SOUTHERN CALIFORNIA TRACON BURBANK AREA STANDARD OPERATING PROCEDURES VIRTUAL AIR TRAFFIC SIMULATION NETWORK LOS ANGELES ARTCC

Similar documents
SOUTHERN CALIFORNIA TRACON LOS ANGELES AREA STANDARD OPERATING PROCEDURES VIRTUAL AIR TRAFFIC SIMULATION NETWORK LOS ANGELES ARTCC

SOUTHERN CALIFORNIA TRACON STANDARD OPERATING PROCEDURES VIRTUAL AIR TRAFFIC SIMULATION NETWORK LOS ANGELES ARTCC

VATSIM LOS ANGELES ARTCC STANDARD OPERATING PROCEDURES

Southern California TRACON and Lindbergh Tower LETTER OF AGREEMENT SUBJECT: INTER-FACILITY COORDINATION AND CONTROL PROCEDURES

SECTOR ROUTE/STAR INSTRUCTION NOTES

Southern California Terminal Radar Approach Control and Ontario Airport Traffic Control Tower

RALEIGH-DURHAM ATCT/TRACON STANDARD OPERATING PROCEDURES

LOS ANGELES TOWER STANDARD OPERATING PROCEDURES

VATUSA PHOENIX TRACON and VATUSA PHOENIX ATCT LETTER OF AGREEMENT. SUBJECT: Interfacility Coordination Procedures

Burlington ATCT Standard Operating Procedures

Providence ATCT Standard Operating Procedures

Greenville Spartanburg International

HOUSTON AIR ROUTE TRAFFIC CONTROL CENTER VATSIM United States Division. Letter of Agreement. Revised: July 25, 2004 Effective: July 25, 2004

ZTL ARTCC / CLT ATCT LETTER OF AGREEMENT. EFFECTIVE: July 10, SUBJECT: APPROACH CONTROL SERVICE

ERIE ATCT STANDARD OPERATING PROCEDURES

VATUSA C90 TRACON AND O HARE ATCT LETTER OF AGREEMENT

ZTL ARTCC. Asheville Regional. Air Traffic Control Tower. Standard Operating Procedures AVL B. Effective: May 1, 2011

RELEASE RECORD. Version Date Author Notes Dec 2006 SK Initial Release

Albany ATCT Standard Operating Procedures


VIRTUAL AIR TRAFFIC SIMULATION NETWORK UNITED STATES DIVISION. SUBJ: Phoenix (PHX) Air Traffic Control Tower (ATCT) Standard Operating Procedures

Version O January 21, 2019

FSBREAK $100 Hamburger Fly in to KSAN

Piedmont Triad International Airport

SID/STAR phraseology FAQ Canadian implementation April 27, 2017

Virtual Jacksonville Air Route Traffic Control Center Tallahassee ATCT Standard Operating Procedures

ATLANTA ARTC CENTER AND CHARLOTTE TOWER LETTER OF AGREEMENT

INTERNATIONAL VIRTUAL AVIATION ORGANISATION CANADIAN AIR TRAFFIC CONTROL PHRASEOLOGY ATC OPERATIONS DECEMBER 2016 BY: MATHIEU LAFLAMME

ZTL ARTCC. Augusta Regional

Cape Area Airports Standard Operating Procedures

- Updated formatting - Re-drawn airspace delegation diagram

Denver ARTCC Colorado Springs ATCT & TRACON STANDARD OPERATING PROCEDURES

PITTSBURGH ATCT STANDARD OPERATING PROCEDURES

Chapter 6. Nonradar. Section 1. General DISTANCE

VATSIM MINNEAPOLIS ARTCC MINNEAPOLIS TRACON LETTER OF AGREEMENT

#1 Semi Valley VFR and Air Carrier Transitions : The area over Semi Valley that is another hotspot is where the Fernando 5 Arrival to Burbank brings j

The IFR Burger. Here is the flight plan: FIM.V186.DEANO.V27.KWANG Cruise Altitude: 6000 ft. ZLA Tech Route: BURN39

LA Basin Hot Spots. Southern California Airspace Users Working Group Education Subcommittee

rearranged (on same page)

