STANDARD OPERATING PROCEDURES (CLE SOP) December 3, 2016

Similar documents
ERIE ATCT STANDARD OPERATING PROCEDURES

RALEIGH-DURHAM ATCT/TRACON STANDARD OPERATING PROCEDURES

VIRTUAL AIR TRAFFIC SIMULATION NETWORK UNITED STATES DIVISION. SUBJ: Phoenix (PHX) Air Traffic Control Tower (ATCT) Standard Operating Procedures

VATUSA PHOENIX TRACON and VATUSA PHOENIX ATCT LETTER OF AGREEMENT. SUBJECT: Interfacility Coordination Procedures

Charlotte - Douglas International

Burlington ATCT Standard Operating Procedures

VATUSA C90 TRACON AND O HARE ATCT LETTER OF AGREEMENT

ZTL ARTCC. Augusta Regional

Virtual Jacksonville Air Route Traffic Control Center Tallahassee ATCT Standard Operating Procedures

Piedmont Triad International Airport

PITTSBURGH ATCT STANDARD OPERATING PROCEDURES

Charlotte - Douglas International Airport Traffic Control Tower

RELEASE RECORD. Version Date Author Notes Dec 2006 SK Initial Release

Greenville Spartanburg International

ZTL ARTCC. Asheville Regional. Air Traffic Control Tower. Standard Operating Procedures AVL B. Effective: May 1, 2011

Cleveland ARTCC and Boston Virtual ARTCC Letter of Agreement

Cape Area Airports Standard Operating Procedures

VIRTUAL AIR TRAFFIC SIMULATION NETWORK NORTH AMERICA REGION - USA DIVISION vzkc KANSAS CITY ARTCC

9/23/2010 RDU B. Raleigh-Durham Air Traffic Control Tower. Standard Operating Procedures

Denver ARTCC Colorado Springs ATCT & TRACON STANDARD OPERATING PROCEDURES

Virtual Air Traffic Simulation Network (VATSIM) United States Division Fort Worth vartcc (ZFW)

Albany ATCT Standard Operating Procedures

VATUSA-VATNZ-VATPAC OCEANIC PARTNERSHIP OAKLAND OCEANIC FSS GENERAL SOP 1 OCT 2012

1.2 An Approach Control Unit Shall Provide the following services: c) Alerting Service and assistance to organizations involved in SAR Actions;

Providence ATCT Standard Operating Procedures

Standard Operating Procedures Atlanta Intl Airport (ATL) Air Traffic Control

SECTION 6 - SEPARATION STANDARDS

INTERNATIONAL VIRTUAL AVIATION ORGANISATION CANADIAN AIR TRAFFIC CONTROL PHRASEOLOGY ATC OPERATIONS DECEMBER 2016 BY: MATHIEU LAFLAMME

BOSTON ARTCC (vzbw) STANDARD OPERATING PROCEDURE KALB) ALBANY APPROACH (ALB

Chapter 6. Nonradar. Section 1. General DISTANCE

SECTION 4 - APPROACH CONTROL PROCEDURES

Letter of Agreement by and between Jacksonville ARTCC and Miami ARTCC

ORDER MSY V. New Orleans. Standard Local Operating Procedures. Rev 3 December 7, 2011

Chapter 6. Airports Authority of India Manual of Air Traffic Services Part 1

USE OF RADAR IN THE APPROACH CONTROL SERVICE

Anchorage ARTCC Phraseology Guide. Clearance Delivery Operations

D01 TERMINAL RADAR APPROACH CONTROL

Southern California Terminal Radar Approach Control and Ontario Airport Traffic Control Tower

SOUTHERN CALIFORNIA TRACON LOS ANGELES AREA STANDARD OPERATING PROCEDURES VIRTUAL AIR TRAFFIC SIMULATION NETWORK LOS ANGELES ARTCC

Standard Operating Procedures

San Juan CERAP. Standard Operation Procedures. Version 2.2 May 5th, Welcome to San Juan CERAP (ZSU ARTCC, TJZS FIR)

IFR SEPARATION WITHOUT RADAR

VATUSA Approval 3/21/18

CHAPTER 5 SEPARATION METHODS AND MINIMA

Section 5. Radar Separation

VFR PHRASEOLOGY. The word IMMEDIATELY should only be used when immediate action is required for safety reasons.

VATUSA CHICAGO ARTCC AND C90 TRACON LETTER OF AGREEMENT

10-February 2019 ZTL JO B VIRTUAL AIR TRAFFIC SIMULATION NETWORK ATLANTA CENTER

Jacksonville ARTCC. F11 TRACON Standard Operating Procedures

This section sets forth all Los Angeles World Airports (LAWA) noise abatement procedures, restrictions, and regulations involving aircraft operations.

