Analysis Item 71: Department of Aviation Aurora State Airport Runway Extension

Similar documents
Chapter 1 Introduction and Project Overview

Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL

Yakima Air Terminal/McAllister Field Airport Master Plan Update

Office of Airports. Overview of the FAA s. Federal Aviation Administration ACI-NA/AAAE Airport Board & Commissioners Conference Indianapolis, IN

For Airport Environmental Services. Date Released: August 27, 2018 Deadline for Submission: 5:00pm, September 17, 2018

Airport. Improvement Program (AIP) Overview. Federal Aviation Administration. Texas Aviation Conference Ben Guttery, Texas ADO April 2017

Chapter 8.0 Implementation Plan

2015 PURDUE ROAD SCHOOL March 11, 2015

CHAPTER 1: INTRODUCTION

Preferred Alternative Summary

MassDOT Aeronautics Division Capital Improvements Presentation

Appendix F Cultural Resource Consultation

BOARD OF AIRPORT COMMISSIONERS

Session Six: State Aviation System Plan Overview GAA Annual Conference & Expo Jekyll Island, Ga Back to the Beach: For a Low Country Luau

PUBLIC NOTICE. Table 1 Projects Proposed by Amendment

MONTROSE REGIONAL AIRPORT

6.0 Capital Improvement Program. 6.1 Capital Improvement Plan (CIP)

Chapter 2 FINDINGS & CONCLUSIONS

Chapter 9 Airport Financial Plan

Addendum - Airport Development Alternatives (Chapter 6)

Chapter 1 Introduction and Project Overview

CHAPTER 3 ALTERNATIVES CONSIDERED

Grants Pass Airport Master Plan & Airport Layout Plan Update

Kittitas County Airport Bowers Field Airport Master Plan Planning Advisory Committee Meeting #1 April 6, 2016

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport

Airport Safety Management Systems: Integrating Planning Into the Process

Introduction DRAFT March 9, 2017

Airports and UAS: Integrating UAS into Airport Infrastructure and Planning

Port of Friday Harbor

What's your fleet mix for design?

PORT OF PORTLAND. Chapter Seven CAPITAL IMPROVEMENT PROGRAM

Federal Aviation Administration. Airport Land Use Compatibility Advisory Circular ACI-NA / FAA. FAA HQ Washington, DC March 27, 2013

HILLSBORO AIRPORT MASTER PLAN UPDATE Planning Advisory Committee Meeting 1

Notice and Opportunity to Comment on New Proposed Passenger Facility Charge (PFC) New Application

PLU Airport Master Plan Master Plan Advisory Committee (MPAC) Meeting #4 MASTER PLAN ADVISORY COMMITTEE (MPAC) - MEETING #4

The presentation was approximately 25 minutes The presentation is part of Working Group Meeting 3

Update on FAA Standard Operating Procedures (SOP)

Norfolk International Airport

RESOLUTION NO

MEETING MINUTES Page 1 of 5

Aviation Tax Report. June 30, 2016

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015

SECURITY OVERSIGHT AGENCY May 2017 EXTENDED DIVERSION TIME OPERATIONS (EDTO)

Passenger Facility Charge Application #1

JOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012

FAA Reauthorization Issues & Impacts on Airports

Appendix D Project Newsletters. Tacoma Narrows Airport. Master Plan Update

L1408 S1, RUNWAY INCURSION MITIGATION STUDY AND COMPREHENSIVE AIRFIELD

Aviation Trust Fund. The Results of Senate Bill 526

CatExes vs. EAs When and How to Prepare

PFC Application #2 Niagara Falls International Airport

General Dick Stout Field: 2010 General Aviation Airport Runway 18/36 3,410 x Hangars 65 Based Aircraft St. George 177 Based A/C Cedar d City 65

Chapter Seven Implementation Plan. Tacoma Narrows Airport. Master Plan Update

FAA Update. Airports Program. Western-Pacific Region. Federal Aviation Administration

