Federal Register / Vol. 83, No. 155 / Friday, August 10, 2018 / Notices

Similar documents
DRAFT. Public Meetings November 7, 9, 15, Year UTP Planning Effort Cost/Revenue Matrix FY FY 2026

WELCOME US 83 Public Meeting

US 380 FEASIBILITY STUDY

FORT WORTH DISTRICT. Springtown Area Projects. Loyl C. Bussell, P.E. Acting District Engineer. Thursday, February 8, 2018 Date.

DULLES AREA HIGHLIGHTS. Gary Garczynski Commonwealth Transportation Board Northern Virginia District. Committee for Dulles August 4, 2016

APPENDIX K RURAL ENVIRONMENTAL CLEARANCE PROJECTS

INTERSTATE 35 CORRIDOR UPDATE

Construction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013

EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015

1.2 Corridor History and Current Characteristics

Section 106 Update Memo #1 Attachment D. Traffic Diversion & APE Expansion Methodology & Maps

A. From I-68 in Monongalia County, West Virginia to SR 6119 in Fayette County, Pennsylvania 1

Lake Erie Commerce Center Traffic Analysis

35EXPRESS PROJECT UPDATE FOR DENTON COUNTY COMMISSIONERS

November 21, 2012 Barbara Kelleher, (954)

EXTERNAL COMMUNICATIONS COMMITTEE MEETING APRIL 2015

5.1 Traffic and Transportation

Parking Amendments - Bay Street, between Harbour Street and Queens Quay West (York Street, Bay Street, and Yonge Street Ramp Removal)

Memorandum. To: From: cc: Date: November 7, Re: 1.0 Purpose and Organization of this Addendum. 2.0 Project Description

TEXAS BORDER DISTRICT TRADE TRANSPORTATION ACTIVITIES

Welcome to Dayton Parkway Interchange Open House. November 26, 2018

APPENDIX C TRANSPORTATION PLANNING DOCUMENTS

US 83 Relief Route. City of La Joya City of Peñitas Hidalgo County. November 15, 2012

Office of Commercial Space Transportation: Notice of Availability, Notice of Public

Wichita Falls MPO - MTP Project List 1 of 6

State of Texas. District: County: Condition: Roadway: Direction: Time: Limits:

1.0 Purpose and Organization of the Community Impact Assessment Addendum

Mission Statement. Spur 601 Project Highlights

NEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release

PURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40

Site Location and Setting

April 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014

LANCASTER CORRIDOR REDEVELOPMENT ROSEDALE STREET REDESIGN PEACH STREET RAILROAD CROSSINGS

Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street

Transportation TRANSPORTATION PROJECTS

District Construction Progr am. John R. Kasich, Ohio Governor Jerry Wray, ODOT Director Steve Mary, P.E., District Deputy Director

THREE MILE PLAN TOWN OF SUPERIOR COLORADO

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications

Route 29 Solutions Projects

Basic Project Information

Chapter 2: Entire US287 Corridor

Bradley Brook Relocation Project. Scoping Notice. Saco Ranger District. United States Department of Agriculture Forest Service

For Immediate Release Christine Girardin January 19, 2018 SUMTER COUNTY FLORIDA S TURNPIKE AND I-75 INTERCHANGE IMPROVEMENTS

Springettsbury Township. Road Improvement Projects

Milestone: Bridge to Nowhere scheduled for demolition Aug 14

US 83 FROM NORTH OF THE STARR/ZAPATA COUNTY LINE TO LOMA BLANCA ROAD

Texas Transportation Institute The Texas A&M University System College Station, Texas

May 1, 2015 Meredith Cruz, (561) Palm Beach County Traffic Report May 1 through May 8, 2015

FY Regional Transportation Improvement Program Basic Project List (All Values in Thousands of Dollars) All costs in current dollars

Pedestrian Safety Review Spadina Avenue

Major Projects Overview

Decision Memo Ice Age Trail Improvement (CRAC 37)

