Connecting the Barcelona tramway network

Similar documents
new social approach for prioritising transport corridors in the metropolitan area of Barcelona (Spain)

16 Eurocruise Barcelona

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts

SCOPING INFORMATION PACKET

Sustainable transportation in Budapest

1. Case Study Area and Character Sections

Passeig Taulat 278, Barcelona 1 - Forum Front door 7:30, 8:00, 8:30

Community Advisory Panel Meeting #

The Metropolitan Mobility Observatory of Spain

PLAN MAESTRO DE TRANSPORTE SOSTENIBLE EN GUATEMALA

Slow Down! Reducing Downtown Bloomington s Progression Speed

Urban mobility planning and tourist flows in the city of Rome

From rail timetables to regional and urban indicators on rail passenger services

NICOSIA - CYPRUS TRANSFORMATION TO A SMART, ATTRACTIVE, PEOPLE- FOCUSED CITY

CITY OF BELGRADE BELGRADE LAND DEVELOPMENT PUBLIC AGENCY

KING STREET PILOT STUDY PUBLIC MEETING

Intermodal passenger transport in Spanish high-speed rail stations. Jaro, Lorenzo. Folgueira, César. ADIF Alta VelocidadI 1

Memorandum. Roger Millar, Secretary of Transportation. Date: April 5, Interstate 90 Operations and Mercer Island Mobility

SR 934 Project Development And Environment (PD&E) Study

FINCH HYDRO CORRIDOR TRAIL PROJECT

South Bay Metro Green Line Extension

Interstate 90 and Mercer Island Mobility Study APRIL Commissioned by. Prepared by

Memorandum. Fund Allocation Fund Programming Policy/Legislation Plan/Study Capital Project Oversight/Delivery Budget/Finance Contract/Agreement Other:

Atlas of a regional transportation network: Oregon Metro's Mobility Corridor Atlas

APPENDIX H MILESTONE 2 TRAFFIC OPERATIONS ANALYSIS OF THE AT-GRADE CROSSINGS

Transportation Demand Management Plan for the Proposed Hampton Inn & Suites in San Mateo, California

ONONDAGA CREEKWALK PHASE II. Public Information Meeting Series 1

TRANSPORTATION ELEMENT

URBAN REGENERATION CENTRED AROUND PUBLIC TRANSPORT

PURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40

Treasure Island Supplemental Information Report Addendum

Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street

Parque Bicentenario Av. Amazonas & Av. de la Prensa, Quito, Ecuador

World-Class Bus Rapid Transit: New Foundations for Transit Oriented Development and Job Access

MODAIR: Measure and development of intermodality at AIRport. INO WORKSHOP EEC, December 6 h 2005

MPRB: Southwest LRT Community Advisory Committee Issues and Outcomes by Location Current to: 12 November 2010

Welcome. Green Line in Your Community

Discover. Metropolis Barcelona. Full of opportunities. barcelonaopportunity.amb.cat. Metropolis Barcelona

TORONTO TRANSIT COMMISSION REPORT NO.

Building the transportation network we need for the future in Niagara Region

The objective is to create a practical travel centre and high-quality urban architecture, upholding the historical features of the station surrounds.

Scoping Paper Belo Horizonte - Brazil

Egnatia Odos: An axis for development and co-operation

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT

University of Wollongong Innovation Campus Masterplan

November 7 th Post Workshop Report

CONNECT WORKSHOP MANCHESTER NOVEMBER 9, 2005

9 CONSTRUCTION OF BATHURST STREET FROM GREEN LANE WEST TO SOUTH OF HIGHWAY 11, TOWN OF EAST GWILLIMBURY AND TOWNSHIP OF KING

Director King County Department of Transportation. King County Department of Transportation

LA Metro Rapid - Considerations in Identifying BRT Corridors. Martha Butler LACMTA, Transportation Planning Manager Los Angeles, California

Planning. Proposed Development at the Southeast Corner of Lakeshore Road West and Brookfield Road Intersection FINAL.

