SECTION 55A1 ROBINSON TOWNSHIP IN WASHINGTON COUNTY

Similar documents
EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015

EXTERNAL COMMUNICATIONS COMMITTEE MEETING APRIL 2015

Night work update: Hills M2 Motorway and westbound on ramp at Pennant Hills Road

Guide to. Road Construction Projects

Ohio Department of Transportation Construction Update

Long water shutdown scheduled for Tuesday, September 18

Mason Street Bike/Pedestrian Trail Project

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Aug , 2016

CONTACT: Nichole Lawrence CELL: FOR IMMEDIATE RELEASE Wednesday March 28, 2018

Hospital Link Project Project Update September 2015

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015

April 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014

Constructor: Joseph B. Fay

PennDOT Interstate Work next week March 30-April 3:

Exit 136 (Centreport Parkway/Stafford County) to Exit 130 (Route 3/Fredericksburg)

BUILD. In this issue: NEW AERIALS OF CONSTRUCTION NEW PROJECT IN CONSTRUCTION PAC K AG E 4. August 2018

FDOT Treasure Coast Traffic Report through

FOR IMMEDIATE RELEASE February 22, 2019 CONTACT: Jen K. Ward, SALEM 69

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016

Public Information Center August 12, 2010

Exit 148 (Quantico) to Exit 133 (Route 17/Fredericksburg)

Palm Beach County Traffic Report July 13 through July 20, 2012

U.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

Southern Beltway Projects Summary

May 1, 2015 Meredith Cruz, (561) Palm Beach County Traffic Report May 1 through May 8, 2015

Palm Beach County Traffic Report August 24 through August 31, 2012

TRAFFIC ALERT FOR DECEMBER 25, 2017 to JANUARY 5, 2018 Highway Work Zones in the Staunton District

APPENDIX F List of Commitments

RELEASE: IMMEDIATE September 14, 2012 CONTACT: Sandy Myers (office) STA (cell)

Regional Connector Transit Project Community Leadership Council. 2 nd Hope Station & Flower St Committees January 17, 2017

AGENDA ITEM I-6 Public Works

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015

Day and night work: Hills M2 Motorway tunnel portals and Coral Tree Drive electrical substation

PennDOT Announces 2016 Allegheny County Highway and Bridge Improvement Projects

State Route 8 Corridor. Northern Summit County s Path to Success

Day and night time road closures and traffic changes on Campbell Street and surrounding streets, St Peters from Monday 9 April to Friday 13 April

BINBIRRI CONTRACTING PTY LTD CAPABILITY STATEMENT 2016

FDOT Treasure Coast Traffic Impact Report

- Countywide - Roadway Cone Zone / Lane Closure / Sidewalk Repair Schedule

WEEKLY PROVINCIAL HIGHWAY CONSTRUCTION UPDATE FOR THURS., AUG. 25, 2016 The law is black and white. Slow to 60 km/hr in Work Zones.

WEEKLY PROVINCIAL HIGHWAY CONSTRUCTION UPDATE FOR THURSDAY, OCTOBER 6, 2016 The law is black and white. Slow to 60 km/hr in Work Zones.

December 2012 Update. I-95 New Haven Harbor Crossing. Corridor Improvement Program

Hospital Link Project Project Update Winter 2018

Exit 148 (Quantico) to Exit 133 (Route 17/Falmouth)

Weekly East Tennessee Construction Report for May 31-June 6, 2018

Public Notice ISSUED: December 10, 2018 EXPIRES: January 9, 2019

BUILD. Update CONSTRUCTION. In this issue: FEATURED PROJECT: KENT AVENUE ARCH CONSTRUCTION AT THE SJ RIVER VIADUCT FEBRUARY 2019

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

MEMORANDUM VILLAGE OF NORTHBROOK

Ohio Department of Transportation Traffic Advisory. District 4 Allen C. Biehl, P.E., Deputy Director S. Arlington Road.