CLEARANCE INSTRUCTION READ BACK

LETTER OF AGREEMENT (LOA)

IFR SEPARATION USING RADAR

LFPG / Paris-Charles de Gaulle / CDG

SOUTHERN CALIFORNIA TRACON STANDARD OPERATING PROCEDURES VIRTUAL AIR TRAFFIC SIMULATION NETWORK LOS ANGELES ARTCC

VFR Arrival and Departure Procedures Rocky Mountain Airshow 2012 Rocky Mountain Metropolitan Airport (KBJC)

HOUSTON AIR ROUTE TRAFFIC CONTROL CENTER VATSIM United States Division. Letter of Agreement. Revised: July 25, 2004 Effective: July 25, 2004

Southern California TRACON and Lindbergh Tower LETTER OF AGREEMENT SUBJECT: INTER-FACILITY COORDINATION AND CONTROL PROCEDURES

BOSTON ARTCC (vzbw) TRAINING SYLLABUS LEVEL: Center Controller (C1)

LETTER OF AGREEMENT. Between

SEATTLE AIR ROUTE TRAFFIC CONTROL CENTER SEATTLE GLIDER COUNCIL LETTER OF AGREEMENT. EFFECTIVE: June 1, 2015

VATSIM MINNEAPOLIS ARTCC MINNEAPOLIS TRACON LETTER OF AGREEMENT

Virtual Jacksonville Air Route Traffic Control Center Daytona Beach ATCT Standard Operating Procedures

PILOT BRIEFING GENEVA RFE 2018

LGB HELICOPTER OPERATIONS

ATC Training Syllabus Philippines vacc Version 1.1 September 25, 2016

FEDERAL AVIATION ADMINISTRATION CENTRAL EN ROUTE AND OCEANIC AREA OPERATIONS FORT WORTH ARTC CENTER, MAJORS ATCT, AND SKYDIVE TANDEM GREENVILLE, LLC

Standard Operating Procedures (SOPs) for BAGHDAD (ORBI)

CHICAGO MIDWAY INTERNATIONAL AIRPORT (KMDW) STANDARD OPERATING PROCEDURES

Federal Aviation Administration. Air Traffic 101. By: Michael Valencia & Dianna Johnston Date: Feb. 26, 2017

MILWAUKEE MKE TRACON GEN. MITCHELL INTL AIRPORT (KMKE) MKE TRACON SATELLITE AIRPORTS STANDARD OPERATING PROCEDURES

OPERATIONS MANUAL PART A

CHICAGO TRACON (C90) O HARE INTERNATIONAL AIRPORT MIDWAY INTERNATIONAL AIRPORT SATELLITE AIRFIELDS STANDARD OPERATING PROCEDURES

SOUTHERN CALIFORNIA TRACON BURBANK AREA STANDARD OPERATING PROCEDURES VIRTUAL AIR TRAFFIC SIMULATION NETWORK LOS ANGELES ARTCC

- Updated formatting - Re-drawn airspace delegation diagram

AIR LAW AND ATC PROCEDURES

AERODROME OPERATIONS 1 INTRODUCTION

c) Advisory service to IFR flights operating within advisory airspace.

ZTL ARTCC / CLT ATCT LETTER OF AGREEMENT. EFFECTIVE: July 10, SUBJECT: APPROACH CONTROL SERVICE

Appendix A COMMUNICATION BEST PRACTICES

From: Commanding Officer, Naval Air Station Pensacola. Subj: NAVAL AIR STATION PENSACOLA CLOSED CONTROL TOWER AIRFIELD OPERATIONS

IVAO Switzerland Division

11/21/2008 ZDC-ZTL LOA Version 1. Letter of Agreement

SULAYMANIYAH INTERNATIONAL AIRPORT MATS CHAPTER 11

CHAPTER 4 AIR TRAFFIC SERVICES

Lecture Minimum safe flight altitude

Any queries about the content of the attached document should be addressed to: ICAO EUR/NAT Office:

Instrument Refresher Course. Airfield Operations Flight Tower 412 OSS/OSAT

RWY 24. Designator Route Remarks. All traffic shall initially climb to 4000FT QNH with climb gradient 3.3% MNM, unless instructed otherwise by ATC.

VATSIM JORDAN vacc QUICK REFERENCE HANDBOOK QUICK REFERENCE - STANDARD FORMATS FOR COMMUNICATION

PTK AIR TRAFFIC CONTROL TOWER OPERATION GOOD CHEER PROCEDURES 2018 (rev A, 12/05/18)

AIR TRAFFIC ROUTE CONTROL CENTER

SFAR 93 and Minimum Altitudes

GENERAL OPERATING PROCEDURES FINLAND(GOP)

Version O January 21, 2019

Project Consultant (PC) Alternative 5 Runway 22R/L RNAV Departures

VIRTUAL AIR TRAFFIC SIMULATION NETWORK CARIBBEAN DIVISION ZSU SAN JUAN CERAP

FLIGHT STRIP MANAGEMENT - APPROACH LEVEL

UNIVERSITY OF ALABAMA FOOTBALL

JACKSONVILLE CENTER AND SAVANNAH TRACON. LETTER OF AGREEMENT EFFECTIVE: December 22, 2006

Transcription:

ORDER VATSIM CLEVELAND ATCT ORDER CLE ATCT CLEVELAND HOPKINS INTERNATIONAL AIRPORT 7110.65I STANDARD OPERATING PROCEDURES (CLE SOP) December 3, 2016

Order CLE ATCT 7110.65I Standard Operating Procedures Forward This order prescribes air traffic control procedures and phraseology for use by personnel providing air traffic control services at the Cleveland ATCT. Controllers are required to be familiar with the provisions of this order that pertain to their operational responsibilities and exercise their best judgment if they encounter situations not covered by this order. It is emphasized that information contained herein is designed and specifically for use in a virtual controlling environment. It is not applicable, nor should be referenced for live operations in the National Airspace System (NAS). The procedures contained within this order document how the positions are to be operated and, in conjunction with FAA Orders 7110.10, 7110.65, and 7210.3, will be the basis for performance evaluations, training, and certification. Michael Scott Date Signed Air Traffic Manager, Cleveland ARTCC December 3, 2016

TABLE OF CONTENTS CHAPTER 1. ADMINISTRATIVE... 5 1-1. PURPOSE....... 6 1-2. DISTRIBUTION....... 6 1-3. CANCELLATION....... 6 1-4. EXPLANATION OF CHANGES.... 6 1-5. EFFECTIVE DATE.... 6 1-6. SOFTWARE UTILIZATION.... 6 CHAPTER 2. GENERAL... 7 2.1. EQUIPMENT....... 7 2.2. COORDINATION, PRE-ARRANGED & QUICKLOOK PROCEDURES... 8 2.3. RADAR AND STARS AUTOMATION UTILIZATION... 9 2.4. AIRSPACE GENERAL...... 10 2.5. AUTOMATED POINT-OUT PROCEDURES... 12 2.6. ACTIVE RUNWAYS... 12 2.7. LINE UP AND WAIT (LUAW)...... 12 CHAPTER 3. TOWER...13 Section 1. CLEARANCE DELIVERY / FLIGHT DATA (CD/FD)... 13 3.1. PROCEDURES AND RESPONSIBILITY... 13 Section 2. GROUND CONTROL (G1, G2)... 15 3.2. G1 and G2 MOVEMENT AREAS... 15 3.3. PROCEDURES AND RESPONSIBILITY... 16 Section 3. LOCAL CONTROL (L1, L2)... 17 3.4. TOWER AIRSPACE... 17 3.5. AREA OF RESPONSIBILITY...... 20 3.6. PROCEDURES AND RESPONSIBILITY...... 24 3.7. NOISE ABATEMENT... 24 3.8. MANAGING TRAFFIC... 25 CHAPTER 4. TRACON... 26 Section 1. DEPARTURE RADAR DRN (D), DRS (R)... 26 4.1. AREA OF JURISDICTION... 26 4.2. PROCEDURES AND RESPONSIBILITY... 29

Section 2. SATELLITE RADAR SAN (F), SKY (P)... 30 4.3. AREA OF JURISDICTION... 30 Section 3. ARRIVAL RADAR ARW (W), ARE (E), ARL (A), ARH (H)... 34 4.5. AREA OF JURISDICTION... 34 4.6. PROCEDURES AND RESPONSIBILITY... 42

RECORD OF CHANGES CLE 7110.65I BULLETIN AUTHORIZED SUBJECT NUMBER BY DATE ENTERED DATE REMOVED 001 Frequency changes to LCL RG 2/26/2012 12/3/2016 7110-I General Updating JQ 12/3/2016

CHAPTER 1. ADMINISTRATIVE 1-1. PURPOSE. This order prescribes standard operating procedures for use by persons providing air traffic control services at the Cleveland ATCT/TRACON (CLE). Controllers are required to be familiar with the provisions of this order that pertain to their operational responsibilities and to exercise their best judgment if they encounter situations that are not covered by it. This order does not address Traffic Management Unit operating procedures. 1-2. DISTRIBUTION. This order is distributed to CLE TRACON and CLE ATCT personnel. 1-3. CANCELLATION. CLE ATCT 7110.65H dated 8/15/2011 is hereby cancelled. 1-4. EXPLANATION OF CHANGES. The significant changes to this order are identified in the Explanation of Changes page(s). 1-5. EFFECTIVE DATE. This order is effective December 3, 2016. 1-6. SOFTWARE UTILIZATION. ZOB has standardized on the Virtual Radar Client (VRC) as its operating software of choice. Any references to software in this and other Facility Orders are written with VRC in mind. Controllers utilizing alternative VATSIM radar clients shall consult with ZOB Facility Engineering regarding the applicability of software settings to their client of choice.