D01 TERMINAL RADAR APPROACH CONTROL

Stanfield VOR Procedures

JACKSONVILLE CENTER AND SAVANNAH TRACON. LETTER OF AGREEMENT EFFECTIVE: December 22, 2006

2. ROLES AND RESPONSIBILITIES.

Letter of Agreement by and between Jacksonville ARTCC and Miami ARTCC

BOSTON ARTCC (vzbw) STANDARD OPERATING PROCEDURE KALB) ALBANY APPROACH (ALB

Charlotte - Douglas International Airport Traffic Control Tower

Anchorage ARTCC Phraseology Guide. Clearance Delivery Operations

VATUSA Approval 3/21/18

FLIGHT STRIP MANAGEMENT - APPROACH LEVEL

Charlotte - Douglas International

SoCal Metroplex Study Area

9/23/2010 RDU B. Raleigh-Durham Air Traffic Control Tower. Standard Operating Procedures

VATUSA-VATNZ-VATPAC OCEANIC PARTNERSHIP OAKLAND OCEANIC FSS GENERAL SOP 1 OCT 2012

Pi Aero Instrument Rating Syllabus

Jax Navy Flying Club Course Rules

Optimization of Airspace and Procedures in the Metroplex

Approach (TMA) Air Traffic Control. An Introduction to Approach/Departure Control Airspace and Operating Positions... 2

VATUSA CHICAGO ARTCC AND C90 TRACON LETTER OF AGREEMENT

IFR SEPARATION WITHOUT RADAR

V.B. Compliance with Departure, En Route, and Arrival Procedures and Clearances

VIRTUAL AIR TRAFFIC SIMULATION NETWORK NORTH AMERICA REGION - USA DIVISION vzkc KANSAS CITY ARTCC

FEDERAL AVIATION ADMINISTRATION CENTRAL EN ROUTE AND OCEANIC AREA OPERATIONS FORT WORTH ARTC CENTER, MAJORS ATCT, AND SKYDIVE TANDEM GREENVILLE, LLC

Standard Operational Procedures

SFAR 93 and Minimum Altitudes

Federal Aviation Administration. Air Traffic 101. By: Michael Valencia & Dianna Johnston Date: Feb. 26, 2017

Standard Operating Procedures

This section sets forth all Los Angeles World Airports (LAWA) noise abatement procedures, restrictions, and regulations involving aircraft operations.

BOSTON ARTCC (vzbw) TRAINING SYLLABUS LEVEL: Center Controller (C1)

USE OF RADAR IN THE APPROACH CONTROL SERVICE


Northern Regional Training Scheme. EGBB Birmingham Airport Pilot s Guide. REVISION 1 (Monday, 30 January 2012)

Jacksonville ARTCC. F11 TRACON Standard Operating Procedures

Optimization of Airspace and Procedures in the Metroplex

San Juan CERAP. Standard Operation Procedures. Version 2.2 May 5th, Welcome to San Juan CERAP (ZSU ARTCC, TJZS FIR)

Instrument Proficiency Check Flight Record

CLEARANCE INSTRUCTION READ BACK

CHAPTER 5 SEPARATION METHODS AND MINIMA

Standard Operating Procedures Atlanta Intl Airport (ATL) Air Traffic Control

Northern Regional Training Scheme. EGNT Newcastle Aerodrome Pilot s Guide. REVISION 2 (Wednesday, 03 August 2011 at 15:51)

STANDARD OPERATING PROCEDURES (CLE SOP) December 3, 2016

ATMM. Air Traffic Management Manual. Air Traffic Management Manual VACC AUSTRIA LOVV ATMM Air Traffic Management Manual

VATUSA CHICAGO ARTCC AND VATUSA INDIANAPOLIS ARTCC LETTER OF AGREEMENT EFFECTIVE: 01/01/2017 SUBJECT: INTERFACILITY COORDINATION

SoCal Metroplex Study Area

1.2 An Approach Control Unit Shall Provide the following services: c) Alerting Service and assistance to organizations involved in SAR Actions;

APPENDIX B DRO INSTRUMENT APPROACH CHARTS & DEPARTURE PROCEDURES

What Does That Mean?

