach County for construction activities. For around-the-clock, real-time, I-95 traffic information, call 511. To view real-time video of I- 95 in Palm Beach County, visit the Florida Department of Transportation s Palm Beach SMART SunGuide Transportation Management Center (TMC) website at www.smartsunguide.com. FDOT and the SunGuide Partners provide these free services. For updated lane closure information, please refer to www.d4fdot.com. Follow us now on Twitter at MyFDOT_SEFL. I-95 Corridor Projects: I-95 Intelligent Transportation System (ITS) Deployment Project (Broward/Palm Beach County Line to Martin/Palm Beach County Line) This $24.5 million, 38.6-mile Design/Build ITS Deployment project began in October 2008. This project is establishing a permanent Intelligent Transportation System (ITS) network along I- 95 through Palm Beach County and includes installing Dynamic Message Signs on I-95 and on crossroads with entrance and exit ramps to/from I-95, and installing Highway Advisory Radio and other ITS-related equipment. The project is being done in two phases: Phase A, between the Broward-Palm Beach County line and PGA Boulevard, was completed in July 2011; Phase B, from PGA Boulevard to the Palm Beach-Martin County Line, began Monday, April 30, 2012, and will last until late spring 2013. Work is being performed by Transcore ITS. Restrictions: Intermittent shoulder closures may occur on I-95 in each direction, from PGA Boulevard to the Palm Beach-Martin County Line, 9 a.m. until 4 p.m., Monday through Friday. Southern Palm Beach County Projects:

Glades Road (SR 808) from west of I-95 to NW 7 th Avenue Construction on this 1.2-mile project began Monday, Apr. 18, 2011, in the City of Boca Raton. Work consists of repaving the roadway, installation of new sidewalks, widening to provide bike lanes, pedestrian and traffic railing upgrades, installation of video detection devices, signage, signalization, and landscaping. The project will cost an estimated $3.9 million. The work is being performed by Ranger Construction South and is expected to be completed summer 2012. Restrictions: One lane will be closed in each direction, 9 p.m. until 11:30 p.m., with two lanes closed, 11:30 p.m. until 6 a.m., Sunday night through Friday morning. Three lanes of I-95 at Glades Road will be closed in each direction, intermittently, 10 p.m. until 5 a.m., Sunday night through Friday morning. Military Trail at Glades Road will have one northbound lane closed, 9 p.m. until 6 a.m., Sunday night through Friday morning. Glades Road (SR 808) from west of Boca Lakes Drive to west of Florida s Turnpike Construction on this 0.825-mile project is expected to begin Monday, July 9, 2012, in the City of Boca Raton. Work consists of repaving the roadway, installation of new sidewalks and ramps to meet ADA standards, pedestrian and traffic signalization upgrades, and sod installation. The project will cost an estimated $1.08 million. The work is being performed by Ranger Construction Industries, Inc. and is expected to be completed fall 2012. Restrictions: There may be intermittent lane closures, 9 a.m. until 5 p.m., Monday through Friday. Central Palm Beach County Projects: Southern Boulevard (SR 80) Drainage Improvements from Lang Road to the C-51 Canal This 0.2-mile drainage and resurfacing project began Tuesday, September 6, 2011 in the Town of Cloud Lake and the Town of Glen Ridge. This project includes re-grading the existing retention pond along Southern Boulevard (just east of Lang Road) to convert to a wet detention pond, the milling and resurfacing of Lang Road from south of Southern Boulevard to just north of Shannondale Road, and the installation of new drainage structures and storm pipes. The work is being performed by CMA Corporation, and is expected to be completed winter 2012. The estimated construction cost is $229,589. Restrictions: Lang Road is closed around-the-clock, from Southern Boulevard to Shannondale Road, through winter 2012. Access will be maintained to existing driveways and the Town of Cloud Lake Municipal Building. Northern Palm Beach County Projects: US 1 (SR 5) from South of 13 th Street to Silver Beach Road This 1.4-mile resurfacing project will begin Monday, July 30, 2012, in the City of Riviera Beach. Work includes milling and resurfacing the existing roadway, drainage and water main installation throughout the project, curb and sidewalk replacement, upgrades to pedestrian and traffic signalization, signage upgrades, and sidewalk and driveway ramp installation to meet

