ATFM Implementation Thailand and Southeast Asia. 55 th DGCA Conference October 2018 Nadi, Fiji

Similar documents
Distributed Multi-Nodal ATFM Project Overview & Progress. ICAO MID ATFM/TF/1 & ICAO World Cup 2022 TF/ Sep 2018

Thailand ATFM Operations at Sub- Regional Level

Information Paper 2 SUMMARY

Multi Nodal Regional ATFM/CDM Concept and Operational Trials Colombo 7 May 2014

Asia/Pacific Region A-CDM Planning

Singapore s Journey to Implement ASBU B-0 & B-1 Modules in PIA-2

Asia Pacific Seamless ATM Plan and Implementation of ATFM in Asia Pacific

AEROTHAI Air Traffic Management Network Management Centre IATA ICAO Cross Border ATFM Workshop

F r o m B O B C AT t o C r o s s - B o r d e r AT F M

International Civil Aviation Organization FIT-ASIA CRA ARRANGEMENTS, PROBLEM REPORTS, AND PERFORMANCE DATA ANALYSIS REPORTING

REPORT ON PROGRESS AND ACCOMPLISHMENTS OF THE ICAO APAC FLIGHT PROCEDURE PROGRAMME (FPP) IN 2012

Why ANSP Management Needs to Drive ATFM Implementation Stuart Ratcliffe, Co-Chair CANSO ATFM Workgroup Metron Aviation

ICAO Asia-Pacific Flight Procedure Programme

Performance Based Navigation (PBN) Update on ICAO APAC Regional Sub-Office, APAC Flight Procedure Programme, and COSCAP Supports

Remarks of CANSO Director General, Jeff Poole, at the CANSO Asia-Pacific Conference, 5-7 May 2014

ICAO International Aviation and Environment Seminar OPERATIONAL IMPROVEMENTS. Presented by ICAO APAC RSO

TWELFTH AIR NAVIGATION CONFERENCE

1 st Bangladesh India Myanmar Thailand ATM Coordination Meeting (BIMT/1) August 2014 ICAO Asia-Pacific Regional Office Bangkok, Thailand

(Presented by Secretariat) EXECUTIVE SUMMARY

ATC Global 2014 EUROCONTROL WORKSHOP Towards GLOBAL ATFM 18 September Ken Mclean Director SFO IATA Singapore

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit

ICAO APAC SCHEDULE OF MEETINGS, WORKSHOPS AND SEMINARS 2018

TWELFTH AIR NAVIGATION CONFERENCE

ICAO GANP Requirements and Evolution

INTERNATIONAL CIVIL AVIATION ORGANIZATION

INTERNATIONAL CIVIL AVIATION ORGANIZATION

55 TH CONFERENCE OF DIRECTORS GENERAL OF CIVIL AVIATION ASIA AND PACIFIC REGIONS

TWELFTH AIR NAVIGATION CONFERENCE DRAFT REPORT OF THE COMMITTEE ON AGENDA ITEM 4

TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22)

ASSEMBLY 39TH SESSION

International Civil Aviation Organization

TWELFTH AIR NAVIGATION CONFERENCE

International Civil Aviation Organization. Performance Based Navigation Sub-Group (PBN SG) MID FLIGHT PROCEDURE PROGRAMME

RECOMMENDED GUIDANCE FOR FPL AND RELATED ATS MESSAGES

NAM/CAR Regional Performance-based Air Navigation Implementation Plan (RPBANIP) Luis Sanchez ICAO NACC Regional Office

ORGANISER HOST LEAD SPONSOR

WORLD INTERNATIONAL CIVIL AVIATION ORGANIZATION 18/7/14 REPORT ON. Fifteenth Session. the

PBN/TF/7 DRAFT Appendix D to the Report D-1

Asia/Pacific Air Traffic Management Perspectives

The EU as a partner for low carbon development Prospects for the aviation sector

MULTI-NODAL ATFM COMMON OPERATING PROCEDURES (COP)

ATFM Procedure using the Bay of Bengal Cooperative ATFM System

From local to regional to global ATFM

International Civil Aviation Organization. Seventh Meeting of CNS/MET Sub-Group of APANPIRG and Tenth Meeting of CNS/ATM IC Sub-Group of APANPIRG