2 Purpose and Need. 2.1 The Need for the CLT OAPM Project Description of the Problem

CHICAGO TRACON (C90) O HARE INTERNATIONAL AIRPORT MIDWAY INTERNATIONAL AIRPORT SATELLITE AIRFIELDS STANDARD OPERATING PROCEDURES

Project Consultant (PC) Alternative 5 Runway 22R/L RNAV Departures

KSMO HIGH. Santa Monica Muni Airport Santa Monica, California, United States

Honeywell.com PBN Concepts Krakow, Poland

VATUSA CHICAGO ARTCC AND VATUSA INDIANAPOLIS ARTCC LETTER OF AGREEMENT EFFECTIVE: 10/15/2018 SUBJECT: INTERFACILITY COORDINATION

THE AREA CONTROL CENTRE (CTR) POSITION

Chapter 6. Airports Authority of India Manual of Air Traffic Services Part 1

Jax Navy Flying Club Course Rules

Click to edit Master title style

PORTUGAL DIRECÇÃO DE SEGURANÇA E DESEMPENHO OPERACIONAL AERONAUTICAL INFORMATION SERVICE APARTADO LISBOA CODEX

Ted Stevens Anchorage International Airport FAR Part 150 Study Update Glossary of Common Acoustic and Air Traffic Control Terms

An Update on Southern California Airspace Modernization November 10, 2016 Chart Publication Date San Diego International, McClellan Palomar, Brown

NAWS CHINA LAKE TRANSIENT PILOT BRIEF For Transient Arrivals & Departures To & From China Lake Naval Air Weapons Station Effective: 20 July 2016

Transcription:

SOUTHERN CALIFORNIA TRACON BURBANK AREA STANDARD OPERATING PROCEDURES VIRTUAL AIR TRAFFIC SIMULATION NETWORK LOS ANGELES ARTCC 1

Table of Contents SECTION 1. GENERAL 3 1-1. PURPOSE 3 1-2. SCOPE OF RESPONSIBILITIES 3 1-3. BURBANK SECTORS 3 SECTION 2. RADAR TEAM PROCEDURES 4 2-1. EXIT FIX PROCEDURES 4 2-2. INTERNAL FLOW CONTROL 4 SECTION 3. COORDINATION 5 3-1. BURBANK AREA PREARRANGED COORDINATION PROCEDURES (P-ACP) 5 3-2. BURBANK AREA SPECIFIC IFR AUTOMATED POINT OUTS 7 3-3. CLASS B CLEARANCE PROCEDURES FOR HOLLYWOOD PARK/COLISEUM ROUTES 7 3-4. CLASS B CLEARANCE PROCEDURES FOR COASTAL ROUTE 7 SECTION 4. MOORPARK SECTOR 8 4-1. SECTOR OPERATIONS 8 4-2. SECTOR SPECIFIC DUTIES AND RESPONSIBILITIES 8 4-3. COORDINATED HANDOFF PROCEDURES 9 SECTION 5. VALLEY SECTOR 11 5-1. SECTOR OPERATIONS 11 5-2. SECTOR SPECIFIC DUTIES AND RESPONSIBILITIES 11 5-3. COORDINATED HANDOFF PROCEDURES 12 SECTION 6. WOODLAND SECTOR 14 6-1. SECTOR OPERATIONS 14 6-2. SECTOR SPECIFIC DUTIES AND RESPONSIBILITIES 14 6-3. COORDINATED HANDOFF PROCEDURES 14 SECTION 7. BURBANK AREA MAPS 15 7-1 MOORPARK SECTOR 15 7-2. VALLEY SECTOR 19 7-3. WOODLAND SECTOR 23 7-4. BURBANK AREA COMBINED 27 7-5. GORMAN AND VALLEY GATES 30 2

SECTION 1. GENERAL 1-1. PURPOSE This chapter establishes the standard operating procedures for the Burbank specialty and prescribes the operational procedures unique to the Burbank area. Controllers staffing the Burbank area must be familiar with and adhere to the information and procedures described in this Chapter to provide a safe, orderly, and efficient flow of air traffic in Southern California TRACON and Burbank area airspace. 1-2. SCOPE OF RESPONSIBILITIES The Burbank specialty is responsible for arrivals, departures, and overflights in and through the Southern California TRACON Burbank area. 1-3. BURBANK SECTORS a. The following sectors make up the Burbank specialty: 1. Moorpark 3

