Table 2: FFYs Transportation Improvement Program (TIP) Development Universe of Projects

Similar documents
TABLE C-1: Greenhouse Gas Regional Highway Project Tracking

Boston Medical Center Shapiro Retail Pharmacy. 725 Albany Street, Boston, MA. Chicopee Health Center Pharmacy. Chicopee, MA.

Project ID Project Description Date Sum of Obligation. Grand Total $7,942,419.19

50 Largest U.S. Metropolitan Areas

ZIP CITY ST ZIP CITY ST ZIP CITY ST CONNECTICUT

Boston Logan International airport (BOS) transfers

2004 Congestion Management System Report

Sustainability: what is it?

^tauaticd. C^lection. be - -., Qlnmmmnufaltlj. of UlaHHarljuHPtta. Public Dc>cuinent No. 43. Secretary of the Commonwealth

PART I CRIME BY STATION: 2010 vs STATION YEAR CRIME COUNT

DANVERS (BOSTON), MASSACHUSETTS

WICKED LOCAL RATES effective January 11, 2016

Preliminary FY18 Sending District Tuition Payments to Commonwealth Charter Schools

HIPAA-strength Enterprise Portals Examples and Architecture. Steve Flammini Chief Technology Officer Partners HealthCare Boston, MA

MSSPA Ice Hockey Tournament (29th. Annual) 4th. Annual Div 1 Emass

OF NEW ENGLAND ENTERTAINMENT RETAIL HOSPITALITY

Store Name Street Town ST TEDESCHIS 945 BEDFORD ST-RTE 18 ABINGTON MA CVS 344 GREAT ROAD ACTON MA CVS 393 MASSACHUSETTS AVE. ACTON MA TEDESCHIS 75

BEST SUMMER EVER! SUMMER CAMPS 2016 FRIENDSHIP, ACCOMPLISHMENT, BELONGING. ymcaboston.org SUMMER CAMP NORTH SUBURBAN YMCA YMCA OF GREATER BOSTON

LEASING FOR OCTOBER 1, 2017 OPENING NOW UNDER CONSTRUCTION. 11 high-profile buildings of 475,000 SF:

Overview of Boston Logan Operations and Noise from Overflights. Presentation to Massport Board March 19, 2015

Fiscal Year 2010 ARRA/IDEA Early Childhood Special Education Amounts Fund Code: 762

Non-Hospital Imaging Centers and Clinical/Diagnostic Labs

THE RIDE GUIDE. MBTA-OTA Page 1 of 12 12/01/07 R 1.7 THE RIDE

Wilton. Townsend Pepperell. Lunenburg. Fitchburg. Class A Office Building With Fitness Center. Leominster. Gates Crossing. South Lancaster.

MSSPA Ice Hockey Tournament (28th. Annual) 3rd. Annual Div 1 Emass

Non-Hospital Imaging Centers and Clinical/Diagnostic Labs

BEST SUMMER EVER! SUMMER CAMPS 2016 FRIENDSHIP, ACCOMPLISHMENT, BELONGING. ymcaboston.org OAK SQUARE YMCA YMCA OF GREATER BOSTON SUMMER CAMP

Massachusetts Department of Elementary and Secondary Education Office of District and School Finance

BEST SUMMER EVER! SUMMER CAMPS 2016 FRIENDSHIP, ACCOMPLISHMENT, BELONGING. ymcaboston.org WALTHAM YMCA YMCA OF GREATER BOSTON SUMMER CAMP

Photo is representative of final product OVER 2 MSF SPEC-TO-SUIT OPPORTUNITY 1424 LUNENBURG ROAD, LANCASTER, MA

APEX CENTER - NOW OPEN!

Labor Day Service Announcement

Boston College Parents Weekend 2010 Nearby Hotels

SUN, FUN & FRIENDSHIP

BRAINTREE (BOSTON), MASSACHUSETTS

Overview Contact Us. Back. New Custom Report. Compare Stats Between Towns (MA only) Rank by Population. 1. Boston city 593,745

Whittier Bridge Project

BRAINTREE (BOSTON), MASSACHUSETTS

MERRIMACK PREMIUM OUTLETS

FY2018 State Aid to Public Libraries Certified Municipalities and Awards - Final

Active Project Listing Data as of September 1, 2015

One Care Plan Service Area

Community G Communit uide y G

Low Income. Low Income

Find CHELSEA FIRE Wicked Hot Sauce at These Locations!!!