FAA Update. Dakota-Minnesota (DMA) Airports District Office. Federal Aviation Administration. Presented to: By: Date: South Dakota Airports Conference

AERONAUTICAL SURVEYS & INSTRUMENT FLIGHT PROCEDURES

TXDOT AVIATION DIVISION

APPENDIX B NATIONAL PLAN OF INTEGRATED AIRPORT SYSTEMS

ACTION TRANSMITTAL

CHAPTER 1. INTRODUCTION

Lake Tahoe Airport Master Plan

CLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257

REVIEW OF THE STATE EXECUTIVE AIRCRAFT POOL

General Aviation Master Plan Update

California State University Long Beach Policy on Unmanned Aircraft Systems

FIRST PUBLIC WORKSHOP

New Opportunities PUBLIC WORKSHOP. Venice Municipal. Bringing g the pieces together

Chapter 10 FAA Compliance Review

Correction to Council Resolution No , dated June 25, Please add the following correction as part of the permanent record:

CHAPTER 1 EXECUTIVE SUMMARY

Agenda: SASP SAC Meeting 3

Federal Aviation Administration. Summary

SASP Advisory Committee Meeting #2

Chapter 9: Financial Plan Draft

The Law of Noise Regulation Daniel S. Reimer


II. Purpose and Need. 2.1 Background

Finance and Implementation

Chapter One PROJECT DESCRIPTION

Pavement LCA Where Do We Go from Here!!

DRAFT MASTER PLAN UPDATE

MOST aircraft need a runway for landing and takeout.

Westover Metropolitan Airport Master Plan Update

JACIP-AIRPORT PROJECT DETAIL REPORT August 15, 2007

FEDERAL AIRPORT IMPROVEMENT PROGRAM (AIP) PRE-APPLICATION FFY 2017 CHECKLIST

Rio Vista Municipal Airport Potential Alternatives for the Future Ownership, Operation and Maintenance of the Airport

Airport Master Plan for. Brown Field Municipal Airport PAC Meeting #3

AirportInfo. Airport Improvement Program

ICAO Provisions: Obligations for Certification Annex 6 Document 8335

Chapter 5 Airport Development Alternatives

Safety, Infrastructure, and Tenant Improvement Project. Public Hearing Informational Brochure February 26, 2013

Notice of Air Carrier Consultation Meeting for PFC Application Niagara Falls International Airport (NFIA/IAG)

Preliminary Findings of Proposed Alternative

Summary of Committee Discussion/Questions Metropolitan Transportation Services Senior Planner Russ Owen presented this item.

Next Generation Air Transportation System Financing Reform Act of 2007

Port of Seattle Sea-Tac Airport Master Plan An Economic Engine for Washington State. Kurt Beckett Deputy Chief Executive Officer

Meeting Presentation. Sacramento International Airport Master Plan Update October 30, 2012

agis a brief overview

Short-Haul Operations Route Support Scheme (RSS)

PLU Airport Master Plan. Master Plan Advisory Committee (MPAC) Meeting #4 March 19, 2018

Transcription:

Analysis Item 71: Department of Aviation Aurora State Airport Runway Extension Analyst: Gregory Jolivette Request: Approve, retroactively, the submission of a federal grant application to the Federal Aviation Administration (FAA) in the amount of $37 million for a runway extension at Aurora State Airport. Analysis: The federal Airport Improvement Program (AIP) provides grants for planning and development of public-use airports included in the National Plan of Integrated Airport Systems. In March, Congress appropriated $1 billion of supplemental funding for AIP discretionary project grants that are available through September 30, 2020. Project grants will be funded 100% by the FAA. The Department of Aviation plans to use the grant funds, if awarded, to extend the airport runaway approximately 1,000 feet. According to the agency, the current runway does not support efficient aircraft operations because it is not long enough to allow aircraft to operate with full fuel and maximum cargo. Extending the runway approximately 1,000 feet would significantly reduce the level of constrained operations and improve airport safety. The agency application was submitted in accordance with the 2018 grant award deadlines. However, since the 2018 grant process prioritized shovel-ready projects -- which the Aurora Runway Project is not, the agency anticipates its application will roll into the 2019 or 2020 award cycle. Legislative Fiscal Office Recommendation: Defer action on the request until the December meeting of the Emergency Board, with instructions that the agency coordinate with local government stakeholders and seek public input on the runway extension project. Legislative Fiscal Office Emergency Board September 2018