CHAPTER 2. GENERAL 2.1. EQUIPMENT. Detailed equipment information is located in the local facility binder. a. Operational Positions and Associated Frequencies (1) TOWER POSITION ID STARS TAG FREQUENCY CALLSIGN RELIEF CALLSIGN VOICE ROOM Local Control 1 L1 L 120.900 CLE_S_TWR CLE_S1_TWR CLE_120.90 Local Control 2 L2 T 135.225 CLE_N_TWR CLE_N1_TWR CLE_135.22 Ground Control 1 G1 G 121.700 CLE_S_GND CLE_S1_GND CLE_121.70 Ground Control 2 G2 -- 133.600 CLE_N_GND CLE_N1_GND CLE_133.60 Clearance Delivery CD D 125.050 CLE_DEL CLE_1_DEL CLE_125.05 Note: Bolded positions are primary and must be opened first. (2) TRACON POSITION ID STARS TAG FREQUENCY CALLSIGN RELIEF CALLSIGN VOICE ROOM East Outer ARE E 124.000 CLE_E_APP CLE_E1_APP CLE_124.00 West Outer ARW W 126.550 CLE_W_APP CLE_W1_APP CLE_126.55 Inner Low ARA A 119.620 CLE_A_APP CLE_A1_APP CLE_119.62 Inner High ARH H 123.850 CLE_H_APP CLE_H1_APP CLE_123.85 North Departure DRN D 128.250 CLE_N_DEP CLE_N1_DEP CLE_128.25 South Departure DRS R 118.150 CLE_S_DEP CLE_S1_DEP CLE_118.15 North Satellite SAN F 118.970 CLE_F_APP CLE_F1_APP CLE_125.35 Sandusky Basin SKY P 126.350 CLE_P_APP CLE_P1_APP CLE_126.35 Note: Bolded positions are primary and must be opened first.

2.2. COORDINATION, PRE-ARRANGED & QUICKLOOK PROCEDURES. a. Tower to TRACON. (1) When no heading is printed on the departure strip, the following pre-arranged headings are understood: RUNWAY DEPARTURE FIX HEADING OBRLN, AMRST, SKY, GEMNI, LLEEO (props) 320 OBRLN, AMRST, SKY, GEMNI, LLEEO (jets) 360 6 FAILS, ERI (jets/props) 035 GILLS 020 HERAK, ACO (jets/props) 095 GILLS, FAILS, ERI (props) 320 AMRST, SKY, GEMNI, LLEEO (props) 300 GEMNI, LLEEO, FAILS, AMRST (jets) 280 24 & 28 OBRLN (jets/props) 260 HERAK (jets/props) 210 ACO (jets) 195 ACO (props) 180 OBRLN, AMRST, SKY, GEMNI, LLEEO (props) 340 OBRLN, AMRST, SKY, GEMNI, LLEEO (jets) 360 6/10 GILLS 020 FAILS, ERI (jets/props) 035 HERAK, ACO (jets, props) 095 b. TRACON to Tower. (1) IAW FAAO 7110.65 and FAAO 7210.3, the inbound sequence will be considered forwarded when the following scratch pad entries are entered: SYMBOL DEFINITION I4L Instrument Approach for Runway 24L I4R Instrument Approach for Runway 24R I6L Instrument Approach for Runway 06L I6R Instrument Approach for Runway 06R V6L Visual Approach to Runway 6L V6R Visual Approach to Runway 6R V4L Visual Approach to Runway 24L V4R Visual Approach to Runway 24R VSL Visual Approach to Runway 6L or 24L with Visual Separation on the preceding aircraft (regardless of runway) VSR Visual Approach to Runway 6R or 24R with Visual Separation on the preceding aircraft (regardless of runway) VS8 Visual Approach to Runway 28 with Visual Separation on the preceding aircraft VS0 Visual Approach to Runway 10 with Visual Separation on the preceding aircraft NOTE: When advertising (via ATIS) ONLY one (1) arrival runway and its associated approach, NO scratchpad entry is required unless the aircraft is re-assigned another runway and/or a different type of approach.

(2) Arrival Control shall transfer control and communication of IFR and VFR aircraft to the appropriate Local Controller prior to the Tower delegated airspace, but no further than 10 NM from CLE. c. PRE-ARRANGED COORDINATION (P-ACP). (1) P-ACP is authorized only for use by Departure Control, D & R. (2) Departure North/South Controllers (positions D & R) may climb or descend, but not level, aircraft through Cleveland arrival airspace without verbal coordination. Departure Control shall ensure lateral or vertical separation including wake turbulence separation from all STARS tracked and coordinated targets that may conflict with any departure/arrival aircraft s flight path. (3) Departure Control shall display at minimum, limited data block information of the arrival controller s aircraft. (4) The use of pre-arranged coordination is not mandatory and may be discontinued by the Arrival Controller in unusual situations. (5) Arrival controller(s) shall verbally inform the appropriate departure controller of all untracked targets or invalid Mode C readouts that may affect prearranged coordination traffic. (6) Pre-arranged coordination may only be used through the arrival airspace, above or below their respective departure airspace. d. MODE C FILTER LIMITS (1) Tower Surface to 6,000 feet as a minimum. (2) TRACON Surface to 13,000 feet as a minimum. 2.3. RADAR AND STARS AUTOMATION UTILIZATION. a. This section is reserved for future use.