2017 CPA AFFORDABLE HOUSING LOW INCOME LIMITS

^tauaticd. C^lection. be - -., Qlnmmmnufaltlj. of UlaHHarljuHPtta. Public Dc>cuinent No. 43. Secretary of the Commonwealth

2011 SSSL 14u Directions

CTPS staff considered roadways that carry on average more than 1,500 weekday MBTA bus passengers in one direction as candidates for dedicated bus

PEABODY (BOSTON), MASSACHUSETTS

Number of Dropouts North Adams - Drury High

Add-A-Lane Contract V. along a Section of I-95 includes 6 Bridges

City/Town Retailer Address Abington 123 Convenience 224 Centre Ave Stop & Shop 375 Centre St., Rt. 123 Acton

MERRIMACK, NEW HAMPSHIRE

State Route 8 Corridor. Northern Summit County s Path to Success

Ending Telephone Property Tax Exemption Increased Revenue by Town

2017 CPA AFFORDABLE HOUSING INCOME LIMITS

Boston, Massachusetts

DMS DENTAL NETWORK LISTING

2005 Massachusetts Private Passenger Automobile and CDM Territories By Town in Alphabetical Order

6 HIGH-OCCUPANCY-VEHICLE (HOV) LANES AND TRAVEL DEMAND MANAGEMENT (TDM) PROGRAMS

Massachusetts Private Passenger Manual Effective Date: 05/01/16 Automobile Manual

Clinton Public Routes Clinton High School

CONSTRUCTION PROJECTS IN CUYAHOGA COUNTY CLEVELAND EUCLID 3/9/18 RICHMOND MAYFIELD HIGHLAND HEIGHTS HEIGHTS SOUTH EAST MAYFIELD EUCLID CLEVELAND

Holliston Fire Department Month of January, 2003 Incident Log Page 1

Ice Hockey Rink/Arena Directions

Moderate Income Limits (property owned and occupied by a senior 60 or older) Household Size: 8. Moderate Income Limits (property

FDOT Treasure Coast Traffic Report through

L e a d - S a f e H o u s i n g R e g i s t r y

FY Regional Transportation Improvement Program Basic Project List (All Values in Thousands of Dollars) All costs in current dollars

The Commonwealth of Massachusetts Executive Office of Public Safety and Security Department of Fire Services

DULLES AREA HIGHLIGHTS. Gary Garczynski Commonwealth Transportation Board Northern Virginia District. Committee for Dulles August 4, 2016

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015

CVRPC FY 13 Project Priorities (Bridge, Roadway, Bike & Ped., Park & Ride) - 3/29/11

Chapter 70 Preliminary FY17 Regional District Summary

Directions to MassDEP Offices

WHERE TO FIND US MASSACHUSETTS ATHOL UPTOWN PACKAGE STORE, 2280 MAIN STREET, ATHOL, MA ATHOL SPIRITS, 9 TUNNEL STREET, ATHOL, MA STAN'S

MBTA ATM/Branding Opportunities 43 ATM Locations Available

PURPOSE AND NEED REPORT. I-93 Transit Investment Study

Transportation TRANSPORTATION PROJECTS

FFY 2017 Federal Funds Obligations by MPO

Projected Advertisement Date

LIBERTY CATS 2014 TICA ANNUAL. Thank you for entering the 2014 TICA Annual show, brought to you by Liberty Cats!

Massachusetts. Adams 701. Acton 729. Accord 801. Acton 801. Adams 801. Agawam 827. Agawam 729. Adams L-1 TS. Amesbury 466.

BOSTON REGION METROPOLITAN PLANNING ORGANIZATION

THE RICHMOND REGION Transportation Priority Projects

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016

Basic Project Information

April 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014

FY TRANSPORTATION IMPROVEMENT PROGRAM. Authority Projects FY

MIDDLE SCHOOL AFTERNOON BUS ROUTES

City Name Street Phone ABINGTON SQUIRES LOFT 460 BEDFORD ST STIX & STONES REST 800 BROCKTON AVENUE

October 31, 2014 Chuck McGinness, (954)

Governor s Mobility Plan. Corridors, Segments and Projects. Allied Junction Corridor 10/12/89