PORT OF CORPUS CHRISTI BUILDING FOR THE FUTURE

All closures this week happen at night, including full closures of Mesa and I-10

FREDERICKSBURG DISTRICT. District Engineer Marcie Parker, P.E. May 8, 2018

FDOT Treasure Coast Traffic Impact Report

DALLAS HORSESHOE PROJECT. Project Update including the Margaret McDermott Bridge Transportation and Trinity River Project Committee February 22, 2016

AGENCY NAME TRANSPORTATION

Summary of Transportation Development Credits (TDCs) Dallas-Fort Worth Metropolitan Planning Organization (MPO) (As of September 30, 2016)

2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016

Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd

IMPLEMENTATION OF 3D DESIGN By: Brent Hillebrenner, Daniel Cruz, Eddie Acosta. October 13, 2015 Implementation of 3D Design October 13, 2015

The Transportation Corridor Overlay District

RELEASE: IMMEDIATE September 14, 2012 CONTACT: Sandy Myers (office) STA (cell)

Road Construction Ahead January-April 2015 NORTHWEST REGION

MEMORANDUM. FROM: John A. Bishop, AICP, Assistant Director - Transportation. May 22, 2017 Transportation Committee Meeting

I-10 West and Sunland Park Drive southbound will close July 13 at night. Detour onto North Mesa will be required.

PROGRESS PARK CONNECTOR

San Mateo County Transportation Authority Board Meeting November 2, 2017 Item #10 1

Palm Beach County Traffic Report July 13 through July 20, 2012

FOR IMMEDIATE RELEASE Fiorella Teodista January 5, 2018 SOUTH FLORIDA AND TREASURE COAST WEEKLY LANE CLOSURES AND WORK ZONE ADVISORY

FHWA Actions on Past Interstate Requests that were approved by the USRN were presented and conditions were lifted. FHWA Approval Date

SR 429/WEKIVA PARKWAY FTBA CONFERENCE March 20-21, Presented By Suzanne Phillips, P.E., FDOT District 5

Arlington County Board Work Session Eastbound Widening January 17, Amanda Baxter, VDOT Special Projects Development Manager

Route 141 and I-44 Design-Build Project Community Involvement Group. March 21, 2016

I-35 Reconstruction Project

TEXAS TRANSPORTATION COMMISSION

INTERSTATE 10 AND INTERSTATE 17 SPINE WORKSHOP

user s guide to Transportation Improvements in Astoria Planning Efforts outside Astoria for more information, contact:

FDOT Treasure Coast Traffic Impact Report

The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP).

FHWA P/N Guidelines. Corridor Relationship. Highway 22 Segment 1 - US 169 to CSAH 2 Relevance / Documentation of Need

WELCOME TO THE OPEN HOUSE

I-10 will close overnight Sunday through Thursday next week. Crews continue to make progress on Sunland s new bridges and ramps.

HAMPTON ROADS CROSSINGS PATRIOTS CROSSING AND HRBT

DOWNTOWN BRT ALTERNATIVE - 19th AVE

Public Informational Meeting

FEASIBILITY CRITERIA

FDOT Treasure Coast Traffic Report through

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015

TRANSPORTATION ELEMENT

Guide to. Road Construction Projects

±100 Acres. FM 359 & Settegast Ranch Road Land For Sale. Randy Wilhelm

PennDOT Interstate Work next week March 30-April 3:

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016

MEMORANDUM. for HOV Monitoring on I-93 North and the Southeast Expressway, Boston Region MPO, November, 2011.

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts

2013 El Paso County Comprehensive Mobility Plan. December 16, 2013

Interstate 90 and Mercer Island Mobility Study APRIL Commissioned by. Prepared by

Section 4(f) and Section 6(f) Technical Analysis

Transcription:

39809 DEPARTMENT OF TRANSPORTATION Federal Highway Administration Notice of Final Federal Agency Actions on Proposed Highway Projects in Texas AGENCY: Texas Department of Transportation (TxDOT), Federal Highway Administration (FHWA), U.S. Department of Transportation. ACTION: Notice of limitation on claims for judicial review of actions by TxDOT and Federal agencies. SUMMARY: This notice announces actions taken by TxDOT and Federal agencies that are final. The environmental review, consultation, and other actions required by applicable Federal environmental laws for these projects are being, or have been, carried-out by TxDOT pursuant to statute and a Memorandum of Understanding dated December 16, 2014, and executed by FHWA and TxDOT. The actions relate to various proposed highway projects in the State of Texas. Those actions grant licenses, permits, and approvals for the projects. DATES: By this notice, TxDOT is advising the public of final agency actions subject to 23 U.S.C. 139(l)(1). A claim seeking judicial review of TxDOT and Federal agency actions on the highway project will be barred unless the claim is filed on or before January 21, 2019. If the Federal law that authorizes judicial review of a claim provides a time period of less than 150 days for filing such a claim, then that shorter time period still applies. FOR FURTHER INFORMATION CONTACT: Carlos Swonke, Environmental Affairs Division, Texas Department of Transportation, 125 East 11th Street, Austin, Texas 78701; telephone: (512) 416 2734; email: carlos.swonke@ txdot.gov. TxDOT s normal business hours are 8:00 a.m. 5:00 p.m. (central time), Monday through Friday. SUPPLEMENTARY INFORMATION: Notice is hereby given that TxDOT and Federal agencies have taken final agency actions by issuing licenses, permits, and approvals for the highway projects in the State of Texas that are listed below. Categorical Exclusion (CE) or issued in connection with the projects and in other key project documents. The CE or EA, and other key documents for the listed projects are available by provided above. This notice applies to all TxDOT and Federal agency decisions as of the issuance date of this notice and all laws under which such actions were taken, including but not limited to: 1. General: National Environmental Policy Act (NEPA) [42 U.S.C. 4321 4351]; Federal-Aid Highway Act [23 U.S.C. 109]. 2. Air: Clean Air Act, 42 U.S.C. 7401 7671(q). 3. Land: Section 4(f) of the Department of Transportation Act of 1966 [49 U.S.C. 303]; Landscaping and Scenic Enhancement (Wildflowers), 23 U.S.C. 319. 4. Wildlife: Endangered Species Act [16 U.S.C. 1531 1544 and Section 1536], Marine Mammal Protection Act [16 U.S.C. 1361], Fish and Wildlife Coordination Act [16 U.S.C. 661 667(d)], Migratory Bird Treaty Act [16 U.S.C. 703 712]. 5. Historic and Cultural Resources: Section 106 of the National Historic Preservation Act of 1966, as amended [54 U.S.C. 300101 et seq.]; Archeological Resources Protection Act of 1977 [16 U.S.C. 470(aa) 11]; Archeological and Historic Preservation Act [54 U.S.C. 312501 et seq.]; Native American Grave Protection and Repatriation Act (NAGPRA) [25 U.S.C. 3001 3013]. 6. Social and Economic: Civil Rights Act of 1964 [42 U.S.C. 2000(d) 2000(d)(1)]; American Indian Religious Freedom Act [42 U.S.C. 1996]; Farmland Protection Policy Act (FPPA) [7 U.S.C. 4201 4209]. 