71 Oregon Department of Aviation Wittekind Request: Oregon Department of Aviation (ODA) is requesting retroactive authorization to apply for a grant through the Federal Aviation Administration (FAA) totaling $37,000,000. Recommendation: Approve the request. Discussion: The Consolidated Appropriations Act of 2018 appropriated $1 billion for airport grants that will be available through September 30, 2020. Any airport included in the FAA s National Plan of Integrated Airport Systems is eligible to request supplemental discretionary funding. On July 9, 2018 the FAA and U.S. Department of Transportation published a document to the Federal Register providing guidance on the process and deadlines for eligible airport sponsors to notify the FAA of any discretionary funding requests. Prior to submitting a preliminary application to the FAA on August 8, 2018, ODA submitted a 10 day notification letter on July 27, 2018 to the Emergency Board. The FAA will be reviewing and evaluating all requests received from airport sponsors. If the preliminary application is accepted by the FAA, the Department plans to apply for the final grant no later than September 1, 2018. ODA plans to include public engagement in all phases of the project as required by FAA grant funding. ODA is requesting $37,000,000 for a runway extension at Aurora State Airport. This grant is unique in that it does not require any airport sponsor matching funds. It is entirely funded by the FAA. The Aurora Airport, an airport that supports many industries is in need of a runway extension as discussed in the most recent Master Plan completed in 2013. The Master Plan required by the FAA was vetted in a series of seven public meetings that addressed community concerns. In addition, ODA presented Master Plan options at several public Aviation Board meetings. A recent constrained operations study identified 700 plus instances of constrained operations that require a runway of 5,901 feet or longer. The FAA s threshold for constrained operations, before funding a runway extension is 500. With the recent opening of the air traffic control tower in late 2015, it is estimated that the number of constrained operations will continue to grow. It is for this reason that the Oregon Department of Aviation is seeking funding to extend the only runway at Aurora State Airport. The runway extension would be completed in four phases. The first phase is to conduct required environmental analysis of previously disturbed undeveloped land owned by ODA owns. The second phase is to purchase property located within the Runway Protection Zone. The third and fourth phases are design and engineering. The construction would consist of a total of 1000 feet, which would bring the total runway length from 5,901 feet to 6,000 feet. The table below summarizes the costs for each phase. Department of Administrative Services 71-i September 26, 2018

Runway Extension Project Costs Phase 1 Environmental $600,000 Phase 2 Property Purchase $3,000,000 Phase 3 Design Engineering $1,400,000 Phase 4 Construction $32,000,000 Department of Administrative Services 71-ii September 26, 2018