FREDERICKSBURG DISTRICT. District Engineer Marcie Parker, P.E. May 8, 2018

Par t II FY Highway and Transit Projects

FDOT Treasure Coast Traffic Impact Report

Guide to. Road Construction Projects

Capital Improvement Program Fiscal Year

Route 29 Solutions Projects

Transcription:

Universe of s Previously scored projects to be considered for TIP funding this year; status noted Other active projects; not yet evaluated and not planned for evaluation in FFY QUINCY QUINCY INTERSECTION IMPROVEMENTS @ SEA STREET & QUINCY SHORE DRIVE 0801 QUINCY QUINCY RECONSTRUCTION OF SEA STREET 08707 MALDEN Newton MALDEN Newton LIGHTING AND SEWALK IMPROVEMENTS ON EXCHANGE STREET Reconstruction & Sigl on Walnut Street, from Homer Street to Route 9 08275 Somerville Somerville McGrath Boulevard 07981 Saugus Revere, Saugus Saugus - Interchange Reconstruction at Walnut Street & Route 1 (Phase II) along Commonwealth Avenue (Route 0), from Alcorn Street to Warren/Kelton Streets (Phase and Phase 4) Reconstruction & Widening on Route 1, from Route 0 to Route 99 REPLACEMENT OF ALLSTON I-90 ELEVATED VIADUCT, B-1-59, INCLUDING INTERCHANGE RECONSTRUCTION BEACON PARK YARD LAYOVER & WEST STATION Reconstruction of Tremont Street, from Court Street to Boylston Street RECONSTRUCTION OF TREMONT STREET, FROM STUART STREET TO MARGINAL ROAD (1,80 FT) INTERSECTION IMPROVEMENTS @ GALLIVAN BOULEVARD (ROUTE 20) & MORTON STREET GRADE SEPARATED MULTI-USE PATH CONSTRUCTION ALONG THE PAUL DUDLEY WHITE PATH AT NORTH HARVARD STREET BRGE OVER CHARLES RIVER (ANDERSON MEMORIAL BRGE) 25% design; FDR on (201); no FDR on (201) $1,85,101 List X X $5,2,081 Complete Streets X X $1,290,58 Complete Streets 4 5 X 01704 25% design $4,48,0 Complete Streets 45 X X ; no FDR on $82,500,000 0151 75% design $19,581,122 08449 05012 0475 01274 01507 018 08055 (201) ; no FDR on (2011); no FDR on on (199); no FDR on 100% design; no FDR on $172,500,000 $4,750,000 $2,81,20 Complete Streets $4,400,000 Complete Streets 4 100 X X 202-0 4 X X 7 X X X X Page 1 of 9 Prepared by CTPS/ Region MPO Staff

Universe of s Previously scored projects to be considered for TIP funding this year; status noted Other active projects; not yet evaluated and not planned for evaluation in FFY Cambridge Cambridge Cambridge Cambridge INTERSECTION IMPROVEMENTS AT 7 INTERSECTIONS ON ROUTE 28 (MONSIGNOR O'BRIEN HIGHWAY) Innovation Boulevard Streetscape &, Between Main Street & Binney Street (Phase I) 04911 0499 on on $1,185,790 $992,1 Complete Streets Everett Everett Reconstruction of Beacham Street Pre-PRC Complete Streets 4 Reconstruction on Route 0 (Commonwealth Newton Newton 0092 (199); no FDR on $2,208,000 Complete Streets Avenue), from Weston Town Line to Auburn Street BREAKDOWN LANE CONSTRUCTION AT VARIOUS LOCATIONS, FROM ROUTE 128 TO EXIT 17 IMPROVEMENTS OF ROUTE 128/I-95 & GROVE STREET 0472 07940 (2011); no FDR on $10,000,055 Complete Streets List INTERSECTION IMPROVEMENTS AT OAK STREET, CHRISTINA STREET AND NEEDHAM STREET 0817 100% design; no FDR on Winthrop Woburn Milton NEEDHAM Chelsea Winthrop NEEDHAM Chelsea Reconstruction & Related Work along Winthrop Street & Revere Street Corridor Reconstruction at Route (Cambridge Road) & Bedford Road and South Bedford Street Reconstruction on Granite Avenue, from Neponset River to Squantum Street INTERSECTION IMPROVEMENTS AT HIGHLAND AVENUE AND FIRST AVENUE RECONSTRUCTION ON WASHINGTON AVENUE, FROM REVERE BEACH PARKWAY TO HEARD STREET 07244 0807 0840 07889 05974 (2012); no FDR on (2015); no FDR on Fil design; no FDR on (2010); no FDR on (2014); no FDR $1,440,000 Complete Streets $,5,14 TRIC, Complete Streets TRIC, Complete Streets RECONSTRUCTION OF SOUTH BANK PARK 08070 IMPROVEMENTS AT AUDUBON CIRCLE 040 25% design Complete Streets 78 Melrose Melrose & Sigl at Main Street 01551 (1995); no FDR on & Essex Street 4 MILTON MILTON REHABILITATION OF CENTRAL AVENUE, FROM BROOK ROAD TO ELIOT STREET 0420 on TRIC, Complete Streets 4 Page 2 of 9 Prepared by CTPS/ Region MPO Staff