7. Wetlands and Water Resources: Clean Water Act, 33 U.S.C. 1251 1377 (Section 404, Section 401, Section 319); Land and Water Conservation Fund (LWCF), 16 U.S.C. 4601 4604; Safe Drinking Water Act (SDWA), 42 U.S.C. 300(f) 300(j)(6); Rivers and Harbors Act of 1899, 33 U.S.C. 401 406; Wild and Scenic Rivers Act, 16 U.S.C. 1271 1287; Emergency Wetlands Resources Act, 16 U.S.C. 3921, 3931; TEA 21 Wetlands Mitigation, 23 U.S.C. 103(b)(6)(m), 133(b)(11); Flood Disaster Protection Act, 42 U.S.C. 4001 4128. 8. Executive Orders: E.O. 11990 Protection of Wetlands; E.O. 11988 Floodplain Management; E.O. 12898, Federal Actions to Address Environmental Justice in Minority Populations and Low Income Populations; E.O. 11593 Protection and Enhancement of Cultural Resources; E.O. 13007 Indian Sacred Sites; E.O. 13287 Preserve America; E.O. 13175 Consultation and Coordination with Indian Tribal Governments; E.O. 11514 Protection and Enhancement of Environmental Quality; E.O. 13112 Invasive Species. (Catalog of Federal Domestic Assistance Program Number VerDate Sep<11>2014 19:03 Aug 09, 2018 Jkt 244001 PO 00000 Frm 00153 Fmt 4703 Sfmt 4703 E:\FR\FM\10AUN1.SGM 10AUN1 20.205, Highway Planning and Construction.) The projects subject to this notice are: 1. US 87 from US 54 to 0.19 miles north of US 385 in Dallam County. TxDOT, Amarillo District, proposes to improve the clearance on US 87 under the Union Pacific Railroad (UPRR) bridge in Dalhart. The proposed project would lower the elevation of US 87 under the railroad bridge up to two feet and add a detention facility to improve drainage particularly during flooding situations. The actions by TxDOT and Assessment (EA) approved on February 10, 2015, the Finding of No Significant Impact (FONSI) issued on February 10, 2015 and other documents in the TxDOT project file. The EA, FONSI, and file are available by contacting TxDOT at the address provided above or the TxDOT Amarillo District Office at 5715 Canyon Drive, Amarillo, Texas 79110; telephone (806) 356 3200. 2. SL 335 from FM 2590 to SW 9th Avenue in Randall and Potter County. TxDOT, Amarillo District, proposes to upgrade existing roadways and a new location alignment to a controlled access facility including frontage roads, ramps, and bicycle and pedestrian accommodations. The project length is approximately 8 miles in length. The approved on July 21, 2017, the Finding of on July 21, 2017 and other documents provided above or the TxDOT Amarillo District Office at 5715 Canyon Drive, Amarillo, Texas 79110; telephone (806) 356 3200. 3. SL 335 from FM 2590 to Bell Street, and IH 27 at SL 335 Interchange in Randall County. TxDOT, Amarillo District, proposes to improve SL 335 in the southwest portion of the City of Amarillo. The improvements would include the conversion of SL 335 from a non-freeway to a freeway section with frontage roads, ramps, grade separations over intersection cross streets, a four main lane section, with a provision for future expansion to an ultimate six main lane section. The purpose of the proposed project is to develop an alternative freight corridor, provide a hazardous cargo route, and to improve traffic operations, mobility, safety, and