CENTRAL AIR TRAFFIC FLOW MANAGEMENT ( C-ATFM ) INDIA CATFM. ATFM Global Symposium /22/2017 ATFM Global Symposium 2017

TWELFTH AIR NAVIGATION CONFERENCE

FAA: ASBU Deployment Status. ASBU Prepared by: Midori Tanino, ATO International NextGen Lead Date: August, 2016

Global Operational Data Link Doc 10037

Myanmar s CNS/ATM Development Master Plan

International Civil Aviation Organization. Aviation System Block Upgrade (ASBU) Methodology An Overview

Bangkok, Thailand, July State PBN Plan and Status of PBN Implementation THAILAND PBN IMPLEMENTATION PLAN. (Presented by Thailand)

Bits to Blocks Aviation System Block Upgrades (ASBU)

ASIA PACIFIC Air Traffic Flow Management

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE

PIRG and RASG Global Coordination Meeting Setting the Stage. Nancy Graham. Director, Air Navigation Bureau

Pacific Project. CPWG/8 - WP/6 Appendix A

Future ATM - from Asian operator's point of view

12 TH COSCAP-SEA STEERING COMMITTEE MEETING

Trajectory-Based Operations (TBO)

INTERNATIONAL CIVIL AVIATION ORGANIZATION

ATFM/CDM ICAO s Perspective

The Information Paper of the. Milestones of Roadmap Development International Communion and Promotion Overview of China's PBN Implementation Roadmap

Leveraging on ATFM and A-CDM to optimise Changi Airport operations. Gan Heng General Manager, Airport Operations Changi Airport Group

ICAO ATFM SEMINAR. Dubai, UAE, 14 December 2016

IBAC Technical Report Summary. Meeting: Asia Pacific DGCA Meeting, Xi an, China, October 22-26, 2007

Suvarnabhumi Airport (VTBS/BKK) Runway Maintenance 3 Mar 2 May ICAO SAIOACG/7 & SEACG/24 March 2017 Bangkok, Thailand

Russian Federation ATM modernization program

30 SEP - 02 OCT, 2014

WORKSHOP 1 ICAO RPAS Panel Working Group 1 Airworthiness

Providing the Context Air Navigation Integrated Work Programme

ICAO APAC SCHEDULE OF MEETINGS, WORKSHOPS AND SEMINARS January

FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE. Saulo Da Silva

International Civil Aviation Organization. Sixth Meeting of CNS/MET Sub-Group of APANPIRG. Bangkok, Thailand, July 2002

ATFM IMPLEMENATION IN INDIA PROGRESS THROUGH COLLABORATION PRESENTED BY- AIRPORTS AUTHORITY OF INDIA

Home LIST OF ACRONYMS

Implementation of SESAR Pilot Common Project. - expected effects

B1 AMET implementation IWXXM

WORLDWIDE SYMPOSIUM ON ENABLING THE NET-CENTRIC INFORMATION ENVIRONMENT:

Aviation System Block Upgrades (ASBU), Blocks 0 and 1

CANSO ATFM Data Exchange Network for the Americas (CADENA) (Presented by ALTA, CANSO, COCESNA and IATA)

SERVICE DEVELOPMENT ROADMAP

ICAO provisions on data link implementation

Packaging Tomorrow s Aviation System

54 th CONFERENCE OF DIRECTORS GENERAL OF CIVIL AVIATION ASIA AND PACIFIC REGIONS. Ulaanbaatar, Mongolia August 2017

Implementation of air traffic flow management (ATFM) in the SAM Region REVIEW OF THE ATFM ACTION PLAN. (Presented by the Secretariat)

TWELFTH AIR NAVIGATION CONFERENCE

ATM STRATEGIC PLAN VOLUME I. Optimising Safety, Capacity, Efficiency and Environment AIRPORTS AUTHORITY OF INDIA DIRECTORATE OF AIR TRAFFIC MANAGEMENT

Financing of Aviation Development Projects by the Asian Development Bank. Asian Development Bank