August 27, 2018 Kate Brown, Governor 3040 25th Street, SE Salem, OR 97302-1125 Phone: (503) 378-4880 Toll Free: (800) 874-0102 FAX: (503) 373-1688 The Honorable Senator Peter Courtney, Co-Chair The Honorable Representative Tina Kotek, Co-Chair State Emergency Board 900 Court Street NE H-178 State Capitol Salem, OR 97301-4048 Dear Co-Chairpersons: Nature of the Request The Oregon Department of Aviation s (ODA) requests retroactive approval during the September Emergency Board to apply for a preliminary federal grant requesting consideration of discretionary funding of $37 Million with the Federal Aviation Administration (FAA) for a runway extension at Aurora State Airport. If ODA receives the grant the department will request a limitation increase during a subsequent Emergency Board Session. Agency Action The Consolidated Appropriations Act of 2018 appropriated an additional $1 billion for airport grants that will be available through September 30, 2020. On Monday, July 9, 2018 the Federal Aviation Administration and U.S. Department of Transportation published document number 2018-14675 to the Federal Register. This document provides supplemental guidance on the process and deadlines for eligible airport sponsors to notify the FAA of any supplemental discretionary funding requests from the Airport Improvement Program (AIP) for fiscal years 2018-2020. The department submitted a 10 notification letter on July 27 th to the Emergency Board and has submitted the preliminary application to the FAA on August 8, 2018. Due to a short time line between the announcement of the available funding and the deadlines to apply for the funding the department was only able to do limited outreach. If the preliminary application is accepted for fiscal year 2018 the department plans to apply for the final grant application no later than September 1, 2018. The department plans to include public engagement in all phases of the project as required by FAA grant funding. The FAA anticipates issuing grants from this supplemental funding during fiscal years 2018, 2019, and 2020. The FAA has not yet released details of how much of the funding it will obligate in each fiscal year. For fiscal year 2018 the FAA plans to issue the grants no later than September 1, 2018. The FAA will be reviewing and evaluating all requests received from airport sponsors and then release more details. Any airport included in the FAA s National Plan of Integrated Airport Systems (NPIAS) is eligible to request supplemental discretionary funding. These grants will be unique in that they will not require airport sponsor matching funds. They will be funded 100% by the FAA. This project will extend the runway at Aurora State Airport from 5003 to 6000. The department recently conducted a constrained operations study at the airport to justify the runway extension. A constrained

operation is defined in its simplest definition as an aircraft that is operating with less than full fuel or cargo on the basis that the runway isn t long enough or doesn t have the weight baring capacity to operate at full fuel and cargo. Through this study it has been determined that Aurora State Airport currently has just under 700 documented constrained operations that require a runway of 6000 or longer. The FAA s threshold for constrained operations, before funding a runway extension is 500. With the recent opening of the air traffic control tower in late 2015, it is estimated that the number of constrained operations will continue to grow. It is for this reason that the Oregon Department of Aviation is seeking funding to extend the only runway at Aurora State Airport. This project is anticipated be complete in four phases. The first phase is the environmental phase. The runway extension will require construction of pavement on previously disturbed, but undeveloped land that the Oregon Department of Aviation owns within the current airport boundary. The purchase of land (phase 2) and new construction of pavement will require a National Environmental Policy Act (NEPA) evaluation and analysis. The department will comply with the state land use process and requirements during all phases of this project. The second phase is the property purchase. Current Runway Protection Zone (RPZ) extends onto property not currently owned by the Oregon Department of Aviation. With the extended runway, this will push the RPZ further onto property not owned or controlled by ODA. Based on the FAA Advisory Circular, AC 150/5300-13A, airport sponsor/owner controlled RPZ is preferred through property acquisition. The final two phases are design engineering and construction. The construction phase will consist of construction of a 1,000 foot runway extension with lighting; strengthening of existing portion of runway 17-35; a 1,000 foot taxiway extension with lighting, relocation of signing and NAVAIDS; and drainage improvements. The table below summarizes the costs for all phases of the project: Aurora Runway Extension Total Project Costs Phase 1 Environmental $ 600,000 Phase 2 Property Purchase $ 3,000,000 Phase 3 Design Engineering $ 1,400,000 Phase 4 Construction $ 32,000,000 $ 37,000,000 Please see the attached FAA Project Applications for more details. Action Requested The department requests the retroactive approval to apply for the Federal Aviation Administration Grant for the Aurora State Airport Runway Extension in the amount of $37 Million Federal Funds. If you have additional questions about the request please contact the State Airports Manager, Matt Maass at (503)378-2523 or the Project Manager, Heather Peck at (503)378-3168. Thank you, Brian DeForest Interim Director Oregon Department of Aviation C: Gregory Jolivette, Legislative Fiscal Office Georgy Naughton, Chief Financial Office Linnea Wittekind, Chief Financial Office 2