Universe of s Previously scored projects to be considered for TIP funding this year; status noted Other active projects; not yet evaluated and not planned for evaluation in FFY Littleton, Ayer Sudbury Concord Concord Hudson, Hudson Bolton Bolton Bolton Bolton INTERSECTION IMPROVEMENTS ON ROUTE 2A AT WILLOW ROAD AND BRUCE STREET at Route 20 & Landham Road & Upgrades to Concord Rotary (Routes 2/2A/119) RECONSTRUCTION & WENING ON ROUTE 2, FROM SANDY POND ROAD TO BRGE OVER MBTA/B&M RAILROAD Reconstruction on Routes I-290 & 495 and Bridge Replacement Bridge Replacement, Cox Street over the Assabet River RECONSTRUCTION OF ROUTE 110 (STILL RIVER ROAD) INTERSECTION IMPROVEMENTS AT I-495/ROUTE 117 INTERCHANGE 0844 (201); no FDR on $2,200,000 MAGIC 07249 75% design $1,55,050 MAGIC 02091 08015 045 0190 02252 0 on (2001); no FDR on (199); no FDR on (1997); no FDR on (2011); no FDR on $10,91,250 MAGIC $8,000,000 MAGIC MAGIC, MAGIC MAGIC Complete Streets MAGIC List X X 7 X X X Page of 9 Prepared by CTPS/ Region MPO Staff

Universe of s Previously scored projects to be considered for TIP funding this year; status noted Other active projects; not yet evaluated and not planned for evaluation in FFY Ashland Ashland REHABILITATION AND RAIL CROSSING IMPROVEMENTS ON CHERRY STREET & Sigl on Route 20 (East Main Street/ Post Road) at Concord Road Hybrid Beacon Installation at Route 9 and Mayrd Road at Route 12/15/MBTA & CSX Railroad TRAFFIC SIGNAL INSTALLATION AT EDGELL ROAD AT CENTRAL STREET 084 0421 ; no FDR on 25% design; FDR on List $1,200,000 Complete Streets X X $1,70,00 0800 25% design $88,228 0109 Holliston Holliston Sigl Installation at Route 1/12 and Oak Street 0242 Holliston Southborough, Westborough WESTON RESURFACING & RELATED WORK ON ROUTE 12 (CONCORD STREET) at I-495 & Route 9 07701 WESTON Post Road (Route 20) at Wellesley Street Improvement Edgell Road Corridor 0208 Reconstruction of Route 20 (East Main Street), from Main Street Easterly to Lincoln Street MULTI-USE TRAIL CONSTRUCTION ON A SECTION OF THE UPPER CHARLES RAIL (2 MILES OF PROPOSED 27 MILES - PHASE I) RECONSTRUCTION OF NORFOLK STREET, FROM SABINA DRIVE TO HOLLY LANE RECONSTRUCTION ON ROUTE 1 (WASHINGTON STREET), FROM QUAIL RUN TO THE SHERBORN T.L. SIGNAL & INTERSECTION IMPROVEMENTS AT ROUTE 9 (WORCESTER ROAD) & TEMPLE STREET (2010); no FDR on $115,000,000 08889 $1,440,000 25% submitted (1999) 02154 $00,000 Complete Streets 04811 02929 02155 05745 085 (201); no FDR on PNF and PIF submitted August 2017 (199); no FDR on 75% design; FDR on 75% design; no FDR on (1997); no FDR on (2010); no FDR on (200); no FDR on $11,15,000 Complete Streets Complete Streets 44 Complete Streets Complete Streets 9 X X 2 X X 202-0 Page 4 of 9 Prepared by CTPS/ Region MPO Staff

