UNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

Similar documents
UNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. UNCLASSIFIED United States Special Operations Command Page 1 of 6 P-1 Line #53

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 17 P-1 Line #13

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 5 P-1 Line #21

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 P-1 Line #35

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 18 P-1 Line #12

UNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. FY 2016 Base FY 2016 OCO FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. FY 2014 Base. OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 P-1 Line #55

UNCLASSIFIED FY 2016 OCO. FY 2016 Base. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 17 P-1 Line #121

UNCLASSIFIED FY 2015 FY 2015 OCO. FY 2015 Base FY 2015 FY Base

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 31 P-1 Line #41

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 31 P-1 Line #2

UNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Total Cost ($ M)

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 33 P-1 Line #94

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 21 P-1 Line #19

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. FY 2016 Base FY 2016 OCO FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 24 P-1 Line #55

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 10 P-1 Line #47

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 16 P-1 Line #57

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 23 P-1 Line #27

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 27 P-1 Line #2

UNCLASSIFIED. FY 2017 Base FY 2017 OCO. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 17 P-1 Line #55

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 16 P-1 Line #15

UNCLASSIFIED. FY 2017 Base FY 2017 OCO. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 18 P-1 Line #56

UNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Unit Cost ($ M) Qty (Each)

UNCLASSIFIED. FY 2016 Base FY 2016 OCO FY 2016 OCO. FY 2016 Base

January 2018 Air Traffic Activity Summary

UNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Total Cost ($ M) Unit Cost ($) Qty (Each)

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. FY 2014 Base. OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED FY 2015 FY 2015 OCO. FY 2015 Base FY 2015 FY Base

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 34 P-1 Line #51

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 151 P-1 Line #32

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 30 P-1 Line #36

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit)

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 16 P-1 Line #15

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Communication, Navigation, Surveillance/Air Traffic Management (CNS/ATM) FY 2012 OCO

UNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 15 P-1 Line #6

UNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Total Cost ($ M) Unit Cost ($) Qty (Each)

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 16 P-1 Line #15

With the completion of this project, we would like to follow-up on the projections as well as highlight a few other items:

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 126 P-1 Line #32

MOBILE DISTRICT 2018 DREDGING PROGRAM

U.S. Army Corps of Engineers Wilmington District

UNCLASSIFIED. UNCLASSIFIED Page 1 of 5. EXHIBIT R-2, RDT&E Budget Item Justification RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-5

D_HO_V ER1 GL_ P03 GL_6030

Greater Orlando Aviation Authority Board Meeting. Wednesday, January 17, 2018

LOUIS ARMSTRONG NEW ORLEANS INTERNATIONAL AIRPORT For the Period Ending September 30, Enplaned Passengers by Airline

Weekly Performance Update

Tallulah Gorge State Park Business Plan. Table of Contents

Weekly Performance Update

_VER1 CC_ PC_5000 FA_21500 C </CELL ><CELL> HO_ADJ 2015.P02 GL_6290 _VER1 GL_6010 PC_5000 FA_21500 C

Weekly Performance Update

Grain Monitoring Program

Norfolk District North Atlantic Division

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE A: AIRCRAFT CERTIFICATION FY 2012 OCO

Naples, Marco Island, Everglades Convention and Visitors Bureau March 2018 Visitor Profile

UNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

SYSTEM BRIEF DAILY SUMMARY

Naples, Marco Island, Everglades Convention and Visitors Bureau August 2018 Visitor Profile

LOUIS ARMSTRONG NEW ORLEANS INTERNATIONAL AIRPORT For the Period Ending August 31, Enplaned Passengers by Airline

Exhibit 2. Preconstruction Jan Jun-19

Naples, Marco Island, Everglades Convention and Visitors Bureau October 2018 Visitor Profile

SAN FRANCISCO DISTRICT FY 2018 NAVIGATION PROGRAM

I 3-Feb-16 ALLENTOWN PA LEHIGH VALLEY INTL I 10-Sep-06 CEDAR RAPIDS IA THE EASTERN IOWA I 14-Oct-07

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

Report for Jan-Nov-2006 pdf. General Statistics

Campus Construction Program Report WLAC Monthly Facilities Committee Meeting November 16, 2015

I T N E T R E N R A N T A I T ON O AL A L A R A R R I R VA V L A S L S A N A D N D D E D PA

JANUARY 2017 BOARD INFORMATION PACKAGE

Norfolk District North Atlantic Division

JANUARY 2018 BOARD INFORMATION PACKAGE

Naples, Marco Island, Everglades Convention and Visitors Bureau February 2017 Visitor Profile