OVERVIEW OF ADS-B COST BENEFIT STUDY

Current status of the experimental radar data exchange in the Southeast Asia

NACC/WG/4 IP/27 17/03/14 Fourth North American, Central American and Caribbean Working Group Meeting (NACC/WG/4) Ottawa, Canada, 24 to 28 March 2014

NAM/CAR Regional Safety/Air Navigation/Aviation Security Implementation Matters 5.2 Effectiveness of air navigation implementation mechanisms

GANP 2019/ASBUs. Olga de Frutos. Marrakesh/10 th December Technical Officer Air Navigation

CAR/SAM ELECTRONIC AIR NAVIGATION PLAN (eanp) (Presented by the Secretariat) EXECUTIVE SUMMARY

PBN Implementation. Phil Rakena. PBN Implementation Programme Manager

The state of the travel and tourism industry in Asia Pacific

AN-Conf/12-WP/162 TWELFTH THE CONFERENCE. The attached report

Review History of ADS-B Study and Implementation Task Force and ADS- B related developments by AN Conf/11 and APANPIRG -Presented by Secretariat

COSCAP CAAM COOPERATION

Transcription:

ATFM Implementation Thailand and Southeast Asia 55 th DGCA Conference 22 26 October 2018 Nadi, Fiji

Thailand and Southeast Asia Air Traffic Growth DISTRIBUTED MULTI-NODAL AIR TRAFFIC FLOW MANAGEMENT

Thailand Air Traffic Demand Growth Historical Annual Traffic Volume in Bangkok FIR Fiscal Year 2007-2017 Forecast Annual Traffic Volume - Fiscal Year 2018-2032 3,500,000 3,000,000 3 848,799 899,700 1,178,190 950,661 1,007,700 1,604,814 1,296,314 2,106,630 1,734,761 2,235,129 2,500,000 2,000,000 1,500,000 1,000,000 500,000 %CAGR 2007-2017 = 8% %CAGR (15Y) 2017-2032= 6% 0 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 Number of Flights Historical Forecast 1-5 Y Forecast 6-10 Y Forecast 11-15 Y Fiscal Year Others Overfly Domestic International Total Revenue Flight

North 246,059 Flights/Year 674 Flights Daily Overall GR: 21.9 % Volume GR Int l 62% 24.7% Dom 33% 17.8% Overfly 5% 16.4% West 141,344 Flights/Year 387 Flights Daily Overall GR: 7.7% Volume GR Int l 70% 6.6% Dom 0% Overfly 30% 10.2% Thailand Air Traffic Demand Overall 1,027,690 Flights/Year 2,816 Flights Daily Overall GR: 8.1% Volume GR Int l 47.3% 11.7% Dom 42.3% 4.6% Overfly 10.4% 6.8% South 266,498 Flights/Year 730 Flights Daily Overall GR: 0.1% Volume GR Int l 34% 3.8% Dom 56% 2.6% East/North East 227,140 Flights/Year 622 Flights Daily Overall GR: 6.0% Volume GR Int l 62% 8.6% Dom 26% 1.2% Overfly 12% 3.4% Note: Annual Growth Rate / Data up to 30 Sep 2018 Overfly 10% 1.6% 4

Why We Need ATFM in Southeast Asia Source: Boeing Current Market Outlook 2017-2036 5

The Challenge: Demand Growth In 20 years China as the world s largest aviation market More than half of new passengers from Asia-Pacific 5 APAC markets among the top 10, with Thailand surpassing France and Italy IATA 20-Year Passenger Forecast, October 2017

Introduction Concept & Project Phases DISTRIBUTED MULTI-NODAL AIR TRAFFIC FLOW MANAGEMENT

Evolution of the Regional ATFM Concept Research Collaboration on Regional ATFM Concept 2013 Distributed Multi Nodal Regional ATFM Concept 2014 -. CANSO Whole of flight CDM Pilot Project between BKK-SIN 2011-2012 Tripartite CDM Project between BKK-HKG-SIN 2012-2013 8

Multi-Nodal ATFM Network Concept ARRIVAL ATFM NODE DEPARTURE ATFM NODE Flight Operations Centre (FOC) Pilot AeroMET Flow Management Position (FMP) ATFM Information Exchange FMP ATS Units ATS Units Airport Operator Airport Operator A-CDM 9