2.4. AIRSPACE GENERAL. a. Cleveland Class BRAVO Airspace (1) Map

(2) Class B Scratch Pad Information a. Issue and terminate Class Bravo clearances IAW FAAO 7110.65. b. Initiate a STARS track and VFR strip for all Class B associated aircraft. c. Ensure that the proper class B conventions (see below) are reflected in the data block: AIRSPACE STATUS CONVENTION V A M P DEFINITION Indicated CLE Departure or CLASS B through-flights Indicates CLE Arrivals Other VFR Overflights Practice Approaches (3) MVA Map

2.5. AUTOMATED POINT-OUT PROCEDURES. a. The INITIATING controller must: (1) Ensure that the correct destination or exit fix is entered in the scratch pad area. (2) If the aircraft is not in level flight, indicate the climbing/descending to altitude. (3) Not deviate more than 30 degrees, either side of aircraft s current track. b. The RECEIVING controller must: (1) Approve the point-out. (2) Disapprove the point-out. (3) Accept a handoff. 2.6. ACTIVE RUNWAYS. A runway shall be considered active when: a. Advertised. b. Immediately upon being informed that a landing or departure will take place on a runway not previously designated active. c. Once a runway is designated active for any reason, it will remain active until otherwise verbally advised. 2.7. LINE UP AND WAIT (LUAW). Line Up and Wait procedures are authorized at CLE. Such operations are generally viewed as necessary to maintain airport efficiency. Use LUAW when it is expected the aircraft will depart after conflicting traffic is clear of the runway. a. The landing clearance need not be withheld if traffic is holding in position. b. Withhold landing clearance when the ceiling is less than 800 ft or visibility is less than 2 miles. Do not use LUAW for departures between successive arrivals.

CHAPTER 3. TOWER Section 1. CLEARANCE DELIVERY / FLIGHT DATA (CD/FD) 3.1. PROCEDURES AND RESPONSIBILITY. a. General responsibilities are outlined in FAAO 7110.65, Tower Team Position Responsibilities. b. Process weather information: (1) Retrieve the latest weather either from VRC or through an accredited weather source. (2) Forward SIGMET and PIREP data to all affected positions. c. Prepare the ATIS. (1) Identify the ATIS by phonetic alphabet code letters Alpha through Mike, in sequential order. Include the following: a. Weather sequence b. Approach/s in use c. Simultaneous Visual Approaches to closely spaced parallel Runways in use when appropriate. d. Runway/Taxiway closures e. Field Condition reports f. Braking Advisories g. Read Back Runway Hold-Short instructions (2) Verbally broadcast and receive acknowledgement of the current ATIS code to all Tower personnel. d. Process flight plan information. (1) Review flight strips for completeness and accuracy. (2) Amend routings in accordance with LOAs. e. Issue clearances. All clearances must include the destination, route, altitude, departure frequency, and beacon code. (1) ROUTES. IFR aircraft shall be cleared out of Cleveland Airspace via routes and altitudes described with Letters of Agreement with the adjacent facilities. Non-standard routings must be coordinated with all affected facilities. (2) IFR ALTITUDES. Aircraft requesting an altitude above 5,000 feet shall be cleared to maintain 5,000 feet and expect their requested altitude ten (10) minutes after departure.

(3) FREQUENCIES. Issue frequencies, 118.15 to South departures and 128.25 to North departures. When positions are combined, issue the appropriate frequency. (4) VFR/CLASS BRAVO. a. VFR aircraft requesting an altitude below the MVA shall be advised to maintain VFR at or below 2,500 feet when their on-course heading is 237 thru 058 degrees and at or below 3,000 feet when their on-course heading is 059 thru 236 degrees. b. Aircraft departing at or below 2,500 feet and not requesting flight following shall have a strip created for the aircraft and assigned to the appropriate local controller. (5) SVFR. Only helicopters may receive SVFR clearances out of, into, or through the Class Bravo surface area. Other aircraft may be allowed upon discretion. (6) LOCAL IFR. Aircraft requesting a local IFR (airports within the CLE terminal area) clearance shall be issued 4,000 feet and radar vectors to destination airport.

Section 2. GROUND CONTROL (G1, G2) 3.2. G1 and G2 MOVEMENT AREAS. a. North Flow: (1) Ground Control 1 (G1) is responsible for ground movement east of the inboard runway and departures off of spots 1 through 6. (2) Ground Control 2 (G2) is responsible for ground movement west of the inboard runway from Kilo taxiway northeast and all taxiways west of the outboard.

b. South Flow: (1) G1 Responsibilities do not change. (2) G2 Responsible for ground movement west of the outboard runway and west of the inboard runway from taxiway Romeo and southwest. 3.3. PROCEDURES AND RESPONSIBILITY. a. Duties and responsibilities are IAW with FAAO 7110.65, Tower Team Position Responsibilities. b. Ground control gives way to Local Control. When aircraft clear or cross Runway 24L at any taxiway, they must enter or cross taxiway L to completely clear Runway 24L. Ensure that ground traffic will not obstruct runway exits that may be used by landing or crossing aircraft. c. Ensure that all aircraft that travel on an active runway (other than crossings) are switched to the appropriate local controller s frequency. d. During simultaneous departure operations, taxi aircraft to the following runway: OUTBOARD RUNWAY OBRLN AMRST SKY GEMNI LLEEO GILLS FAILS INBOARD RUNWAY HERAK ACO