39810 Federal Register / Vol. 83, No. 155 / Friday, August 10, 2018 / Notices connectivity through Amarillo. The approved on May 1, 2015, the Finding of on May 1, 2015 and other documents in the TxDOT project file. The EA, FONSI, project file are available by contacting TxDOT at the address provided above or the TxDOT Amarillo District Office at 5715 Canyon Drive, Amarillo, Texas 79110; telephone (806) 356 3200. 4. SL 255 from FM 1520 to US 271 in Camp County. TxDOT, Atlanta District, proposes to construct a new location two-lane roadway, State Loop SL 255 (formerly referred to as Farm-to-Market Road FM 3535), near Pittsburg, Texas. The total length of the proposed project is approximately 2.45 miles with a proposed right-of-way (ROW) width of approximately 150 feet (ft.). The purpose of the project is to provide an efficient east-west roadway for the various users of the northern Camp County transportation system. The approved on June 26, 2017, the Finding of on June 26, 2017 and other documents provided above or the TxDOT Atlanta District Office at 701 East Main Street, Atlanta, Texas 75551; telephone (903) 799 1308. 5. I 35 from Rundberg Lane to US 290 East, Travis County. The project would include the addition of three direct connectors, collector-distributors to bypass the St. Johns Avenue signalized intersection, reconstruction of the St. Johns Avenue bridge and bicycle and pedestrian improvements. The project is approximately 1.6 miles in length. The approved on August 1, 2016, the (FONSI) issued on August 1, 2016, and Austin District Office at 7901 North I 35, Austin, TX 78753; telephone (512) 832 7000. 6. FM 969 from FM 973 to Hunters Bend Road, Travis County. The project would include widening the existing two-lane roadway to four lanes, with a continuous two-way center turn lane, outside shoulders and a continuous sidewalk. The actions by TxDOT and Assessment (EA) approved on September 18, 2017, the Finding of No Significant Impact (FONSI) issued on September 18, 2017, and other the provided above or the TxDOT Austin District Office at 7901 North I 35, Austin, TX 78753; telephone (512) 832 7000. 7. RM 2222 and RM 620 from RM 620 to Bonaventure Drive and Steiner Ranch Boulevard to RM 2222, Travis County. The project includes the addition of a northbound auxiliary lane on RM 620 from Steiner Ranch Blvd. to a 0.4 mile new arterial connector from RM 620 to RM 2222, improved operations at the RM 620/RM 2222/Bullick Hollow Road intersection, and improvements to RM 2222 from the new arterial connector to the RM 620/RM 2222/Bullick Hollow Road intersection. The actions by approved on April 4, 2018, the Finding of on April 4, 2018, and other documents provided above or the TxDOT Austin District Office at 7901 North I 35, Austin, TX 78753; telephone (512) 832 7000. 8. US 59/I 69 from Fostoria Road near the Montgomery/Liberty County line to SL 573, Montgomery/Liberty County. This project intends to widen the existing four lane (two lanes in each direction) divided highway with no designated frontage roads to six lanes (three lanes in each direction) and oneway, two lane frontage roads. The project will also include installation of sidewalks on the outside of the southbound frontage road and the construction of 8-foot wide, shared use lanes for bicycles on the northbound and southbound frontage lanes. The project length is approximately 4.475 miles in length. The actions by TxDOT and Federal agencies and the laws under which such actions were taken VerDate Sep<11>2014 19:03 Aug 09, 2018 Jkt 244001 PO 00000 Frm 00154 Fmt 4703 Sfmt 4703 E:\FR\FM\10AUN1.SGM 10AUN1 are described in the Final approved on March 19, 2018, the (FONSI) issued on March 23, 2018, and Beaumont District Office at 8350 Eastex Freeway, Beaumont, TX 77708; telephone (409) 892 7311. 9. IH 20 from 3.5 miles east of LP 254 to SH 16 in Eastland County. TxDOT, Brownwood District, proposes to realign the interstate approximately 500 feet to the south of the existing alignment to alleviate the existing horizontal and vertical curvature. Two new continuous two-way frontage roads would be constructed on both sides of the new highway. The project length is approximately 3 miles in length. The proposed improvements would alleviate the safety hazards that contribute to the high frequency and severity of traffic incidents at Ranger Hill. The actions by approved on October 26, 2016, the (FONSI) issued on October 26, 2016 and Brownwood District Office at 2495 Highway 183 North, Brownwood, Texas 76802; telephone (325) 646 2591. 10. US 281 at Premont from 0.5 miles north of FM 1538 to 1.0 miles north of CR 431, Jim Wells County. The proposed project includes construction of an access controlled relief route around the city of Premont that meets interstate standards. This 5.17 mile long project would consist of two northbound and southbound 12-foot mainlanes with 10-foot outside shoulders and 4-foot inside shoulders, separated by a 48-foot grassy median. The project purpose is to develop US 281 to an Interstate facility that would meet Interstate design standards and improve safety in a manner that is sensitive to the environment and serves the access and mobility needs of the affected communities. The actions by approved on October 2, 2015, the (FONSI) issued on October 2, 2015, and

