SEWERS AND STORM DRAINS. Storm Drain Pipe Repair

Similar documents
VOTING PRECINCT NO. ALTADENA Polling Place: Residence 559 Royce Street Altadena, CA (626) Accessible to Handicapped: Yes

Final Drainage Letter Pikes Peak Community College Downtown Parking Lot Colorado Springs, Colorado

Capital Improvement Program Fiscal Year

Capital Improvement Plan

Village of Lombard, Illinois Capital Improvement Plan FUNDING SOURCE SUMMARY

SCHOOL LOCATOR BY STREET Updated

Use this option if you plan to arrive to the Rose Bowl anytime after 10:00 am

HASTINGS RANCH FOR LEASE 3801 E. FOOTHILL BOULEVARD, PASADENA, CA FOR MORE INFORMATION CONTACT:

Short Range Transit Plan Department of Transportation. September 2013

ORDINANCE NO. "Summary

THREE MILE PLAN TOWN OF SUPERIOR COLORADO

Punahou School Marching Band 127th Rose Parade Tour. December 26 - January 3

Pre-Flips will be conducted Sunday, November 5

CITY OF LYNDEN STORMWATER MANAGEMENT PROGRAM REPORT MARCH 1, 2016

Appendix E. System Issues

CHAPTER 3.0 PROJECT DESCRIPTION

CITY OF BROOKFIELD Capital Improvement Fund Budget

FIRE Equipment Fire Training Equipment 105, , Total of Equipment 105, ,

Dos Pueblos cs * Corona del Mar. * Lutheran/ Orange vs Corona del Mar Lutheran/ Orange Automatic Lutheran/ Orange vs * Foothill

VI. ALTERNATIVES TO THE MASTER PLAN C. RENOVATED EAST BUILDING ALTERNATIVE

DRAFT. Dorabelle Campground Rehabilitation

VISTA AZUL- APPROVED 20 LOT TENTATIVE MAP

BOARD OF AIRPORT COMMISSIONERS

Community Advisory Panel Meeting #

Contents EXECUTIVE SUMMARY... 7 Study Timeframe... 7 Study Organization... 7 Data Analysis... 7 Public Involvement... 7 Recommendations... 7 INTRODUCT

Organization Name Address City State Zip Code Phone Fax Fenton Avenue LLC Fenton Avenue Sylmar CA

Welcome KROSNO CREEK DIVERSION PROJECT CLASS ENVIRONMENTAL ASSESSMENT

2016 SCE Reliability Review. November 27 th, 2017 Irwindale, California

OFFICE OF THE CITY MANAGER MEMORANDUM August 30, 2013

Contents EXECUTIVE SUMMARY... 7 Report Timeframe & Data... 7 Study Organization... 7 Data Analysis... 7 Public Involvement... 7 Recommendations... 8 I

APPROVED 10 LOT TENTATIVE TRACT MAP - OCEAN VIEWS

Ditch flows slowly to the north

MEMORANDUM VILLAGE OF NORTHBROOK

November 21, 2012 Barbara Kelleher, (954)

City of Tallahassee, FL Department of Aviation

TEAM-CLINE.COM LOCAL EXPERTISE. INTERNATIONAL REACH. WORLD CLASS.

City of Sierra Madre STUDY AREA PROFILE

Circuit Reliability Review

RIO VISTA MUNICIPAL AIRPORT

Brevard County Utility Services Department

The 710 Tunnel Threatens Pasadena. March, 2013

State Route 8 Corridor. Northern Summit County s Path to Success

Rail /Trail Service Plan & Infrastructure Upgrade Project 14 April 2018

Agenda Report. Spruce Street Outlet Drainage Improvements Tower Road Relief Sewer

Project Deliverable 4.1.3d Individual City Report - City of La Verne

CITY COUNCIL AGENDA MEMORANDUM

ZIP Codes/Territories In Numerical Order By ZIP Code ZIP Code. ZIP Code

Ann Arbor Municipal Airport Ann Arbor, MI Date of Latest ALP ACIP Airport Code - A Airport Identifier - ARB