Section 3. LOCAL CONTROL (L1, L2) 3.4. TOWER AIRSPACE. a. North Flow

b. South Flow and Runway 28

c. Runway 6/10

3.5. AREA OF RESPONSIBILITY. a. South Flow (1) L1 provides service to arrivals and departures on the inboard and crosses on the departures awaiting the outboard. (2) L2 provides service to arrivals and departures on the outboard. In addition, L2 assumes all movement areas delegated to G2 when it is closed.

b. North Flow (1) L1 provides service to arrivals and departures on the inboard runway. Additionally, L1 crosses departures for the outboard runway. (2) L2 provides service to arrivals and departures on the outboard. L2 assumes all movement areas delegated to G2 when it is closed.

c. Runway 6/10 (1) L1 provides service to arrivals and departures on the inboard runway and Runway 10/28. (2) L2 provides service to arrivals on the outboard runway. (3) If G2 is open, all movement areas between Runway 6L and Runway 6R revert to G2.

d. Intersection Departures

3.6. PROCEDURES AND RESPONSIBILITY. a. Duties and responsibilities are IAW FAAO 7110.65, Tower Team Position Responsibilities. b. When VFR, Local Control is responsible to ensure separation inside the marker. c. CLE ATCT is authorized to use reduced separation on final to Runway 6L/24R and Runway 6R/24L IAW FAAO 7110.65. 3.7. NOISE ABATEMENT. Headings are not intended to be so inflexible that they would compromise safety or cause excessive delays. Runway 6R is the designated primary late night (11:00pm to 6:00am) departure runway, wind and weather permitting. a. Time 6:00 am to 11:00pm (1) Runway 6: a. North Departure Turn jet departures left to headings within a corridor between 360 right to 035 until reaching 5 NM from the airport and has vacated 3,500 feet MSL, or vacated 5,000 feet MSL regardless of distance from the airport. b. South Departure - Turn jet departures right to headings within a corridor between 065 right to 095 until reaching 5 NM from the airport and has vacated 3,500 feet MSL, or vacated 5,000 feet MSL regardless of distance from the airport. (2) Runway 24: a. North Departure - Turn jet departures right to headings within a corridor between 250 right to 280 until reaching 5 NM from the airport and has vacated 3,500 feet MSL, or vacated 5,000 feet MSL regardless of distance from the airport. b. South Departure - Turn jet departures left to headings within a corridor between 190 right to 220 until reaching 5 NM from the airport and has vacated 3,500 feet MSL, or vacated 5,000 feet MSL regardless of distance from the airport. (3) Runway 28: a. No noise abatement. b. Time 10:00pm to 6:00am All Runways All aircraft on a visual approach must be vectored to intercept the final approach course no closer than 4 NM from the runway end. c. Time 10:00pm to 6:00am (Midnight Operations) Runway 6 is the PRIMARY late night departure runway, wind and weather permitting. Assign headings within a corridor of 090 right to 100 until leaving 5,000 MSL.

3.8. MANAGING TRAFFIC. a. Departures: (1) Automatic releases are authorized for all departures, except for unusual flight paths, requests, or cross complex departures. (2) Provide initial separation of successive departures IAW FAAO 7110.65, Same Runway Separation, Simultaneous Parallel Runway Departures. This distance between Runway 6L/24R and Runway 6R/24L is 1,241 feet. (3) Use a pre-coordinated form of transferring flight plan information to the appropriate departure controller, whether it be via text or voice. b. Missed Approaches: (1) Missed approaches should be climbed to 4,000 feet and handled as a normal departure.

CHAPTER 4. TRACON 4.1. AREA OF JURISDICTION. Section 1. DEPARTURE RADAR DRN (D), DRS (R) a. Departure North DRN (D) and Departure South DRS (R) Positions (1) Runway 24:

(2) Runway 28:

(3) Runway 6:

(4) Runway 6/10: 4.2. PROCEDURES AND RESPONSIBILITY. a. Duties and responsibilities are IAW FAAO 7110.65, Terminal Radar Team Position Responsibilities. b. Departure assumes separation responsibilities when altering Tower assigned headings. c. Departure may not alter noise abatement headings until the noise abatement aircraft is 5 NM from the airport and has vacated 3,500 feet or the aircraft has vacated 5,000 feet. d. After a runway change, advise the tower when to begin automatic releases. e. Departure aircraft should be handed off at the highest altitude possible IAW LOA s.

Section 2. SATELLITE RADAR SAN (F), SKY (P) 4.3. AREA OF JURISDICTION. a. Satellite North SAN (F) and Satellite BASIN (P) Positions (1) Runway 24:

(2) Runway 28:

(3) Runway 6:

(4) Runway 6/10: 4.4. PROCEDURES AND RESPONSIBILITY. a. Duties and responsibilities are IAW FAAO 7110.65 Terminal Radar Team Position Responsibilities. b. Obtain an arrival time or cancellation of IFR for aircraft operating into airport not towered. c. If aircraft are unable to cancel IFR while in the air due to frequency limitations or weather conditions, have them cancel via text while on the ground.