2-1. EXIT FIX PROCEDURES SECTION 2. RADAR TEAM PROCEDURES The following procedures are common to the Burbank area. They must be referred to as GMN/OROSZ or PMD/SLAPP Exit Fix Procedure. a. GMN/OROSZ: All aircraft must be vectored toward GMN/, direct OROSZ, or if west of V23, instructed to join the airway or departure SID prior to V386. b. PMD/SLAPP: 1. Requesting 13,000 MSL and below: Vector over or west of LANGE/CCHUM intersection to intercept PMD218R or SID. P/Q class aircraft must be at or climbing to the requested altitude. 2. Requesting above 13,000 MSL: J class aircraft vector over or west of LANGE/CCHUM intersection. M/P/Q aircraft vector over or west of LANGE to intercept PMD218R/V518 or SID, climb to 13,000 MSL. 2-2. INTERNAL FLOW CONTROL Except for J class aircraft routed via GMN/OROSZ, the departure sector must provide a minimum flow of eight (8) miles-in-trail or the posted flow, whichever is greater, to the enroute sector for aircraft that will enter Los Angeles Center s airspace. This would apply to like-type aircraft routed over the same fix. 4

SECTION 3. COORDINATION 3-1. BURBANK AREA PREARRANGED COORDINATION PROCEDURES (P-ACP) The procedures listed below constitute prearranged coordination for the Burbank area. In addition to the conditions listed below, all conditions listed in section 1-3 of the SCT General SOP must be met. Failure to comply with all requirements must invalidate the procedures and require that appropriate verbal coordination be completed in accordance with FAA Order 7110.65. a. P-ACP BETWEEN MOORPARK AND WOODLAND SECTORS 1. Moorpark radar may enter P-ACP airspace with IFR arrivals on the VNY RWY 16 final approach course and IFR aircraft departing runway 34 northbound. 2. Moorpark radar must be responsible for maintaining approved separation between aircraft under their control and all traffic in the P-ACP airspace. 5

b. P-ACP BETWEEN VALLEY AND WOODLAND SECTORS 1. Valley radar may enter P-ACP airspace with departures from BUR and VNY airports. 2. Valley radar must be responsible for maintaining approved separation between aircraft under their control and all traffic in the P-ACP airspace. 6

3-2. BURBANK AREA SPECIFIC IFR AUTOMATED POINT OUTS Use of the automated point out function is authorized for the IFR operations described below. a. Moorpark Sector is authorized to use the automated point out function for point outs to the Zuma Sector on aircraft routed through the Gorman gate. Acceptance of the automated point out by the Zuma Sector authorizes Moorpark to climb through Zuma airspace with aircraft that transition northbound through the Gorman gate. 3-3. CLASS B CLEARANCE PROCEDURES FOR HOLLYWOOD PARK/COLISEUM ROUTES a. The Burbank area must: 1. Issue Hollywood Park Route Class B clearances. 2. Issue Coliseum Route Class B clearances. 3. Ensure southbound aircraft on the Hollywood Park or Coliseum Route enter Del Rey area airspace level at an assigned altitude of 9,500 MSL. In the event of an overtake 9,000 MSL may be assigned. 3-4. CLASS B CLEARANCE PROCEDURES FOR COASTAL ROUTE a. The Burbank area must: 1. Issue Coastal Route clearances either via the route as published or on a vector to join the LAX323R north of the Santa Monica Pier. 2. Ensure southbound aircraft on a Coastal Route clearance enter Manhattan airspace level at an assigned altitude of 5,500 MSL. b. Manhattan must handoff northbound aircraft exiting the Coastal Route to Moorpark at or below 6,500 MSL. Moorpark has control north of the shoreline and must remain clear of Malibu airspace. 7