Universe of s Previously scored projects to be considered for TIP funding this year; status noted Other active projects; not yet evaluated and not planned for evaluation in FFY Reading Reading READING, STONEHAM, WAKEFIELD, WOBURN READING, STONEHAM, WAKEFIELD Wilmington WOBURN Woburn RESURFACING & RELATED WORK ON ROUTE 28 (MAIN STREET) INTERSECTION SIGNALIZATION @ ROUTE 28 & HOPKINS STREET 04804 Interchange to I-9/I-95 0505 Wilmington WOBURN Woburn IMPROVEMENTS ALONG ROUTE 128/95, FROM NORTH OF INTERCHANGE 7 TO INTERCHANGE 40, INCLUDING MODIFICATIONS TO INTERCHANGE 8 Reconstruction on Route 8 (Main Street), from Route 2 to the Woburn C.L. MDLESEX CANAL PARK IMPROVEMENTS, FROM ALFRED STREET TO SCHOOL STREET (PHASE II - SEGMENT 5) Bridge Replacement & Related Work, W-4-028, Washington Street over I-95 (200); no FDR on 0705 25% design $84,97 NSPC 0809 08051 004 08097 (2009); no FDR on (2010); no FDR on List $5,25,174 NSPC Complete Streets X $27,708,78 NSPC $10,521,21 NSPC Complete Streets 4 NSPC NSPC NSPC Bridge 4 4 X 4 4 Page 5 of 9 Prepared by CTPS/ Region MPO Staff

Universe of s Previously scored projects to be considered for TIP funding this year; status noted Other active projects; not yet evaluated and not planned for evaluation in FFY Peabody Peabody Rehabilitation of Central Street (2017) NSTF Complete Streets X Danvers Danvers Reconstruction on Collins Street, from Sylvan Street to Centre & Holten Streets 0210 75% design $5,18,121 NSTF Complete Streets 4 51 X X Beverly Beverly Reconstruction of Bridge Street 0848 $5,280,000 NSTF Complete Streets 4 59 X X Ipswich Ipswich Resurfacing & Related Work on Central & South Main Streets 0574 25% design $2,24,154 NSTF Complete Streets 4 8 X X Peabody Mainline on Route 128 (Phase II) 048 100% design $24,01,419 NSTF 4 X X Beverly Beverly Interchange Reconstruction at Route 128/Exit 19 at 07727 over $20,000,000 NSTF Brimbal Avenue (Phase II) Salem Salem Reconstruction of Bridge Street, from Flint Street to 599 Washington Street on $24,810,210 NSTF Complete Streets Manchester by the Sea Manchester by the Sea Pine Street - Central Street (Route 127) to Rockwood Heights Road Gloucester Gloucester Washington Street And Railroad Avenue 0477 Salem Salem Street 0098 12/27/1 25% design; FDR on (1994); no FDR on NSTF Complete Streets 4 NSTF Complete Streets 4 49 NSTF Complete Streets 4 List Page of 9 Prepared by CTPS/ Region MPO Staff

Universe of s Previously scored projects to be considered for TIP funding this year; status noted Other active projects; not yet evaluated and not planned for evaluation in FFY List WEYMOUTH WEYMOUTH RECONSTRUCTION ON ROUTE A, INCLUDING PEDESTRIAN AND TRAFFIC SIGNAL IMPROVEMENTS 0821 SSC Complete Streets X X Cohasset HINGHAM HINGHAM HINGHAM HINGHAM Corridor and Related Work on Justice Cushing (Route A), from Beechwood Street to the Scituate Town Line INTERSECTION IMPROVEMENTS ON ROUTE A @ KILBY STREET IMPROVEMENTS ON ROUTE A FROM OTIS STREET/COLE ROAD INCLUDING SUMMER STREET AND ROTARY; ROCKLAND STREET TO GEORGE WASHINGTON BOULEVARD. 08007 25% design SSC Complete Streets 5 X X 017 0518 (2000); no FDR on (2009); no FDR on $250,000 SSC $7,500,001 SSC Complete Streets 5 5 Holbrook Holbrook Corridor on South Franklin Street (Route 7) from Snell Street to King Road /0/1 SSC Complete Streets 5 Hull Hull Corridor along Nantasket Avenue from Moutford Road to A Street /0/1 SSC Complete Streets 5 Duxbury Duxbury Sigl Installation at Route (NB & SB) Ramps & Route A (Tremont St) 0002 (2010); FDR on SSC 5 Holbrook WEYMOUTH Holbrook WEYMOUTH INTERSECTION IMPROVEMENTS & RELATED WORK AT WEYMOUTH STREET, PINE STREET & SYCAMORE STREET NEW ROADWAY CONNECTION BETWEEN TROTTER ROAD AND EAST WEST PARKWAY 07255 25% design $1,01,54 SSC 08092 Fil design; no FDR on SSC Complete Streets 5 Page 7 of 9 Prepared by CTPS/ Region MPO Staff