Pasadena City Redistricting Task Force

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016

Mason Street Bike/Pedestrian Trail Project

CONSTRUCTION PROJECTS IN CUYAHOGA COUNTY CLEVELAND EUCLID 3/9/18 RICHMOND MAYFIELD HIGHLAND HEIGHTS HEIGHTS SOUTH EAST MAYFIELD EUCLID CLEVELAND

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015

Guide to. Road Construction Projects

DIRECTIONS TO SCHOOLS

EAST VALLEY PARKWAY FOR SALE - RESIDENTIAL DEVELOPMENT OPPORTUNITY 3141 E. VALLEY PARKWAY ESCONDIDO, CA ACRE SITE $1,100,000

REDONDO AVE

OFFICE OF THE CITY MANAGER

8,251 SF INDUSTRIAL BUILDING FOR LEASE OR SALE

5128 N FIGUEROA STREET

Figure San Dimas Bonita at San Dimas Avenue (view looking west)

CASS COUNTY MICHIGAN. Drain Commissioner

Recent Erosion and Mass Wasting Observed in Sunset Cliffs Natural Park. Craig Barilotti and Camilla Ingram Sunset Cliffs Association

Deterioration Factors at Girder Ends

COPYRIGHT: The Arizona Historical Society owns the copyright to this collection.

CAPITAL IMPROVEMENT PLAN

COASTAL CONSERVANCY. Staff Recommendation September 22, 2011 BAY AREA RIDGE TRAIL: HOOD MOUNTAIN TO HIGHWAY 12

Lower St. Johns River Tributaries Fecal Coliform Basin Management Action Plan Jacksonville Environmental Symposium

FDOT Treasure Coast Traffic Report through

520± Acre. Las Aldeas Farm. Imperial Valley, CA. agribusiness solutions team. Curtis Buono CA Lic.

FDOT Treasure Coast Traffic Impact Report

TOWN OF MOUNT PLEASANT, SOUTH CAROLINA PUBLIC SERVICES COMMITTEE Monday, July 2, 2018

Stephanie Sinnott, Executive Director, Finance, Office of the City Manager

Project Purpose: Project History and Status:

GILBERT & WEST TOWN INTERCOUNTY DRAIN Windsor Township, Eaton County and City of Lansing, Delhi Township, Ingham County, Michigan

SANDAG s Regional Transportation Plan

SWAN CREEK VILLAGE HOMEOWNERS ASSOCIATION. P.O. Box Bountiful, UT

DATE: 23 March, 2011 TO: Communities FROM: BlazeSports America. RE: Accessible Trails Checklist 1

Emily to Blind Lake Trail PROPOSED TRAIL DEVELOPMENT APPLICATION SUMMARY

Bear Creek Habitat Improvement Project

LYNDHURST NEW URBAN DEVELOPMENT AREA STRUCTURE PLAN. Lyndhurst New Urban Development Area Structure Plan OUTCOMES AND PERFORMANCE STANDARDS

Exit 136 (Centreport Parkway/Stafford County) to Exit 130 (Route 3/Fredericksburg)

Project Management, Environmental Assessment, Stormwater Management. Hydrologic Modelling. Natural Heritage. Fluvial Geomorphology

Town of Danvers Planning Board

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT

Chapter 4.0 Alternatives Analysis

2018 Collector and Above Street List

Northaven Trail Phase 2 Initial Project Overview

ES Aircraft Deicing Document Identification Number Date: March 15, ) Activity Description:

OFFICE OF THE CITY MANAGER

Circuit Reliability Review

CAPITAL PROGRAM SUMMARY

Capital Prioritization

APPROVED 8 LOT TENTATIVE MAP WITH 1 EXISTING HOME 220 S. CITRUS AVENUE ESCONDIDO, CA 92027

ANNUAL REPORT DALLAS LOVE FIELD AIRPORT. March 14, 2006

NOTICE OF PREPARATION/NOTICE OF PUBLIC SCOPING MEETING

The Evolution of DFW Airport s Deicing Program Balancing Risks with Results MAY 20, 2015

Paso Robles Parking Action Plan 1

CITY OF LAREDO, TEXAS CAPITAL IMPROVEMENTS FUND PROJECT BUDGET FY

Morristown Municipal Airport Runway 5-23 Rehabilitation Environmental Assessment

Transcription:

A D O P T E D C A P I T A L I M P R O V E M E N T P R O G R A M B U D G E T F I S C A L Y E A R 2 1 5-2 1 9 SEWERS AND STORM DRAINS Storm Drain Pipe Repair

FY 215-219 Capital Improvement Program Description FY 214 FY 215 FY 216 FY 217 FY 218 FY 219 1 Preventive Maintenance - Sewer System FY 211-215 3,85,954 3,5,954 8, (7691) 2 Preventive Maintenance - Corrugated Metal Pipe Storm 1,1, 9, 2, Drains FY 211-215 (7692) 3 Preventive Maintenance - Curbs and Gutters FY 211-215 2,558,794 2,258,794 3, (7693) 4 Storm Drain Structure Repairs and Improvements FY 211-45, 36, 9, 215 (7694) 5 NPDES - Storm Water Pollution Prevention Program (7629) 2,67, 2,17, 25, 25, 6 Drainage Improvements on Streets with Flat Grades FY 211-1,174,487 974,487 2, 215 (7695) 7 Rehabilitation of Arroyo Parkway Storm Drain from Holly 1,837, 1,246, 2, 391, Street to South City Limit (76538) 8 Sewer Capacity Upgrades - FY 211-215 (7696) 2,382,99 2,82,99 3, 9 El Mirador Tract Storm Drain (7639) 917,4 61,32 37,98 16,941,544 13,653,446 2,34, 25, 698,98 7 - Summary

FY 215-219 Capital Improvement Program Preventive Maintenance - Sewer System FY 211-215 7691 1 7691 Preventive Maintenance - Sewer System FY 211-215 FY 214 FY 215 FY 216 FY 217 FY 218 FY 219 Private Capital 954 954 Sewer Maintenance and Construction Fund 3,85, 3,5, 8, 3,85,954 3,5,954 8, Maintenance to Sewer System DESCRIPTION: This project provides for the systematic repair, rehabilitation, or replacement of the City's sewer collection system. The system consists of 311 miles of sewer pipes ranging in size from 6-inch to 3-inch in diameter. JUSTIFICATION: Although cleaned and maintained on a regular basis, the system is aged and suffers from a variety of defects. Pipes are subject to breakage from wear and tear, earthquake movements, improper installation, protruding house connections, and chemical corrosion. SCHEDULE: Work will be conducted based on the findings of the yearly sewer inspection and evaluation. RELATIONSHIP TO GENERAL PLAN: This project is consistent with the Land Use Element by continuing to implement capital improvements which will maintain or rehabilitate infrastructure. IMPACT ON THE NORTHWEST: Approximately 25 percent of this project is located in Northwest Pasadena which is an area that has been targeted for revitalization. HISTORY: This project was created and received initial funding in FY 199 as project number 76267. The project was segmented into five year increments starting in FY 211 and fully funded in FY 215. A new five year phase of this project will be created in FY 216. 7.1