SECTION 4. MOORPARK SECTOR 4-1. SECTOR OPERATIONS Moorpark is a combined arrival/departure/enroute sector responsible for: a. Departure service for aircraft departing Burbank and Del Rey area airspace routed via GMN/OROSZ, FIM, and LHS. b. VNY RWY 16 arrivals and RWY 34 departures. c. Services at WHP d. Feeding BUR arrivals to RWY 08/26/33 to the Woodland sector e. Class C services for the portion of the BUR class C airspace delegated to the Moorpark sector. 4-2. SECTOR SPECIFIC DUTIES AND RESPONSIBILITIES a. Arrivals 1. Moorpark is the approach sequencing authority to Burbank Airport for all IFR aircraft landing RWY 15. 2. Moorpark is the approach sequencing authority for all Van Nuys airport RWY 16 IFR arrivals. 3. Moorpark is the approach sequencing authority for all Whiteman arrivals. 4. Moorpark must obtain an intersection sequence from Woodland for J and M aircraft landing RWY 15, unable to hold short of RWY 8. 8

4-3. COORDINATED HANDOFF PROCEDURES a. To the Moorpark Sector from: SECTOR TYPE DEST/RTE ALT HDG/INFO MALIBU LAX W J GMN SID or V23 A/C80 RV 360-020 through the Gorman Gate to join the route LADYJ/TOPMM SID via GMN/OROSZ On the SID or direct LADYJ/OROSZ to resume the SID M GMN SID or V23 A70 RV340-020 through the Gorman Gate to join V23 JCF JMPQ LNDG BUR/VNY A80 On appropriate STAR. WDLR control at JANNY. ZLA 13 JM LNDG BUR/VNY/WHP/SMO D110 FERN arrival or equiv preferential route PQ A90 VALLEY JM BUR RWY 8/15 Depts to GMN/OROSZ A/C130 RV twds GMN/OROSZ 9

b. From the Moorpark Sector to: SECTOR TYPE DEST/RTE ALT HDG/INFO ZLA 4 J Via GMN/OROSZ A/C130/ 230 On or joining the appropriate DP/route or direct GMN/OROSZ clear of Sector 13 airspace and at least 5 miles west of V459 centerline. WOODLAND JMPQ Lndg VNY A/D70 On appropriate routing LNDG VNY After FIM direct TOAKS, ILS RWY 8, or appropriate arrival or on the route. VALLEY BUR RWY 33 JM BUR RWY 26/33 dept to PMD/SLAPP A/C130 RV over or west of LANGE VALLEY VNY RWY 34 JM Via HAYEZ Dept A/C130 On the route 10

SECTION 5. VALLEY SECTOR 5-1. SECTOR OPERATIONS Valley is a combination arrival/departure/enroute sector responsible for: a. Departures from Burbank RWY 08/15 south through southwest. b. Departures from VNY RWY 16 eastbound. c. Providing Class C in the portion of the BUR Class C airspace delegated to Valley. d. Traffic routed via V186. e. Arrivals to Los Angeles area airspace. f. Arrival sequence to BUR RWY 26. g. Arrival sequence to SMO. h. SMO RWY 03 CHOII/SMO SID departures. i. BUR/VNY/WHP departures to PMD/SLAPP. j. When LAX is East: 1. LAX Departures routed over GMN and GARDY. 2. Empire Area departures routed over GMN, EHF, LHS, DAG, and AVE. 5-2. SECTOR SPECIFIC DUTIES AND RESPONSIBILITIES a. Arrivals 1. San Gabriel Valley Airport (EMT) VOR/DME-B Approach. a. Obtain approval from Empire prior to issuing an approach clearance. b. After receipt of approval make a point out to Stadium sector. c. Hand off to Pomona prior to leaving Valley s airspace. d. Terminate radar service and transfer communications to EMT Tower or to Empire area when EMT Tower is closed prior to reaching IMEFY/35 DME fix. 2. SMO VOR-A RWY 21 and RNAV (GPS) RWY 21 approaches. 11