39811 Corpus Christi District Office at 1701 S. Padre Island Drive, Corpus Christi, TX 78416 1324; telephone (361) 808 2300. 11. Holly Road from SH 286 (Crosstown Expressway) to Greenwood Drive, Nueces County. The project would include constructing two additional travel lanes, providing a four lane curb and gutter facility with a raised median, sidewalks, and bicycle lanes along Holly Road from SH 286 (Crosstown Expressway) to Greenwood Drive in Corpus Christi, Nueces County, Texas, a distance of approximately 3,960 linear feet (0.75 mile). The purpose of the project is to improve mobility and enhance safety. The approved on July 15, 2016, the Finding of on July 15, 2016, and other documents provided above or the TxDOT Corpus Christi District Office at 1701 S. Padre Island Drive, Corpus Christi, TX 78416 1324; telephone (361) 808 2300. 12. SH 200 from SH 361 to FM 1069 in San Patricio County. SH 200 is proposed to be constructed as a principal arterial roadway to route commercial/industrial traffic around the southwestern portion of the city of Ingleside. The proposed project is approximately 1.98 miles in length, with an initial phase of construction of two 12-foot travel lanes and two 10-foot wide shoulders within a 160-foot wide right-of-way, and an ultimate build-out of four 12-foot wide travel lanes and two 10-foot wide shoulders. The actions by approved on August 26, 2016, the (FONSI) issued on August 26, 2016, and Corpus Christi District Office at 1701 S. Padre Island Drive, Corpus Christi, TX 78416 1324, telephone (361) 808 2300. 13. FM 2478 from US 380 to North of FM 1461 in Collin County, Texas. The proposed the expansion of the existing facility from a two-lane rural to a six-lane urban divided roadway. Approximately 0.54 miles of FM 2478 would be realigned and constructed on new location from Rhea Mills Circle north to FM 1461. The approximately 3 miles. The purpose of the proposed project is to improve mobility and bring the roadway up to current design standards. The actions by approved on September 22, 2017, (FONSI) issued on September 22, 2017, project telephone (214) 14. FM 455 from West of FM 2450 to East of Mario Road, in Denton County. The project would reconstruct and widen FM 455 west of FM 2450 to east of Marion Road for an approximate distance of 5.53 miles. Proposed improvements would involve the expansion of FM455 from a two-lane rural highway to a four-lane. The approved on March 15, 2018, the (FONSI) issued on March 15, 2018, and telephone (214) 15. Loop 9 from Interstate 35 East to Interstate 45 in Dallas and Ellis Counties, Texas. The proposed constructing a six-lane new location frontage road system. The project would also construct intersections at major crossroads and grade separations at Interstate Highway 35 East and BNSF Railroad. The length of the proposed project is approximately 10 miles. The purpose of the proposed project is to provide a direct link from Interstate 35 East to Interstate 45 to serve the residents and businesses in the area. Final VerDate Sep<11>2014 19:03 Aug 09, 2018 Jkt 244001 PO 00000 Frm 00155 Fmt 4703 Sfmt 4703 E:\FR\FM\10AUN1.SGM 10AUN1 approved on September 28, 2017, (FONSI) issued on November 16, 2017, project telephone (214) 16. SH 121 from Collin County Outer Loop to County Road 635 in Collin reconstructing and widening the existing two-lane undivided roadway to a rural four-lane divided highway from Collin County Outer Loop to north of County Road 635. Grade separation intersections are proposed at FM 455 and FM 2862. The length of the proposed project is approximately 9.52 miles. The purpose of the proposed project is to improve mobility, decrease congestion, accommodate population growth, and enhance safety for the traveling public, while upgrading the facility to current design standards. The approved on January 19, 2018, Finding of on January 19, 2018, and other the 17. SH 310 and Interstate 45 (S.M. Wright, Phase IIB): SH 310 from Pennsylvania Avenue to north of Al Lipscomb Way; and Interstate 45 from Lenway Street to Good Latimer in Dallas reconstructing the existing freeway-tofreeway connections to achieve greater connectivity with major Interstate 45 cross streets. The proposed project would realign S.M. Wright Parkway to connect exclusively to Cesar Chavez Boulevard between Pennsylvania Avenue and Al Lipscomb Way. The approximately.05 mile for SH 310 (S.M. Wright Parkway) and approximately 1.0 mile for IH 45. The purpose of the proposed project is to improve operability, connections, and mobility between Interstate 45 and major cross streets near S.M. Wright Parkway. The