Universe of s Previously scored projects to be considered for TIP funding this year; status noted Other active projects; not yet evaluated and not planned for evaluation in FFY Milford South Main Street (Route 12) - Douglas Drive to Mechanic Street Reconstruction (Route 140) Rehabilitation on Route 1, from Route 109 to Beaver Street 08887 PIF submitted /2/17 Wrentham Construction of I-495/Route 1A Ramps 079 25% design $,05,09 SWAP Franklin Millis Franklin Millis RAMP CONSTRUCTION & RELOCATION, I-495 AT ROUTE 12 (HARTFORD AVENUE) South Main Street (Route 12) - Elm Street to Douglas Drive Reconstruction IMPROVEMENTS AT 2 LOCATIONS: MECHANIC STREET/MENDON STREET (ROUTE 140) & NORTH MAIN STREET/SOUTH MAIN STREET (ROUTE 12) Reconstruction of Pleasant Street, from Main Street to Chestnut Street Reconstruction of Village Street, from Main Street (Route 109) to the Medway Town Line 08045 0482 0445 0159 024 (200); no FDR on /1/17 (2005) 75% design; FDR on (200); no FDR on List $,900,000 SWAP Complete Streets X X $2,700,000 SWAP Complete Streets X X $1,54,400 SWAP SWAP Complete Streets SWAP SWAP Complete Streets 2 SWAP Complete Streets 5 5 X X X Page 8 of 9 Prepared by CTPS/ Region MPO Staff

Universe of s Previously scored projects to be considered for TIP funding this year; status noted Other active projects; not yet evaluated and not planned for evaluation in FFY Dedham Canton, Westwood NORWOOD, WESTWOOD SHARON Dedham NORWOOD, WESTWOOD SHARON PEDESTRIAN IMPROVEMENTS ALONG BUSSEY STREET, INCLUDING SUPERSTRUCTURE REPLACEMENT, D-05-010, BUSSEY STREET OVER MOTHER BROOK Interchange at I-95 / I-9 / University Avenue / I-95 Widening INTERSECTION IMPROVEMENTS AT UNIVERSITY AVENUE & CANTON STREET SIGNAL & INTERSECTION IMPROVEMENTS ON SOUTH MAIN STREET 07899 25% design $,902,755 TRIC Complete Streets 25 X X 87790 07557 05708 Westwood Westwood Route 109 Traffic Operatiol Westwood Westwood Reconstruction of Canton Street and Everett Street 08158 Medfield Medfield Reconstruction of North Street, from Frairy Street to Pine Street Canton Canton Reconstruction on Route 18, from I-9 to Dan Road 088 STOUGHTON STOUGHTON RECONSTRUCTION OF TURNPIKE STREET 07214 STOUGHTON Walpole STOUGHTON Walpole INTERSECTION IMPROVEMENTS AND RELATED WORK AT CENTRAL STREET, CANTON STREET AND TOSCA DRIVE Reconstruction of Route 1A, from Common Street to the Norfolk Town Line on 100% design; no FDR on 75% design; no FDR on September 2017 (2015); no FDR on $202,205,99 TRIC TRIC TRIC TRIC Complete Streets TRIC Complete Streets 0475 25% design $2,210,050 TRIC Complete Streets 0 X 08279 0071 (200); no FDR on (2012); no FDR on (201); no FDR on on TRIC Complete Streets TRIC Complete Streets 5 TRIC TRIC Complete Streets 5 List X 5 5 Page 9 of 9 Prepared by CTPS/ Region MPO Staff