Naples, Marco Island, Everglades Convention and Visitors Bureau June 2018 Visitor Profile

Naples, Marco Island, Everglades Convention and Visitors Bureau December 2017 Visitor Profile

Naples, Marco Island, Everglades Convention and Visitors Bureau January 2018 Visitor Profile

APRIL 2016 BOARD INFORMATION PACKAGE

SEPTEMBER 2015 BOARD INFORMATION PACKAGE

April 2012 Visitor Profile

A DIALOGUE WITH THE NORTHERN VIRGINIA DISTRICT. Nicholas J. Roper, P.E. Northern Virginia District Project Development Engineer

March 2012 Visitor Profile

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 7 P-1 Line #5

The Corps of Engineers Dredges on the West Coast

Transcription:

Exhibit P-40, Budget Item Justification Sheet: PB 2014 Navy : April 2013 Ammo, MC / BSA 1: Marine Corps Ammunition ID Code (A=Service Ready, B=Not Service Ready) : A Program Elements for Code B : Other Related Program Elements: MDAP/MAIS Code(s): Resource Summary Prior FY 2014 Years FY 2012 FY 2013 # Base FY 2014 FY 2014 OCO ## FY 2015 FY 2016 FY 2017 FY 2018 To Complete Procurement Quantity (Units in Each) - - - - - - - - - - - - Gross/Weapon System ($ in Millions) 27.264 10.920-3.349-3.349 1.620 3.350 3.350 3.350-53.203 Less PY Advance Procurement ($ in Millions) - - - - - - - - - - - - Net Procurement (P1) ($ in Millions) 27.264 10.920-3.349-3.349 1.620 3.350 3.350 3.350-53.203 Plus CY Advance Procurement ($ in Millions) - - - - - - - - - - - - Obligation Authority ($ in Millions) 27.264 10.920-3.349-3.349 1.620 3.350 3.350 3.350-53.203 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway (Units in Dollars) - - - - - - - - - - - - Gross/Weapon System (Units in Dollars) - - - - - - - - - - - - # FY 2013 Program is from the FY 2013 President's Budget, submitted February 2012 ## The FY 2014 OCO Request will be submitted at a later date Description: The family of 60mm mortar cartridges is designed to be fired from the M224 lightweight company mortar system. The family consists of high explosive, smoke, illumination, and training rounds. The 60mm family of cartridges is used to provide close-in indirect fire support of ground troops at ranges of approximately 70 to 3,500 meters. Item Nomenclature* Item Schedule Prior Years FY 2012 FY 2013 FY 2014 Base FY 2014 OCO FY 2014 Exhibits ID CD LI Navy Page 1 of 8 P-1 Line #18 P40A, P5A 27.264 10.920-3.349-3.349 Gross/Weapon System 27.264 10.920-3.349-3.349 *Item Nomenclature represents Item Number, DODIC, and Item Name for the P40A and P5; Name for the P18 and P23; Modification Number and Modification Title for the P3A; Item Number and Item Name for the P10. Note: s in this Exhibit P-40 set may not be exact or add due to rounding. Justification: FY 2012 Base Appropriation Request: $0.937M procured the Cartridge, 60mm High Explosive with Multi-option Fuze for the training and combat requirement that has been identified in the Munitions Requirement (TMR). FY 2012 Overseas Contingency Operations (OCO) Request $9.983M:

Exhibit P-40, Budget Item Justification Sheet: PB 2014 Navy : April 2013 Ammo, MC / BSA 1: Marine Corps Ammunition ID Code (A=Service Ready, B=Not Service Ready) : A Program Elements for Code B : Other Related Program Elements: MDAP/MAIS Code(s): $3.995M procured the Cartridge, 60mm High Explosive with Point Detonating (PD) Fuze and $5.988M procured the Cartridge, 60mm High Explosive with Multi-option Fuze for replenishment of munitions that have been expended by Marine forces during preparation, rehearsals and combat engagements utilizing established tactics, techniques and procedures. FY 2013 Base Appropriation Request: N/A FY 2013 Overseas Contingency Operations (OCO) Request: N/A FY 2014 Base Appropriation Request: $3.349M will procure the Cartridge, 60mm Full Range Practice for the training and combat requirement that has been identified in the Munitions Requirement (TMR). LI Navy Page 2 of 8 P-1 Line #18