FY 215-219 Capital Improvement Program Preventive Maintenance - Corrugated Metal Pipe Storm Drains FY 211-215 7692 2 7692 Preventive Maintenance - Corrugated Metal Pipe Storm Drains FY 211-215 FY 214 FY 215 FY 216 FY 217 FY 218 FY 219 Sewer Maintenance and Construction Fund 1,1, 9, 2, 1,1, 9, 2, Corrugated Metal Pipe DESCRIPTION: This project provides for the inspection and systematic lining or replacement of portions of corrugated metal pipe (CMP) storm drains throughout the City. The City has 6,456 lineal feet of CMP storm drains that were installed from 1925 to 1953. Several of these drains are rusted and are in immediate need of repair. JUSTIFICATION: The old corrugated metal pipes are an integral part of the City's storm drain system. Many of these pipes are in various stages of deterioration depending on their slope, age, and the type of soil surrounding them. The CMPs have been televised to determine the extent of deterioration, and repair priorities will be based upon the need to protect each slope. SCHEDULE: In FY 215, repair or rehabilitation of failed pipes will continue based on the evaluation of the FY 27 video inspection results, and subsequent inspections. RELATIONSHIP TO GENERAL PLAN: This project is consistent with the Public Facilities Element of the General Plan in that the City is almost fully built out and the drainage system elements, particularly older facilities, are subject to ongoing repair, replacement, or modification. IMPACT ON THE NORTHWEST: Approximately five percent of this project is located in Northwest Pasadena which is an area that has been targeted for revitalization. HISTORY: This project was created and received initial funding in FY 1995 as project number 76473. The project was segmented into five year increments starting in FY 211 and fully funded in FY 215. A new five year phase of this project will be created in FY 216. 7.2

FY 215-219 Capital Improvement Program Preventive Maintenance - Curbs and Gutters FY 211-215 7693 3 7693 Preventive Maintenance - Curbs and Gutters FY 211-215 FY 214 FY 215 FY 216 FY 217 FY 218 FY 219 Private Capital 1,8,794 1,8,794 Sewer Maintenance and Construction Fund 1,55, 1,25, 3, 2,558,794 2,258,794 3, Preventative Maintenance - Curbs and Gutter DESCRIPTION: This project provides for the annual repair of broken or raised concrete curbs and gutters along City streets. JUSTIFICATION: The curb and gutter system is an integral part of the City's drainage system by conveying surface runoff to the appropriate drainage structure. It also protects the streets from water seepage which will prevent early deterioration of the street surface. The majority of the necessary repairs are due to tree roots uplifting the curbs and gutters. SCHEDULE: Curb and gutter repair will continue in advance of resurfacing streets as needed. RELATIONSHIP TO GENERAL PLAN: This project is consistent with the Public Facilities Element of the General Plan by encouraging a high level of maintenance of existing facilities. It also encourages quality public service through efficient management. SPECIAL CONSIDERATION: Funding deficiencies do not allow for the repair of all needed curbs and gutter in advance of slurry seal. IMPACT ON THE NORTHWEST: A portion of this project is located in Northwest Pasadena which is an area that has been targeted for revitalization. HISTORY: This project was created and received initial funding in FY 1989 as project number 76358. The project was segmented into five year increments starting in FY 211 and fully funded in FY 215. A new five year phase of this project will be created in FY 216. 7.3

FY 215-219 Capital Improvement Program Storm Drain Structure Repairs and Improvements FY 211-215 7694 4 7694 Storm Drain Structure Repairs and Improvements FY 211-215 FY 214 FY 215 FY 216 FY 217 FY 218 FY 219 Sewer Maintenance and Construction Fund 45, 36, 9, 45, 36, 9, Damaged Storm Drain DESCRIPTION: This project provides for the repair of damaged storm drain structures and minor improvements of storm drain facilities at various locations throughout the City on an ongoing basis. JUSTIFICATION: Existing damaged, substandard, or missing structures result in inefficient operation and create risk-prone facilities. SCHEDULE: This is an ongoing project and work will be done on an as needed basis. RELATIONSHIP TO GENERAL PLAN: This project is consistent with the Public Facilities Element of the General Plan by encouraging a high level of maintenance of existing facilities. It also encourages quality public service through efficient management. IMPACT ON THE NORTHWEST: Approximately 15 percent of this project is located in Northwest Pasadena which is an area that has been targeted for revitalization. HISTORY: This project was created and received initial funding in FY 199 as project number 76283. The project was segmented into five year increments starting in FY 211 and fully funded in FY 215. A new five year phase of this project will be created in FY 216. 7.4