39812 Federal Register / Vol. 83, No. 155 / Friday, August 10, 2018 / Notices approved on March 30, 2017, Finding of on March 30, 2017, and other the 18. US 77 from south of FM 66 to north of McMillan Street in Ellis the addition of a new two-lane bridge on new alignment west of the existing viaduct, and the conversion of Elm Street and Monroe Street to a one-way couplet system. The length of the proposed project is approximately 1.2 miles. The purpose of the proposed project is to improve the safety of the US 77 viaduct and reduce congestion and improve mobility through downtown Waxahachie, Texas. The approved on March 27, 2017, Finding of on March 27, 2017, and other the 19. US 377 Relief Route from approximately one mile south of SH 171 to approximately one mile north of SH 171 in Hood and Johnson Counties, Texas. The proposed project would construct a four-lane relief route west of US 377 and the City of Cresson. The approximately 3.02 miles. The purpose of the proposed project is to provide a long-term solution to identified traffic issues at the US 377 and SH 171 intersection. The actions by TxDOT and Assessment (EA) approved on August 3, 2017, (FONSI) issued on September 20, 2017, project Fort Worth District Office at 2501 SW Loop 820, Fort Worth, TX 76133; telephone (817) 370 6500. 20. FM 2218 from IH 69 to SH 36, Fort Bend County. The project widens the existing two-lane undivided roadway to a four-lane divided roadway with a raised grass median. FM 2218 will also be realigned just south of Longleaf Drive, with the former road ending in a cul-de-sac. The length of the project is approximately 3.7 miles. The purpose of the project is to accommodate existing and projected growth, and bring the roadway to current design standards between SH 36 and IH 69. The actions by approved on March 9, 2018, Finding of on March 9, 2018, and other documents 21. Crabb River Road (Farm-to-Market Road 2759/Farm-to-Market Road 762), from 0.25 mile south of Sansbury Boulevard to the Lamar Consolidated Independent School District Secondary School Complex, in Fort Bend County. The project widens the existing twolane undivided roadway to a four-lane divided roadway. The project is approximately 2.9 miles long. The purpose of the project is to improve mobility, alleviate traffic congestion, and improve safety. The actions by approved on March 20, 2017, Finding of on March 20, 2017, and other the 22. FM 2854, from Loop 336 to Interstate Highway 45, in Montgomery County. The project will reconstruct the existing two-lane, undivided facility to a four-lane roadway with a curb and gutter and a flush median. The project is approximately two miles long. The purpose of the proposed project is to improve safety and mobility, and reduce congestion for the travelling public by constructing a divided roadway and VerDate Sep<11>2014 19:03 Aug 09, 2018 Jkt 244001 PO 00000 Frm 00156 Fmt 4703 Sfmt 4703 E:\FR\FM\10AUN1.SGM 10AUN1 signalized intersections. The roadway improvements will accommodate anticipated future growth in the region by adding additional capacity needed, while providing accommodations for bicyclists and pedestrians through the construction of shared-use lanes and sidewalks, in accordance with FHWA and TxDOT guidelines and policies. The approved on August 1, 2016, Finding of on August 1, 2016, and other documents 23. McHard Road Extension, from Cullen Boulevard to Mykawa Road, Brazoria County. The project is an extension of McHard Road from Cullen Boulevard to Mykawa Road. McHard Road Extension will have an urban cross-section consisting of a four-lane divided, curb-and-gutter roadway. The project is approximately 3.45 miles long. The purpose of the project is to improve connectivity between Pearland Parkway and State Highway 288, improve mobility on FM 518/Broadway Street, and provide residents in the project area better access to amenities in the City of Pearland and Harris and Brazoria Counties. The actions by approved on July 7, 2017, Finding of No Significant Impact (FONSI) issued on July 7, 2017, and other documents in the TxDOT project file. The EA, FONSI, and file are available by contacting TxDOT at the address provided above or the TxDOT Houston District Office at 7600 Washington Avenue, Houston, Texas 77007; 24. SH 105, from Mount Mariah Road to FM 149, Montgomery County. The project will widen SH 105 both to the north and south of the existing highway from an undivided, two-lane highway to a four-lane divided highway. The project length is approximately 6.2 miles. The purpose of the project is to improve traffic flow within the study area and larger region and reduce the number of traffic accidents from Mount Mariah Road to FM 149. The actions by