How We Approach The Project: Multi-Phase Work Phase 1 (2015-2016) Phase 2 (2017-20XX) Phase X Distributed GDP/CTOT to regulate traffic into constrained arrival airports Distributed GDP/CTOT to regulate traffic into constrained airspace Globally-interconnected ATFM network, enabled by SWIM infrastructure Identification of Elements Development of Relevant Provisions ATFM System-to-System Information Linkage (SWIM-Enabled) 10

Who The Members Are: Tiered Participation Level 3 ATFM Nodes Generate, Distribute, Comply to CTOT Level 2 ATFM Nodes Receive and Comply to CTOT China Hong Kong China Singapore Thailand Cambodia Indonesia Malaysia Myanmar Philippines Level 1 ATFM Nodes Observers (soon to upgrade) Lao PDR** Viet Nam** 11

Key Achievements Planned Events Ad-Hoc WX-Induced Emergency Spectrum of ATFM Operations Validated procedures for distributed GDP Proven benefits for constrained airports Increased awareness for cross-border ATFM Contribution to APAC States ATFM readiness 12 11

Technical Sub-Group Distributed Multi-Nodal ATFM Network DISTRIBUTED MULTI-NODAL AIR TRAFFIC FLOW MANAGEMENT

MET Info ADP Flight Info ATFM Measure Now AFTN E mail AFTN AFTN AFTN E mail AFTN E mail Fax Phone Operations Control Centre (OCC)

Allow effective information sharing TSG s Objectives For effective ATFM operation Need for information sharing between ATFM systems TSG s objectives Achieve synchronization between ATFM systems TSG established to achieve ATFM to ATFM systems interconnection Using standardized data format and interoperable infrastructure

Improved availability of quality data and information Improved shared situational awareness Improved decision making More flexible and cost effective communications Increased system performance Near Future Loose system coupling Use of open standards Use of interoperable services SWIM

What ve been done so far Technical Sub Group of Distributed Multi Nodal ATFM Network Project System to system connection designed based on SOA with the use of XML based information exchange model Operational Scenarios (Operational Requirements) CTOT, CLDT, etc. not included in FIXM4.1 Core Successful System to System between AEROTHAI and CAAS Required Data Elements Mapping to FIXM ATFM Sys Sys Connection Develop FIXM Extension ATFM Sys Sys ICD System Test

ATFM on SWIM Forward Plan ATFM related services development based on operational scenarios SWIM in ASEAN Demonstration Oct 2018 2018 June 2019 2020 Key milestones Network connection: CRV ICD amendment to include ADP service

ASEAN ATFM Implementation Support Team DISTRIBUTED MULTI-NODAL AIR TRAFFIC FLOW MANAGEMENT

ASEAN ATM Enhancement Guidance ICAO Global Air Navigation Plan (DOC 9750) ICAO Asia Pacific Seamless ATM Plan ASEAN ATM Master Plan 5 th Edition of the GANP, covering 15-year strategic plan, including the introduction of the Aviation System Block Upgrades (ASBU) Version 2.0, endorsed by APANPIRG/27 September 2016 Adopted at the 23 rd ASEAN Transport Ministers Meeting in October 2017

ATFM in ASEAN Master Plan Context Required ASEAN-Wide Harmonized Implementation Initiatives Performance Based Navigation (PBN) Routes Air Traffic Flow Management (ATFM) ATS Inter-facility Data Communication (AIDC) Aeronautical Information Management (AIM) Common Aeronautical Virtual Private Network (CRV) 21

ATFM in ASEAN Master Plan Context ATFM Implementation Expectations Phases Target Completion Phase I 31 Dec 2018 Phase II 31 Dec 2020 Expectations All Member States to achieve Level-2 capability in the Multi-Nodal ATFM Network Established local procedure to comply with ATFM measures distributed by other States All Member States with major aerodromes to achieve Level-3 capability in the Multi-Nodal ATFM Network Established procedure balance demand-capacity with ATFM measures 22