FY 215-219 Capital Improvement Program NPDES - Storm Water Pollution Prevention Program 7629 5 7629 NPDES - Storm Water Pollution Prevention Program FY 214 FY 215 FY 216 FY 217 FY 218 FY 219 Sewer Maintenance and Construction Fund 2,67, 2,17, 25, 25, 2,67, 2,17, 25, 25, NPDES Catch Basin DESCRIPTION: This project provides for the implementation of procedures and the installation of devices to prevent the pollution of storm water citywide. Various items of work will be done annually to comply with the schedule contained in the National Pollutant Discharge Elimination System (NPDES) permit and the trash and metal Maximum Daily Load (TMDL), including additional installation of the trash capture system and televising of larger storm drain pipes for illegal connections. JUSTIFICATION: The NPDES permit issued by the Regional Water Quality Control Board requires the City to take steps necessary to reduce and/or eliminate pollution in storm water runoff. This project provides for the management, compliance and implementation of the permit. SCHEDULE: In FY 215, work will be done as needed to meet the conditions of the NPDES permit. RELATIONSHIP TO GENERAL PLAN: This project is consistent with the Land Use Element by continuing to implement capital improvements which will maintain or rehabilitate infrastructure. IMPACT ON THE NORTHWEST: Portions of this project are located in Northwest Pasadena which is an area that has been targeted for revitalization. HISTORY: This project was created and initially funded in FY 24. Construction of the first phase of catch basin modifications to comply with the Trash TMDL was completed in FY 29. Construction of the second phase of catch basin modifications was completed in FY 212. 7.5

FY 215-219 Capital Improvement Program Drainage Improvements on Streets with Flat Grades FY 211-215 7695 6 7695 Drainage Improvements on Streets with Flat Grades FY 211-215 FY 214 FY 215 FY 216 FY 217 FY 218 FY 219 Sewer Maintenance and Construction Fund 1,174,487 974,487 2, 1,174,487 974,487 2, Curb Drainage DESCRIPTION: This project provides for drainage improvements on streets with flat grades throughout the City. The work involves the reconstruction of curb, gutter, and pavement as necessary to correct drainage problems. JUSTIFICATION: Many streets in the City have flat longitudinal grades. The roots of street trees have uplifted the curb, gutter, and pavement on the streets creating areas of ponding water. Standing water is a serious health and safety nuisance requiring elimination. SCHEDULE: In FY 215, construction will begin at the following locations: Waverly Drive - Fair Oaks Avenue to Pasadena Avenue Mountain Street - Sunset Avenue to Fair Oaks Avenue Stanton Street - West End to Mentone Avenue Coniston Avenue - Arroyo Boulevard to Kenneth Way Del Vina Street - Avocado Avenue to Sierra Madre Villa Avenue Claremont Street -Forest Avenue to Lincoln Avenue Mountain Street - El Molino Avenue to Lake Avenue Howard Street - Lincoln Avenue to Mentone Avenue Lombardy Road - Hill Avenue to Sierra Bonita Avenue RELATIONSHIP TO THE GENERAL PLAN: This project is consistent with the Public Facilities Element Objective 5 of the General Plan by continuing to implement capital improvements which will maintain or rehabilitate infrastructure. IMPACT ON THE NORTHWEST: Portions of this project (Mountain Street, Stanton Street, Coniston Avenue, Claremont Street, Howard Street) are located in Northwest Pasadena which is an area that has been targeted for revitalization. 7.6

