US 83 Relief Route. City of La Joya City of Peñitas Hidalgo County. November 15, 2012

Similar documents
US 83 FROM NORTH OF THE STARR/ZAPATA COUNTY LINE TO LOMA BLANCA ROAD

WELCOME US 83 Public Meeting

US 380 FEASIBILITY STUDY

HAMPTON ROADS CROSSINGS PATRIOTS CROSSING AND HRBT

SR 934 Project Development And Environment (PD&E) Study

Austin-Bergstrom International Airport Master Plan Update

INTERSTATE 35 CORRIDOR UPDATE

WELCOME TO THE OPEN HOUSE

Northwest Corridor LRT Line to Irving/DFW

Northwest Corridor LRT Line to Irving/DFW

FORT WORTH DISTRICT. Springtown Area Projects. Loyl C. Bussell, P.E. Acting District Engineer. Thursday, February 8, 2018 Date.

Appendix F Environmental Data for Alternative Route Evaluation

PUBLIC SCOPING MEETING APRIL 2018

National Forests and Grasslands in Texas

Groundwater Recharge/Discharge Y 1, 2, 3, 4, 5, 16 X Wetland appears to be a contiguous hydraulic system, draining towards Goff Mill Brook.

LBJ Corridor Study. LBJ Corridor Study. LBJ Corridor Study. LBJ Corridor Study. LBJ Corridor Study. LBJ Corridor Study. Agenda.

White Mountain National Forest Saco Ranger District

FEDERAL HIGHWAY ADMINISTRATION NEVADA DEPARTMENT OF TRANSPORTATION ENVIRONMENTAL IMPACT STATEMENT RE-EVALUATION

Chuckanut Ridge Fairhaven Highlands EIS Scoping Concerns

Bradley Brook Relocation Project. Scoping Notice. Saco Ranger District. United States Department of Agriculture Forest Service

I-35 Reconstruction Project

TRINITY RIVER CORRIDOR

Clam Harbour Provincial Park

AIRPORT MASTER PLAN. Newport State Airport. Draft. (Colonel Robert F. Wood Airpark) THE Louis Berger Group, INC. Prepared for: Prepared by:

Maxcare Rx Pharmacy Network (Hidalgo County) Name Address City State Zip Phone Fax STD_COUNTY

White Mountain National Forest Saco Ranger District

Project Overview. Hunter Mill Road Over Colvin Run Bridge Replacement Fairfax County. Get Involved. Public Information Meeting. Contact Information

1 PLANNING BOARD COUNTY OF ALBANY

Decision Memo Ice Age Trail Improvement (CRAC 37)

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT

South Bay Metro Green Line Extension

EAST DON TRAIL ENVIRONMENTAL ASSESSMENT. Community Liaison Committee Meeting #3 July 15, :30 to 8:30 pm Flemingdon Park Library

Northaven Trail Phase 2 Initial Project Overview

DRAFT FINAL REPORT AIRPORT MASTER PLAN. Rifle Garfield County Airport Revised May 15, 2014

Texas Department of Transportation Corpus Christi District. Corpus Christi Harbor Bridge

CHAPTER III: TRAIL DESIGN STANDARDS, SPECIFICATIONS & PERMITS

THOMAS A. SWIFT METROPARK Introductions History Present Conditions Future Development Plans Implementation Strategies Statistics

Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge

Thornton Water Project. Larimer County Route Study and Project Update September 12, 2017

Classification and Management Planning (CAMP) Washington State Parks and Recreation Commission

Welcome to Dayton Parkway Interchange Open House. November 26, 2018

With the first portion of this process complete, we anticipate the general timeline for the remainder of the process to be:

WELCOME to the Iditarod Dog Sledding Historic District (IDSHD) Workshop. January 11, Houston Middle School Houston, Alaska

I-3 DFW Extension Public Hearing. June 2, 2011

City of Madison, Buckeye Road Monona Drive to Stoughton Road County AB Dane County Public Involvement Meeting

AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY

I. INTRODUCTION EAST COAST GREENWAY STUDY PURPOSE

~ s: Memorandum

$866,000. $1,400,000 Health Benefits $13,156,000 TOTAL ANNUAL DIRECT BENEFITS. $10,890,000 Economic Benefits