Exhibit P-40A, Budget Item Justification For Aggregated : PB 2014 Navy : April 2013 ( indicates the presence of a P-5A) 1) B643, CTG, 60MM HE 1.1) B643 LOAD, ASSEMBLE, AND PACK (LAP) 1.2) B643 SHELL BODY, 60MM HE ID CD MDAP/ MAIS Code LI Navy Page 3 of 8 P-1 Line #18 All Prior Years FY 2012 FY 2013 FY 2014 Base FY 2014 OCO FY 2014 A 53.95 67,250 3.628 55.89 14,229 0.795 - - - - - - - - - - - - A 33.01 91,276 3.013 41.23 14,797 0.610 - - - - - - - - - - - - 1.3) B643 M935 FUZE A 55.00 90,382 4.971 50.88 14,656 0.746 - - - - - - - - - - - - 1.4) B643 M702 IGNITION CARTRIDGE 1.5) B643 CHARGE, PROPELLING 60MM M204 1.6) B643 FIN ASSEMBLY M27 1.7) B643 COMP A-5 CLASS I 1.8) B643 COMP B TYPE I GRADE A 1.9) B643 PRODUCTION ENGINEERING 1.10) B643 QUALITY ASSURANCE 1.11) B643 ACCEPTANCE TESTING 1.12) B643 GOVERNMENT FURNISHED MATERIAL 1.13) B643 PC&H FOR EXPLOSIVES Subtotal 1) B643, CTG, 60MM HE 2) BA16, CARTRIDGE, 60MM WITH MOF 2.1) BA16 LOAD, ASSEMBLE, AND PACK (LAP) 2.2) BA16 FUZE, MULTI-OPTION M734A1 2.3) BA16 SHELL BODY (HF1) 60MM A 17.28 91,281 1.577 15.01 14,797 0.222 - - - - - - - - - - - - A 11.00 365,091 4.016 8.82 59,191 0.522 - - - - - - - - - - - - A 6.50 91,231 0.593 8.95 14,797 0.132 - - - - - - - - - - - - A 4.01 2,744 0.011 3.12 427 0.001 - - - - - - - - - - - - A 2.54 149,213 0.379 19.93 24,188 0.482 - - - - - - - - - - - - - - 2.489 - - 0.888 - - - - - - - - - - - - - - 0.019 - - - - - - - - - - - - - - - - - 1.768 - - 0.088 - - - - - - - - - - - - A - - -0.390 - - -0.491 - - - - - - - - - - - - A - - 0.035 - - - - - - - - - - - - - - - 22.109 3.995 - - - - A 49.24 18,928 0.932 61.24 15,430 0.945 - - - - - - - - - - - - A - - - 213.06 16,047 3.419 - - - - - - - - - - - - A 38.45 19,688 0.757 41.63 16,047 0.668 - - - - - - - - - - - -

Exhibit P-40A, Budget Item Justification For Aggregated : PB 2014 Navy : April 2013 ( indicates the presence of a P-5A) 2.4) BA16 M702 IGNITION CARTRIDGE 2.5) BA16 PROPELLANT CHARGE M235 2.6) BA16 FIN ASSEMBLY M27 2.7) BA16 PRODUCTION ENGINEERING 2.8) BA16 QUALITY ASSURANCE 2.9) BA16 ACCEPTANCE TESTING 2.10) BA16 EPA - COST OF MATERIALS 2.11) BA16 FIRST ARTICLE TESTING Subtotal 2) BA16, CARTRIDGE, 60MM WITH MOF 3) BA15, CARTRIDGE, 60MM FULL RANGE PRACTICE 3.1) BA15 LOAD, ASSEMBLE AND PACK (LAP) 3.2) BA15 FUZE PRACTICE M775 3.3) BA15 SHELL BODY 60MM FRPC 3.4) BA15 M702 IGNITION CARTRIDGE 3.5) BA15 PROPELLANT CHARGE M235 3.6) BA15 FIN ASSEMBLY M27 3.7) BA15 PRODUCTION ENGINEERING 3.8) BA15 QUALITY ASSURANCE ID CD MDAP/ MAIS Code All Prior Years FY 2012 FY 2013 FY 2014 Base FY 2014 OCO FY 2014 A 19.31 19,679 0.380 14.51 16,047 0.233 - - - - - - - - - - - - A 7.59 78,788 0.598 7.71 64,189 0.495 - - - - - - - - - - - - A 7.21 19,695 0.142 6.80 16,047 0.109 - - - - - - - - - - - - - - - - - 0.937 - - - - - - - - - - - - - - 0.006 - - - - - - - - - - - - - - - - - 1.041 - - 0.119 - - - - - - - - - - - - A - - 0.052 - - - - - - - - - - - - - - - - - 0.014 - - - - - - - - - - - - - - - 3.922 6.925 - - - - A - - - - - - - - - 16.94 19,625 0.332 - - - 16.94 19,625 0.332 A - - - - - - - - - 23.78 20,214 0.481 - - - 23.78 20,214 0.481 A - - - - - - - - - 37.48 20,214 0.758 - - - 37.48 20,214 0.758 A - - - - - - - - - 16.10 20,214 0.325 - - - 16.10 20,214 0.325 A - - - - - - - - - 9.58 81,640 0.782 - - - 9.58 81,640 0.782 A - - - - - - - - - 9.61 20,214 0.194 - - - 9.61 20,214 0.194 - - 0.988 - - - - - - - - 0.336 - - - - - 0.336 - - 0.025 - - - - - - - - 0.002 - - - - - 0.002 LI Navy Page 4 of 8 P-1 Line #18