ASEAN ATFM Implementation Support Team Core Idea: ASEAN ATM Master Plan ASEAN Members supporting ATFM as Level-2 by 2018 Support group to aid AMS in ATFM implementation Workshop series Guided / specific operational trials Proposed Strategy: Singapore (CAAS) & Thailand (AEROTHAI) to lead Kick-off meeting: 24 August 2018, Bangkok Develop a roadmap for harmonized ATFM implementation among ASEAN Members

Where We Are Headed: Road Forward ASEAN ATFM Implementation Leads Appointed by ASEAN ATM SPG to lead the support for other Member States Initiatives PBN Routes ATFM AIDC AIM CRV Lead / Co-leads Cambodia & Lao PDR Singapore & Thailand Malaysia Singapore & Thailand Singapore & Thailand 24

Key Success Factors Collaboration Synergy Consensus Global and Regional Development 25

If you want to go fast, go alone. If you want to go far, go together.

27

Phase 1 Key Objective & Work Plan Distributed GDP for Constrained / Congested Arrival Airports Phase 1 Stage 1 Phase 1 Stage 2 Phase 1 Stage 3 Communication Linkage and Information Exchange Protocol Design Procedure Development and Demonstration Flights ATFM System-to-System Information Linkage Stakeholder Engagement Progressive implementation effort 28

Phase 2 Key Objective & Work Plan Distributed GDP (+other measures) for Constrained / Congested Airspace Volume Phase 2 Stage 1 Phase 2 Stage 2 Phase 2 Stage 3 Airspace Demand- Capacity Assessment Capability Procedure Development for Single-Constraint DCB ATFM System-to-System Information Linkage Stakeholder Engagement Procedure Development for Multi-Constraint DCB For recent ATFM programs, refer to http://tinyurl.com/multi-nodal-16 29

Summary ASEAN ATFM Implementation Support Team Kick Off Meeting

Updated AMS ATFM Implementation Status + (Informal) Update during ASEAN ATFM Support / 1 BRUNEI AMS Expected Starting Date To be provided Phase 1 1 Jan 2018 to 31 Dec 2020 Expected Completion Date To be provided Progress (ASEAN ATFM/1) Expected Starting Date To be provided Phase II 1 Jan 2018 to 31 Dec 2022 Expected Completion Date To be provided Progress (ASEAN ATFM/1) CAMBODIA Started 31 Dec 17 100% Started 31 Dec 20 Completed INDONESIA 26 Jun 16 31 Dec 17 100% 26 Jun 16 31 Dec 18 Expect completion 31 Dec 2019 LAO PDR 28 Dec 18 31 Dec 20 30% 31 Dec 20 30 Dec 22 None MALAYSIA Started Completed 100% 01 Dec 19 3rd Quarter 2020 MYANMAR Started 31 Dec 19 Completed Started 31 Dec 20 PHILIPPINES 02 Apr 18 01 Nov 18 01 Nov 18 01 Nov 19 SINGAPORE Started 01 Apr 17 100% Started 01 Sep 18 Completed 30 Sep 2017? THAILAND Started 31 May 17 100% Started 30 Sep 17 100% VIETNAM Started 31 Dec 18 80% Started 31 Dec 20 24 August2018 Updated : ASEAN As ATFM of Oct ImplementationSupport 2017 As of Jul 2018 31

Prioritized Work Areas ATFM Implementation Support Wish List Prioritized Elements Phase I 1. ATFM operations training 2. Regulatory framework development Prioritizes Elements Phase II 1. ATM resource capacity assessment Input into EU ARISE Plus workshops 24 August2018 ASEAN ATFM ImplementationSupport 32

EU ARISE Plus Workshops Workshop # 1: ASEAN ATM Master Plan Introduction to ATM Master Plan and Key Initiatives Date 10 12 September 2018 Host Civil Aviation Authority of Thailand (CAAT) Venue Pathumwan Princess Hotel, Bangkok Workshop # 3: Implementation of ATFM To assist implementation of ATFM in ASEAN Date 24 26 September 2018 Host AirNav Indonesia Venue AirNav Indonesia HQ, Tangerang City 24 August2018 ASEAN ATFM ImplementationSupport 33

Thank You!