Viaduct Demolition at Girard Interchange

Commonwealth Avenue Bridge Deck Replacement Project. Legislative and Stakeholder Briefing. April 13, 2017

Weekly construction update

TRAFFIC ALERT FOR JANUARY 15-19, 2018 Highway Work Zones in the Staunton District

TRAFFIC ALERT FOR MARCH 5-9, 2018 Highway Work Zones in the Staunton District

Kentucky Lock Project Update Inland Waterways Users Board Meeting No. 84

Road Commission for Oakland County 2016 Road and Permit Projects (6/29/16 Update) Community or Communities

Spencer Environmental Appendix A: Alternative Analysis for Construction Access Route

TRAFFIC ALERT FOR MARCH 26-30, 2018 Highway Work Zones in the Staunton District

State Project Reconstruction I-84

Project Overview. Hunter Mill Road Over Colvin Run Bridge Replacement Fairfax County. Get Involved. Public Information Meeting. Contact Information

Exposition Light Rail Transit Project

Atlantic Street Bridge Project CTDOT Project Nos & (Phase 2)

Sandbag Barrier. Suitable Applications Sandbag barriers may be suitable: As a linear sediment control measure:

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

Abandoned Mine Sites Policy

PennDOT's NORTHEASTERN PENNSYLVANIA District 4 (includes Pike and Wayne counties) ROADWORK SCHEDULE - June 14-20

All closures this week happen at night, including full closures of Mesa and I-10

I-95 WIDENING INCLUDING THE INTERCHANGES AT I-4 AND US 92 DESIGN-BUILD

RELEASE: IMMEDIATE Oct. 6, 2017 CONTACT: Darragh Copley Frye (office) (cell)

The Holes Creek Bridge Replacement By Bradley McClelland

Frequently Asked Questions on the Route 29 Solutions Improvements Projects

25 th Avenue Grade Separation. Community Meeting November 13, 2018

LESLIE BARNS & CONNECTION TRACK. Construction Liaison Group Meeting #6 January 30, 2014

Northern Rail Extension, Phase One

For Immediate Release Christine Girardin January 19, 2018 SUMTER COUNTY FLORIDA S TURNPIKE AND I-75 INTERCHANGE IMPROVEMENTS

Addendum - Airport Development Alternatives (Chapter 6)

25 th Avenue Grade Separation. December 13, 2017

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT June 12 June 18, 2016

Blackburn Road Blackburn Level Crossing Removal. Frequently Asked Questions August 2014 GENERAL

BUREAU OF TRANSPORTATION AND SAFETY SECRETARIAL LETTERS RAILROAD SAFETY DIVISION

Second Street Improvements Project Project Update Archive

Neighbourhood Committee NDG - Westmount. September 12, 2016

Important Lane Closures, April 3 9, 2011

A. From I-68 in Monongalia County, West Virginia to SR 6119 in Fayette County, Pennsylvania 1

November 21, 2012 Barbara Kelleher, (954)

Rural Rustic Road Program

STAGE 2 & 3 Pavement reconstruction within viaduct footprint, pavement widening and resurfacing N/S of viaduct footprint, sidewalk

SOUTHERN BELTWAY I-79 TO MON/FAYETTE EXPRESSWAY

Florida Department of Transportation MIKE DEW SECRETARY

LOST HILLS ROAD INTERCHANGE PROJECT CONSTRUCTION UPDATE. CALABASAS CITY COUNCIL April 26, 2017

OFFICE OF THE CITY MANAGER

Project Start Date: Project Completion Date: July 1, Contractor: Mattson Construction Contact Information: Nate Lillemon

G Street Undercrossing. City Council Meeting Date: November 3, 2008

Sierra Roadwork Schedule Sunday through Saturday, October 1-7, 2017 LONG-TERM PROJECTS

MORGAN CREEK GREENWAY Final Report APPENDICES

Report to the Strategic Development Committee. Ronald Reagan Washington National Airport Project Journey. June 2018

Agenda Report. Spruce Street Outlet Drainage Improvements Tower Road Relief Sewer

Work Zone. Steve Hubbard: Lane Construction Safety Training Manager. Michael Grey: Rea Contracting Project Superintendent

Transcription:

WEEK ENDING FEBRUARY 1, 2019 SECTION 55A1 ROBINSON TOWNSHIP IN WASHINGTON COUNTY Contractor: Independence Excavating Inc. 1. Work Shift Day shift (M-F), with Saturday as a makeup day. 2. Traffic The new Beech Hollow Connector is expected to open next spring. No impacts to S.R. 980, S.R. 22 and Quicksilver Road are anticipated. Truck deliveries may be accessing the project onto S.R. 980 from the new Beech Hollow Connector. 3. Earthwork All blasting is complete for Section 55A1. 4. Roadway and Bridge Work No work will be taking place that could impact traffic. 5. Gas/Oil Wells All gas/oil well work is complete for Section 55A1. 6. Noise/Dust/Runoff Control Erosion and sedimentation control measures are in place, functioning and inspected weekly, as well as after every rain event. SECTION 55A1 TARGET COMPLETION DATE MAY 2019