39813 approved on July 24, 2017, Finding of on July 24, 2017, and other documents 25. Bulverde Road from Marshall Road to Wilderness Oak in Bexar County. The project would convert the existing two-lane roadway to a four-lane roadway with five-foot shoulders, curb and gutter, sidewalks and turn lanes. Final approved on July 20, 2016, Finding of on July 20, 2016 and other documents 26. I 10 West from FM 3351 (Ralph Fair Road) to La Cantera Parkway, Bexar County. The project would add one general-purpose lane and one High Occupancy Vehicle (HOV) lane in each direction of IH 10 from approximately 3,800 feet north of FM 3351 (Ralph Fair Rd.) to La Cantera Parkway. The project would transition to the two generalpurpose lanes approximately 3,800 feet north of FM 3351 (Ralph Fair Rd.) and would tie into the three general-purpose lanes at La Cantera Parkway. In addition, a 12-ft wide auxiliary lane would be added to the IH 10 westbound main lanes between the westbound onramp from Dominion Drive to the westbound exit ramp to FM 3351 (Ralph Fair Rd.). The actions by TxDOT and Assessment (EA) approved on March 30, 2017, (FONSI) issued on March 30, 2017 and San 27. Loop 1604 from FM 1957 to FM 471 in Bexar County. The project would convert the existing four-lane divided roadway to a four-lane expressway, and would include the construction of the southbound Loop 1604 main lanes and frontage road, entrance and exit ramps, and three grade separations. The length of the proposed project is approximately 4.1 miles. The actions by TxDOT and Assessment (EA) approved on May 4, 2016, (FONSI) issued on May 4, 2016 and San 28. Loop 1604 from US 90 to FM 1957 in Bexar County. The project would convert the existing four-lane divided roadway to a four-lane expressway with continuous frontage roads. The project would also include the construction of grade separations at major intersections located within the project limits as well as a direct connector from southbound LP 1604 to eastbound US 90. The approved on May 27, 2016, Finding of on May 27, 2016 and other documents 29. Quintana Road from Harmon Avenue to McKenna Avenue in Bexar County. The project includes roadway realignment, median, shared use path, turn lanes and drainage improvements. Final approved on June 22, 2017, Finding of on June 22, 2017 and other documents 30. SH 211 from FM 1957 to FM 471 in Bexar and Medina Counties. The project includes construction of a new 7.6 mile two-lane rural arterial roadway on new location. The actions by TxDOT and Federal agencies and the laws under which such actions were taken are described in the Final approved on July 14, 2017, Finding of on July 14, 2017 and other documents Authority: 23 U.S.C. 139(l)(1). Issued on: August 6, 2018. Michael T. Leary, Director, Planning and Program Development, Federal Highway Administration. [FR Doc. 2018 17144 Filed 8 9 18; 8:45 am] BILLING CODE 4910 22 P VerDate Sep<11>2014 19:03 Aug 09, 2018 Jkt 244001 PO 00000 Frm 00157 Fmt 4703 Sfmt 4703 E:\FR\FM\10AUN1.SGM 10AUN1 DEPARTMENT OF TRANSPORTATION Maritime Administration [Docket No. MARAD 2018 0114] Deepwater Port License Application: Texas Gulf Terminals, Inc. AGENCY: Maritime Administration, Department of Transportation. ACTION: Notice of intent; notice of public meeting; request for comments. SUMMARY: The U.S. Coast Guard (USCG), in coordination with the Maritime Administration (MARAD), will prepare an environmental impact statement (EIS) as part of the environmental review of the Texas Gulf Terminals, Inc. (TGTI) deepwater port license application. The application proposes the ownership, construction, operation and eventual decommissioning of an offshore oil export deepwater port that would be located in Federal waters approximately 12.7 nautical miles off the coast of Corpus Christi, Texas in a water depth of approximately 93 feet. The deepwater port would allow for the loading of Very Large Crude Carriers (VLCCs) via a single point mooring buoy system. This Notice of Intent (NOI) requests public participation in the scoping process, provides information on how to participate and announces an informational open house and public meeting in Texas. Pursuant to the criteria provided in the Deepwater Port Act of 1974, as amended, 33 U.S.C. 1501 et seq. (the Act), Texas is the designated