Section 3. ARRIVAL RADAR ARW (W), ARE (E), ARL (A), ARH (H) 4.5. AREA OF JURISDICTION. a. Outer ARW (W) and ARE (E) Positions (1) Runway 24:

(2) Runway 28:

(3) Runway 6:

(4) Runway 6/10:

b. Inner Low ARL (A) and Inner High ARH (H) Positions (1) Runway 24:

(2) Runway 28:

(3) Runway 6:

(4) Runway 6/10:

4.6. PROCEDURES AND RESPONSIBILITY. a. Runway Operations (1) Runway 6L/24R is considered the OUTBOARD runway. (2) Runway 6R/24L is considered the INBOARD runway. (3) Dual Runway Operations: a. Visual (Weather 5,000 foot ceiling, 5 NM visibility) ARL is responsible for establishing the sequence. ARH is responsible for vectoring their aircraft one mile or less behind and 1,000 feet above the ARL aircraft until visual separation can be applied. ARL traffic should be on base at their lowest usable altitude. b. PRM/SOIA transition ARL issues the ILS approach to the outboard runway, ARH issues LDA/DME approach to the inboard runway. When there is a sufficient enough volume to pair arrivals, ARL issues ILS/PRM approach to the outboard runway and ARH issues LDA/PRM approach to the inboard runway. ARL is responsible for establishing the arrival sequence. (4) ARL and ARH are responsible for the correct Runway ID scratch pad entries. (5) All arrival positions must quick-look each other. b. Outer Positions ARW (W), ARE (E) (1) Duties and responsibilities are IAW FAAO 7110.65 Terminal Radar Team Position Responsibilities. (2) When operating on a Runway 6/10 operation, provide 5 NM gaps at 170kts for all Runway 10 arrivals. (3) When operating with two (2) final controllers in Dual Runway Operations, ARW feeds to ARL at 6,000 feet and ARE feeds to ARH at 7,000 feet. (4) Descend to your lowest available altitude on downwind in any runway configuration. (5) Assign speeds appropriate to maintain the proper amount of spacing or as requesting by the inner controller.

c. Inner Positions ARL (A), ARH (H) (1) Duties and responsibilities are IAW FAAO 7110.65 Terminal Radar Team Position Responsibilities. (2) Achieve and maintain the desired spacing requested by the configuration in use or as dictated by the tower. (3) ARL (A) should descend and turn base at their lowest available altitude. (4) When vectoring multiple aircraft to the final (i.e. opposing base legs, straight-in, etc.), altitude separation shall be maintain. ARH (H) is responsible for ensuring vertical separation with ARL (A) traffic until other approved separation (lateral, visual, etc.) is assured. (5) Maintain a general awareness of the traffic situation. (6) Ensure the correct runway assignment scratch pad entries are made to on all inbound traffic. (7) For noise abatement (Between 11:00pm to 6:00am), all aircraft on a visual approach must be vectored to intercept the final approach course no closer than 4 NM from the runway end. (8) ARL/ARH has control for turns and descent after handoff and frequency change. d. Good Operating Practices (1) Positive Control (2) Communicate with the other final controller (3) Duty Priorities (4) Treat as single runway for separation standards during turn-on to final (5) Effective use of speed control (6) Correct Phraseology (7) Ensure correct readbacks