Exhibit P-40A, Budget Item Justification For Aggregated : PB 2014 Navy : April 2013 ( indicates the presence of a P-5A) 3.9) BA15 ACCEPTANCE TESTING Subtotal 3) BA15, CARTRIDGE, 60MM FULL RANGE PRACTICE ID CD MDAP/ MAIS Code All Prior Years FY 2012 FY 2013 FY 2014 Base FY 2014 OCO FY 2014 - - 0.220 - - - - - - - - 0.139 - - - - - 0.139 1.233 - - 3.349-3.349 27.264 10.920-3.349-3.349 LI Navy Page 5 of 8 P-1 Line #18

Exhibit P-5A, Budget Procurement History and Planning: PB 2014 Navy : April 2013 1) B643, CTG, 60MM HE 1.1) B643 LOAD, ASSEMBLE, AND PACK (LAP) 2011 1.1) B643 LOAD, ASSEMBLE, AND PACK (LAP) 2011 O C O FY Contractor and Location AMERICAN ORDNANCE / MILAN, TN CANADIAN COMMERCIAL CORPORATION / OTTAWA, CANADA Method/Type, or Funding Vehicle SS / FFP SS / FFP 1.1) B643 LOAD, ASSEMBLE, AND PACK (LAP) 2012 UNKNOWN / UNKNOWN SS / FFP 1.2) B643 SHELL BODY, 60MM HE 2011 1.2) B643 SHELL BODY, 60MM HE 2011 MEDICO INDUSTRIES / WILKES-BARRE, PA MEDICO INDUSTRIES / WILKES-BARRE, PA 1.2) B643 SHELL BODY, 60MM HE 2012 UNKNOWN / UNKNOWN 1.3) B643 M935 FUZE 1.4) B643 M702 IGNITION CARTRIDGE 2011 1.4) B643 M702 IGNITION CARTRIDGE 2011 2012 UNKNOWN / UNKNOWN POCAL INDUSTRIES / SCRANTON, PA POCAL INDUSTRIES / SCRANTON, PA 1.4) B643 M702 IGNITION CARTRIDGE 2012 UNKNOWN / UNKNOWN C / IDIQ 1.5) B643 CHARGE, PROPELLING 60MM M204 2011 1.5) B643 CHARGE, PROPELLING 60MM M204 2011 AMERICAN ORDNANCE / MILAN, TN AMERICAN ORDNANCE / MILAN, TN 1.5) B643 CHARGE, PROPELLING 60MM M204 2012 UNKNOWN / UNKNOWN C / IDIQ Location of PCO Award of First Delivery Specs Now? Sep 2011 Jul 2013 49,440 53.94 Y Sep 2011 Jul 2013 17,810 53.94 Y Jun 2013 Jun 2015 14,229 55.89 Y Sep 2011 Sep 2012 58,952 33.01 Y Sep 2011 Sep 2012 32,324 33.01 Y Jun 2013 Dec 2014 14,797 41.23 Y Jun 2013 Jan 2015 14,656 50.88 Y Nov 2012 May 2013 58,941 17.00 Y Nov 2012 May 2013 32,340 17.78 Y Jun 2013 Dec 2014 14,797 15.01 Y Jan 2011 Sep 2012 235,727 11.00 Y Jan 2011 Sep 2012 129,364 11.00 Y Jun 2013 Dec 2014 59,191 8.82 Y Revsn RFP Issue LI Navy Page 6 of 8 P-1 Line #18