HARBOR BRIDGE PROJECT COMMUNITY ADVISORY BOARD MEETING MINUTES April 5, 2018

Transit Financial Summary Abilene MPO FY TIP

DENISON STREET EXTENSION. Transportation Committee. January 14, Feasibility Study

Rockin River Ranch State Park

Fairview Citizen Airport Advisory Committee. August 1, Paul Hendricks

Arlington County Board Work Session Eastbound Widening January 17, Amanda Baxter, VDOT Special Projects Development Manager

County of Riverside - PSEC Project General Habitat Assessment Appendix A

Rural Rustic Road Program

Fairfax County Transportation Advisory Commission (TAC)

FAA RECORD OF DECISION. Appendix D FINAL EIS ADDENDUM DOCUMENTS

Improving Houston METRO HOV/HOT Lane Safety Fall TexITE: Fort Worth August 31 st, 2012 Dustin Qualls, PE, PTOE Nader Mirjamali, PE

3.0 EXISTING PARK & RECREATION SPACE

Full I-35E Mainlane Closure at Beckley Avenue - July 27-30

Decision Memo Broken Wheel Ranch Equestrian Outfitter Special-Use Permit Proposed Action

Office of Commercial Space Transportation: Notice of Availability, Notice of Public

HIGHWAY 17 WILDLIFE and REGIONAL TRAIL CROSSINGS

145th Crossing Sammamish River Trail Connection Tourism District Pedestrian Enhancement. ~ King County PIBBI. YourBigBa~

F.J. Martin Roberts Evening (Mt Coot-tha from Dutton Park) 1898

Decision Memo for Desolation Trail: Mill D to Desolation Lake Trail Relocation

ONONDAGA CREEKWALK PHASE II. Public Information Meeting Series 1

I-75 in Hamilton County Project Termini

The Joint Charlotte County - Punta Gorda and Lee MPO Meeting has changed from 10:00 a.m. to 9:30 a.m.

4.0 Context for the Crossing Project

FHWA P/N Guidelines. Corridor Relationship. Highway 22 Segment 1 - US 169 to CSAH 2 Relevance / Documentation of Need

DATE: January 19, WCA Governing Board. Johnathan Perisho, Project Manager. Mark Stanley, Executive Officer

White Mountain National Forest

Table of Contents. Master Plan March 2014 TOC i Spokane International Airport

Fairfax County Parkway Widening Fairfax County

Recommended Performance Measures

Auburn Trail/Ontario Pathways Trail Connector Feasibility Study Project Advisory Group Meeting August 25, 2011 Farmington Town Hall Approved Minutes

The San Diego Region s Air Transportation Future

Alternatives Study of Alignment

CatExes vs. EAs When and How to Prepare

2016 Regional Transportation Alternatives Program (TAP) Grant Application

BACKGROUND DECISION. Decision Memo Page 1 of 6

Public Notice ISSUED: December 10, 2018 EXPIRES: January 9, 2019

San Mateo County Transportation Authority Board Meeting November 2, 2017 Item #10 1

I-70/I-71 Project Public Meeting Presented By

Daisy Dean Trail 628/619 ATV Trail Construction

DHS Consolidation at St. Elizabeths Master Plan Amendment. Transportation Interstate 295 / Malcolm X Avenue Interchange

I-405 Express Toll Lanes Coming in 2015

MISSION TRAILS REGIONAL PARK CITIZENS ADVISORY COMMITTEE MINUTES OF THE MEETING OF MAY 3, 2016

EAST SIDE TRANSPORTATION INITIATIVE APEGM SEPTEMBER 9, 2009

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES

Dulles Toll Road Rate Setting Process

Merritt Island Airport

MINUTES OF THE SPECIAL MEETING OF THE LADY LAKE TOWN COMMISSION LADY LAKE, FLORIDA June 20, 2016

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT

Virginia Department of Transportation s Rural Rustic Road Program

Chapter Seven REFERENCES

TRANSPORTATION ADVISORY BOARD. Metropolitan Council, 390 Robert Street North, Saint Paul, Minnesota 55101

Transcription:

US 83 Relief Route City of La Joya City of Peñitas Hidalgo County November 15, 2012 TxDOT Mission: Work with others to provide safe and reliable transportation solutions for Texas.