ADA standards. The work will be performed by Gibbs and Register, Inc., and is expected to be completed winter 2014. The estimated construction cost is $12.8 million. Restrictions: All lanes are open. SR A1A Little Lake Worth Bridge Replacement Project This 0.8-mile bridge replacement project began Tuesday, Jan. 3, 2012 in the City of Palm Beach Gardens, unincorporated Palm Beach County, and the Village of North Palm Beach. Work includes replacing the existing low-level fixed bridge with a new two-lane fixed bridge in the same location. The new bridge will provide four additional feet of clearance (for a total of 12 feet) to meet current FDOT standards, and minimize future damage to the bridge deck from salt water. The work is being performed by The Murphy Construction Company, in conjunction with the Little Blue Heron Bridge Replacement Project, which was completed in September 2011. The combined cost for these two projects is estimated at $10.1 million. Construction is expected to be completed early winter 2012. Restrictions: Flaggers will be on-site, Monday through Friday, 7 a.m. until 6 p.m., as needed. East Blue Heron Boulevard and North Ocean Drive (SR A1A) from US 1 (SR 5) to South of Burnt Bridge on Singer Island This 3-mile resurfacing project began July 28, 2010 in the City of Riviera Beach. This project includes milling and resurfacing of the existing roadway, storm water drainage improvements, new decorative sidewalks and crosswalks, lighting, bike paths, pedestrian upgrades of the existing traffic signals, and infrastructure work including new water mains and sanitary sewer improvements. Work is being performed by H & J Contracting, Inc. and is expected to be completed summer 2012. The estimated construction cost is $11 million. This project is also part of the American Recovery and Reinvestment Act (ARRA) stimulus, and is a Local Agency Program (LAP). For more information, please contact Target Engineering at 561-939-3389. Restrictions: The westbound and eastbound outside lanes of Blue Heron Boulevard, between Lake Shore Drive and Lake Drive, will be closed through July 2012. Traffic may be reduced to one lane in each direction throughout the project limits Monday through Tuesday, and Thursday through Friday, through July 2012. The north sidewalk along Blue Heron Boulevard between Lakeshore and Lake Drive is closed to pedestrian traffic; however, pedestrian access will be maintained on the south side during construction. US 1 (SR 5) from north of Parker Bridge to just south of Indiantown Road This 7-mile resurfacing project began Monday, Aug. 8, 2011, in the Village of North Palm Beach, the City of Palm Beach Gardens, unincorporated Palm Beach County, the Town of Juno Beach, and the Town of Jupiter. This project includes milling and resurfacing the roadway, sidewalk installation and ADA improvements, landscaping, irrigation, signalization, signage and pavement markings. Work is being performed by Community Asphalt Corporation, and will be completed late spring 2013. The estimated construction cost is $9.6 million. Restrictions: One lane may be closed in each direction, between Universe Boulevard (Juno Beach) and the Parker Bridge (North Palm Beach), 9 a.m. until 4 p.m., Monday through Friday.

US 1 (SR 5) Low-level Bridges from north of Indiantown Road to south of Ocean Boulevard (A1A) Construction on this 0.607-mile bridge project began Thursday, June 16, 2011 in the Town of Jupiter. Work includes the replacement of four (4) low-level bridges along US 1. This designbuild project costs an estimated $11.6 million and is expected to be completed winter 2012. The work is being performed by Johnson Brothers. Restrictions: Traffic has been placed onto the newly constructed southbound bridges. One lane is open in each direction at all times. Traffic will remain in this pattern through winter 2012 while workers replace the existing northbound bridges. Motorists should use caution and be aware of personnel and equipment moving in and around the work zone. SCUBA diving, swimming and boating are restricted in the vicinity of the bridges for the duration of the project for safety reasons. Western Palm Beach County Projects: SR 80 (west of CR 827 to north of SE Avenue F) / SR 880 (east of SR 80 to E Canal Street S intersection) / SR 717 (east of SR 715 to SR 80) Construction began Monday, Oct. 17, 2011 in the City of Belle Glade. Work includes milling and resurfacing the roadway, ADA curb and ramp replacement, drainage improvements, pedestrian improvements, and guardrail and landscaping installation. This project costs an estimated $3 million and is expected to be completed summer 2012. Work is being performed by Weekley Asphalt Paving, Inc. Restrictions: SR 80 may have one lane closed in each direction, 7:30 a.m. until 4 p.m., Monday through Friday. SR 880 may have one lane closed in each direction, 7:30 a.m. until 4 p.m., Monday through Friday. Maintenance, Utility and Permit Closures: Restrictions: The Spanish River Bridge, over the Intracoastal Waterway in the City of Boca Raton, will have intermittent lane closures in each direction, 12 p.m. until 3:30 p.m., Monday, July 16, and 9 a.m. until 3:30 p.m., Tuesday, July 17, and Wednesday, July 18, for electrical repairs. Restrictions: The Atlantic Avenue Bridge, over the Intracoastal Waterway in the City of Delray Beach, will have the outside lane closed in each direction, 9 a.m. until 3:30 p.m., Wednesday, July 18, for electrical repairs. Restrictions: The Lake Avenue Bridge, over the Intracoastal Waterway in the City of Lake Worth, will have alternating traffic, 9 a.m. until 3 p.m., Thursday, July 19, for concrete repairs. Restrictions: The Ocean Avenue Bridge, over the Intracoastal Waterway in the City of Boynton Beach and the Town of Ocean Ridge, will have alternating traffic, 9 a.m. until 12 p.m., Thursday, July 19, for concrete repairs.

Restrictions: State Road 7, from Palmetto Park Road to Glades Road, will have southbound left lane closures for irrigation and landscaping. Please watch for workers. For more information about this project, please contact Palm Beach County Construction Services at 561-684-4000. Restrictions: Blue Heron Boulevard at Congress Avenue, in the City of Riviera Beach, will have the outside lane closed in each direction, daily, Monday through Friday, for intersection improvements. For more information about this project, please contact Palm Beach County Construction Services at 561-684-4000. Restrictions: The Ocean Avenue Bridge, over the Intracoastal Waterway in the Town of Lantana, is closed through spring 2014, for complete reconstruction. Traffic is being detoured via A1A, Lake Ave./Lucerne Ave., and US-1. For more information about this project, please contact Palm Beach County Construction Services at 561-684-4000. Restrictions: State Road A1A/South Ocean Boulevard is closed, around the clock, between Southern Boulevard and Sloan s Curve, through August 2012, for force main replacement by the Town of Palm Beach. Local traffic will be allowed up to but not past the dig site. Emergency vehicles will be permitted at all times, and access to homes will be maintained. For more information, please contact the Town of Palm Beach at fmain@townofpalmbeach.com, or Construction Manager Wayne King at 561-718-2605. www.dot.state.fl.us Consistent, Predictable, Repeatable