SUSTAINABLE TRANSPORT IN METROPOLITAN AREAS AND REGIONS

Integrated Optimization of Arrival, Departure, and Surface Operations

Metro ExpressLanes April 5, 2011 Community Meeting re: Adams Blvd Improvements

OR MISSION TRAIL ELEMENTARY

Restoration of Historic Streetcar Services in Downtown Los Angeles

Mohawk Hudson Bike Hike Trail Crossroad Connection Study

INTER-MOBILITY AS A ROLL FOR URBAN (RE) DEVELOPMENT OF BELGRADE PUBLIC SPACE AREAS - BETWEEN MOBILITY AND SUSTAINABILLITY IN CASE OF BELGRADE

DRAFT TH AVE NE URBAN DESIGN MERIT PRESENTATION DPD# NOVEMBER 2017

Welcome to the Cross County Trail Public Input Session!

Workshop on Advances in Public Transport Control and Operations, Stockholm, June 2017

Regional Connector Transit Project Community Leadership Council. 2 nd Hope Station & Flower St Committees January 17, 2017

Construction Staging Adelaide Street West

UNION STATION ACCESS AND CAPACITY IMPROVEMENT STUDY PROJECT REPORT

Transportation Impact Assessment Paradise Shores RV Resort Development Stettler County, Alberta Progress Update February 2018 PO#

Arlington County Board Meeting Project Briefing. October 20, 2015

IMPACT conference 2018 «Affordability of Public Transport» Enforcing attractiveness & relevance Of Public Transport Services

Public Transport Volumes in Prague and its Suburbs

Organize: 16th International Vintage Microcar and Bubblecar Meeting. ...in Sitges! ENG

Downtown to Defiance Trolley Key Messages Jan. 2017

November 11, 2009 BY . Planning and Growth Management Department 110 Laurier Avenue West, 4 th Floor Ottawa, Ontario K1P 1J1. Dear Mr.

A Study of Tradeoffs in Airport Coordinated Surface Operations

Transfer Scheduling and Control to Reduce Passenger Waiting Time

South Bay Metro Light Rail Extension. Summer/Fall 2017 Project Briefings

Our hotels on the BCN metro map

12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization

Medellin Metro Cable: A urban redevelopment success story. New transport solutions for the future. p o m a. n e t

1 Bicentenario Centrality Convention Center of the Metropolitan District of Quito

NAIOP. Marcia McAllister Metropolitan Washington Airports Authority

Union Station Queens Quay Transit Link Study

Master Commercial Developer Industry Forum

Multimodal Planning Studies

PRESS RELEASE HISPANIA ACQUIRES TWO OFFICE BUILDINGS IN BARCELONA FOR MILLION

TORONTO TRANSIT COMMISSION REPORT NO.

South Bay Light Rail Extension Summer/Fall 2017 Project Briefing

Self-Guided Tour for the Mission Park to Mission Canyon Multimodal Improvement Project

Technical considerations on rapid transit mode selection BRT / LRT potentialities in France

ETOBICOKE CREEK NORTH TRAIL PROJECT. May 18, 2017 at Michael Power High School 105 Eringate Drive, Etobicoke ON M9C 3Z7

Regional fact sheets Municipality of Burgos

Citrus Heights Creek Corridor Trail Project Trail Advisory Group Field Trip #2 September 11, :00 11:00 am Trellis Hall, Citrus Heights

284,557 inhabitants + 23% 60,000 vehicles during peak periods Growing need in terms of moving people public transit Saturation of the road network

SAN RAFAEL City Council January 20, 2015

Attachment 1 PARK & RIDE GUIDELINES

ANCLOTE COASTAL TRAIL ALTERNATIVES ANALYSIS STUDY

SECOND AIRPORTS ARABIA CONFERENCE - ARE AIRPORT CITY THE FUTURE OF AIRPORTS?