Public Meeting Agenda US 83 Relief Route Welcome & Introductions Mario Jorge, P.E. TxDOT Pharr District Engineer Technical Overview Epigmenio Gonzalez, P.E. TxDOT Project Manager Next Steps in Project Development Mario Jorge, P.E., TxDOT Exhibit Viewing Period Public Comment Adjournment

Public Meeting Purpose US 83 Relief Route Encourage and maintain effective communication with citizens Provide project information Receive comments Important step in environmental process

Provide Your Comments US 83 Relief Route Sign up to speak tonight Leave comments at registration table tonight Mail or drop off comments: Mailing Address P.O. Box 1717 Pharr, TX 78577 Physical Address 600 W. US 83 Expwy Pharr, TX 78577 Fax comments to (956) 702-6110 Email to Robin.Gelston@txdot.gov Comment period ends Sunday, November 25, 2012

Project Area Begin US 83 Relief Route End US 83 Relief Route

Current Traffic Conditions

Project Need and Purpose US 83 Relief Route Project Need: Increased congestion Lack of mobility Increased accident rate Poor corridor connectivity Project Purpose: Reduce congestion Improve mobility Improve safety Improve corridor connectivity

Project Scope -Limits US 83 Relief Route Project Scope Four lane controlled access expressway facility Project Limits From: 1.0 miles east of FM 886 to: 0.5 mile west of Showers Road

Project Alternative Route Begin US 83 Relief Route Project End US 83 Relief Route Project La Joya Lake Alternative 1 Alternative 2 Alternative 3 Alternative 4 Alternative 5 Alternative 6

Project Alternative Route Begin US 83 Relief Route Project End US 83 Relief Route Project La Joya Lake Alternative 1 Alternative 2 Alternative 3 Alternative 4 Alternative 5 Alternative 6

Typical Roadway Section

Drainage Begin US 83 Relief Route Project High Point End US 83 Relief Route Project

Alternative Evaluation Criteria US 83 Relief Route Impacts to human environment: Impacts to community including churches, community centers and recreational facilities Impact to commercial, residential and agricultural properties Impacts to historical/cultural resources such as historical markers and cemeteries Effects on air quality, traffic noise and visual impacts

Alternative Evaluation Criteria US 83 Relief Route Impacts to natural environment: Impacts to 100 year floodplain Impacts to wetlands Impacts to threatened and endangered species and wildlife habitat

Alternative Impacts Begin US 83 Relief Route Project End US 83 Relief Route Project La Joya Lake Alternative 1 Alternative 2 Alternative 3 Alternative 4 Alternative 5 Alternative 6

Technically Preferred Alternative Begin US 83 Relief Route Project End US 83 Relief Route Project La Joya Lake Alternative 3

Project Development First Public Meeting Nov.15, 2012 Second Public Meeting Spring 2013 Environmental Clearance from FHWA December 2013 Expected Letting Date Phase I Construction April 2015 Expected Completion of Phase I Construction Summer 2017 Begin ROW Acquisition January 2014 SCHEMATIC ENVIRONMENTAL DOCUMENT FINALIZE PLANS, SPECIFICATIONS AND ESTIMATE ACQUIRE RIGHT-OF-WAY PHASE I CONSTRUCTION J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J 2012 2013 2014 2015 2016 2017

15 Minute Viewing Period Recess US 83 Relief Route

Public Comment Period US 83 Relief Route Use the microphone State your name State your interest in the project Give your comments on the project Please observe 3 minute rule

Adjournment Thank You For Participating US 83 Relief Route Leave comments at registration table tonight Mail or drop off comments: Mailing Address P.O. Box 1717 Pharr, TX 78577 Physical Address 600 W. US 83 Expwy Pharr, TX 78577 Fax comments to (956) 702-6110 Email to Robin.Gelston@txdot.gov Comment period ends Sunday, November 25, 2012