Section: 55A1 Pictured: Grading mounds at SB 217 and 218 Abutment 1 SECTION 55A1 TARGET COMPLETION DATE MAY 2019

WEEK ENDING FEBRUARY 1, 2019 SECTION 55A2 ROBINSON AND MOUNT PLEASANT TOWNSHIPS IN WASHINGTON COUNTY Contractor: Trumbull Corp. 1. Work Shift Day shift (M-F), with Saturday as a makeup day. 2. Traffic Temporary flagging continues on Noblestown Road and Johns Avenue as needed for deliveries. A notice for a 30-day closure of Noblestown Road beginning Feb. 11 was issued. The closure is for work associated with acid mine drainage mitigation. 3. Earthwork Pre-blast survey notifications continue to be mailed for properties within 1,000 feet of proposed blasting areas. 4. Roadway and Bridge Work Roadway and bridge work is planned to begin in early 2019. 5. Gas/Oil Wells Plugging of gas/oil wells within the 55A2 project will be necessary. This work has not yet been scheduled. 6. Noise/Dust/Runoff Control Preliminary clearing is ongoing to prepare for access and mobilization. Erosion and sedimentation control measures are being installed. SECTION 55A2 TARGET COMPLETION DATE JUNE 2019

Section: 55A2 Pictured: Crane at Access Road 1 off Cooks Road SECTION 55A2 TARGET COMPLETION DATE JUNE 2019

WEEK ENDING FEBRUARY 1, 2019 SECTION 55B CECIL AND SOUTH FAYETTE TOWNSHIPS IN WASHINGTON AND ALLEGHENY COUNTIES Contractor: Fay 1. Work Shift Double shifts, five days per week (M-F), ending at 10 p.m., with Saturday as a makeup day. 2. Traffic Upper Laurel Hill Road will remain closed until paving can take place in the spring. 3. Earthwork Major excavation work will continue at the eastern end of the project near Laurel Hill Road. This activity will take place during day and evening shifts. Work is proceeding on grading the waste area on the western side of the project. Also, grading of the slope under the bridge on the west side of S.R. 980 is proceeding. Blasting for the bulk excavation is complete. There remains a possibility that blasting will be required for the excavation of Pond 3B along the east side of S.R. 980. The contractor will give a 30-second horn blast, wait 30 seconds and repeat. There is one minute from the time of the first horn until the actual blast occurs. Usually five to 10 minutes after the blast, and upon review of the blast area, the all-clear siren will sound. 4. Roadway and Bridge Work Concrete pavement is not anticipated to start again until spring. No concrete placement on the bridge deck is planned until spring. It was determined that paving Laurel Hill Road during this time of year may be detrimental to the quality of the future township road. The contractor will be responsible for maintaining access through the winter for residents affected by the work. 5. Gas/Oil Wells Well capping continues. Noise levels are being monitored. SECTION 55B TARGET COMPLETION DATE FALL 2019

6. Noise/Dust/Runoff Control Two water trucks are working throughout the project area to control dust during dry periods. A street sweeper is on-site and will be deployed to clean public roads as needed. Erosion and sedimentation control measures are in place, functioning and inspected weekly, as well as after every rain event. Section: 55B Pictured: Fill placement in front of abutment SECTION 55B TARGET COMPLETION DATE FALL 2019