FY 215-219 Capital Improvement Program Drainage Improvements on Streets with Flat Grades FY 211-215 7695 HISTORY: This project was created in FYand received initial funding in FY 25 as project number 7658. The project was segmented into five year increments starting in FY 211 and fully funded in FY 215. A new five year phase of this project will be created in FY 216. The following flat streets were designed and constructed in FY 211: Wyoming Street - Forest Avenue to Lincoln Avenue Las Lunas Street - Hill Avenue to Allen Avenue Loma Vista Street - Allen Avenue to Palo Verde Avenue The following flat streets were designed and constructed in FY 212: Paloma Street - Hill Avenue to Allen Avenue Elizabeth Street - Holliston Avenue to Hill Avenue Pinehurst Drive - Wentworth Avenue to Hillcrest Avenue Atchison Street - Los Robles Avenue to Madison Avenue Pepper Street - Sunset Avenue to east end La Mesa Place - Prospect Avenue to Armada Drive Del Monte Street - Arroyo Boulevard to Forest Avenue The following flat streets were designed in FY 213 and constructed in FY 214: Arbor Street - Grand Avenue to Orange Grove Boulevard Santa Barbara Avenue - Lake Avenue to El Molino Avenue State Street - Pasadena Avenue to Avoca Avenue Wyoming Street - Lincoln Avenue to Mentone Avenue Villa Street - Sierra Bonita Avenue to Allen Avenue Boston Court - Lake Avenue to Mentor Avenue Claremont Street - Sunset Avenue to Fair Oaks Avenue Kenneth Way - Coniston Avenue to north end of Coniston Avenue Claremont Avenue - Catalina Avenue to Wilson Avenue Ranch Top Road - Hasting Ranch Drive to Carriage House Road Wellington Avenue - Lida Street to Bryant Street Mentor Avenue - California Boulevard to Cornell Avenue 7.6

FY 215-219 Capital Improvement Program Rehabilitation of Arroyo Parkway Storm Drain from Holly Street to South City Limit 76538 7 76538 Rehabilitation of Arroyo Parkway Storm Drain from Holly Street to South City Limit FY 214 FY 215 FY 216 FY 217 FY 218 FY 219 Sewer Maintenance and Construction Fund 1,837, 1,246, 2, 391, 1,837, 1,246, 2, 391, Arroyo Parkway Storm Drain DESCRIPTION: This project provides for the repair of defects on the Broadway storm drain. The Broadway storm drain is a large, concrete arch storm drain in Arroyo Parkway between Holly Street and the south city limit. JUSTIFICATION: An inspection of the Broadway storm drain in 23 revealed numerous and significant defects such as extensive exposure and deterioration of reinforcement steel. Repair of the defects will ensure that the top of the storm drain does not deteriorate and collapse. SCHEDULE: Construction of Phase III (from one manhole north of Glenarm Street to Glenarm Street) will be completed in FY 215. Design of Phase IV (Holly Street to Colorado Boulevard) will be completed in FY 215 and construction will begin in FY 216. RELATIONSHIP TO GENERAL PLAN: This project is consistent with Land Use Element Policy 7.4 by continuing to implement capital improvements which will maintain or rehabilitate infrastructure, including improvements related to upgrading the sewer system. HISTORY: This project was created and received initial funding in FY 26. Design of Phase I (Del Mar to one manhole north of Glenarm) was completed in FY 28 and construction was completed in FY 21. Design of Phase II from Del Mar Boulevard to Colorado Boulevard was completed in FY 21, and construction was completed in FY 211. Design of Phase III (from one manhole north of Glenarm to Glenarm) began in FY 211 and was completed in FY 213. 7.7

FY 215-219 Capital Improvement Program Sewer Capacity Upgrades - FY 211-215 7696 8 7696 Sewer Capacity Upgrades - FY 211-215 FY 214 FY 215 FY 216 FY 217 FY 218 FY 219 Private Capital 232,99 232,99 Sewer Facility Charge 1,95, 1,65, 3, Sewer Maintenance and Construction Fund 2, 2, 2,382,99 2,82,99 3, 7.8