5-3. COORDINATED HANDOFF PROCEDURES a. To the Valley Sector from: SECTOR TYPE DEST/RTE ALT HDG/INFO MALIBU LAX W M SKWRL SID C70 On SID at or prior to NTSHA MALIBU LAX E J GARDY DP Climb via E130 On the route or direct TRAPP to resume GMN DP A/C130 RV320 west of V459 WNNDY DP POMONA JM LNDG BUR, SMO, VNY via THRNE STAR Climb via E130 Descend via On the route or direct JRGSN to resume On the STAR or direct VNY (BUR, VNY) or DARTS (SMO) POMONA LAX E J Via SNSHN/POM DP C90 On the route. Moorpark control at POM. JCF JMPQ Via V518..V459 DARTS or KIMMO arrival ZLA 4 JMPQ Via V459.DARTS/KIMMO/WAYVE STAR A80 A110 On the route On the route MOORPAR K BUR RWY 33 JM BUR RWY 26/33 dept to PMD/SLAPP A/C130 RV over or west of LANGE MOORPAR K VNY RWY 34 JM Via HAYEZ Dept A/C130 On the route 12

b. From the Valley Sector to: SECTOR TYPE DEST/RTE ALT HDG/INFO STADIUM LAX W JMPQ Enroutes LNDG LAX from the vicinity of DARTS A/D 70 RV140 Vcnty DARTS at 210kts. Stadium ctrl for descend to cross DARTS at or above 060. At DARTS Stadium ctrl for vectors southbound toward the SMO FAC and descent to 040. ZLA 4 J Via PMD/SLAPP A/C130 On the route ZLA 4 LAX E JM Via GMN/WNNDY A/C130 GMN DP DRCT GMN, WNNDY on route J Via GARDY A/C130 On the GARDY/SNSHN DP. ZLA has control. J Via SNSHN SID A/C130 MOORPARK JM BUR RWY 8/15 Depts to GMN/OROSZ A/C130 RV twds GMN/OROSZ 13

SECTION 6. WOODLAND SECTOR 6-1. SECTOR OPERATIONS Woodland is a combination departure/arrival/enroute sector responsible for: a. Sequencing arrivals to BUR RWYs 08/33, BUR RWY 8/15 intersection, and VNY RWY 34. b. VNY departures, except those departing VNY RWY 16 over PMD/SLAPP and eastbound. 6-2. SECTOR SPECIFIC DUTIES AND RESPONSIBILITIES a. Arrivals. 1. Woodland is the approach sequencing authority for Burbank RWY 8/33. 2. Woodland is the approach sequencing authority for Burbank RWY 8/15 intersection. 3. Woodland is the approach sequencing authority for Van Nuys RWY 34. 4. BUR RWY 8: Visual approaches and VFR aircraft inbound over the VNY Class D surface area must be issued a restriction to Cross VNY at 3,000. Aircraft at or below 3,500 MSL or lower over VNY do not require a point out to Valley. 6-3. COORDINATED HANDOFF PROCEDURES a. To the Woodland Sector from: SECTOR TYPE DEST/RTE ALT HDG/INFO MOORPAR K JMPQ Lndg VNY A/D70 On appropriate routing LNDG VNY After FIM direct TOAKS, ILS RWY 8, or appropriate arrival or on the route. 14

SECTION 7. BURBANK AREA MAPS 7-1 MOORPARK SECTOR a. MOORPARK SECTOR - LAX WEST, BUR 8/15 15

b. MOORPARK SECTOR - LAX EAST, BUR 8/15 16

c. MOORPARK SECTOR - LAX WEST, BUR 26/33 17

d. MOORPARK SECTOR - LAX EAST, BUR 26/33 18

7-2. VALLEY SECTOR a. VALLEY SECTOR - LAX WEST, BUR 8/15 19

b. VALLEY SECTOR - LAX EAST, BUR 8/15 20

c. VALLEY SECTOR - LAX WEST, BUR 26/33 21

d. VALLEY SECTOR - LAX EAST, BUR 26/33 22

7-3. WOODLAND SECTOR a. WOODLAND SECTOR - LAX WEST, BUR 8/15 23

b. WOODLAND SECTOR - LAX EAST, BUR 8/15 24

c. WOODLAND SECTOR - LAX WEST, BUR 26/33 25

d. WOODLAND SECTOR - LAX EAST, BUR 26/33 26

7-4. BURBANK AREA COMBINED a. BURBANK AREA - LAX WEST 27

b. BURBANK AREA - LAX EAST 28

c. BURBANK AREA - LAX OVER OCEAN 29

7-5. GORMAN AND VALLEY GATES 30