SUMMARY. Presentation 3. How to get around 4. Places you must visit 6. Restaurants 8. Museums 10. Nightlife 11

Public Open House. Chief Peguis Trail Project

Evaluation of Quality of Service in airport Terminals

Pedestrian Safety Review Spadina Avenue

1.2 Corridor History and Current Characteristics

Transcription:

Transportation Planning and Management in the Territory M. Eng. in Civil Engineering Course 2015-16 PGTTe Planificació i Gestió del Transport en el Territori Plan de Formación (40h) Curs 2015-2016 - Màster en Enginyeria de Camins, Canals i Ports Connecting the Barcelona tramway network 2018 IMPACTS Conference, Tallinn Thursday 31st May

The actual Tram Network 30 25 TRAMBAIX 20 15 10 5 0 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 M journeys TRAMBESÒS 15 km + 14 km 56 stations 23 + 18 tramways 26.7 million passengers/year (100.000 passengers/day in 2016) Growing 4% Trambaix & 8% Trambesòs (2016)

2010 Font: EMEF 2014. Dades bàsiques de mobilitat. Serveis de mobilitat, Ajuntament de Barcelona

2012 2018

Transportation Planning and Management in the Territory M. Eng. in Civil Engineering Course 2015-16 PGTTe Planificació i Gestió del Transport en el Territori Plan de de Formación (40h) Plan Formación (40h) Curs 2015-2016 - Màster en Enginyeria de Camins, Canals i Ports

Transportation Planning and Management in the Territory M. Eng. in Civil Engineering Course 2015-16 PGTTe Planificació i Gestió del Transport en el Territori Plan de de Formación (40h) Plan Formación (40h) Curs 2015-2016 - Màster en Enginyeria de Camins, Canals i Ports PL. FRANCESC MACIÀ PL. GLÒRIES

Transportation Planning and Management in the Territory M. Eng. in Civil Engineering Course 2015-16 PGTTe Planificació i Gestió del Transport en el Territori Plan de de Formación (40h) Plan Formación (40h) Curs 2015-2016 - Màster en Enginyeria de Camins, Canals i Ports PL. FRANCESC MACIÀ TECHNICAL STUDIES: Analysis of route alternatives Demand study Impact on traffic Environment effect investigation Social, economic and environmental evaluation PL. GLÒRIES

THREE BASIC QÜESTIONS TO ANSWER: Is this connection necessary? Which is the best transport mode to do it? And, which is the best path?

ROUTE ALTERNATIVES PLAÇA F.MACIÀ TARRAGONA COMTE D URGELL PROVENÇA Ps. De Sant Joan MARINA PLAÇA DE LES GLÒRIES Alternative 1: Diagonal tramway Alternative 2: Underground Diagonal tramway Alternative 3: Eixample streets tramway Alternative 4: New electric bus

DEMAND STUDIES Captured the first 3 years after entering into service The connection between two tramway networks doubles the user s demand. Scenario of connecting tramway network by Diagonal Av captures 222,000 pax/day. Scenario with tunnel captures more passengers, the demand is close to 236,000 passengers. 189.000 222.000 236.000 104.000 + 49.000 Eixample Streets Tramway Diagonal Tramway Underground Diagonal Tramway New Diagonal Bus

SOCIAL, ENVIRONMENTAL AND ECONOMIC EVALUATION The Social Return of the Investment 500 400 300 200 100 0 100 200 300 400 500 600 Millions of Diagonal Tramway Diagonal Eixample Tramway Tramway Túnel Autobús Bus D30 +11% Eixample Streets Cost de manteniment i explotació del projecte Inversions del projecte (infraestructura, material mòbil, cotxeres) Cost de l'increment de congestió del trànsit Underground Diagonal +1% Balanç de la reestructuració d'autobusos associada al projecte Estalvis de temps dels usuaris del transport públic New Diagonal -3% -6%