Approved 02-04-2017 by email Mani Manigault Air Traffic Director VATUSA - Northeastern Region Quoting Joe Carr <datm@clevelandcenter.org>: SOPs Purpose Letter of Agreement New York ARTCC (ZNY) & Cleveland ARTCC (ZOB) Rev. 3 Jan 13, 2017 This agreement prescribes transfer of control procedures, radar handoff procedures, route/altitude assignments, and delegation of airspace between New York ARTCC (ZNY) and Cleveland ARTCC (ZOB). KAGC - https://www.dropbox.com/s/s1sze8h2wvu4s8n/agc_7110.2o.pdf?dl=0 Cancellation KBUF - https://www.dropbox.com/s/1ffawpwxjle08ih/buf_7110.6h.pdf?dl=0 ZNY and ZOB Letter of Agreement, dated Jan 24, 2006, is hereby cancelled. KCLE - https://www.dropbox.com/s/cf8jbsjrr1o9do1/cle%207110.65i.pdf?dl=0 02-04-2017 Scope The procedures contained herein shall apply unless prior coordination is effected. General Procedures a. ZOB/ZNY ATC shall at all times: i. Coordinate and resolve, in a practical manner that provides the smoothest experience to the pilot, all deviations from, and situations not addressed by, this document (e.g., non-standard sectorization, holding, pilots unable to accept LOA routes, aircraft above/below LOA altitudes, etc.). ii. Ensure that all aircraft are at a 1X simulation rate prior to initiating handoff iii. Unless otherwise stated in this document or coordinated via verbal or textual means, aircraft must be climbing to, descending to, or level at the correct altitude for direction of flight prior to any handoff. iv. Ensure that aircraft on the same route segment at the same altitude (or different altitudes, but same destination airport within ZOB or ZNY) are separated by not less than 10 nm (steady or increasing) or other value specified herein unless greater MIT separation is requested real-time by vzob/vzny. NOTE: Separation of less than 10 nm is permitted provided the trailing aircraft is operating at a speed that will permit it to overtake the lead aircraft, and both are vertically separated. v. Transfer of radar identification shall be made in relation to the center prescribed boundary. Boundaries defining lateral/vertical control jurisdiction between centers shall be defined as the Transfer Point (TP). 1. Ensure that handoff requests are made at least 10nm prior to the relevant airspace boundary unless otherwise specified in this document. Handoff requests may be initiated up to 50nm without prior coordination. NOTE: Transfer of radio communications can be delayed no later than the lateral boundary. vi. Ensure that all conflicts, imminent situations, and MIT separation issues are resolved prior to handoff. vii. Ensure that all scratchpad entries are cleared unless required to convey operational information (e.g. M80 for assigned Mach number, H### for assigned heading) not coordinated by other means (e.g. private message, verbally, etc.). viii. Ensure the datablock is formatted as follows: 1. For aircraft climbing to an altitude lower than the flight planned altitude: a. If the altitude is consistent with an LOA procedure, no entry. b. If the altitude is non-standard or not contained within this LOA, a temporary altitude reflecting the cleared altitude. 2. For aircraft descending to meet an issued crossing restriction, a temporary altitude with the applicable crossing altitude. Exception: ZNY controllers may use hard altitudes instead of temporary altitudes in these circumstances. 3. For aircraft descending to an assigned altitude, no temporary altitude is used, and the filed/planned altitude is amended to the new cleared/assigned altitude. 4. No scratchpad, except if specific control instructions that differ from LOA procedures have been issued. In these cases, the alternate instruction shall be verbally or textually included as well as included in the scratchpad. Scratchpad entries may include: a. Indicated speed restrictions (e.g., 210, 270+ ) b. M for Mach speed restrictions (e.g., M81, M78+ ) c. H for heading assignments (e.g., H230 ) d. H and direction for deviations (e.g., H15L for 15 degrees left of track) b. The transferring facility shall not be required to change or issue routing to aircraft if it is satisfactory to the first fix in the receiving facility's area unless the aircraft originates in the transferring facility's area. i. Ensure that all portions of a flight plan are accurate prior to initiating a handoff. 1. If an aircraft was cleared direct to a waypoint along the route of flight, then delete the route segment up to, but not including, the waypoint. c. Aircraft enroute between centers shall be transferred at the altitude/flight levels specified in Attachment 4. d. Each facility has control for beacon code changes on traffic within 10 NM of the ZNY/ZOB boundary. ZOB to ZNY a. 60 NM west of HAR, ZNY has control of aircraft destined KPHL / KPHL Satellites and KACY via J152, at FL240 and above, to descend to FL240, turns 20 left or right of course, and to change beacon code assignment. b. Aircraft on J584/FQM STAR may be cleared direct FQM if they enter ZNY airspace within 5 NM of the centerline of J584/FQM STAR. c. ZNY has control for right turns of KUNV arrivals via V501 at BLINK intersection. d. Aircraft within 10 NM of V12 may be cleared direct HAR. ZNY to ZOB a. Aircraft departing KMDT / KMDT Satellites cleared via routing south of J64, excluding J64, requesting FL260 or above shall be cleared to FL260. b. Aircraft departing KMDT/KMDT Satellites cleared via J60/J64 requesting FL300 or above shall be cleared to FL300 and handed off to the BKI (Brecksville) sector. c. Aircraft on J110/J230/Q480 may be cleared direct AIR if they enter ZOB airspace within 10 NM of the centerline of J110/J230/Q480. ZNY shall ensure that this traffic does not conflict with J152. d. Aircraft on V474 may be cleared direct IHD if they enter ZOB airspace within 10 NM of the centerline of V474. e. Aircraft destined to KPIT / KPIT Satellites may be cleared direct IHD if they enter ZOB airspace within 10 NM north of the centerline of J110/J230/Q480. ZNY shall ensure that this traffic does not conflict with J152. f. Aircraft departing KPSB, KN96 and KUNV requesting 10,000 or above shall be cleared to 10,000'. ZOB has control for climb and turns up to 30 either side of course subsequent to acceptance of radar handoff and frequency change. g. Aircraft within 10 NM of V12 may be cleared direct JST. h. ZOB shall have control for turns of up to 20 left or right of course, at or above FL260, south of J152 and within 10 NM of the ZNY/ZOB boundary on aircraft routed via J110/J230/Q480, BRNAN and PSYKO. ZOB shall be responsible for any point out requirements to adjacent facilities or other sectors within ZNY resulting from this procedure. ZOB shall ensure that any aircraft turned by ZOB within ZNY airspace on either route will not conflict with aircraft on the other route.