WEEK ENDING FEBRUARY 1, 2019 SECTION 55C1-1 CECIL AND SOUTH FAYETTE TOWNSHIPS IN WASHINGTON AND ALLEGHENY COUNTIES Contractor: Beaver Excavating Co. 1. Work Shift Single 10-hour shift (M-F) with Saturday as a makeup day through the remainder of the project, except for the large fill at Millers Run Road (S.R. 3001). Work will be two 10-hour shifts (M-F) to place embankment at this location. 2. Traffic Millers Run Road, Cecil-Sturgeon Road (T-842) and Cecil-Reissing Road (T-840) are closed. S.R. 50 has a long-term single-lane closure that will be in effect for motorists traveling east between S.R. 978 and S.R.1001 (Reissing Road) for approximately 0.4 miles. The right lane will be closed. 3. Earthwork Excavation continues between Cecil-Reissing Road and Cecil-Sturgeon Road, along with embankment construction west of Millers Run Road. Blasting continues between Cecil-Reissing and Cecil-Sturgeon roads, as well as between Cecil-Sturgeon and Millers Run roads. The contractor will give a 30-second horn blast, wait 30 seconds and repeat. There is one minute from the time of the first horn until the actual blast occurs. Usually five to 10 minutes after the blast, and upon review of the blast area, the all-clear siren will sound. Mine grouting operations are occurring east of S.R. 50. 4. Roadway and Bridge Work Substructure work continues for the bridges that will span Millers Run Road and S.R. 50. Substructure work started at bridge SB-253, which spans the new S.R. 576 roadway at the S.R. 50 connector road. 5. Gas/Oil Wells All gas/oil well work is complete for Section 55C1-1. SECTION 55C1-1 TARGET COMPLETION DATE NOVEMBER 2019

6. Noise/Dust/Runoff Control A contained street sweeper is on-site and will be deployed to clean public roads as needed. Erosion and sedimentation control measures are in place, functioning and inspected weekly, as well as after every rain event. Section: 55C1-1 Pictured: 42-inch pipe installation at Cecil-Reissing Road SECTION 55C1-1 TARGET COMPLETION DATE NOVEMBER 2019

WEEK ENDING FEBRUARY 1, 2019 SECTION 55C1-2 SOUTH FAYETTE TOWNSHIP IN ALLEGHENY COUNTY Contractor: Trumbull Corp. 1. Work Shift Day shift work hours of 7 a.m. to 5:30 p.m. Night shift work hours of 7 p.m. to 5:30 a.m. 2. Traffic Hickory Grade Road is closed, and traffic is being detoured. Construction vehicles access the work site between S.R. 50 up Parks Road and onto Hickory Grade Road. Construction vehicles also use Bowman Road to access two work-site entrances. 3. Earthwork Earthwork is ongoing at the far east end of the project between old Coal Pit Run Road and County Line Road. Large-scale earthwork continues on the hilltop adjacent to S.R. 50, in the valley adjacent to Parks Road and at Hickory Grade Road. Blasting will continue on the hilltop adjacent to S.R. 50, as well as at Hickory Grade Road. For all blasts, the contractor will give a 30-second horn blast, wait 30 seconds and repeat. There is one minute from the time of the first horn until the actual blast occurs. Usually five to 10 minutes after the blast, and upon review of the blast area, the all-clear siren will sound. 4. Roadway and Bridge Work Bridge work will begin in early winter. 5. Gas/Oil Wells All gas/oil well work is complete for Section 55C1-2. 6. Noise/Dust/Runoff Control A street sweeper is on-site and will be deployed to clean public roads as needed. Erosion and sedimentation control measures are in place, functioning and inspected weekly, as well as after every rain event. SECTION 55C1-2 TARGET COMPLETION DATE MAY 2020

Section: 55C1-2 Pictured: Coal Run stream relocation excavation SECTION 55C1-2 TARGET COMPLETION DATE MAY 2020

WEEK ENDING FEBRUARY 1, 2019 SECTION 55C2-2 CECIL TOWNSHIP IN WASHINGTON COUNTY Contractor: Independence Excavating Inc. 1. Work Shift Day shift (M-F) 10 hours, with Saturday as a makeup day. 2. Traffic Long-term shoulder restrictions began Jan. 28. Preliminary maintenance and protection of traffic devices are being placed on I-79 accordingly. Morgan Road is closed to traffic between Morganza Road and I-79. Traffic is being detoured using County Line Road. Intermittent traffic stoppages and/or single-lane closures of Morganza Road may occur as the contractor performs work. Flagging is provided for these elements and will be provided when construction vehicles cross Morganza Road. 3. Earthwork Construction of erosion and sedimentation basins and ponds is taking place. Construction of the future Morganza Road embankment is ongoing. 4. Roadway and Bridge Work Preparations for roadwork are beginning. 5. Gas/Oil Wells Gas well capping/plugging is nearing completion. 6. Noise/Dust/Runoff Control Erosion and sedimentation control measures are in place, functioning and inspected weekly, as well as after every rain event. SECTION 55C2-2 TARGET COMPLETION DATE JUNE 2020

Section: 55C2-2 Pictured: Temporary stream SECTION 55C2-2 TARGET COMPLETION DATE JUNE 2020