IMPACT ON TRAFFIC Simulation areas VEH x KM: CENTRE ESCENARI TOTALS LOS F % LOS F % veh x km LOS F respecteactual VELOCITAT (KM/H) % ACTUAL 0 4.208.382 91.631 2,2% 0,0% 27,93 0,0% 0' 4.195.123 124.072 3,0% 35,4% 27,91 0,07% 1 4.240.650 98.186 2,3% 7,2% 27,76 0,61% 2 4.241.707 99.240 2,3% 8,3% 27,72 0,75% 3 4.245.984 99.407 2,3% 8,5% 27,72 0,75% 4 4.246.784 91.454 2,2% 0,2% 27,72 0,75% 5 4.234.875 111.268 2,6% 21,4% 27,58 1,25% 6 4.237.375 106.261 2,5% 16,0% 27,87 0,23% 7 4.226.313 95.026 2,2% 3,7% 27,70 0,82% LOS LEVEL OF SERVICE

DIAGONAL S TRAMWAY

DIAGONAL S TRAMWAY Objectives Increase the competitiveness, comfort and quality of public transport, making it more attractive. Increase the quality and healthiness of urban spaces. Promote modal split. Reduce the weight of private vehicle inside Barcelona. Reduce travel time. Attract the maximum possible demand. Increase the connections with the rest of public transport. Improve the connection of public transport in the Metropolitan Area.

METROPOLITAN SCOPE 9 metropolitan municipalities Cornellà de Ll. Sant Feliu de Ll. Sant Joan Despí L Hospitalet de Ll. Sant Just Desvern Esplugues de Ll. Barcelona 450,000 inhabitants within 500 meters of current tramway layout Badalona Sant Adrià de Besòs 16

DIAGONAL AVE TRAMWAY DEMAND Estimated demand of 222,000 passengers, comparable to a metro line. 350.000 310.000 Passengers/day TRAM L9 L5 250.000 222.000 190.000 170.000 L1 L2 TRAM L1 L5 L3 TRAM unificat L2 L4

DEMAND PER STOP Average demand per stop up to 10,000 commuters/day in the central section New stops Uniform load in all the diagonal 70.000 Stop Diagonal Ave Tramway F. Macià 8.514 Muntaner 10.050 Balmes 10.983 Diagonal 11.407 Bailen 8.730 Sicilia 9.497 Lepant 8.025 Glòries 9.456

TRAMBAIX DIAGONAL S TRAMWAY TRAMBESÒS

TRAMWAY LINKED DIAGONAL S TRAMWAY

NEW DEMAND: 60 million per year (2021?..) DIAGONAL S TRAMWAY OLD DEMAND: 27 million per year (2016) BCN Airport: 44 million per year (2016)

PEDESTRIANS Enlargement of sidewalks Reduction of the roadway to be crossed Removal of bike lanes on sidewalks Provided traffic lights allow pedestrians to cross every crossroad adequately

BICYCLES Creation of a separated bike lane, with more security and comfort Extension of the city bike lane network. Generation of new connection nodes It is estimated that each rider can win 5 minutes on the route of the new urbanized section

PUBLIC TRANSPORT Possibility to travel along the entire avenue Highest transport capacity Impact of traffic jams minimized Diagonal corridor becomes a public transport axis with important benefits: regularity and frequency Network effect Adjustment of bus lines to new configuration

Some street management changes are needed in the sorroundings streets to minimize the impact on traffic Traffic lights optimization allow to reduce queues PRIVATE VEHICLES

CURRENT SITUATION Two public administrations commitment: ATM (Metropolitan Transport Authority) Railway project Barcelona Municipality Urbanization project Project done Pending political agreement for execution

Transportation Planning and Management in the Territory M. Eng. in Civil Engineering Course 2015-16 01 Plan de Formación (40h) Curs 2015-2016 - Màster en Enginyeria de Camins, Canals i Ports PGTTe Planificació i Gestió del Transport en el Territori Situació Thank you!