FY 215-219 Capital Improvement Program Sewer Capacity Upgrades - FY 211-215 7696 Work on Villa Street DESCRIPTION: This project provides for the replacement or repair of 8.5 miles of existing sewer pipes that are hydraulically deficient. This five year project will continue to address the remaining deficiencies at the following locations: Sierra Madre Boulevard from Colorado Boulevard to Mohawk Street Colorado Boulevard from Grand Oaks Avenue to 225 feet west of Sierra Madre Boulevard Forest Avenue from Hammond Street to Everts Street Parke Street from Garfield Avenue (west) to Garfield Avenue (east) Villa Street from Wilson Avenue to Mar Vista Avenue Hampton Road at Hastings Ranch Drive Hastings Ranch Drive from Newhaven Road to 11 ft south of Newhaven Road Del Mar Boulevard from Euclid Avenue to Los Robles Avenue Colorado Boulevard from Hudson Avenue to Lake Avenue Altadena Drive from Dudley Street to 77 feet south Sierra Madre Boulevard from Medford Road to Hastings Ranch Drive Sunset Avenue from 78 feet south of Glorieta Street to 22 feet southeast of Poplar Lane North Garfield Avenue from Villa Street to Maple Street Hill Avenue from Monte Vista Street to Maple Street Hill Avenue from Orange Grove Boulevard to Monte Vista Street Green Street from Mills Place to Fair Oaks Avenue De Lacey Avenue from Valley Street to Orange Place Orange Place from De Lacey Avenue to Fair Oaks Avenue Del Mar Boulevard from Fair Oaks Avenue to Raymond Avenue Annandale golf course sewer east of Patrician Way 7.8

FY 215-219 Capital Improvement Program Sewer Capacity Upgrades - FY 211-215 7696 Nithsdale Road from San Rafael Avenue to San Miguel Road 22. Laguna Road from Lagunita Road to south of Hermosa Road La Loma Road from Laguna Road to 15 feet west Laguna Road from La Loma Road to 3 feet south Laguna Road from La Loma Road to 6 feet north Laguna Road from Burleigh Drive to San Rafael Avenue Laguna Road from Hermosa Road to Arroyo Boulevard Arroyo Boulevard from San Rafael Avenue to 68 feet south of Columbia Street Arroyo Boulevard from 2 feet north of Bellefontaine Street to 888 S Arroyo Boulevard South Marengo Avenue from 9 feet south of Euclid Avenue to 6 feet north of Los Robles Avenue South Marengo Avenue from Euclid Avenue to 75 feet south Green Street north from El Molino Avenue to Oak Knoll Avenue Green Street south from Hudson Avenue to 22 feet west Green Street south from Shoppers Lane to Mentor Avenue Green Street south from west of Catalina Avenue to Hill Avenue Michillinda Avenue from Mayfair Drive to Foothill Boulevard Fair Oaks Avenue from Glenarm Street to State Street Columbia Place from State Street to Columbia Street Columbia Street from Pasadena Avenue to Columbia Place Glenarm Street from Fair Oaks Avenue to Raymond Avenue Glenarm Street from Marengo Avenue to 3 feet east Fair Oaks Avenue from Arlington Drive to Glenarm Street Los Robles Avenue from Alpine Street to Glenarm Street Los Robles Avenue from 25 feet north of Alpine St to 5 feet north of Alpine Street Fillmore Street from Los Robles Avenue to Oakland Avenue California Boulevard from Madison Avenue to El Molino Avenue Mentor Avenue from Cornell Road to 32 feet south Linda Vista Avenue from Mira Vista Terrace to 4 feet north Green Street south sewer east of Marengo Avenue El Molino Avenue from 4 feet to 56 feet south of Villa Street Hill Avenue from Villa Street to 426 feet south JUSTIFICATION: The Master Sewer Plan (MSP) adopted by the City Council on January 22, 27, identified specific improvements required to accommodate current and future demands on the system. The construction of these improvements will improve the reliability of the sewer system and reduce the need for extraordinary maintenance and monitoring of sewer segments that meet or 7.8