Exhibit P-5A, Budget Procurement History and Planning: PB 2014 Navy : April 2013 1.6) B643 FIN ASSEMBLY M27 1.7) B643 COMP A-5 CLASS I O C O FY Contractor and Location Method/Type, or Funding Vehicle 2012 UNKNOWN / UNKNOWN C / IDIQ 2012 1.8) B643 COMP B TYPE I GRADE A 2012 2) BA16, CARTRIDGE, 60MM WITH MOF GOVERNMENT FURNISHED MATERIAL / N/A GOVERNMENT FURNISHED MATERIAL / N/A MIPR MIPR 2.1) BA16 LOAD, ASSEMBLE, AND PACK (LAP) 2012 UNKNOWN / UNKNOWN C / IDIQ 2.2) BA16 FUZE, MULTI-OPTION M734A1 2012 2.3) BA16 SHELL BODY (HF1) 60MM 2012 2.4) BA16 M702 IGNITION CARTRIDGE 2011 L-3 FUZING & ORDNANCE SYSTEMS INC / CINCINATTI, OH MEDICO INDUSTRIES / WILKES-BARRE, PA POCAL INDUSTRIES 1 / SCRANTON, PA C / IDIQ 2.4) BA16 M702 IGNITION CARTRIDGE 2012 UNKNOWN / UNKNOWN C / IDIQ 2.5) BA16 PROPELLANT CHARGE M235 2011 AMERICAN ORDNANCE / MILAN, TN 2.5) BA16 PROPELLANT CHARGE M235 2012 UNKNOWN / UNKNOWN C / IDIQ 2.6) BA16 FIN ASSEMBLY M27 2.6) BA16 FIN ASSEMBLY M27 3) BA15, CARTRIDGE, 60MM FULL RANGE PRACTICE 2011 Flexible Concepts / Elkhart, IN 2012 GAYSTON CORP / SPRINGSBORO, OH C / IDIQ Location of PCO Award of First Delivery Specs Now? Jun 2013 Dec 2014 14,797 8.95 Y Jun 2013 Jun 2013 427 3.12 Y Jun 2013 Jun 2013 24,188 19.93 Y Mar 2013 Mar 2015 15,430 61.24 Y Mar 2012 Nov 2013 16,047 213.06 Y Sep 2012 Mar 2013 16,047 41.63 Y Nov 2012 May 2013 19,679 19.31 Y Mar 2013 Sep 2014 16,047 14.51 Y Sep 2011 Mar 2012 78,788 7.59 Y Mar 2013 Sep 2014 64,189 7.71 Y Sep 2011 Mar 2012 15,118 7.21 Y Jul 2012 Jan 2013 16,047 6.80 Y Revsn RFP Issue LI Navy Page 7 of 8 P-1 Line #18

Exhibit P-5A, Budget Procurement History and Planning: PB 2014 Navy : April 2013 O C O FY Contractor and Location Method/Type, or Funding Vehicle 3.1) BA15 LOAD, ASSEMBLE AND PACK (LAP) 2014 UNKNOWN / UNKNOWN C / IDIQ 3.2) BA15 FUZE PRACTICE M775 2014 UNKNOWN / UNKNOWN C / TBD 3.3) BA15 SHELL BODY 60MM FRPC 2014 UNKNOWN / UNKNOWN 3.4) BA15 M702 IGNITION CARTRIDGE 2014 UNKNOWN / UNKNOWN C / IDIQ 3.5) BA15 PROPELLANT CHARGE M235 2014 UNKNOWN / UNKNOWN 3.6) BA15 FIN ASSEMBLY M27 2014 UNKNOWN / UNKNOWN C / IDIQ Location of PCO Award of First Delivery Specs Now? Mar 2014 Mar 2016 19,625 16.94 Y Mar 2014 Jun 2015 20,214 23.78 Y Mar 2014 Jun 2015 20,214 37.48 Y Dec 2013 Jun 2015 20,214 16.10 Y Mar 2014 Jun 2015 81,640 9.58 Y Dec 2013 Jun 2015 20,214 9.61 Y Revsn RFP Issue LI Navy Page 8 of 8 P-1 Line #18