FY 215-219 Capital Improvement Program Sewer Capacity Upgrades - FY 211-215 7696 y g g exceed desirable operating levels. SCHEDULE: In FY 215, sewer capacity upgrades will begin at locations to be determined. RELATIONSHIP TO THE GENERAL PLAN: This project is consistent with the Public Facilities Element Objective 5 of the General Plan by continuing to implement capital improvements which will maintain or rehabilitate infrastructure. IMPACT ON THE NORTHWEST: Portions of this project are located within Northwest Pasadena which is an area of the City that has been targeted for revitalization. HISTORY: This project was created and received initial funding in FY 28 as part of project number 76999 with a total estimated cost of $16,295,33. This project was segmented into five year increments starting in FY 211 as project number 7696 and fully funded in FY 215. A new five year phase of this project will begin in FY 216. The following work has been completed since FY 211: Los Robles Avenue - 1 feet north of Parke Street to Villa Street - COMPLETED FY 211; Sierra Madre Boulevard - Hastings Ranch Drive to Medford Avenue - COMPLETED FY 211; Villa Street - Wilson Avenue to Mar Vista Avenue - COMPLETED FY 211; Garfield Avenue - Villa Street to Maple Street - COMPLETED FY 211; Parke Street - Garfield Avenue (west) to Garfield Avenue (east) - COMPLETED FY 211 Del Mar Boulevard from Euclid Avenue to Los Robles Avenue - COMPLETED FY 212; Altadena Drive from Dudley Street to 77 feet south - COMPLETED FY 212; Hill Avenue from Villa Street to 426' south - COMPLETED FY 212; Hasting Ranch Drive from Newhaven Road to 11 ft south of Newhaven Road - COMPLETED FY 212; El Molino Avenue from Villa Street to 4 feet south of Villa Street - COMPLETED FY 212; Forest Avenue from Hammond Street to Everts Street - COMPLETED FY 213; Hill Avenue from Las Lunas Street to Villa Street - COMPLETED FY 213; Sunset Avenue from 78' south of Glorieta Street to 22' southeast of Poplar Lane - COMPLETED FY 213; Green Street from Mills Place to Fair Oaks Avenue - COMPLETED FY 214; Michillinda Avenue from Mayfair Drive to Foothill Boulevard - COMPLETED FY 214. 7.8

FY 215-219 Capital Improvement Program El Mirador Tract Storm Drain 7639 9 7639 El Mirador Tract Storm Drain FY 214 FY 215 FY 216 FY 217 FY 218 FY 219 Private Capital 61,32 61,32 Unfunded 37,98 37,98 917,4 61,32 37,98 El Mirador Tract Storm Drain DESCRIPTION: The developer of the El Mirador Tract (No. 41465) did not complete all of the storm drain requirements for this subdivision. This project provides for the completion of the storm drain system per the Los Angeles County 's standards, which includes construction of debris barriers, modification of debris basins and storm drains, and miscellaneous punch list work as well as easement preparation and processing. JUSTIFICATION: Completion of this storm drain system will eliminate flooding during rainstorms and will control the potential debris resulting from a fire/flood cycle. This system will be maintained by the County when completed. SCHEDULE: The current scope of this project will be reviewed by the Los Angeles County and a new cost estimate will be developed. Scheduling will depend upon the results of this review. RELATIONSHIP TO GENERAL PLAN: This project is consistent with the Public Facilities Element of the General Plan by enhancing the delivery of a high level of public services as a means of maintaining or improving the City's urban environment and raising the quality of life for its residents. It is also consistent with the Mobility Element by providing drainage systems for new development. HISTORY: This project was created in FY 1993. litigation, the City was awarded a judgment, and the private funds were received in FY 2. 7.9